This document is an Amendment (Number 0004) to a federal solicitation for the Gulf Islands National Seashore project in Mississippi, specifically for the Park Road Reconstruction (Project MS NP GUIS 15(4)). The amendment addresses several key modifications: responding to bidder questions/clarifications, replacing the Solicitation Bid Schedule pages B-1 through B-9, and providing revised plan sheets for B, C, and R sections. The bid opening date of April 8, 2025 at 2:00 p.m. EDT remains unchanged.
The amendment includes detailed responses to 46 contractor questions covering technical specifics such as boardwalk material pricing, helical pile installation procedures, railing system components, potential design modifications, and project execution requirements. Notable clarifications include specifications for timber railing systems, helical pile installation methods, cable handrail configurations, and guidance on structural concrete and timber components. The project involves constructing paved shoulders, boardwalks, culvert replacement, and guardrail work, with multiple contract schedules/options and an estimated total project value between $5-10 million.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Results of Bid Opening - MS NP GUIS 15(4).pdf | ||
| Amendment 0005 - MS NP GUIS 15(4).pdf | ||
| Amendment 0003 - MS NP GUIS 15(4).pdf | ||
| Amendment 0002 - MS NP GUIS 15(4).pdf | ||
| Amendment 0001 - MS NP GUIS 15(4).pdf | ||
| Plans - MS NP GUIS 15(4).pdf | ||
| GUIS 15(4) - Final Geotechnical Report.pdf | ||
| FP14_Eng.pdf | ||
| IFB Solicitation - MS NP GUIS 15(4).pdf | ||
| ADV_Bidders Qualifications Form.doc | DOC document | |
| Categorical Exclusion Form (NEPA).pdf | ||
| MS NP GUIS 15(4)_Culvert Sizing and Scour Protection Design Evaluation and Recommendations Report_FINAL_adv.pdf | ||
| VETS-4212 Form.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
693C7325B000008 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ASHBURN VA 20147
ATTN: Construction
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
ASHBURN VA 20147
ATTN: Acquisitions
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
See Block 1404/02/20250004
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
02/26/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
MS NP GUIS 15(4)
The purpose of this Amendment is to:
1) Respond to bidder questions/clarifications.
2) Replace the Solicitation Bid Schedule pages B-1 through B-9.
3) Provide revised plans sheets (B, C and R sheets).
4) The bid opening date of April 8, 2025 at 2:00 p.m. EDT remains unchanged.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment 0004
Info Page 1 of 6
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0004 Project MS NP GUIS 15(4)
Gulf Islands National Seashore Solicitation: 693C73-25-B-000008
The purpose of this Amendment is to:
1) Respond to bidder questions/clarifications.
2) Replace the Solicitation Bid Schedule pages B-1 through B-9.
3) Provide revised plans sheets (B, C and R sheets).
4) The bid opening date of April 8, 2025 at 2:00 p.m. EDT remains unchanged.
Bidder Questions/Clarifications
Question 1: In regard to the unit price form, the spec does not specifically say what bid item the boardwalk materials are paid under. Specifically, bid items: B0150, B0160, B0170, and B0180. For example, bid item B0160 says “BRIDGE RAILING, TIMBER (BOARDWALK RAILING SYSTEM). The detail on sheet R09 shows the railing system, but what material is paid with bid item B0160. Is it timber top rail, timber spacer rail, the screws that go into the top rail, the 4”x6” timber post, and the stainless-steel cable? Do we put the bolts that attach to the stringers with the RAILING SYSTEM (B0160) or the STRUCTURAL TIMBER (B0180). There needs to be clarification for this part of the unit price sheet; it is very vague what bid item the hardware and timber gets paid under.
Response: For Bid Item B0160 - BRIDGE RAILING, TIMBER (BOARDWALK RAILING SYSTEM), include all items associated with constructing the bridge railing on to the Boardwalk as it would be considered part of the Boardwalk Railing System. Bid Item B0160 will include as mentioned the “timber top rail, timber spacer rail, the screws that go into the top rail, the 4”x6” timber post, and the stainless-steel cable,” and will also include the bolts that attach to stringers as those bolts would be required to install the railing to the boardwalk.
For the Bid Item B0180 STRUCTURAL TIMBER AND LUMBER, TREATED (BOARDWALK SYSTEM), will include all items associated with constructing the boardwalk system outside of the Railing System (bid items B0150 and B0160) and the deck system (bid item B0190).
Question 2: In executing this project, can one superintendent fulfill the supervision, safety, and QAQC roles?
Response: See FP – 14 Section 153, CONTRACTOR QUALITY CONTROL for requirements.
Question 3: Are contractors required to issue a contract specific QA/QC Plan?
Response: See FP – 14 Section 153, CONTRACTOR QUALITY CONTROL for requirements.
Question 4: Are contractors required to issue a contract specific Safety Plan?
Response: See FP-14 Section, Section 107. — LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC, for requirements.
Info Page 2 of 6
Question 5: Is this project tax exempt?
Response: See FP-14 Section, Section 107. — LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC, for requirements.
Question 6: It appears that on a number of the construction notes that there are items indicated that request that detailed design and engineering should be included pre-construction for approval by the owner. And that this project would require significant engineering/design development to bring drawings and layout to a minimum of 95% completion for final design review by the DOT/CO. Should this project be reconsidered as a design/build project effort with appropriate engineering cost added to bring drawings to 100% design completion based upon the number of instances (including RFI questions 6 thru
20) which require that more engineering to be done? This condition is indicative of the next RFI questions following and may not be representative of all of the engineering remaining to be done.
Response: No, this project will not be reconsidered for design/build. All submittals for design will be done through construction submittal process for review and approval by the CO.
Question 7: Regarding the helical pile installation through the ACM, how is the helical pile installed through the ACM?
