This document is Amendment 0001 for a federal solicitation (693C73-26-B-000002) for Sign and Safety Repairs in Puerto Rico's Metro, North, and South Regions. The amendment modifies the original solicitation by adding a pay item for lead-based paint removal, revising certain bid schedule quantities, replacing project plans, and rescheduling the bid opening date to January 20, 2026, at 2:00 pm EST. The project involves repairing signs, guardrails, and other infrastructure damages caused by Hurricanes Irma and Maria, with work including traffic sign assemblies, guardrail installations, end-terminals, bridge transitions, and temporary traffic control across multiple municipalities.
The solicitation is set aside exclusively for Small Business Concerns, with an estimated project cost between $15-25 million. The project is structured with multiple work schedules/contract options, allowing for flexible award scenarios. Key changes in this amendment include adding pay items for lead-based paint removal on Schedules B and C, clarifying sign assembly details, and addressing contractor questions about project scope, sign specifications, and performance periods. Performance periods vary by schedule, ranging from 260 to 475 calendar days depending on which schedules are awarded, with a maximum of 1,145 days if all schedules are awarded simultaneously.
View the file
Other files
Show 40 more
Latest 50 of 192 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
693C7326B000002 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ASHBURN VA 20147
ATTN: Construction
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
ASHBURN VA 20147
ATTN: Acquisitions
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
See Block 1412/23/20250001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
11/24/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Project PR ER DOT PRMNT RPR(27)
The purpose of this Amendment is to:
1) Provide a summary of responses to questions/clarifications asked by potential bidders.
2) Revise the Solicitation Bid Schedule to:
a) Replace the Bid Schedule for Schedules B and C to add a pay item and revise pay item quantity.
b) See Bid Schedule Changes for details.
3) Revise the project Plans to:
a) Delete and replace Plans - PR ER DOT PRMNT RPR(27) - 832578 with revised plans.
b) See Plan Sheet Changes for details.
4) Reschedule the Bid Opening date to Tuesday, January 20, 2026, at 2:00 pm EST.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment No. 0001
Info Page 1 of 1
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Project PR ER DOT PRMNT RPR(27)
Sign and Safety Repairs - Metro, North, and South Regions
Solicitation: 693C73-26-B-000002
The purpose of this Amendment is to:
1) Provide a summary of responses to questions/clarifications asked by potential bidders.
2) Revise the Solicitation Bid Schedule to:
a) Replace the Bid Schedule for Schedules B and C to add a pay item and revise pay item quantity.
b) See Bid Schedule Changes for details.
3) Revise the project Plans to:
a) Delete and replace Plans - PR ER DOT PRMNT RPR(27) – 832578 with revised plans.
b) See Plan Sheet Changes for details.
4) Reschedule the Bid Opening date to Tuesday, January 20, 2026, at 2:00 pm EST.
Questions/Clarifications
Bidders can send written questions or inquiries for clarification to: eflhd.contracts@dot.gov.
Questions can be submitted at any time, but questions submitted within 10 days of the bid opening may not be answered in time for the bidder to properly incorporate the responses into their proposal.
The following questions and issues were asked via email. The Government response or clarification is provided. Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised, and some questions may not be included. The
Government’s direct response to the sender may also have been updated below for better clarity.
1. Plan Set AC-817578 Group 1 (Aibonito, Coamo, Cayey) page TS-349, We request The
KM and KM/HM table to determine the signs sizes, we don’t know the speed limits of road.
Please include the km, km/hm marker tables.
Response: The kilometers are shown in the Plan Set for AC-817578 on the Traffic Signs plan sheets along the road alignments. The location numbers in the table on sheet TS-
349 are listed by road, in the same order as shown on the plan sheets. The parentheses next to some of the location numbers listed indicate the specific road on the plan sheets
(e.g., 1.1 for PR-162, 1.2 for PR-173, etc.); they appear only next to the first and last location numbers for each road. Refer to the Plan Set AC-817578 Traffic Signs Data
Table and Traffic Sign plan sheets for additional information.
Additionally, pay item 15001-1000 - Field Assessment is included on each schedule.
Refer to SCR Subsection 150.05(k)(1) Traffic Sign Field Assessment for additional information.
Contractors are required to coordinate with the CO on any noted difference in the plans before proceeding with the proposed work in accordance with FAR 52.236-21.
Payment will be made for the actual quantities of work performed and accepted, or for material furnished, in accordance with the contract. The scheduled quantities may be increased, decreased, or deleted.
mailto:eflhd.contracts@dot.gov
2. Plan Set AC-832578 (825541), Carolina P.R. Pages TSP-1, TSP-5, TSP-6, For the Code
Signs Number 3,6,76,95,97, this labels have a pay item with the letter W, the description of the pay item is for Overhead Signs- New Structure Type I-B . The schedule proposal do not have the letters W. Please Advise.
Response: The plans for AC-832578 (825541), Carolina, P.R., have been revised with the most updated version. The Proposed Sign Data Tables show the correct Pay Item
Code (H-H) instead of the letter “W” for pay item 61312-3000 - Traffic Sign Assembly, Code HH in. Refer to the amended plans.
Additionally, pay item 15001-1000 - Field Assessment is included on each schedule.
Refer to SCR Subsection 150.05(k)(1) Traffic Sign Field Assessment for additional
Payment will be made for the actual quantities of work performed and accepted, or for material furnished, in accordance with the contract. The scheduled quantities may be
3. If the government awards the contracts as Schedule A only , the performance period to complete all schedule A work will be 260 calendar days, for Schedule B a work will be 475 days, for Schedule C will be 345. In comparison of the time and construction of the schedule
A with the other schedules, we understand that it does not allow a reasonable amount of time for its execution. Please revised the calendar days for maximum time allowed for Schedule
A, if awarded separately.
Response: The comparison of quantities across all schedules shows that Schedule A has less guardrail work than the other schedules. Work on one item can be performed simultaneously with work on another. Each Offeror has its own “means and methods” for completing the base contract work from Notice to Proceed. Refer to Specification
155 for additional information.
4. Schedules B and C do not include the removal and disposal of lead paint, as reports indicate there are some areas containing lead. Please Verify.
Response: 93101-1000 - Removal and Disposal of Lead-Based Paint (Painted Guardrail) have been included on Schedules B and C. Refer to the amended B pages for additional
Payment will be made for the actual quantities of work performed and accepted, or for material furnished, according to the contract. The scheduled quantities may be
5. Please consider changing the date for submitting the proposal, that day is a holiday in
Puerto Rico.
Response: The Bid Opening date has been rescheduled to January 20, 2026, at 2:00 pm
EST.
B Pages Changes Summary Page 1 of 1
Bid Schedule (B-Pages) Changes
1. Delete Bid Schedule Pages B-1 through B-11 and substitute with the amended Bid Schedule
Pages B-1 through B-11.
a) Revised the following pay item quantity for Schedules B and C:
1) Pay item 60600-4000 Removal, Storage and Delivery of Existing Guardrail.
b) Added the following pay item for Schedules B and C:
1) Pay item 93101-1000 Removal and Disposal of Lead Based Paint (Painted Guardrail).
c) Added the following pay item for Schedule C:
1) Pay item 93501-0000 Locate Utility, Test Pit.
B I D S C H E D U L E Schedule A
Project No: PR ER DOT PRMNT RPR(27)
Item No. Quantity Unit Unit Price Amount
15001-0000 Line A0020 ALL LPSM $
15001-1000 Line A0040 ALL LPSM $
15100-1000 Line A0060 ALL LPSM $
15102-0000 Line A0080 1 CTSM $ 510,000.00$
15401-0000 Line A0100 ALL LPSM $
15401-1000 Line A0120 ALL LPSM $
15501-0000 Line A0140 ALL LPSM $
20100-0000 Line A0160 1 CUERDA $ $
21201-1000 Line A0180 1 CTSM $ $
60600-1000 Line A0200 3,550 M $ $
60600-4000 Line A0220 2,600 M $ $
60600-5000 Line A0240 20 Each $ $
60604-3000 Line A0260 2 Each $ $
61101-0000 Line A0280 25 MO $ $
61310-1000 Line A0300 12,000 SQFT $ $
61310-2000 Line A0320 7,300 SQFT $ $
61310-3000 Line A0340 4,500 SQFT $ $
61310-4000 Line A0360 3,250 SQFT $ $
61310-5000 Line A0380 1,800 SQFT $ $
61310-6000 Line A0400 600 SQFT $ $
Construction Survey and Staking
Field Assessment
Mobilization
Reimbursement for Municipal Tax Payments
Contractor Testing
Cultural Resource Protection and Monitoring
Traffic Sign Assembly, Code E
Traffic Sign Assembly, Code F
Thrie-Beam Transition, Type I
Field Office
Traffic Sign Assembly, Code A
Construction Schedule
Clearing and Grubbing
Reconditioning of Shoulders and Ditches
W-Beam Guardrail, Single Face
Removal, Storage and Delivery of Existing Guardrail
Crashworthy End Terminal Type 2, TL-2
Traffic Sign Assembly, Code B
Traffic Sign Assembly, Code C
Traffic Sign Assembly, Code D
Submitted by: __________________________
Name: Signing and Guardrail Repairs on AC-831578
Schedule Total: _________________________
B-1 Amendment No. 0001
Amendment No.
Schedule A
Project No: PR ER DOT PRMNT RPR(27)
Item No. Quantity Unit Unit Price Amount
Name: Signing and Guardrail Repairs on AC-831578
61311-2000 Line A0420 1,500 SQFT $ $
62100-1000 Line A0440 305 Each $ $
62100-2000 Line A0460 1,100 Each $ $
62101-1000 Line A0480 605 Each $ $
63800-1000 Line A0500 ALL LPSM $
66100-1000 Line A0520 4 Each $ $
91001-5100 Line A0540 2 Each $ $
91300-5000 Line A0560 2,292 Each $ $
91300-6000 Line A0580 7 Each $ $
93101-1000 Line A0600 49 M $ $
93501-0000 Line A0620 15 Each $ $
Locate Utility, Test Pit
Traffic Sign Assembly, Code R
Maintenance of Traffic
Project Funding Sign
New Transition Module (Less than 45mph)
Removal of Existing Traffic Signs (Ground Mounted)
Removal of Existing Traffic Signs (Breakaway)
Removal and Disposal of Lead Based Paint (Painted Guardrail)
Kilometer Marker
Hectometer Marker
Object Markers
B-2 Amendment No. 0001
Option B
Project No: PR ER DOT PRMNT RPR(27)
Item No.
Quantity Unit Unit Price Amount
15001-0000
Line B0020 ALL LPSM $
15001-1000
Line B0040 ALL LPSM $
15100-1000
Line B0060 ALL LPSM $
15102-0000
Line B0080 1 CTSM $ 405,000.00$
15401-0000
Line B0100 ALL LPSM $
15401-1000
Line B0120 ALL LPSM $
15501-0000
Line B0140 ALL LPSM $
20100-0000
Line B0160 1 CUERDA $ $
21201-1000
Line B0180 1 CTSM $ $
60600-1000
Line B0200 8,960 M $ $
60600-4000
Line B0220 8,860 M $ $
60600-5000
Line B0240 3 Each $ $
61101-0000
Line B0260 20 MO $ $
61310-1000
Line B0280 2,000 SQFT $ $
61310-2000
Line B0300 750 SQFT $ $
61310-3000
Line B0320 3,130 SQFT $ $
61310-4000
Line B0340 3,400 SQFT $ $
61310-5000
Line B0360 450 SQFT $ $
61311-2000
Line B0380 250 SQFT $ $
62100-1000
Line B0400 200 Each $ $
Name: Signing and Guardrail Repairs on AC-833578 Schedule Total: _________________________
Submitted by: __________________________
Traffic Sign Assembly, Code C
Traffic Sign Assembly, Code D
Traffic Sign Assembly, Code E
Construction Survey and Staking
Field Assessment
Mobilization
Reimbursement for Municipal Tax Payments
Contractor Testing
Cultural Resource Protection and Monitoring
Traffic Sign Assembly, Code R
Kilometer Marker
Field Office
Traffic Sign Assembly, Code A
Traffic Sign Assembly, Code B
Construction Schedule
Clearing and Grubbing
Reconditioning of Shoulders and Ditches
W-Beam Guardrail, Single Face
Removal, Storage and Delivery of Existing Guardrail
Crashworthy End Terminal Type 2, TL-2
Amendment No. 0001
Amendment No.
B-3
Option B
Project No: PR ER DOT PRMNT RPR(27)
Item No.
Quantity Unit Unit Price Amount
Name: Signing and Guardrail Repairs on AC-833578
62100-2000
Line B0420 870 Each $ $
63800-1000
Line B0440 ALL LPSM $
66100-1000
Line B0460 10 Each $ $
91001-5100
Line B0480 2 Each $ $
91300-5000
Line B0500 600 Each $ $
91300-6000
Line B0520 400 Each $ $
93101-1000
Line B0540 100 M $ $
93501-0000
Line B0560 35 Each $ $
Locate Utility, Test Pit
Maintenance of Traffic
Project Funding Sign
New Transition Module (Less than 45mph)
Hectometer Marker
Removal of Existing Traffic Signs (Ground Mounted)
Removal of Existing Traffic Signs (Breakaway)
Removal and Disposal of Lead Based Paint (Painted Guardrail)
Amendment No. 0001
Amendment No.
B-4
Option C
Project No: PR ER DOT PRMNT RPR(27)
Item No. Quantity Unit Unit Price Amount
15001-0000
Line C0020 ALL LPSM $
15001-1000
Line C0040 ALL LPSM $
15100-1000
Line C0060 ALL LPSM $
15102-0000
Line C0080 1 CTSM $ 310,000.00$
15401-0000
Line C0100 ALL LPSM $
15401-1000
Line C0120 ALL LPSM $
15501-0000
Line C0140 ALL LPSM $
20100-0000
Line C0160 1 CUERDA $ $
21201-1000
Line C0180 1 CTSM $ $
60600-1000
Line C0200 4,000 M $ $
60600-4000
Line C0220 2,900 M $ $
60600-5000
Line C0240 3 Each $ $
60604-3100
Line C0260 15 Each $ $
61101-0000
Line C0280 15 MO $ $
61310-1000
Line C0300 4,900 SQFT $ $
61310-2000
Line C0320 1,550 SQFT $ $
61310-3000
Line C0340 1,450 SQFT $ $
61310-4000
Line C0360 1,150 SQFT $ $
61310-5000
Line C0380 50 SQFT $ $
61311-2000
Line C0400 150 SQFT $ $
Construction Survey and Staking
Field Assessment
Mobilization
Reimbursement for Municipal Tax Payments
Contractor Testing
Cultural Resource Protection and Monitoring
Traffic Sign Assembly, Code E
Traffic Sign Assembly, Code R
Thrie-Beam Transition, Type II
Field Office
Traffic Sign Assembly, Code A
Construction Schedule
Clearing and Grubbing
Reconditioning of Shoulders and Ditches
W-Beam Guardrail, Single Face
Removal, Storage and Delivery of Existing Guardrail
Crashworthy End Terminal Type 2, TL-2
Traffic Sign Assembly, Code B
Traffic Sign Assembly, Code C
Traffic Sign Assembly, Code D
Submitted by: __________________________
Name: Signing and Guardrail Repairs on AC-832578
Schedule Total: _________________________
Amendment No. 0001
Amendment No.
B-5
Option C
Project No: PR ER DOT PRMNT RPR(27)
Item No. Quantity Unit Unit Price Amount
Name: Signing and Guardrail Repairs on AC-832578
61312-2000
Line C0420 100 SQFT $ $
61312-3000
Line C0440 1,200 SQFT $ $
62100-1000
Line C0460 100 Each $ $
62100-2000
Line C0480 410 Each $ $
63800-1000
Line C0500 ALL LPSM $
66100-1000
Line C0520 2 Each $ $
91001-5100
Line C0540 15 Each $ $
91300-5000
Line C0560 230 Each $ $
91300-6000
Line C0580 630 Each $ $
91300-7000
Line C0600 5 Each $ $
93101-1000
Line C0620 1,100 M $ $
93501-0000
Line C0640 15 Each $ $
Removal and Disposal of Lead Based Paint (Painted Guardrail)
Locate Utility, Test Pit
Traffic Sign Assembly, Code GG
Maintenance of Traffic
Project Funding Sign
New Transition Module (Less than 45mph)
Removal of Existing Traffic Signs (Ground Mounted)
Removal of Existing Traffic Signs (Breakaway)
Removal of Existing Traffic Signs (Overhead)
Traffic Sign Assembly, Code HH
Kilometer Marker
Hectometer Marker
Amendment No. 0001
Amendment No.
B-6
Option D
Project No: PR ER DOT PRMNT RPR(27)
Item No. Quantity Unit Unit Price Amount
15001-0000 Line D0020 ALL LPSM $
15001-1000 Line D0040 ALL LPSM $
15100-1000 Line D0060 ALL LPSM $
15102-0000 Line D0080 1 CTSM $ 240,000.00$
15401-0000 Line D0100 ALL LPSM $
15401-1000 Line D0120 ALL LPSM $
15501-0000 Line D0140 ALL LPSM $
20100-0000 Line D0160 1 CUERDA $ $
21201-1000 Line D0180 1 CTSM $ $
60600-1000 Line D0200 4,200 M $ $
60600-4000 Line D0220 3,050 M $ $
60600-5000 Line D0240 3 Each $ $
61101-0000 Line D0260 15 MO $ $
61310-1000 Line D0280 2,200 SQFT $ $
61310-2000 Line D0300 800 SQFT $ $
61310-3000 Line D0320 2,200 SQFT $ $
61310-4000 Line D0340 1,830 SQFT $ $
61310-5000 Line D0360 280 SQFT $ $
61311-2000 Line D0380 180 SQFT $ $
62100-1000 Line D0400 100 Each $ $
Construction Survey and Staking
Field Assessment
Mobilization
Reimbursement for Municipal Tax Payments
Contractor Testing
Cultural Resource Protection and Monitoring
Traffic Sign Assembly, Code R
Kilometer Marker
Field Office
Traffic Sign Assembly, Code A
Traffic Sign Assembly, Code B
Construction Schedule
Clearing and Grubbing
Reconditioning of Shoulders and Ditches
W-Beam Guardrail, Single Face
Removal, Storage and Delivery of Existing Guardrail
Crashworthy End Terminal Type 2, TL-2
Traffic Sign Assembly, Code C
Traffic Sign Assembly, Code D
Traffic Sign Assembly, Code E
Submitted by: __________________________
Name: Signing and Guardrail Repairs on AC-817578
Schedule Total: _________________________
B-7 Amendment No. 0001
Option D
Project No: PR ER DOT PRMNT RPR(27)
Item No. Quantity Unit Unit Price Amount
Name: Signing and Guardrail Repairs on AC-817578
62100-2000 Line D0420 505 Each $ $
63800-1000 Line D0440 ALL LPSM $
66100-1000 Line D0460 6 Each $ $
91300-5000 Line D0480 1,444 Each $ $
91300-6000 Line D0500 65 Each $ $
93101-1000 Line D0520 1,143 M $ $
Hectometer Marker
Removal of Existing Traffic Signs (Breakaway)
Removal and Disposal of Lead Based Paint (Painted Guardrail)
Maintenance of Traffic
Project Funding Sign
Removal of Existing Traffic Signs (Ground Mounted)
B-8 Amendment No. 0001
Option E
Project No: PR ER DOT PRMNT RPR(27)
Item No.
Quantity Unit Unit Price Amount
15001-0000 Line E0020 ALL LPSM $
15001-1000 Line E0040 ALL LPSM $
15100-1000 Line E0060 ALL LPSM $
15102-0000 Line E0080 1 CTSM $ 235,000.00$
15401-0000 Line E0100 ALL LPSM $
15401-1000 Line E0120 ALL LPSM $
15501-0000 Line E0140 ALL LPSM $
20100-0000 Line E0160 1 CUERDA $ $
21201-1000 Line E0180 1 CTSM $ $
60600-1000 Line E0200 2,450 M $ $
60600-4000 Line E0220 2,350 M $ $
60600-5000 Line E0240 3 Each $ $
61101-0000 Line E0260 15 MO $ $
61310-1000 Line E0280 4,500 SQFT $ $
61310-2000 Line E0300 2,800 SQFT $ $
61310-3000 Line E0320 1,800 SQFT $ $
61310-4000 Line E0340 1,500 SQFT $ $
61310-5000 Line E0360 530 SQFT $ $
61311-2000 Line E0380 600 SQFT $ $
62100-1000 Line E0400 60 Each $ $
Name: Signing and Guardrail Repairs on AC-834578 Schedule Total: _________________________
Submitted by: __________________________
Traffic Sign Assembly, Code C
Traffic Sign Assembly, Code D
Traffic Sign Assembly, Code E
Construction Survey and Staking
Field Assessment
Mobilization
Reimbursement for Municipal Tax Payments
Contractor Testing
Cultural Resource Protection and Monitoring
Traffic Sign Assembly, Code R
Kilometer Marker
Field Office
Traffic Sign Assembly, Code A
Traffic Sign Assembly, Code B
Construction Schedule
Clearing and Grubbing
Reconditioning of Shoulders and Ditches
W-Beam Guardrail, Single Face
Removal, Storage and Delivery of Existing Guardrail
Crashworthy End Terminal Type 2, TL-2
B-9 Amendment No. 0001
Option E
Project No: PR ER DOT PRMNT RPR(27)
Item No.