Response: The contractor is responsible for the means and methods for installing the helical piles and ACM. Recommend installing helical piles before ACM due to helical head diameters.
Question 8: Regarding the helical pile installation through the ACM, can one piece of the mat be removed for installation?
Response: The contractor is responsible for the means and methods for installing the helical piles and ACM. See response to question 7.
Question 9: Regarding the helical pile installation through the ACM, is so what is placed in the space where the mat was previously located?
Response: The contractor is responsible for the means and methods for installing the helical piles and ACM. See response to question 7.
Question 10. Regarding the helical pile installation through the ACM, does the piece need to be cut and replaced? Is so how is it reattached to the existing mat? The term "articulated" in the name ACM indicates that the individual pieces are attached to each other by some mechanical means.
Response: The contractor is responsible for the means and methods for installing the helical piles and AMC. For locations in conflict between helical pile and ACM, a block from the ACM may be removed without damaging the revetment cable as approved by the CO.
Question 11. Regarding the helical pile installation through the ACM, what is the plan if the pile placement is overlapping multiple mat pieces?
Response: The contractor is responsible for the means and methods for installing the helical piles and AMC. See response to questions 7 and 10.
Question 12: Regarding the cable handrail system, how can the cables be tensioned?
Response: See revised R sheets in this amendment.
Question 13: Regarding the cable handrail system, how can the cables be anchored?
Response: Follow manufacturers recommendation.
Info Page 3 of 6
Question 14: Regarding the cable handrail system, how to prevent the first and last handrail post adjacent to the anchor from being pulled out of alignment? Will the double handrail be sufficient to prevent this?
Response: The two-bolt stringer connection and top rail connection is adequate to prevent misalignment.
Question 15: Regarding the cable handrail system, would it be better to redesign the cable system or change it to a wire panel system?
Response: Wire panel system is not approved for this project.
Question 16. Regarding the top rail, it shows the 2x6 and the underlying 2x4 spacer splicing on the same post. Would it be better alternate splice locations by overlapping the splice joint?
Response: Proposed alternating splice for top rail and spacer rail may be acceptable. Contractor will submit shop drawings for this option for approval by the CO.
Question 17: On the "CONCRETE BOARDWALK DETAIL" Bridge Plan Sheet page 13 of 18, Sheet number R13 it shows “5 1/2" dia, helical pile (Typ.)" Despite the fact that this is a typical pipe measurement it is NOT a typical helical pile supplied by the helical pile manufacturers; 4 1/2" and 6" is.
While at least one manufacturer is quoting this on spec but must charge for retooling. Can 4 1/2" or 6" be substituted? This is still going to cause the cost to be well in excess on a million dollars just for the helical piles. Could a redesign of the walk substitute timber piles?
Response: It is the responsibility of the contractor to identify suppliers. The federal government does not endorse suppliers or manufacturers. Alternate design for the helical piles is acceptable, however design calculations will be needed to be provided for any changes for approval by the CO. Timber piles are not approved. All shop drawings and justification for change will need to be submitted for approval by the
CO.
Question 18: On the "CONCRETE BOARDWALK DETAIL" Bridge Plan Sheet page 13 of 18, Sheet number R13 it shows Under "TYPICAL SECTION" it states, "Precast concrete pile connection" Does Not Exist (DNE) If so, please list supplier and item number?
Response: It is the responsibility of the contractor to identify suppliers. The federal government does not endorse suppliers or manufacturers.
Question 19: On the "CONCRETE BOARDWALK DETAIL" Bridge Plan Sheet page 13 of 18, Sheet number R13 it shows Under "TYPICAL SECTION" it states, "Max 8"x10" precast concrete beam (Typ.)" Does Not Exist (DNE) If so, please list supplier and item number?
Response: It is the responsibility of the contractor to identify suppliers. The federal government does not endorse suppliers or manufacturers.
Question 20: On the "CONCRETE BOARDWALK DETAIL" Bridge Plan Sheet page 13 of 18, Sheet number R13 it shows Under "TYPICAL SECTION" it states, "Railing bracket" Even though the plans acknowledge that this bracket DNE; anchoring a wood post to a flat surface by use of a metal bracket, lateral loading would not be advised due to the natural characteristics of wood. (Handrails, by design, are for lateral loading or to prevent harm when lateral loading). The note 5 requires contractor to design, a sufficient design would require a bracket at least 8" tall. It also requires a tension capacity of 50000 lbs., Is that spec for the bracket only? The wood post will never have a tension capacity of 50000 lbs. Would metal posts be an acceptable substitute? If so, please spec.
Response: Please see revised plan sheet R13 where tension capacity for backet has been removed. Metal posts are not approved for this project.
Info Page 4 of 6
Question 21: On the "CONCRETE BOARDWALK DETAIL" Bridge Plan Sheet page 13 of 18, Sheet number R13 it shows under "TIMBER RAIL ELEVATION" "Min 4"x24" precast concrete tread(Typ.)" DNE If so, please list suppliers and item number?
Response: It is the responsibility of the contractor to identify suppliers. The federal government does not endorse suppliers or manufacturers.
Question 22: Speaking with the Micro Surfacing contractors, no one has used tack coat for decades. Can you consider removing the tack coat bid item from the unit price form?
Response: The Tack Coat item is to be used for the asphalt concrete pavement (ACP) patches. It is not necessary for use on top of the existing asphalt concrete pavement roadway, or under the micro surfacing It will remain in the capacity for quantity of the widening work necessary to tie into the existing ACP joints and perimeter of patches. See revised sheets included in this amendment.
Question 23: Addendum 2 addressed the 3 days given to do the Bottomless culvert. Can you consider giving more than 3 days to do this? 3 days is not even possible, given we have to remove the existing culvert, do a dynamic pile test (which will take at least a day), then drive the concrete piles, set up coffer dams, set the pile caps, set the bottomless culvert, and then backfill. Even after that the road will have to be paved. I think it would take 2 weeks minimum.