Quantity Unit Unit Price Amount
Name: Signing and Guardrail Repairs on AC-834578
62100-2000 Line E0420 480 Each $ $
63800-1000 Line E0440 ALL LPSM $
66100-1000 Line E0460 10 Each $ $
91300-5000 Line E0480 435 Each $ $
93101-1000 Line E0500 25 M $ $
Maintenance of Traffic
Project Funding Sign
Removal of Existing Traffic Signs (Ground Mounted)
Hectometer Marker
Removal and Disposal of Lead Based Paint (Painted Guardrail)
B-10 Amendment No. 0001
B-11
BID SUMMARY
Project PR ER DOT PRMNT RPR(27)
(1) Schedule A (Base Contract) Bid Total (from Page B-1) = (1) $____________________
(2) Schedule B (Government Option 1) Bid Total (from Page B-3) = (2) $____________________
(3) Schedule C (Government Option 2) Bid Total (from Page B-5) = (3) $____________________
(4) Schedule D (Government Option 3) Bid Total (from Page B-7) = (4) $____________________
(5) Schedule E (Government Option 4) Bid Total (from Page B-9) = (5) $____________________
Total Price of Project (for evaluation purposes only)
EVALUATION TOTAL PRICE OF PROJECT = (1) + (2) + (3) + (4) + (5) $____________________
Maximum Time Allowed for the Contract if Schedules A, B, C, D, and E are Awarded at the Same
Time:
If the Government awards the contract as Schedules A + B + C + D + E, the performance period to complete all contract work will be 1145 calendar days.
Maximum Time Allowed for Each Schedule of Work if Awarded Separately:
If the Government awards the contract as Schedule A only, the performance period to complete all
Schedule A work will be 260 calendar days and will start on the effective date of Schedule A’s Notice to
Proceed.
If Schedule B (Government Option 1) is exercised after the award of the original contract, the performance period to complete all Schedule B work will be 475 calendar days and will start on the effective date of Schedule B’s Notice to Proceed.
If Schedule C (Government Option 2) is exercised after the award of the original contract, the performance period to complete all Schedule C work will be 345 calendar days and will start on the effective date of Schedule C’s Notice to Proceed.
If Schedule D (Government Option 3) is exercised after the award of the original contract, the performance period to complete all Schedule D work will be 315 calendar days and will start on the effective date of Schedule D’s Notice to Proceed.
If Schedule E (Government Option 4) is exercised after the award of the original contract, the performance period to complete all Schedule E work will be 435 calendar days and will start on the effective date of Schedule E’s Notice to Proceed.
Plan Sheet Changes 1 of 1
Plan Sheet Changes
Delete Plans - PR ER DOT PRMNT RPR(27) - 832578 - Part 1 of 2 and Plans - PR ER DOT
PRMNT RPR(27) - 832578 - Part 2 of and substitute with the amended Plans - PR ER DOT
PRMNT RPR(27) – 832578.
Amendment No. 001
BARRETTHALE ALAMO
MPH
10'=3.05 Mts.
FEET MTS.
11'=3.35 Mts.
FEET MTS.
12'=3.65 Mts.
FEET MTS.
FEET MTS. FEET MTS. FEET MTS.
Amendment No. 001
N ot e:
Th e M
O T is p ai d fo r a t c on tra ct lu m p su m p ric e, w hi ch is d es cr ib ed in th e
SC
R
, M O
T pl an s, a nd a ll th e ne ce ss ar y ite m s to fu lfi ll th e
M O
T.
Th e co nt ra ct or s ha ll co ns id er a ny a dd iti on al it em s or q ua nt iti es th at m ay b e ne ed ed to e st ab lis h th e
M O
T in th ei r p ric e pr op os al
N ot e:
Th e M
O T is p ai d fo r a t c on tra ct lu m p su m p ric e, w hi ch is d es cr ib ed in th e
SC
R
, M O
T pl an s, a nd a ll th e ne ce ss ar y ite m s to fu lfi ll th e
M O
T.
Th e co nt ra ct or s ha ll co ns id er a ny a dd iti on al it em s or q ua nt iti es th at m ay b e ne ed ed to e st ab lis h th e
M O
T in th ei r p ric e pr op os
N ot e:
Th e M
O T is p ai d fo r a t c on tra ct lu m p su m p ric e, w hi ch is d es cr ib ed in th e
SC
R
, M O
T pl an s, a nd a ll th e ne ce ss ar y ite m s to fu lfi ll th e
M O
T.
Th e co nt ra ct or s ha ll co ns id er a ny a dd iti on al it em s or q ua nt iti es th at m ay b e ne ed ed to e st ab lis h th e
M O
T in th ei r p ric e pr op os
N ot e:
Th e M
O T is p ai d fo r a t c on tra ct lu m p su m p ric e, w hi ch is d es cr ib ed in th e
SC
R
, M O
T pl an s, a nd a ll th e ne ce ss ar y ite m s to fu lfi ll th e
M O
T.
Th e co nt ra ct or s ha ll co ns id er a ny a dd iti on al it em s or q ua nt iti es th at m ay b e ne ed ed to e st ab lis h th e
M O
T in th ei r p ric e pr op os
N ot e:
Th e M
O T is p ai d fo r a t c on tra ct lu m p su m p ric e, w hi ch is d es cr ib ed in th e
SC
R
, M O
T pl an s, a nd a ll th e ne ce ss ar y ite m s to fu lfi ll th e
M O
T.
Th e co nt ra ct or s ha ll co ns id er a ny a dd iti on al it em s or q ua nt iti es th at m ay b e ne ed ed to e st ab lis h th e
M O
T in th ei r p ric e pr op os
OFFSET REQUIREMENTS
ROUTE FROM TO OFFSET
ALL ROADS ALL PROJECT .60 mts.ALL PROJECT
BARRETTHALE ALAMO
Amendment No. 001
N ot e:
Th e M
O T is p ai d fo r a t c on tra ct lu m p su m p ric e, w hi ch is d es cr ib ed in th e
SC
R
, M O
T pl an s, a nd a ll th e ne ce ss ar y ite m s to fu lfi ll th e
M O
T.
Th e co nt ra ct or s ha ll co ns id er a ny a dd iti on al it em s or q ua nt iti es th at m ay b e ne ed ed to e st ab lis h th e
M O
T in th ei r p ric e pr op os
KM 1.3
TO PR-951
a b
TO PR-26
PROJECT LIMITS
PR-187 BEGINS
KM 0.0
KM 2.8
ba a 2 3 a b
TO PR-951TO
P
R -2
KM 5.8
b K
M
.3
KM 7.3
b a
TO PR-26
a b
KM 8.8
ba aKM 10.4
7 8
TO PR-951
TO PR-26
KM 13.498
ab b a
KM 11.9
a b
KM 16.3
b a b
KM 14.9
KM 18.7
TO 65 INFANTRY AVE.
TO PR-951
KM 21.4
KM 19.9
KM 22.9
a b ba
TO 65 INFANTRY AVE.
TO
P
R -9 a b
K M
4.
b b a a aKM 25.9
KM 27.4
PROJECT LIMITS
PR-187 ENDS
KM 30.1
TO 65 IN
FANTRY AVE.
TO PR-951
KM 28.9 21
b a b
TO PASEO DE LOS GIGANTES AVE.
PROJECT LIMITS
FIDALGO DIAZ AVE. BEGINS
KM 0.0
KM 1.3
b a
Km 2.65
Km 2.65
INTERSECTION
KM 2.65
PR-190 / PASEO DE LOS GIGANTES AVE.
a b
KM 2.65
PROJECT LIMITS
FIDALGO DIAZ AVE. ENDS
KM 3.6
Km 2.65
Km 2.65
TO 65 INFANTRY AVE.
TO PASEO DE LOS GIGANTES AVE.
INTERSECTION
KM 2.65
PR-190 / PASEO DE LOS GIGANTES AVE.
a bKM 2.65
Km
.0
Km 0.1
Km 0.2 Km 0.3
Km 0.4 Km 0.5 Km 0.6
Km 0.7
Km 0.8
Km 0.9
Km 1.0
Km 1.1
Km 1.2
Km 1.3
Km 1.4
Km 1.5
Km 1.6
Km 1.7
Km 1.8 Km 1.9
Km 2.0
Km 2.65
Km 2.1 Km 2.2
Km 2.3
Km 2.4 Km 2.5
Km 2.6
Km 2.65 Km 2.7
Km 2.8
Km 2.9 Km 3.0 Km 3.1 Km 3.2 Km 3.3
Km 3.4 Km 3.5 Km 3.6 Km 3.7
Km 3.8 Km 3.9
Km 4.0
.0
Km 0.1
Km 0.2 Km 0.3
Km 0.4 Km 0.5 Km 0.6
Km
.0
Km 0.1
Km 0.2 Km 0.3
Km 0.4 Km 0.5 Km 0.6
Km 0.7
Km 0.8
Km 0.9
Km 1.0
Km 1.1
Km 1.2
Km 1.3
Km 0.7
Km 0.8
Km 0.9
Km 1.0
Km 1.1
Km 1.2
Km 1.3
Km 1.6
Km 1.7
Km 1.8 Km 1.9
Km 2.0
Km 1.4
Km 1.5
Km 1.6
Km 1.7
Km 1.8 Km 1.9
Km 2.0
Km 2.65
Km 2.1 Km 2.2
Km 2.3
Km 2.4 Km 2.5
Km 2.6 Km 2.65
Km 2.1 Km 2.2
Km 2.3
Km 2.4 Km 2.5
Km 2.6
Km 2.65
Km 2.8
Km 2.9 Km 3.0 Km 3.1 Km 3.2 Km 3.3
Km 2.65 Km 2.7
Km 2.8
Km 2.9 Km 3.0 Km 3.1 Km 3.2 Km 3.3
Km 3.4 Km 3.5 Km 3.6 Km 3.7
Km 3.8 Km 3.9
Km 4.0
Km 3.4 Km 3.5 Km 3.6 Km 3.7
Km 3.8 Km 3.9
Km 4.0
PROJECT LIMITS
PR-848 BEGINS
KM 0.0
KM 3.11 b a a b
KM 1.5
TO PR-181
TO PR-887
PROJECT LIMITS
PR-848 ENDS
KM 4.67
TO PR-887
TO PR-181
a b Km 4.67
Km 0.0
Km 0.1
Km 0.2
Km 0.3
Km 0.4 Km 0.5 Km 0.6 Km 0.7
Km 0.7
Km 0.8
Km 0.9
Km 1.0
Km 1.1
Km 1.2
Km 1.3
Km 1.4
Km 1.5
Km 1.6
Km 1.6
Km 1.7
Km 1.8
Km 1.9
Km 2.0
Km 2.1
Km 2.2
Km 2.
3 Km 2.4
Km 2.4
Km 2.5 Km 2.6
Km 2.7
Km 2.8
Km 2.9
Km 3.0
Km 3.1
Km 3.1
Km 3.2
Km 3.3
Km 3.4
Km 3.5
Km 3.6
Km 3.7
Km 3.8
Km 3.9
PR-848
Km 4.67
Km 4.0 Km 4.1
Km 4.2
Km 4.3
Km 4.4
Km 4.5
Km 4.6
PR
-8
Km 0.2
Km 0.3
Km 0.4 Km 0.5 Km 0.6 Km 0.7
Km 0.7
Km 0.8
Km 0.9
Km 1.0
Km 1.1
Km 1.2
Km 1.3
Km 1.4
Km 1.5
Km 1.6
Km 1.8
Km 1.9
Km 2.0
Km 2.1
Km 2.2
Km 2.