Response: All work necessary for the closure and opening of the box culvert section of roadway is to be completed in no longer than 72 hours timeframe or the penalties will be assessed. This work will commence once the contractor has completed all work that can be completed prior to the removal of the box culvert while maintaining access to the neighborhood for the residents.
Question 24: Do the Superintendent, SSHO and QC Manager need to be 3 separate individuals?
Response: See FP – 14 Section 153, CONTRACTOR QUALITY CONTROL for requirements.
Question 25: Can the period of performance be extended after award once the material/equipment lead times are confirmed due to helical head diameters?
Response: Period of performance may not change. Contract time may be extended with fair and reasonable justification to the awarded contractor. No changes will be made during advertisement.
Question 26: Please provide bidding quantities for the deteriorated base course.
Response: See B and C sheets for approximate quantities for this item.
Question 27: Please provide the site visit registration list.
Response: There is no site visit registration list. Contractors can visit the site following the information provided in the advertisement documents.
Question 28: Is there a bulk water fill i.e. a hydrant or water source we can pump from for grading operations in proximity?
Response: Contractor is responsible to provide water according to Special Contract Requirements 637.
Question 29: Does this project require phasing? If so....(estimator needs to add to question).
Response: Construction sequencing is the responsibility of the contractor. Traffic control phasing has been included in the Plans.
Question 30: Where will the field office be located?
Response: See Special Contract Requirements Section 637 for location.
Info Page 5 of 6
Question 31: Is power available nearby?
Response: Contractor is responsible to provide power according to Special Contract Requirements Section 637.
Question 32. Can we shut down roadway access or do we need to maintain one lane for travel?
Response: See plans and Special Contract Requirements Section 156 for roadway closures.
Question 33: What are the limitations for construction intervals (for proposed road work)?
Response: See Special Contract Requirements Sections 108 and 156 for construction limitations and restrictions.
Question 34: On p.7 table 5 Geotech, it lists a different load for the alligator pond boardwalk. We did not notice these loads in any of the plans, which load is the correct load? Are we to use the loads called out on the structural plans of 11kips and 4kips?
Response: Table 5 of the Geotechnical Report presents the estimated axial resistance from the soil to install the helical piles at 30-foot and 50-foot depths, The estimated resistance will be verified on the field. The structural plans calling for 11 kips axial and 4 kips lateral come from the structural loads calculated from AASHTO LRFD for the helical .
Question 35: Upon review it is unclear as to how many piles are 30' deep vs. 50' deep. Please clarify pile count for 30' depth and 50' depth.
Response: See the revised R sheets in this amendment.
Question 36: How many are to have timber connections vs concrete connections?
Response: Concrete connections will need be present at all abutments and the 4 piles at the concrete boardwalk section. The remainder are timber connections.
Question 37: What direction are the lateral loads?
Response: Lateral loads are acting transverse to the boardwalk.
Question 38: What are the helical pile quantities?
Response: See bid item A0440. See revised sheets in this amendment.
Question 39: Are CAD files available? If so, please provide.
Response: MicroStation files are available and will be provided at the time of award.
Question 40: Please provide the limits of schedule A & B. The map on plan page A04 calls out both schedules on the same section of road.
Response: See plan sheet A01 for stations for each schedule.
Question 41: Please clarify what is to be priced for Schedule C line 63405-2890 PAVEMENT MARKINGS, TYPE H (184 EACH). There is no designation on the plans or specs calling out what these symbols will be (assuming they are symbols).
Response: See the updated C sheets in this amendment.
Question 42: I noticed there is a spec section for the cellular confinement system; however, what product needs to be used?
Response: See C sheets for stations and S sheet for design.
Info Page 6 of 6
Question 43: The boardwalk sections on sheet R13 show that a ½” diameter stainless steel cable is required for the boardwalk. Talking to suppliers, a ½ diameter cable is completely overkill for this system and many of them do not even sell that. Is there a possibility that the size the be reduced to 3/16” or 5/16” diameter?
Response: Change for stainless steel cable to have 5/16-inch diameter or 3/8-inch diameter is accepted.
Question 44: Is a design required for the piles and pile cap beneath the bottomless culvert? If so, where should we include said design pricing within the pricing schedule?
Response: Please see Sheet R01 Scope of Work Schedule A and SCR Subsections 551.01 and 552.01.
Pricing for design to be considered part of pay item associated with work. A0380 / 55101-0800 for piles and A0400 / 55210-0000 for Pile Caps.
Question 45: Per amendment 1 the updated Utility Plans state "For information only constructed by others". Is this scope of work to be included in our proposal?
Response: No, this work will be completed by other.
Question 46: Will you consider another extension once RFI responses are issued to allow time for contractors to review?
Response: No.