3 Km 2.4
Km 2.4
Km 2.5 Km 2.6
Km 2.7
Km 2.8
Km 2.9
Km 3.0
Km 3.1
Km 3.1
Km 3.3
Km 3.4
Km 3.5
Km 3.6
Km 3.7
Km 3.8
Km 3.9
PR-848
Km 4.67
Km 4.0 Km 4.1
Km 4.2
Km 4.3
Km 4.4
Km 4.5
Km 4.6
PR
-8
KM 4.5
TO PR-185
a b a a bb
PROJECT LIMITS
PR-853 BEGINS
KM 0.0
TO 65 INFANTRY AVE.
a a b b
TO PR-185
TO 65 INFANTRY AVE.
KM 8.0
a b ba
TO PR-185
TO 65 INFANTRY AVE.
KM 11.2
PROJECT LIMITS
PR-853 ENDS
KM 13.97
Km 13.97 a b b a TO PR-185
TO 65 INFANTRY AVE.
Km 0.2
Km 0.3
Km 0.4
Km 0.5
Km 0.6
Km 0.7
Km 0.8
Km 0.8
Km 0.9 Km 1.0
Km 1.1
Km 1.2 Km 1.3
Km
.4
Km
.5
1.3
Km 1.4
Km 1.5
Km 1.6
Km 1.7 Km 1.8
Km 1.9
Km 2.0
Km 2.1
Km 2.1
Km 2.2
Km 2.3
Km 2.4
Km 2.5
Km 2.6
Km 2.7
Km 2.8
Km 2.9
Km 3.0
Km
3.1 Km 3.2
Km 3.3
Km 3.4
Km
.5
Km 3.6
Km 3.7
Km 3.7
Km 3.8
Km 3.
Km 4.0
Km 4.1
Km 4.2 Km 4.3
Km 4.4 Km 4.5
Km 4.6
Km 4.7
Km 4.8
Km 4.9
Km 5.0
Km 5.1
Km 5.2
Km 5.3
Km
.4
Km 5.4
Km 5.5
Km 5.6
Km 5.7
Km 5.8
Km 5.
Km 6.0
Km 6.1
Km 6.2
Km 6.1
Km 6.2 Km 6.3
Km 6.4
Km 6.5
Km 6.
Km 6.7
Km 6.8
Km 6.9
Km 6.9
Km 7.0
Km 7.1
Km 7.2
Km 7.3
Km 7.4
Km
.5 Km
.6
Km
.7
Km 7.8 Km 7.9
Km 8.0
Km 7.9
Km 8.0
Km
.1
Km 8.2
Km 8.3 Km 8.4
Km
.5
Km 8.6 Km 8.7
Km 8.8
Km 8.9
Km 9.0 Km 9.1
Km 9.2
Km 9.3 Km 9.
Km 9.5
Km
.6
Km 9.7
Km 9.6
Km 9.7
Km 9.
Km 9.9
Km 10.0
Km 10.1
Km 10.2
Km 10.3
Km 10.4
Km 10.5
Km 10.4
Km 10.5
Km 10.6
Km 10.7
Km 10.8
Km 10.9
Km 11.0
Km 11.1 Km 11.2
11.2
Km 11.3
Km 11.4 Km 11.5 Km 11.6
Km 11.7
Km 11.8
Km 11.9
Km 12.0
Km 12.0
Km 12.1
Km 12.2
Km 12.3 Km 12.4 Km 12.5 Km 12.6
Km 12.7
Km 12.7
Km 12.8
Km 12.9
Km 13.0
Km 13.1
Km 13 .2
Km 13.3
Km 13.4
Km 13.97
Km 13.5
Km 13.6 Km 13.7 Km 13.8
Km 13.9
Km 0.2
Km 0.3
Km 0.4
Km 0.5
Km 0.6
Km 0.7
Km 0.8
Km 0.0
Km 0.1
Km 0.2
Km 0.3
Km 0.4
Km 0.5
Km 0.6
Km 0.7
Km 0.8
Km 0.8
Km 0.9 Km 1.0
Km 1.1
Km 1.2 Km 1.3
Km
.4
Km
.5
Km 0.8
Km 0.9 Km 1.0
Km 1.1
Km 1.2 Km 1.3
Km
.4
Km
.5
1.3
Km 1.4
Km 1.5
Km 1.6
Km 1.7 Km 1.8
Km 1.9
Km 2.0
Km 2.1
Km 1.3
Km 1.4
Km 1.5
Km 1.6
Km 1.7 Km 1.8
Km 1.9
Km 2.0
Km 2.1
Km 2.1
Km 2.2
Km 2.3
Km 2.4
Km 2.5
Km 2.6
Km 2.7
Km 2.8
Km 2.1
Km 2.2
Km 2.3
Km 2.4
Km 2.5
Km 2.6
Km 2.7
Km 2.8
Km
3.1 Km 3.2
Km 3.3
Km 3.4
Km
.5
Km 3.6
Km 3.7
Km 2.9
Km 3.0
Km
3.1 Km 3.2
Km 3.3
Km 3.4
Km
.5
Km 3.6
Km 3.7
Km 3.7
Km 3.8
Km 3.
Km 4.0
Km 4.1
Km 4.2 Km 4.3
Km 4.4 Km 4.5Km 3.7
Km 3.8
Km 3.
Km 4.0
Km 4.1
Km 4.2 Km 4.3
Km 4.4 Km 4.5
Km 4.6
Km 4.7
Km 4.8
Km 4.9
Km 5.0
Km 5.1
Km 5.2
Km 5.3
Km
.4
Km 4.6
Km 4.7
Km 4.8
Km 4.9
Km 5.0
Km 5.1
Km 5.2
Km 5.3
Km
.4
Km 5.4
Km 5.5
Km 5.6
Km 5.7
Km 5.8
Km 5.
Km 6.0
Km 6.1
Km 6.2
Km 5.4
Km 5.5
Km 5.6
Km 5.7
Km 5.8
Km 5.
Km 6.0
Km 6.1
Km 6.2
Km 6.1
Km 6.2 Km 6.3
Km 6.4
Km 6.5
Km 6.
Km 6.7
Km 6.8
Km 6.9
Km 6.1
Km 6.2 Km 6.3
Km 6.4
Km 6.5
Km 6.
Km 6.7
Km 6.8
Km 6.9
Km 6.9
Km 7.0
Km 7.1
Km 7.2
Km 7.3
Km 7.4
Km
.5 Km
.6
Km
.7
Km 7.8 Km 7.9
Km 8.0
Km 6.9
Km 7.0
Km 7.1
Km 7.2
Km 7.3
Km 7.4
Km
.5 Km
.6
Km
.7
Km 7.8 Km 7.9
Km 8.0
Km 7.9
Km 8.0
Km
.1
Km 8.2
Km 8.3 Km 8.4
Km
.5
Km 8.6 Km 8.7
Km 8.8
Km 7.9
Km 8.0
Km
.1
Km 8.2
Km 8.3 Km 8.4
Km
.5
Km 8.6 Km 8.7
Km 8.8
Km 8.9
Km 9.0 Km 9.1
Km 9.2
Km 9.3 Km 9.
Km 9.5
Km
.6
Km 9.7
Km 8.9
Km 9.0 Km 9.1
Km 9.2
Km 9.3 Km 9.
Km 9.5
Km
.6
Km 9.7
Km 9.6
Km 9.7
Km 9.
Km 9.9
Km 10.0
Km 10.1
Km 10.2
Km 10.3
Km 10.4
Km 10.5
Km 9.6
Km 9.7
Km 9.
Km 9.9
Km 10.0
Km 10.1
Km 10.2
Km 10.3
Km 10.4
Km 10.5
Km 10.4
Km 10.5
Km 10.6
Km 10.7
Km 10.8
Km 10.9
Km 11.0
Km 11.1 Km 11.2
Km 10.4
Km 10.5
Km 10.6
Km 10.7
Km 10.8
Km 10.9
Km 11.0
Km 11.1 Km 11.2
11.2
Km 11.3
Km 11.4 Km 11.5 Km 11.6
Km 11.7
Km 11.8
Km 11.9
Km 12.0
Km 11.2
Km 11.3
Km 11.4 Km 11.5 Km 11.6
Km 11.7
Km 11.8
Km 11.9
Km 12.0
Km 12.0
Km 12.1
Km 12.2
Km 12.3 Km 12.4 Km 12.5 Km 12.6
Km 12.7 Km 12.0
Km 12.1
Km 12.2
Km 12.3 Km 12.4 Km 12.5 Km 12.6
Km 12.7
Km 12.7
Km 12.8
Km 12.9
Km 13.0
Km 13.1
Km 13 .2
Km 13.3
Km 13.4
Km 12.7
Km 12.8
Km 12.9
Km 13.0
Km 13.1
Km 13 .2
Km 13.3
Km 13.4
Km 13.97
Km 13.5
Km 13.6 Km 13.7 Km 13.8
Km 13.9
Km 13.97
Km 13.5
Km 13.6 Km 13.7 Km 13.8
Km 13.9
TO PR-185
a b
PROJECT LIMITS
PR-857 BEGINS
KM 0.0
TO 65 INFANTRY AVE.
KM 3.2
a b
KM 6.6a b
TO PR-185
TO 65 INFANTRY AVE.
a b
PR-857 ENDS
KM 10.88
Km 10.88
TO
65 INFANTRY AVE.
TO PR-185
Km 0.0 Km 0.1 Km 0.2 Km 0.3 Km 0.4
Km 0.5
Km 0.6
Km 0.0 Km 0.1 Km 0.2 Km 0.3 Km 0.4
Km 0.5
Km 0.6
Km 0.6
Km 0.7
Km 0.8
Km 0.9 Km 1.0
Km 1.1
Km 1.2
Km 1.3 Km 1.4
Km 0.6
Km 0.7
Km 0.8
Km 0.9 Km 1.0
Km 1.1
Km 1.2
Km 1.3 Km 1.4
Km 1.6
Km 1.7 Km 1.8
Km 1.9
Km 2.0
Km 2.1
Km 2.2Km 1.4
Km 1.5
Km 1.6
Km 1.7 Km 1.8
Km 1.9
Km 2.0
Km 2.1
Km 2.2
Km 2.1
Km 2.2
Km 2.3
Km 2.4
Km 2.5
Km 2.6
Km 2.7
Km 2.8
Km 2.9
Km 3.0
Km 3.1
Km
.2
Km 3.3
Km 2.1
Km 2.2
Km 2.3
Km 2.4
Km 2.5
Km 2.6
Km 2.7
Km 2.8
Km 2.9
Km 3.0
Km 3.1
Km
.2
Km 3.3
Km 3.3
Km 3.