B - 1
Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount
A0100 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
A0110 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
A0120 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
A0130 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
A0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
675 LNFT $____________ $____________
A0150 15705-1800 SOIL EROSION CONTROL, TEMPORARY DIVERSION BERM
205 LNFT $____________ $____________
A0160 15706-0200 SOIL EROSION CONTROL, CHECK DAM
3 EACH $____________ $____________
A0170 15706-2200 SOIL EROSION CONTROL, FILTER BAG
1 EACH $____________ $____________
A0180 15720-0000 STORM WATER POLLUTION PREVENTION PLAN
ALL LPSM $___LPSM_____ $____________
A0190 20101-0000 CLEARING AND GRUBBING
1.40 ACRE $____________ $____________
A0200 20301-1100 REMOVAL OF GATE
1 EACH $____________ $____________
A0210 20301-1400 REMOVAL OF INLET
1 EACH $____________ $____________
A0220 20301-2400 REMOVAL OF SIGN
2 EACH $____________ $____________
A0230 20302-1400 REMOVAL OF GUARDRAIL, TIMBER
305 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:MS NP GUIS 15(4)
Project Name:Construction of paved shoulders, boardwalks, and replacement of the culvert at Park Road
B - 2
A0240 20302-2100 REMOVAL OF PIPE CULVERT
55 LNFT $____________ $____________
A0250 20302-2600 REMOVAL OF PAVEMENT MARKINGS
10,900 LNFT $____________ $____________
A0260 20401-0000 ROADWAY EXCAVATION
2,050 CUYD $____________ $____________
A0270 20425-1000 DITCH, EXCAVATION
105 LNFT $____________ $____________
A0280 20435-1000 BACKFILL, SELECT GRANULAR (#57 STONE)
130 CUYD $____________ $____________
A0290 20701-1000 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 2, TYPE E
1,290 SQYD $____________ $____________
A0300 20801-0000 STRUCTURE EXCAVATION (BOTTOMLESS CULVERT EXCAVATION)
655 CUYD $____________ $____________
A0310 20803-0000 STRUCTURAL BACKFILL (BOTTOMLESS CULVERT BACKFILL)
175 CUYD $____________ $____________
A0320 20815-0000 COFFERDAMS
ALL LPSM $___LPSM_____ $____________
A0330 25306-1000 REVETMENT MAT, ARTICULATED CONCRETE BLOCK (BOTTOMLESS
CULVERT)
615 SQYD $____________ $____________
A0340 30101-4000 AGGREGATE BASE GRADING C OR D
1,200 TON $____________ $____________
A0350 40101-0200 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/8-INCH NOMINAL
MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL (TYPE IV PAVEMENT
ROUGHNESS, PG 67-22 OR PG 70-22)
665 TON $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:MS NP GUIS 15(4)
Project Name:Construction of paved shoulders, boardwalks, and replacement of the culvert at Park Road
B - 3
A0360 40901-2000 MICRO SURFACING, TYPE 2
9,840 SQYD $____________ $____________
0004 A0370 41202-0000 TACK COAT
255 GAL $____________ $____________
A0380 55101-0800 PRECAST PRESTRESSED CONCRETE PILE, 18-INCH X 18-INCH, IN PLACE
(BOTTOMLESS CULVERT)
990 LNFT $____________ $____________
A0390 55104-1000 DYNAMIC PILE LOAD TEST (BOX CULVERT)
2 EACH $____________ $____________
A0400 55210-0000 PRECAST STRUCTURAL CONCRETE (PILE CAPS)
45 CUYD $____________ $____________
A0410 55210-0000 PRECAST STRUCTURAL CONCRETE (WINGWALLS)
25 CUYD $____________ $____________
A0420 55601-1400 BRIDGE RAILING, TIMBER, STEEL-BACKED (TUBULAR STEEL-BACKED
TIMBER RAILING)
45 LNFT $____________ $____________
A0430 55901-0000 MEMBRANE WATERPROOFING (BOX CULVERT)
105 SQYD $____________ $____________
A0440 58201-0000 HELICAL PILE, IN PLACE (BOARDWALKS)
14,300 LNFT $____________ $____________
A0450 60201-0600 18-INCH PIPE CULVERT
10 LNFT $____________ $____________
A0460 60220-0000 PRECAST REINFORCED CONCRETE BOX CULVERT (20-FOOT SPAN X
10-FOOT RISE (BOTTOMLESS))
34 LNFT $____________ $____________
A0470 60403-1400 INLET, FLH TYPE 5B
1 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:MS NP GUIS 15(4)
Project Name:Construction of paved shoulders, boardwalks, and replacement of the culvert at Park Road
B - 4
A0480 61108-4000 ADJUST VALVE BOX
1 EACH $____________ $____________
0004 A0490 61113-0100 WATER SYSTEM, UTILITY COMPANY COMPENSATION
ALL CTSM $___CTSM_____ $150,000.00
0004 A0500 61210-0000 SANITARY SEWER SYSTEM, UTILITY COMPANY COMPENSATION
ALL CTSM $___CTSM_____ $150,000.00
A0510 61701-4000 GUARDRAIL SYSTEM SBTB
215 LNFT $____________ $____________
A0520 61702-1400 TERMINAL SECTION, TYPE SBT TANGENT (TL-2)
4 EACH $____________ $____________
A0530 61707-2000 STRUCTURE TRANSITION RAILING, SBT SYSTEM
125 LNFT $____________ $____________
A0540 61902-0900 GATE, METAL
1 EACH $____________ $____________
A0550 62303-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES (ARCHEALOGICAL
MONITORING)
ALL LPSM $___LPSM_____ $____________
A0560 62403-0000 FURNISHING AND PLACING TOPSOIL
245 CUYD $____________ $____________
A0570 62501-0000 TURF ESTABLISHMENT
0.63 ACRE $____________ $____________
A0580 62901-0800 ROLLED EROSION CONTROL PRODUCT, TYPE 2.D
3,250 SQYD $____________ $____________
A0590 63304-0900 SIGNS, ALUMINUM PANELS, TYPE 3 SHEETING
85 SQFT $____________ $____________
A0600 63312-0000 SPEED HUMP
1 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:MS NP GUIS 15(4)
Project Name:Construction of paved shoulders, boardwalks, and replacement of the culvert at Park Road
B - 5
A0610 63316-1000 REMOVE AND RESET SIGN
11 EACH $____________ $____________
A0620 63401-1500 PAVEMENT MARKINGS, TYPE H, SOLID
11,200 LNFT $____________ $____________
A0630 63403-0800 PAVEMENT MARKINGS, TYPE H
80 SQFT $____________ $____________