Km 3.
Km 3.6 Km 3.7
Km 3.8
Km 3.9
Km
.0
Km 4.1
Km
.2
Km 3.2
Km 3.3
Km 3.
Km 3.
Km 3.6 Km 3.7
Km 3.8
Km 3.9
Km
.0
Km 4.1
Km
.2
Km 4.1
Km 4.2
Km 4.3
Km 4.4
Km 4.5
Km 4.6
Km 4.7
Km 4.8
Km 4.
Km 5.0
Km 5.1
Km 4.1
Km 4.2
Km 4.3
Km 4.4
Km 4.5
Km 4.6
Km 4.7
Km 4.8
Km 4.
Km 5.0
Km 5.1
Km 5.0
Km 5.1
Km 5.2
Km 5.3
Km 5.4
Km 5.5
Km 5.6
Km 5.
Km 5.8
Km 5.0
Km 5.1
Km 5.2
Km 5.3
Km 5.4
Km 5.5
Km 5.6
Km 5.
Km 5.8
Km 5.9
Km 6.0 Km 6.1
Km 6.2
Km 6.3
Km 6.4 Km 6.5
Km 6.6
Km 5.9
Km 6.0 Km 6.1
Km 6.2
Km 6.3
Km 6.4 Km 6.5
Km 6.6
Km 6.
Km 6.6
Km 6.7 Km 6.8
Km
.9
Km 7.0
Km 7.1
Km 7.2
Km 7.3
Km 7.4
Km 6.
Km 6.6
Km 6.7 Km 6.8
Km
.9
Km 7.0
Km 7.1
Km 7.2
Km 7.3
Km 7.4
Km
.4
Km
.5
Km 7.6
Km 7.7
Km 7.8
Km 7.9
Km
.0
Km 8.1
Km
.2
Km
.3
Km 8.4
Km
.4
Km
.5
Km 7.6
Km 7.7
Km 7.8
Km 7.9
Km
.0
Km 8.1
Km
.2
Km
.3
Km 8.4
.3
Km
.4
Km 8.5
Km 8.6
Km 8.7 Km 8.8
Km 8.9
Km 9.0
Km 9.1 Km 9.2
Km
.3
Km
.4
Km 8.5
Km 8.6
Km 8.7 Km 8.8
Km 8.9
Km 9.0
Km 9.1 Km 9.2
Km
.1
Km 9.2
Km 9.3
Km 9.4
Km 9.5
Km 9.6 Km 9.7
Km 9.8
Km 9.9
Km 10.0
Km
.1
Km 9.2
Km 9.3
Km 9.4
Km 9.5
Km 9.6 Km 9.7
Km 9.8
Km 9.9
Km 10.0
Km 10.88
Km 10.0
Km 10.1
Km 10.2
Km 10.3
Km 10.4
Km
0.
Km 10.6
Km 10.7
Km 10.8
Km 10.88
Km 10.0
Km 10.1
Km 10.2
Km 10.3
Km 10.4
Km
0.
Km 10.6
Km 10.7
Km 10.8
Km 0.3 Km 0.4
Km 0.5
Km 0.6
Km 0.0 Km 0.1 Km 0.2 Km 0.3 Km 0.4
Km 0.5
Km 0.6
Km 0.6
Km 0.7
Km 0.8
Km 0.9 Km 1.0
Km 1.1
Km 1.2
Km 1.3 Km 1.4
Km 0.6
Km 0.7
Km 0.8
Km 0.9 Km 1.0
Km 1.1
Km 1.2
Km 1.3 Km 1.4
Km 1.6
Km 1.7 Km 1.8
Km 1.9
Km 2.0
Km 2.1
Km 2.2Km 1.4
Km 1.5
Km 1.6
Km 1.7 Km 1.8
Km 1.9
Km 2.0
Km 2.1
Km 2.2
Km 2.1
Km 2.2
Km 2.3
Km 2.4
Km 2.5
Km 2.6
Km 2.7
Km 2.8
Km 2.9
Km 3.0
Km 3.1
Km
.2
Km 3.3
Km 2.1
Km 2.2
Km 2.3
Km 2.4
Km 2.5
Km 2.6
Km 2.7
Km 2.8
Km 2.9
Km 3.0
Km 3.1
Km
.2
Km 3.3
Km 3.3
Km 3.
Km 3.
Km 3.6 Km 3.7
Km 3.8
Km 3.9
Km
.0
Km 4.1
Km
.2
Km 3.2
Km 3.3
Km 3.
Km 3.
Km 3.6 Km 3.7
Km 3.8
Km 3.9
Km
.0
Km 4.1
Km
.2
Km 4.1
Km 4.2
Km 4.3
Km 4.4
Km 4.5
Km 4.6
Km 4.7
Km 4.8
Km 4.
Km 5.0
Km 5.1
Km 4.1
Km 4.2
Km 4.3
Km 4.4
Km 4.5
Km 4.6
Km 4.7
Km 4.8
Km 4.
Km 5.0
Km 5.1
Km 5.0
Km 5.1
Km 5.2
Km 5.3
Km 5.4
Km 5.5
Km 5.6
Km 5.
Km 5.8
Km 5.0
Km 5.1
Km 5.2
Km 5.3
Km 5.4
Km 5.5
Km 5.6
Km 5.
Km 5.8
Km 5.9
Km 6.0 Km 6.1
Km 6.2
Km 6.3
Km 6.4 Km 6.5
Km 6.6
Km 5.9
Km 6.0 Km 6.1
Km 6.2
Km 6.3
Km 6.4 Km 6.5
Km 6.6
Km 6.
Km 6.6
Km 6.7 Km 6.8
Km
.9
Km 7.0
Km 7.1
Km 7.2
Km 7.3
Km 7.4
Km 6.
Km 6.6
Km 6.7 Km 6.8
Km
.9
Km 7.0
Km 7.1
Km 7.2
Km 7.3
Km 7.4
Km
.4
Km
.5
Km 7.6
Km 7.7
Km 7.8
Km 7.9
Km
.0
Km 8.1
Km
.2
Km
.3
Km 8.4
Km
.4
Km
.5
Km 7.6
Km 7.7
Km 7.8
Km 7.9
Km
.0
Km 8.1
Km
.2
Km
.3
Km 8.4
.3
Km
.4
Km 8.5
Km 8.6
Km 8.7 Km 8.8
Km 8.9
Km 9.0
Km 9.1 Km 9.2
Km
.3
Km
.4
Km 8.5
Km 8.6
Km 8.7 Km 8.8
Km 8.9
Km 9.0
Km 9.1 Km 9.2
Km
.1
Km 9.2
Km 9.3
Km 9.4
Km 9.5
Km 9.6 Km 9.7
Km 9.8
Km 9.9
Km 10.0
Km
.1
Km 9.2
Km 9.3
Km 9.4
Km 9.5
Km 9.6 Km 9.7
Km 9.8
Km 9.9
Km 10.0
Km 10.88
Km 10.0
Km 10.1
Km 10.2
Km 10.3
Km 10.4
Km
0.
Km 10.6
Km 10.7
Km 10.8
Km 10.88
Km 10.0
Km 10.1
Km 10.2
Km 10.3
Km 10.4
Km
0.
Km 10.6
Km 10.7
Km 10.8
TO PR-853
TO PR-852
PROJECT LIMITS
PR-858 BEGINS
KM 0.0
KM 2.8
ba a b
PROJECT LIMITS
PR-858 ENDS
KM 5.0
a b a
TO PR-852
TO PR-853
Km 0.2
Km 0.3 Km 0.4 Km 0.5
Km 0.
Km 0.6 Km 0.7
Km 0.8 Km 0.9
Km 1.0
Km 1.1 Km 1.2
Km 1.3
Km 1.3
Km 1.5 Km 1.6 Km 1.7
Km 1.8
Km 1.9
Km 2.0
Km
.1
Km 2.1
Km 2.2
Km 2.3 Km 2.4
Km 2.5
Km 2.6
Km 2.7
Km 2.8
Km 2.9
Km 2.
Km 2.
Km 3.0 Km 3.1
Km 3.2 Km 3.3 Km 3.4
Km 3.5
Km 3.6
Km 3.6
Km 3.7 Km 3.8
Km 3.9
Km 4.0 Km 4.1
Km 4.2
Km 4.3
Km 4.4
Km
.5
Km 4.2
Km 4.3
Km 4.4
Km
.5
Km 4.6
Km 4.7
Km
.8
Km 4.9
Km 5.0 Km 5.0
Km 0.2
Km 0.3 Km 0.4 Km 0.5
Km 0.
Km 0.6 Km 0.7
Km 0.8 Km 0.9
Km 1.0
Km 1.1 Km 1.2
Km 1.3
Km 1.5 Km 1.6 Km 1.7
Km 1.8
Km 1.9
Km 2.0
Km
.1
Km 2.1
Km 2.2
Km 2.3 Km 2.4
Km 2.5
Km 2.6
Km 2.7
Km 2.8
Km 2.9
Km 2.
Km 2.
Km 3.0 Km 3.1
Km 3.2 Km 3.3 Km 3.4
Km 3.5
Km 3.6
Km 3.6
Km 3.7 Km 3.8
Km 3.9
Km 4.0 Km 4.1
Km 4.2
Km 4.3
Km 4.4
Km
.5
Km 4.3
Km 4.4
Km
.5
Km 4.6
Km 4.7
Km
.8
Km 4.9
Km 5.0 Km 5.0
TO PR-887
PR-860 BEGINS
KM 0.0
b a
PROJECT LIMITS
PR-860 ENDS
KM 0.91
Km 0.91
Km 0.2
Km 0.3
Km 0.4
Km 0.5
Km 0.0
Km 0.1
Km 0.2
Km 0.3
Km 0.4
Km 0.5
Km 0.91
Km
.5
Km 0.6
Km 0.7 Km 0.8 Km 0.9 Km 0.91
Km
.5
Km 0.6
Km 0.7 Km 0.8 Km 0.9
Km 0.2
Km 0.3
Km 0.4
Km 0.5
Km 0.0
Km 0.1
Km 0.2
Km 0.3
Km 0.4
Km 0.5
Km 0.91
Km
.5
Km 0.6
Km 0.7 Km 0.8 Km 0.9 Km 0.91
Km
.5
Km 0.6
Km 0.7 Km 0.8 Km 0.9
PR-874 ENDS
KM 6.73
TO 65 INFANTRY AVE.
TO PASEO DE LOS GIGANTES AVE.
TO
C
AR
O
LI
N
A C
EN
TR
O
TO
P
AS
EO
D E
LO
S
G
IG
AN
TE
S A
VE
PR
O
JE
C
T
LI
M
IT
S
PR
-8
B
EG
IN
S
KM
.0
KM 2.8
b a a b
TO 65 INFANTRY AVE.
KM 5.3
b b a a
Km 1.28
Km 0.2 Km 0.3 Km 0.4 Km 0.5 Km 0.6
Km 0.7
Km 0.8
Km 0.9
Km 1.0 Km 1.1
Km 1.2
Km 1.3
Km 1.3 Km 1.4 Km 1.5 Km 1.6 Km 1.7
.8
Km
.9
Km 1.9
Km 2.0
Km 2.1 Km 2.2 Km 2.3
Km 2.4 Km 2.5
Km 2.6
Km 2.6
Km 2.8
Km 2.9
Km 3.0
Km 3.1
Km 3.2
Km 3.3 Km 3.4
Km 3.5
Km 3.6
Km 3.7
Km 3.8
Km 3.9 Km 4.0
Km 4.1
Km 4.3 Km 4.4
Km 4.5 Km 4.6 Km 4.7
Km 4.8 Km 4.9
Km 5.0 Km 5.1
Km 5.2
Km
.3
Km 5.3
Km 5.4
Km 5.5
Km 5.6
Km 5.7
Km 5.8
Km 5.9
Km 6.0
Km 6.73 Km 6.1 Km 6.2 Km 6.3 Km 6.4 Km 6.5 Km 6.6 Km 6.7
Km 1.28
Km 0.2 Km 0.3 Km 0.4 Km 0.5 Km 0.6 Km 1.28
Km 0.1 Km 0.2 Km 0.3 Km 0.4 Km 0.5 Km 0.6
Km 0.7
Km 0.8
Km 0.9
Km 1.0 Km 1.1
Km 1.2
Km 1.3
Km 0.7
Km 0.8
Km 0.9
Km 1.0 Km 1.1
Km 1.2
Km 1.3
Km 1.3 Km 1.4 Km 1.5 Km 1.6 Km 1.7
.8
Km
.9
Km 1.3 Km 1.4 Km 1.5 Km 1.6 Km 1.7
Km
.8
Km
.9
Km 1.9
Km 2.0
Km 2.1 Km 2.2 Km 2.3
Km 2.4 Km 2.5
Km 2.6
Km 1.9
Km 2.0
Km 2.1 Km 2.2 Km 2.3
Km 2.4 Km 2.5
Km 2.6
Km 2.8
Km 2.9
Km 3.0
Km 3.1
Km 3.2 Km 2.6
Km 2.7
Km 2.8
Km 2.9
Km 3.0
Km 3.1
Km 3.2
Km 3.3 Km 3.4
Km 3.5
Km 3.6
Km 3.7
Km 3.8
Km 3.9 Km 4.0 Km 3.3 Km 3.4
Km 3.5
Km 3.6
Km 3.7
Km 3.8
Km 3.9 Km 4.0
Km 4.1
Km 4.3 Km 4.4
Km 4.5 Km 4.6 Km 4.7Km 4.1
Km 4.2
Km 4.3 Km 4.4
Km 4.5 Km 4.6 Km 4.7
Km 4.8 Km 4.9
Km 5.0 Km 5.1
Km 5.2
Km
.3
Km 4.8 Km 4.9
Km 5.0 Km 5.1
Km 5.2
Km
.3
Km 5.3
Km 5.4
Km 5.5
Km 5.6
Km 5.7
Km 5.8
Km 5.9
Km 6.0 Km 5.3
Km 5.4
Km 5.5
Km 5.6
Km 5.7
Km 5.8
Km 5.9
Km 6.0
Km 6.73 Km 6.1 Km 6.2 Km 6.3 Km 6.4 Km 6.5 Km 6.6 Km 6.7 Km 6.73 Km 6.1 Km 6.2 Km 6.3 Km 6.4 Km 6.5 Km 6.6 Km 6.7
PR-887 BEGINS
KM 0.0
KM 2.7
b a
TO CAROLINA CENTRO
TO 65 INFANTRY AVE.
ba
PROJECT LIMITS
PR-887 ENDS
KM 3.8
TO 65 INFANTRY AVE.
a b
TO CAROLINA CENTRO
KM 2.7
Km 0.1 Km 0.2 Km 0.3 Km 0.4 Km 0.5 Km 0.6
Km 0.7
Km 0.8
Km 0.9 Km 1.0 Km 1.1
Km 1.2
Km 1.3
Km 1.4 Km 1.5 Km 1.6 Km 1.7 Km 1.8 Km 1.9 Km 2.0
Km 2.0
Km 2.1
Km 2.2 Km 2.3 Km 2.4
Km 2.5
Km 2.6
Km 2.7
Km 2.8
Km 2.9
Km 3.0
Km 3.1
Km 3.2 Km 3.3
Km 3.8
Km 3.4 Km 3.5 Km 3.6 Km 3.7
Km 0.1 Km 0.2 Km 0.3 Km 0.4 Km 0.5 Km 0.6
Km 0.0 Km 0.1 Km 0.2 Km 0.3 Km 0.4 Km 0.5 Km 0.6
Km 0.7
Km 0.8
Km 0.9 Km 1.0 Km 1.1
Km 1.2
Km 1.3Km 0.7
Km 0.8
Km 0.9 Km 1.0 Km 1.1
Km 1.2
Km 1.3
Km 1.4 Km 1.5 Km 1.6 Km 1.7 Km 1.8 Km 1.9 Km 2.0Km 1.4 Km 1.5 Km 1.6 Km 1.7 Km 1.8 Km 1.9 Km 2.0
Km 2.0
Km 2.1
Km 2.2 Km 2.3 Km 2.4
Km 2.5
Km 2.6
Km 2.7
Km 2.0
Km 2.1
Km 2.2 Km 2.3 Km 2.4
Km 2.5
Km 2.6
Km 2.7
Km 2.8
Km 2.9
Km 3.0
Km 3.1
Km 3.2 Km 3.3
Km 2.7
Km 2.8
Km 2.9
Km 3.0
Km 3.1
Km 3.2 Km 3.3
Km 3.8
Km 3.4 Km 3.5 Km 3.6 Km 3.7
Km 3.8
Km 3.4 Km 3.5 Km 3.6 Km 3.7
TO PR-181
PR-8887 BEGINS
KM 0.0
KM 1.3
ba
TO PR-860
Km 3.45
Km . 35.8
Km. 0.2
Km. 0.1
Km. 0.3 Km. 0.4
Km. 0.5
Km. 0.6
Km. 0.7 Km. 0.8 Km. 0.9
Km. 1.0
Km. 1.1
Km. 1.2
Km. 1.3
Km. 1.4
Km. 1.5
Km. 1.6
Km. 1.7 Km. 1.8
Km. 1.9
Km. 2.0
Km. 2 .1
Km. 2.2
Km. 2.3
Km. 0.0
Km. 2.4
Km. 2 .5
Km. 2 .6
Km. 2.7
Km. 2.8
Km. 2.9
Km. 3.0
Km. 3.1
Km. 3.2
Km. 3.3
Km. 3.4 a b a
KM 2.8
PROJECT LIMITS
PR-8887 ENDS
KM 3.45
Km. 0.2
Km. 0.1 Km. 0.3
Km. 0.4
Km. 0.5
Km. 0.6
Km. 0.0
Km. 0.6
Km. 0.7 Km. 0.8
Km. 0.9
Km. 1.0
Km. 1.1
Km. 1.2 Km. 1.3
Km. 1.4
Km. 1.5
Km. 1.6 Km. 1.7
Km. 1.8
Km. 1.9
Km. 2.0
Km. 2.1
Km. 2.1
Km. 2.2
Km. 2.3
Km. 2.4 Km. 2.5 Km. 2.6
Km . 2.7
Km . 2.8
Km 3.45
Km. 2.8
Km. 2.9 Km. 3.0
Km. 3.1
Km. 3.2 Km. 3.3
Km. 3.4
Km. 0.2
Km. 0.1 Km. 0.3
Km. 0.4
Km. 0.5
Km. 0.6
Km. 0.0
Km. 0.2
Km. 0.1 Km. 0.3
Km. 0.4
Km. 0.5
Km. 0.6
Km. 0.0
Km. 0.6
Km. 0.7 Km. 0.8
Km. 0.9
Km. 1.0
Km. 1.1
Km. 1.2 Km. 1.3
Km. 0.6
Km. 0.7 Km. 0.8
Km. 0.9
Km. 1.0
Km. 1.1
Km. 1.2 Km. 1.3
Km. 1.4
Km. 1.5
Km. 1.6 Km. 1.7
Km. 1.8
Km. 1.9
Km. 2.0
Km. 2.1
Km. 1.4
Km. 1.5
Km. 1.6 Km. 1.7
Km. 1.8
Km. 1.9
Km. 2.0
Km. 2.1
Km. 2.1
Km. 2.2
Km. 2.3
Km. 2.4 Km. 2.5 Km. 2.6
Km . 2.7
Km . 2.8
Km. 2.1
Km. 2.2
Km. 2.3
Km. 2.4 Km. 2.5 Km. 2.6
Km . 2.7
Km . 2.8
Km 3.45
Km. 2.8
Km. 2.9 Km. 3.0
Km. 3.1
Km. 3.2 Km. 3.3
Km. 3.4 Km 3.45
Km. 2.8
Km. 2.9 Km. 3.0
Km. 3.1
Km. 3.2 Km. 3.3
Km. 3.4
Km 0.37
Km. 35.8
Km. 0.1 Km. 0.2
Km. 0.3
Km 0.37
Km. 35.8
Km. 0.1 Km. 0.2
Km. 0.3
CAMPO RICO AVE. BEGINS
KM 1.45
ba KM 4.1
TO 65 INFANTRY AVE.
TO 435 ST.
Km 1.45
KM 2.7
a b
PROJECT LIMITS
CAMPO RICO AVE. ENDS
KM 6.21
TO 435 ST.
a b
TO 65 INFANTRY AVE.