0004 A0640 63501-0000 TEMPORARY TRAFFIC CONTROL
ALL LPSM $___LPSM_____ $____________
A0650 63602-2000 SYSTEM INSTALLATION, LIGHTING (RRFB, SOLAR-POWERED)
4 EACH $____________ $____________
A0660 63701-0000 FIELD OFFICE
1 EACH $____________ $____________
A0670 64620-0000 REMOVE AND RESET (KEY PAD)
1 EACH $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:MS NP GUIS 15(4)
Project Name:Construction of paved shoulders, boardwalks, and replacement of the culvert at Park Road
B - 6
B0100 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
B0110 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
B0120 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
B0130 55201-0800 STRUCTURAL CONCRETE, CLASS D (AE) (BOARDWALK ABUTMENTS)
3 CUYD $____________ $____________
B0140 55210-0000 PRECAST STRUCTURAL CONCRETE (CONCRETE BOARDWALK SYSTEM)
5 CUYD $____________ $____________
B0150 55601-1300 BRIDGE RAILING, TIMBER (BOARDWALK CURB SYSTEM)
750 LNFT $____________ $____________
B0160 55601-1300 BRIDGE RAILING, TIMBER (BOARDWALK RAILING SYSTEM)
1,760 LNFT $____________ $____________
B0170 55601-1300 BRIDGE RAILING, TIMBER (BOARDWALK RAILING ON CONCRETE SYSTEM)
40 LNFT $____________ $____________
B0180 55701-2000 STRUCTURAL TIMBER AND LUMBER, TREATED (BOARDWALK SYSTEMS)
21 MFBM $____________ $____________
B0190 57705-0100 FIBER REINFORCED POLYMER (FRP), DECK PANEL, 3-INCHES - 5-INCHES
THICKNESS (1-INCH THICKNESS DECK PANELS)
7,530 SQFT $____________ $____________
B0200 62303-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES (ARCHEALOGICAL
MONITORING)
ALL LPSM $___LPSM_____ $____________
B0210 63301-0000 SIGN SYSTEM (WAYSIDE INTERPRETIVE SIGN)
1 EACH $____________ $____________
Bid Schedule Schedule:B Schedule Type:Options
Project No:MS NP GUIS 15(4)
Project Name:Construction of paved shoulders, boardwalks, and replacement of the culvert at Park Road
B - 7
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:B Schedule Type:Options
Project No:MS NP GUIS 15(4)
Project Name:Construction of paved shoulders, boardwalks, and replacement of the culvert at Park Road
B - 8
C0100 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
C0110 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
0004 C0120 20302-2600 REMOVAL OF PAVEMENT MARKINGS
48,000 LNFT $____________ $____________
0004 C0130 40901-2000 MICRO SURFACING, TYPE 2
35,000 SQYD $____________ $____________
C0140 41401-2000 CRACKS, CLEANING AND SEALING
575 LNFT $____________ $____________
C0150 41801-1000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1
25 SQYD $____________ $____________
C0160 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2
20 SQYD $____________ $____________
C0170 62903-0000 CELLULAR CONFINEMENT SYSTEM
3,420 SQYD $____________ $____________
C0180 63401-1500 PAVEMENT MARKINGS, TYPE H, SOLID
48,000 LNFT $____________ $____________
0004 C0185 63403-0800 PAVEMENT MARKINGS, TYPE H
155 SQFT $____________ $____________
0004 C0190 63405-2890 PAVEMENT MARKINGS, TYPE H
184 EACH $____________ $____________
0004 C0200 63501-0000 TEMPORARY TRAFFIC CONTROL
ALL LPSM $___LPSM_____ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:C Schedule Type:Options
Project No:MS NP GUIS 15(4)
Project Name:Construction of paved shoulders, boardwalks, and replacement of the culvert at Park Road
B - 9
BID SUMMARY
Project MS NP GUIS 15(4)
(1) Schedule A (Base Contract) Bid Total (from Page B-5) = (1) $
(2) Schedule B (Government Option 1) Bid Total (from Page B-7) = (2) $
(3) Schedule C (Government Option 2) Bid Total (from Page 8) = (3) $
Total Price of Project (for evaluation purposes only)
EVALUATION TOTAL PRICE OF PROJECT = (1) + (2) + (3) $
Maximum Time Allowed for the Contract if Schedules A, B, and C are Awarded at the Same
Time:
If the Government awards the contract as Schedules A + B + C, the performance period to complete all contract work will be 759 calendar days.
Maximum Time Allowed for Each Schedule of Work if Awarded Separately:
If the Government awards the contract as Schedule A only, the performance period to complete all
Schedule A work will be 333 calendar days and will start on the effective date of Schedule A’s Notice to Proceed.
If Schedule B (Government Option 1) is exercised after the award of the original contract, the performance period to complete all Schedule B work will be 367 calendar days and will start on the effective date of Schedule B’s Notice to Proceed.
If Schedule C (Government Option 2) is exercised after the award of the original contract, the performance period to complete all Schedule C work will be 59 calendar days and will start on the effective date of Schedule C’s Notice to Proceed.
1V:3H
5'
Existing ground
6" depth, Aggregate base, grading C or D
Travel lane structure pavement
Existing
Shoulder
11' or e 2%
10" depth, Roadway excavation
1' pavement existing
Saw cut excavation
Roadway
2" depth, Embankment construction control product, Type 2.D, and establish turf
Place topsoil, 3" depth, rolled erosion
See Cut and Fill Location Table
Park Road Typical Section - 5' Shoulder with Fill Slope
Limit of construction
PG 67-22 or 70-22)
0.3 To <3 million ESAL's (Type IV pavement roughness, 2" depth, ACP, Gyratory mix, ⅜" NMSA, Existing profile grade line Tack coat
0.3 To <3 million ESAL's
2" depth, ACP, Gyratory mix, ⅜" NMSA, LC
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 1 of 6
GULF ISLANDS NATIONAL SEASHORE
4 3/31/25BDPAMD #4 - Removed micro surfacing typical from sheet.
4AMENDMENT NO. 4
:1
P M
M a rc h
B
P R
O J E
C T
S \g u is
\1
(4
H W
Y
D E
S \C
A D
D \B
-B
-G
U
IS
(4 ty p
.d g n
TYPICAL SECTIONS
NO SCALE
PROJECT
NUMBER
SHEET
B01
NPS Drwg No. 635/186839 PMIS No. 237156
MS NP GUIS 15(4)
SCHEDULE A
U.S. DEPARTMENT OF TRANSPORTATION GULF ISLANDS NATIONAL SEASHORE
4 3/31/25 BDP AMD #4 - Deleted pay items 61113-0100 and 61210-0000.
AMD #4 - Revised quantity for pay item 41202-0000.3/31/25 BDP4
4AMENDMENT NO.4
:0
A p r il
T
A B
O F
Q U
A N
T S
C H
A S
H E
E T
M O
D E
L
P R
O J E
C T
S \g u is
\1 (4
H
W Y
D
E S
\C A
D D
\C -C
-G
U
IS
(4
Q n ty
.d g n
TABULATION OF QUANTITIES
PROJECT
C01
SCHEDULE B
U.S. DEPARTMENT OF TRANSPORTATION GULF ISLANDS NATIONAL SEASHORE
SCHEDULE C
3/31/25 BDP AMD#4 - Adjusted pay item 40901-2000 quantity.
3/31/25 BDP
with 63403-0800.
AMD#4 - Removed pay item 63405-2890 and replaced
AMENDMENT NO. 4
:0 p r il
T
A B
O F
Q U
A N
T S
C H
B S
H E
E T
M O
D E
L
P R
O J E
C T
S \g u is
\1 (4
H
W Y
D
E S
\C A
D D
\C -C
-G
U
IS
(4
Q n ty
.d g n
TABULATION OF QUANTITIES
PROJECT
C02
U.S. DEPARTMENT OF TRANSPORTATION GULF ISLANDS NATIONAL SEASHORE
:5
N o v e m b e r
B a s e .B
.U S
C
E n g in e e r in g
S o f tw a r e \O p e n
R o a d s D e s ig n e r C
E
.1
\C o n f ig u r a ti o n
\O r g a n iz a ti o n
C iv il
\F L
H
S td s W
S
.1
.2
.0
V
\C e ll
\F L
H C e ll s .c e l
SCHEDULES AND SUMMARIES
PROJECT
C05
MS NP GUIS 15(4)
3/31/25 BDP AMD #4 - Updated pay item and quantities.
AMENDMENT NO. 4
U.S. DEPARTMENT OF TRANSPORTATION GULF ISLANDS NATIONAL SEASHORE
:5
N o v e m b e r
B a s e .B
.U S
C
E n g in e e r in g
S o f tw a r e \O p e n
R o a d s D e s ig n e r C
E
.1
\C o n f ig u r a ti o n
\O r g a n iz a ti o n
C iv il
\F L
H
S td s W
S
.1
.2
.0
V
\C e ll
\F L
H C e ll s .c e l
SCHEDULES AND SUMMARIES
PROJECT
C08
MS NP GUIS 15(4)
Section 629 and as directed by the CO.
Install cellular confinement system according to 4.
Devices" (MUTCD), latest edition.
on Uniform Traffic Control accordance with the "Manual
Construct and erect all signs in3.
directed by the CO.
Adjust actual locations of signs as2.
Details E633-01 & E633-03.
Install signs post supports according to1.
NOTES:
3/31/25 BDP AMD #4 - Revised quantity.
AMENDMENT NO. 4
3/31/25 BDP
with 63403-0800.
AMD #4 - Removed pay item 63405-2890 and replaced
R09
/2
/2
M
P R
O J E
C T
S \g u is
\1 (4
B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \1
\0 P
R O
J E
C T
S .d g n
NO. DATE BY REVISIONS NO. DATE BY REVISIONS
Notes:
CL
(Typ.) (See Note 2 - Note 4) dia. helical pile "2
TYPICAL SECTION
RAILING SECTION DETAIL - 1
TIMBER BOARDWALK -
As shown
Scale: 1" = 1'-0"
" = 1'-0"4 3Scale:
rail (Typ.)
2" x 6" Timber top
TIMBER RAIL ELEVATION
R
G U
IS
(4
T
IM
B
E R
B W
R a il in g
D
T S
.D G
N A
C T
U A
L F
IL
E
: 4.
3.
2.
1.
D1.5 when applicable.
Weld according to current AASHTO/AWS, Bridge Welding Code hurricane ties.
hurricane ties interfere with helical piles, do not install accordance with manufacturer's recommendation. Where
Attach stringer to header with stainless steel hurricane ties, in helical pile corrosion for 50 year service life.
corrosion. Provide enough sacrifical zinc anodes to prevent
Install sacrifical zinc anodes on helical piles to protect from correlations. See Geotechnical Report for details.
Verify each helical pile capacity using the installation torque length.
RAILING SECTION DETAIL - 2" sheet for estimated helical pile and a lateral load of 4.1 kips. See "TIMBER BOARDWALK -inches. Install helical piles to resist an axial load of 11.0 kips
Grade 75 and maintain a minimum wall thickness of 0.361-
Provide hot dip galvanized helical piles according to ASTM A123 prior to construction.
helical piles, and aluminum interpretive sign for CO approval
Submit drawings of boardwalk, boardwalk railing, abutments, top rail (Typ.)
2" x 6" Timber post (Typ.)
4" x 6" Timber spacer board (Typ.)