KM 5.6
Km 6.21 a
3 4
Km 1.45
Km 1.6 Km 1.7
Km 1.8
Km 1.9
Km 2.0
Km 1.45
Km 1.5
Km 1.6 Km 1.7
Km 1.8
Km 1.9
Km 2.0
Km 2.0
Km 2.1
Km 2.2 Km 2.3 Km 2.4 Km 2.5 Km 2.6 Km 2.7
Km 2.0
Km 2.1
Km 2.2 Km 2.3 Km 2.4 Km 2.5 Km 2.6 Km 2.7
Km 2.8 Km 2.9 Km 3.0 Km 3.1 Km 3.2 Km 3.3 Km 3.4
Km 2.8 Km 2.9 Km 3.0 Km 3.1 Km 3.2 Km 3.3 Km 3.4
Km 3.5 Km 3.6 Km 3.7 Km 3.8 Km 3.9
Km 4.0
Km 4.1
Km 4.2
Km 3.5 Km 3.6 Km 3.7 Km 3.8 Km 3.9
Km 4.0
Km 4.1
Km 4.2
Km 4.3 Km 4.4 Km 4.5 Km 4.6 Km 4.7 Km 4.8
Km 4.2 Km 4.3 Km 4.4 Km 4.5 Km 4.6 Km 4.7 Km 4.8
Km 4.9
Km 5.0
Km 5.1
Km 5.2
Km 5.3
Km 5.4 Km 5.5
Km 5.6
Km 4.9
Km 5.0
Km 5.1
Km 5.2
Km 5.3
Km 5.4 Km 5.5
Km 5.6
Km 6.21 Km 5.7 Km 5.8 Km 5.9 Km 6.0 Km 6.1 Km 6.2
Km 6.21 Km 5.7 Km 5.8 Km 5.9 Km 6.0 Km 6.1 Km 6.2
Km 1.45
Km 1.6 Km 1.7
Km 1.8
Km 1.9
Km 2.0
Km 2.0
Km 2.1
Km 2.2 Km 2.3 Km 2.4 Km 2.5 Km 2.6 Km 2.7
Km 2.8 Km 2.9 Km 3.0 Km 3.1 Km 3.2 Km 3.3 Km 3.4
Km 3.5 Km 3.6 Km 3.7 Km 3.8 Km 3.9
Km 4.0
Km 4.1
Km 4.2
Km 4.3 Km 4.4 Km 4.5 Km 4.6 Km 4.7 Km 4.8
Km 4.9
Km 5.0
Km 5.1
Km 5.2
Km 5.3
Km 5.4 Km 5.5
Km 5.6
Km 6.21 Km 5.7 Km 5.8 Km 5.9 Km 6.0 Km 6.1 Km 6.2
ROBERTO CLEMENTE AVE. BEGINS
KM 0.0
ba
KM 1.4
TO 65 INFANTRY AVE.
a b
KM 2.9
PROJECT LIMITS
ROBERTO CLEMENTE AVE. ENDS
KM 4.17
TO CAMPO RICO AVE.
a b Km 4.17
TO PASEO DE LOS GIGANTES AVE.
Km 0.0 Km 0.1 Km 0.2 Km 0.3 Km 0.4 Km 0.5 Km 0.6
Km 0.7 Km 0.8 Km 0.9 Km 1.0 Km 1.1 Km 1.2 Km 1.3
Km 1.4
Km 1.5 Km 1.6 Km 1.7 Km 1.8 Km 1.9
Km 2.1
Km 2.2 Km 2.3
Km 2.4
Km 2.5
Km 2.6
Km 2.7
Km 2.8
Km 2.9
Km 3.0
Km 3.1 Km 3.2
Km 3.3
Km 3.4
Km 3.5
Km 4.17Km 3.6
Km 3.7
Km 3.8 Km 3.9
Km 4.0
Km 4.1
Km 0.0 Km 0.1 Km 0.2 Km 0.3 Km 0.4 Km 0.5 Km 0.6
Km 0.7 Km 0.8 Km 0.9 Km 1.0 Km 1.1 Km 1.2 Km 1.3
Km 1.4
Km 1.5 Km 1.6 Km 1.7 Km 1.8 Km 1.9
Km 2.1
Km 2.2 Km 2.3
Km 2.4
Km 2.5
Km 2.6
Km 2.7
Km 2.8
Km 2.9
Km 3.0
Km 3.1 Km 3.2
Km 3.3
Km 3.4
Km 3.5
Km 4.17Km 3.6
Km 3.7
Km 3.8 Km 3.9
Km 4.0
Km 4.1
PONTEZUELA AVE. BEGINS
KM 0.0
a
PROJECT LIMITS
PONTEZUELA AVE. ENDS
KM 1.1
TO PR-26
TO GALICIA AVE.
b
Km 0.1 Km 0.2 Km 0.3 Km 0.4 Km 0.5
Km 0.0 Km 0.1 Km 0.2 Km 0.3 Km 0.4 Km 0.5
Km 0.6
Km 0.7 Km 0.8 Km 0.9 Km 1.0 Km 1.1
Km 0.6
Km 0.7 Km 0.8 Km 0.9 Km 1.0 Km 1.1
Km 0.1 Km 0.2 Km 0.3 Km 0.4 Km 0.5
Km 0.0 Km 0.1 Km 0.2 Km 0.3 Km 0.4 Km 0.5
Km 0.6
Km 0.7 Km 0.8 Km 0.9 Km 1.0 Km 1.1
Km 0.6
Km 0.7 Km 0.8 Km 0.9 Km 1.0 Km 1.1
SANCHEZ CASTAÑO AVE. BEGINS
KM 0.0
a
PROJECT LIMITS
SANCHEZ CASTAÑO AVE. ENDS
KM 1.98
TO FIDALGO DIAZ AVE.
TO PR-874
KM 1.4
b Km 1.98 a
Km 0.2 Km 0.3 Km 0.4 Km 0.5 Km 0.6
Km 0.0
Km 0.1
Km 0.2 Km 0.3 Km 0.4 Km 0.5 Km 0.6
Km 0.7 Km 0.8 Km 0.9 Km 1.0 Km 1.1 Km 1.2 Km 1.3
Km 0.7 Km 0.8 Km 0.9 Km 1.0 Km 1.1 Km 1.2 Km 1.3
Km 1.98
Km 1.5
Km 1.6
Km 1.7
Km 1.8
Km 1.9
Km 1.98 Km 1.4
Km 1.5
Km 1.6
Km 1.7
Km 1.8
Km 1.9
Km 0.2 Km 0.3 Km 0.4 Km 0.5 Km 0.6
Km 0.0
Km 0.1
Km 0.2 Km 0.3 Km 0.4 Km 0.5 Km 0.6
Km 0.7 Km 0.8 Km 0.9 Km 1.0 Km 1.1 Km 1.2 Km 1.3
Km 0.7 Km 0.8 Km 0.9 Km 1.0 Km 1.1 Km 1.2 Km 1.3
Km 1.98
Km 1.5
Km 1.6
Km 1.7
Km 1.8
Km 1.9
Km 1.98 Km 1.4
Km 1.5
Km 1.6
Km 1.7
Km 1.8
Km 1.9
SANCHEZ OSORIO AVE. BEGINS
KM 0.0
ba
PROJECT LIMITS
SANCHEZ OSORIO AVE. ENDS
KM 2.56
TO FRAGOSO AVE.
TO CAMPO RICO AVE.
KM 1.3
Km 2.56 b a
Km 0.0 Km 0.1 Km 0.2 Km 0.3 Km 0.4 Km 0.5
Km 0.6 Km 0.7 Km 0.8 Km 0.9 Km 1.0 Km 1.1 Km 1.2
Km 1.3
Km 0.6 Km 0.7 Km 0.8 Km 0.9 Km 1.0 Km 1.1 Km 1.2
Km 1.3
Km 1.2
Km 1.4
Km 1.5
Km 1.6
Km 1.7
Km 1.8
Km 1.9
Km 2.0
Km 1.2
Km 1.3
Km 1.4
Km 1.5
Km 1.6
Km 1.7
Km 1.8
Km 1.9
Km 2.0
Km 2.56 Km 2.0
Km 2.1 Km 2.2 Km 2.3 Km 2.4 Km 2.5
Km 2.56 Km 2.0
Km 2.1 Km 2.2 Km 2.3 Km 2.4 Km 2.5
Km 0.6 Km 0.7 Km 0.8 Km 0.9 Km 1.0 Km 1.1 Km 1.2
Km 1.3
Km 0.6 Km 0.7 Km 0.8 Km 0.9 Km 1.0 Km 1.1 Km 1.2
Km 1.3
Km 1.2
Km 1.4
Km 1.5
Km 1.6
Km 1.7
Km 1.8
Km 1.9
Km 2.0
Km 1.2
Km 1.3
Km 1.4
Km 1.5
Km 1.6
Km 1.7
Km 1.8
Km 1.9
Km 2.0
Km 2.56 Km 2.0
Km 2.1 Km 2.2 Km 2.3 Km 2.4 Km 2.5
Km 2.56 Km 2.0
Km 2.1 Km 2.2 Km 2.3 Km 2.4 Km 2.5
TO FIDALGO DIAZ AVE.
PROJECT LIMITS
FRAGOSO AVE. BEGINS
KM 0.0
KM. 0.50
a b
PROJECT LIMITS
FRAGOSO AVE. ENDS
KM 1.01
Km 1.01
AEROPUERTO AVE. BEGINS
KM 0.0
a
PROJECT LIMITS
AEROPUERTO AVE. ENDS
KM 0.95
TO PR-26
TO AIRPORT TERMINALS
b Km 0.95
Km 0.2
Km 0.3
Km 0.4
Km 0.95
Km 0.5 Km 0.6 Km 0.7 Km 0.8
Km 0.9
Km 0.2
Km 0.3
Km 0.4
Km 0.0
Km 0.1
Km 0.2
Km 0.3
Km 0.4
Km 0.95
Km 0.5 Km 0.6 Km 0.7 Km 0.8
Km 0.9
Km 0.95
Km 0.5 Km 0.6 Km 0.7 Km 0.8
Km 0.9
PASEO DE LOS GIGANTES AVE. BEGINS
KM 0.0
ba
KM 1.2
TO PR-26
Km 0.10
KM 2.7
TO PR-874
a b
(2021) Distrib ution Airbus DS
PROJECT LIMITS
PASEO DE LOS GIGANTES AVE. ENDS
KM 3.88
TO PR-874
a b
TO PR-26
Km 3.88
Km 0.10 Km 0.2
Km 0.3 Km 0.4 Km 0.5
Km 0.10 Km 0.2
Km 0.3 Km 0.4 Km 0.5
Km 0.6 Km 0.7 Km 0.8 Km 0.9 Km 1.0 Km 1.1 Km 1.2Km 0.6 Km 0.7 Km 0.8 Km 0.9 Km 1.0 Km 1.1 Km 1.2
Km 1.3 Km 1.4 Km 1.5 Km 1.6 Km 1.7 Km 1.8 Km 1.9Km 1.3 Km 1.4 Km 1.5 Km 1.6 Km 1.7 Km 1.8 Km 1.9
Km 2.0 Km 2.1 Km 2.2 Km 2.3 Km 2.4 Km 2.5 Km 2.6Km 2.0 Km 2.1 Km 2.2 Km 2.3 Km 2.4 Km 2.5 Km 2.6
Km 2.8
Km 2.9
Km 3.0
Km 3.1
Km 3.2
Km 3.3
Km 3.4
Km 2.6
Km 2.7
Km 2.8
Km 2.9
Km 3.0
Km 3.1
Km 3.2
Km 3.3
Km 3.4
Km 3.88
Km 3.5
Km 3.6
Km 3.7
Km 3.8
Km 3.88
Km 3.5
Km 3.6
Km 3.7
Km 3.8
Km 0.10 Km 0.2
Km 0.3 Km 0.4 Km 0.5
Km 0.10 Km 0.2
Km 0.3 Km 0.4 Km 0.5
Km 0.6 Km 0.7 Km 0.8 Km 0.9 Km 1.0 Km 1.1 Km 1.2Km 0.6 Km 0.7 Km 0.8 Km 0.9 Km 1.0 Km 1.1 Km 1.2
Km 1.3 Km 1.4 Km 1.5 Km 1.6 Km 1.7 Km 1.8 Km 1.9Km 1.3 Km 1.4 Km 1.5 Km 1.6 Km 1.7 Km 1.8 Km 1.9
Km 2.0 Km 2.1 Km 2.2 Km 2.3 Km 2.4 Km 2.5 Km 2.6Km 2.0 Km 2.1 Km 2.2 Km 2.3 Km 2.4 Km 2.5 Km 2.6
Km 2.8
Km 2.9
Km 3.0
Km 3.1
Km 3.2
Km 3.3
Km 3.4
Km 2.6
Km 2.7
Km 2.8
Km 2.9
Km 3.0
Km 3.1
Km 3.2
Km 3.3
Km 3.4
Km 3.88
Km 3.5
Km 3.6
Km 3.7
Km 3.8
Km 3.88
Km 3.5
Km 3.6
Km 3.7
Km 3.8
Km 0.64
Km 0.1 Km 0.2 Km 0.3 Km 0.4 Km 0.5 Km 0.6
Km 0.64
Km 0.1 Km 0.2 Km 0.3 Km 0.4 Km 0.5 Km 0.6 Km 0.64
Km 0.0
Km 0.1 Km 0.2 Km 0.3 Km 0.4 Km 0.5 Km 0.6
ITURREGUI AVE. BEGINS
KM 0.4
a
PROJECT LIMITS
ITURREGUI AVE. ENDS
KM 2.73
TO PR-8
TO PR-26
b
Km 2.73 a b
KM 1.5
Km 0.4 Km 0.5 Km 0.6 Km 0.7 Km 0.8
Km 0.9
Km 0.9 Km 1.0 Km 1.1 Km 1.2 Km 1.3 Km 1.4
Km 1.5
Km 1.8
Km 1.9 Km 2.0
Km 2.1
Km 2.2
Km 2.73Km 2.3 Km 2.4 Km 2.5 Km 2.6 Km 2.7
Km 0.4 Km 0.5 Km 0.6 Km 0.7 Km 0.8
Km 0.9
Km 0.4 Km 0.5 Km 0.6 Km 0.7 Km 0.8
Km 0.9
Km 0.9 Km 1.0 Km 1.1 Km 1.2 Km 1.3 Km 1.4
Km 1.5
Km 0.9 Km 1.0 Km 1.1 Km 1.2 Km 1.3 Km 1.4
Km 1.5
Km 1.8
Km 1.9 Km 2.0
Km 2.1
Km 2.2 Km 1.6
Km 1.7
Km 1.8
Km 1.9 Km 2.0
Km 2.1
Km 2.2
Km 2.73Km 2.3 Km 2.4 Km 2.5 Km 2.6 Km 2.7 Km 2.73Km 2.3 Km 2.4 Km 2.5 Km 2.6 Km 2.7
435 STREET BEGINS
KM 0.0
PROJECT LIMITS
435 STREET ENDS
KM 1.4
TO PASEO DE LOS GIGANTES AVE.