3" x 12" x 18" Timber stringer (Typ.)
3" x 12" Timber split pile cap (Typ.)
x 12" Timber"(2) 3
(See Note 10) polymer (FRP) decking
1" Fiber reinforced
(Typ.)
spacer board (Typ.)
3" x 12" x 18" Timber recommendation.
Tension stainless steel cable using turntables or manufacturers adjustable post chair.
Provide spacer board as needed to secure stringer to manufacturers recommendation and approved by the CO.
Install stainless steel adjustable post chair in accordance to recommendation.
Install and fasten FRP decking according to manufacturers is over land as approved by the CO.
Install geocomposite sheet drain at locations where boardwalk
Install geocomposite sheet drain to the underside of FRP deck.
-inch beyond end of nut. Typical for all locations. 2 Extend bolts dome head, 3-inch diameter washer and hex nut.
inch diameter -4
-inch diameter timber dock bolts with 28
Use
6.
7.
(Typ.)
(See Note 5)
Hurricane tie
(See Note 5)
Hurricane tie spacer rail (Typ.)
2" x 4" Timber cable (Typ.)
" Ø Stainless steel2 spacer rail (Typ.)
2" x 6" Timber pile cap (Typ.)
x 12" Split "(2) 3
CL
(See Note 2 - Note 4) dia. helical pile (Typ.)"2
CL Rail post (Typ.)
cable (Typ.)
" Ø Stainless steel2 post (Typ.)
4" x 6" Timber
ABUTMENT DETAIL
Scale: 1" = 1'-0"
1" FRP decking stringer (Typ.)
3" x 12" Timber
See Note 7
5.
CONNECTION" detail
See "TOP RAIL SPLICE
CONNECTION DETAIL"
See "TOP RAIL
SECTION A-A
No Scale
SECTION B-B
No Scale
TOP RAIL CONNECTION DETAIL
Scale: 3" = 1'-0"
TOP RAIL SPLICE CONNECTION
No Scale
Top Rail
2" X 6" Timber top rail
2" X 6" Timber spacer rail
2" X 4" Timber spacer rail
2" X 4" Timber
" Stainless steel lag bolt8 post
4" X 6" Timber
" Stainless steel lag bolt8
Top Rail
2" X 6" Timber
Top Rail
2" X 6" Timber post
4" X 6" Timber post
4" X 6" Timber
AA
BB
" Stainless steel lag bolt8 drain (See Note 9)
Geocomposite sheet
8.
9.
10.
(See Note 11)
Adjustable post chair
11.
(See Note 11)
Spacer board
1 3/27/25 BC
12.
Notes revision
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
186839
237156 MS MS NP GUIS 15(4)
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
BC BC
DRAWN BY
Carlos Pena-MarshNR of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-133418
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
GULF ISLANDS NATIONAL SEASHORE
PARK ROAD RECONSTRUCTION
April 2025
6'-0"
4'-0" O.C. Max.
10'-0" O.C. Max.
4'-6"
"8
1'-5
9"9"
O
.C
M a x
M a x
T y p
M in
"2
1'-0"
"8
1"8
1"8
1"8
"2
"4
2"4
"2
5'-8"
R10
/2
/2
M
P R
O J E
C T
S \g u is
\1 (4
B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \1
\0 P
R O
J E
C T
S .d
(Typ.) (See Note 2 - Note 4) dia. helical pile "2
TYPICAL SECTION
RAILING SECTION DETAIL -2
TIMBER BOARDWALK -
As shown
Scale: 1" = 1'-0"
" = 1'-0"4 3Scale:
rail (Typ.)
2" x 6" Timber top
TIMBER RAIL ELEVATION
R G
U
IS
(4
T
IM
B
E R
B W
R a il in g D
T S
W S
IG
N
.D G
N A
C T
U A
L F
IL
E
3.
2.
1.
D1.5 when applicable.
Weld according to current AASHTO/AWS, Bridge Welding Code hurricane ties.
hurricane ties interfere with helical piles, do not install accordance with manufacturer's recommendation. Where
Attach stringer to header with stainless steel hurricane ties, in helical pile corrosion for 50 year service life.
corrosion. Provide enough sacrifical zinc anodes to prevent
Install sacrifical zinc anodes on helical piles to protect from correlations. See Geotechnical Report for details.
Verify each helical pile capacity using the installation torque helical pile lengths.
and a lateral load of 4.1 kips. See table below for estimated inches. Install helical piles to resist an axial load of 11.0 kips
Grade 75 and maintain a minimum wall thickness of 0.361-
Provide hot dip galvanized helical piles according to ASTM A123 prior to construction.
helical piles, and aluminum interpretive sign for CO approval
Submit drawings of boardwalk, boardwalk railing, abutments, top rail (Typ.)
2" x 6" Timber post (Typ.)
4" x 6" Timber spacer board (Typ.)
3" x 12" x 18" Timber stringer (Typ.)
3" x 12" Timber split pile cap (Typ.)
x 12" Timber"(2) 3
(See Note 11) polymer (FRP) decking
1" Fiber reinforced
(Typ.)
spacer board (Typ.)
3" x 12" x 18" Timber recommendation.
Tension stainless steel cable using turnbuckles or manufacturers recommendation.
Install and fasten FRP decking according to manufacturers is over land as approved by the CO.
Install geocomposite sheet drain at locations where broadwalk
Install geocomposite sheet drain to the underside of FRP deck.
recommendation as approved by the CO.
interpretive sign according to the manufacturer's design, location, and connection to boardwalk. Install
Coordinate with CO and NPS on aluminum interpretive sign
-inch beyond end of nut. Typical for all locations. 2 Extend bolts dome head, 3-inch diameter washer and hex nut.
inch diameter -4
-inch diameter timber dock bolts with 28
Use
6.
8.
(Typ.)
(See Note 5)
Hurricane tie
(See Note 5)
Hurricane tie spacer rail (Typ.)
2" x 4" Timber cable (Typ.)
" Ø Stainless steel2
(See Note 9)
Interpretive sign pile cap (Typ.)
x 12" Split "(2) 3
CL
(See Note 2 - Note 4) dia. helical pile (Typ.)"2
CL Rail post (Typ.)
cable (Typ.)
" Ø Stainless steel2 post (Typ.)
4" x 6" Timber
See Note 7 4.
9.
Interpretive sign
INTERPRETIVE SIGN DETAIL
Scale: 1" = 1'-0"
Base plate
"2 8" x 8" x
7.
Boardwalk Name Begin Station End Station Pile Length
Estimated Helical
Northbound Boardwalk
30 feet
4004+83.09 4005+89.39
50 feet
Southbound Boardwalk
Northbound Boardwalk
Alligator Pond Boardwalk 6100+11.17 6101+71.38
4006+09.39 4008+10.25
4004+83.094004+32.13
4000+19.27 4002+82.13
5000+18.03
5002+93.52 5003+36.78
5000+70.14
Timber Boardwalk Railing Section - Helical Pile Length drain (See Note 10)
Geocomposite sheet
10.
5.
11.
Southbound Boardwalk
Southbound Boardwalk
Southbound Boardwalk
3/27/252
1 3/27/25 BC
BC
Revised table
Notes revision
12.
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
186839
237156 MS MS NP GUIS 15(4)
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
BC BC
DRAWN BY
Carlos Pena-MarshNR of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-133418
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
GULF ISLANDS NATIONAL SEASHORE
PARK ROAD RECONSTRUCTION
April 2025
6'-0"
4'-0" O.C. Max.
10'-0" O.C. Max.
4'-6"
"8
1'-5
9"9"
O
.C
M a x
M a x T y p
M in
5'-0"
± 3'-4"
30°
R11
/2
/2
M
P R
O J E
C T
S \g u is
\1 (4
B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \1
\0 P
R O
J E
C T
S .d
(Typ.) (See Note 3 - Note 5) dia. helical pile "2
TYPICAL SECTION
CURB SECTION DETAIL
TIMBER BOARDWALK -
As shown
Scale: 1" = 1'-0"
" = 1'-0"4 3Scale:
TIMBER RAIL ELEVATION
R
G U
IS
(4
T
IM
B
E R
B W
C u rb
D T
S .D
G N
A C
T U
A L
F
IL
E
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
Do not place curb splice at centerline of pile bends.
D1.5 when applicable.
Weld according to current AASHTO/AWS, Bridge Welding Code hurricane tie.
hurricane ties interfere with helical piles, do not install accordance with manufacturer's recommendation. Where
Attach stringer to header with stainless steel hurricane ties, in helical pile corrosion for 50 year service life.
corrosion. Provide enough sacrifical zinc anodes to prevent
Install sacrifical zinc anodes on helical piles to protect from correlations. See Geotechnical Report for details.
Verify each helical pile capacity using the installation torque helical pile lengths.
and a lateral load of 4.1 kips. See table below for estimated inches. Install helical piles to resist an axial load of 11.0 kips
Grade 75 and maintain a minimum wall thickness of 0.361-
Provide hot dip galvanized helical piles according to ASTM A123 and helical piles for CO approval prior to construction.
Submit drawings of boardwalk, boardwalk curb, abutments, approved by the CO.
30 inches maximum above existing ground elevation as
Construct curb boardwalk section with top of deck elevation at
(Typ.)
CL Structure
CL
(See Note 3 - Note 5) dia. helical pile (Typ.)"2 split pile cap (Typ.)
(2) 3" x 12" Timber stringer (Typ.)
3" x 12" Timber curb (Typ.)
4" x 4" Timber post (Typ.)
2" x 4" x 24" Timber
(See Note 11) polymer (FRP) decking
1" Fiber reinforced elevation Existing ground
CURB CONNECTION DETAIL
" = 1'-0"2
1Scale:
CURB SPLICE CONNECTION DETAIL
" = 1'-0"2
1Scale:
curb (Typ.)
4" X 4" Timber
Timber post
2" x 4" x 24" curb (Typ.)
4" X 4" Timber dome head, 3-inch diameter washer and hex nut.
inch diameter-4
-inch diameter timber dock bolts with 28 se U
(Typ.)
bolt (See Note 9)
" Ø Timber dock8
(Typ.)
(See Note 6)
Hurricane tie curb retainer (Typ.)
2" x 4" x 24" Timber
(Typ.)
bolt (See Note 9)
" Ø Timber dock8
Boardwalk Name Begin Station End Station Pile Length
Estimated Helical
Northbound Boardwalk 30 feet
5000+70.14
4002+82.13 4003+32.13
5002+93.52
Timber Boardwalk Curb Section - Helical Pile Length curb (Typ.)
4" x 4" Timber
Timber curb retainer post and 2" x 4" x 24"
2" x 4" x 24" TimberCL retainer curb
2" x 4" x 24" Timber
Timber post
2" x 4" x 24" retainer curb
2" x 4" x 24" Timber Timber curb retainer post and 2" x 4" x 24"
2" x 4" x 24" TimberCL
Timber curb retainer post and 2" x 4" x 24"
2" x 4" x 24" TimberCL drain (See Note 10)
Geocomposite sheet is over land as approved by the CO.
Install geocomposite sheet drain at locations where boardwalk
Install geocomposite sheet drain to the underside of FRP deck.
1" FRP decking
1" FRP decking recommendation.
Install and fasten FRP decking according to manufactueres
Southbound Boardwalk
1 3/27/25 BC Notes revision
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
186839
237156 MS MS NP GUIS 15(4)