TO CAMPO RICO AVE.
a b
KM 0.7
Km 0.2
Km 0.3
Km 0.4
Km 0.5
Km 0.6
Km 0.7
Km 0.7
Km 0.8
Km 0.9 Km 1.0 Km 1.1 Km 1.2 Km 1.3
Km 1.4
Km 0.2
Km 0.3
Km 0.4
Km 0.5
Km 0.6
Km 0.7Km 0.0
Km 0.1
Km 0.2
Km 0.3
Km 0.4
Km 0.5
Km 0.6
Km 0.7
Km 0.7
Km 0.8
Km 0.9 Km 1.0 Km 1.1 Km 1.2 Km 1.3
Km 1.4
Km 0.7
Km 0.8
Km 0.9 Km 1.0 Km 1.1 Km 1.2 Km 1.3
Km 1.4
GALICIA AVE. BEGINS
KM 0.0
PROJECT LIMITS
GALICIA AVE. ENDS
KM 0.91
TO CAMPO RICO AVE.
TO PONTEZUELA AVE.
a b
KM 0.4
Km 0.91
Km 0.0 Km 0.1 Km 0.2 Km 0.3 Km 0.4
Km 0.91Km 0.5 Km 0.6 Km 0.7 Km 0.8 Km 0.9
Km 0.0 Km 0.1 Km 0.2 Km 0.3 Km 0.4
Km 0.91Km 0.5 Km 0.6 Km 0.7 Km 0.8 Km 0.9
Km 3.06
TO FRAGOSO AVE.
TO CAMPO RICO AVE.
PROJECT LIMITS
FIDALGO DIAZ AVE. BEGINS
KM 0.0
KM. 1.5 KM. 2.3
1 2 a b b a
PROJECT LIMITS
FIDALGO DIAZ AVE. ENDS
KM 3.6
Km 0.1 Km 0.2 Km 0.3 Km 0.4 Km 0.5 Km 0.6 Km 0.7
Km 0.7
Km 0.8
Km 0.9
Km 1.0
Km 1.1 Km 1.2
Km 1.3
Km 1.4
Km 1.5
Km 1.8
Km 1.9
Km 2.0 Km 2.1
Km 2.2
Km 2.3
Km 3.06
Km 2.3 Km 2.4
Km 2.5 Km 2.6
Km 2.7 Km 2.8
Km 2.9
Km 3.0
Km 0.1 Km 0.2 Km 0.3 Km 0.4 Km 0.5 Km 0.6 Km 0.7
Km 0.7
Km 0.8
Km 0.9
Km 1.0
Km 1.1 Km 1.2
Km 1.3
Km 1.4
Km 1.5
Km 1.8
Km 1.9
Km 2.0 Km 2.1
Km 2.2
Km 2.3
Km 3.06
Km 2.3 Km 2.4
Km 2.5 Km 2.6
Km 2.7 Km 2.8
Km 2.9
Km 3.0
CALDERON AVE. BEGINS
KM 0.0
a
PROJECT LIMITS
CALDERON AVE. ENDS
KM 1.56
TO PR-874
TO PASEO DE LOS GIGANTES AVE.
KM 0.8
b Km 1.56
Km 0.
Km 0.
Km 0.2
Km 0.3
Km 0.4
Km 0.5
Km 0.6
Km 0.7
Km 0.8
Km 1.56 Km 0.8
Km 0.9
Km 1.0
Km 1.1
Km 1.2
Km 1.3
Km 1.4
Km 1.5
Km 0.
Km 0.
Km 0.2
Km 0.3
Km 0.4
Km 0.5
Km 0.6
Km 0.7
Km 0.8
Km 1.56 Km 0.8
Km 0.9
Km 1.0
Km 1.1
Km 1.2
Km 1.3
Km 1.4
Km 1.5
RIVERA / FDEZ. JUNCOS ST. BEGINS
KM 0.0
PROJECT LIMITS
RIVERA / FDEZ. JUNCOS ST. ENDS
KM 1.28
TO 65 INFANTRY AVE.
TO PR-874
a b
KM 0.7
Km 1.28
Km 0.2
Km 0.3
Km 0.4
Km 0.5
Km 0.6
Km 0.7
Km 1.28Km 0.7
Km 0.8 Km 0.9 Km 1.0 Km 1.1 Km 1.2
Km 0.2
Km 0.3
Km 0.4
Km 0.5
Km 0.6
Km 0.7
Km 1.28Km 0.7
Km 0.8 Km 0.9 Km 1.0 Km 1.1 Km 1.2
Km 0.3
Km 0.3 panelStyle:guide_exp_advance_b.ssipanelName:6panelQuantity:1panelStation:1682panelMaterial:0legendMaterial:0panelMounting:0panelWidthLock:1panelHeightLock:1marginAlign:9panelRoundCorners:0constructPanelMode:0constructPanels:36|24|18panelSizes:panelStandard:2levels:GSCOLORFILL|GSBWFILL|GSOUTLINEversion:2widthRounding:6heightRounding:6panelShape:0panelBorderRadius:12.000chevronTipRadius:12.000chevronShoulderRadius:12.000 panelStyle:guide_exp_advance_b.ssi panelName:3panelQuantity:1panelStation:1683panelMaterial:0legendMaterial:0panelMounting:0panelWidthLock:1panelHeightLock:1marginAlign:9panelRoundCorners:0constructPanelMode:0constructPanels:36|24|18panelSizes:panelStandard:2levels:GSCOLORFILL|GSBWFILL|GSOUTLINE version:2widthRounding:6heightRounding:6panelShape:0panelBorderRadius:12.000chevronTipRadius:12.000chevronShoulderRadius:12.000
NO
PARE
NO
ESTACIONE
panelStyle:guide_con_street name_route shield_2012.ssi panelName:23panelQuantity:1panelStation:1292panelMaterial:0legendMaterial:0panelMounting:0panelWidthLock:1panelHeightLock:1marginAlign:9panelRoundCorners:0constructPanelMode:0constructPanels:36|24|18panelSizes:panelStandard:2levels:GSCOLORFILL|GSBWFILL|GSOUTLINE version:2widthRounding:2heightRounding:6panelShape:0panelBorderRadius:12.000chevronTipRadius:12.000chevronShoulderRadius:12.000
NO
ESTACIONE
PARADA
PESO
MAXIMO
TONS
45 T 55 T
30 T panelStyle:warning.ssipanelName:W12-3panelQuantity:1panelStation:nonepanelMaterial:0legendMaterial:0panelMounting:0panelWidthLock:0panelHeightLock:0marginAlign:9panelRoundCorners:0constructPanelMode:0constructPanels:36|24|18panelSizes:BIKE:18x18,MIN.:24x24,STD.:30x30,EXP.:36x36,SPCL.:48x48panelStandard:2levels:GSCOLORFILL|GSBWFILL|GSOUTLINEversion:2widthRounding:1heightRounding:1panelShape:0panelBorderRadius:12.000chevronTipRadius:12.000chevronShoulderRadius:12.000 panelStyle:r16-2.ssipanelName:namepanelQuantity:1panelStation:nonepanelMaterial:0legendMaterial:2panelMounting:1panelWidthLock:1panelHeightLock:1marginAlign:9panelRoundCorners:0constructPanelMode:0constructPanels:36|24|18panelSizes:panelStandard:2levels:GSCOLORFILL|GSBWFILL|GSOUTLINEversion:2widthRounding:6heightRounding:6panelShape:0panelBorderRadius:12.000chevronTipRadius:12.000chevronShoulderRadius:12.000 panelStyle:regulatory.ssipanelName:namepanelQuantity:1panelStation:nonepanelMaterial:0legendMaterial:2panelMounting:1panelWidthLock:1panelHeightLock:1marginAlign:9panelRoundCorners:0constructPanelMode:0constructPanels:36|24|18panelSizes:panelStandard:2levels:GSCOLORFILL|GSBWFILL|GSOUTLINEversion:2widthRounding:6heightRounding:6panelShape:0panelBorderRadius:12.000chevronTipRadius:12.000chevronShoulderRadius:12.000
PESO
MAXIMO
panelStyle:guide_con_advance street…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .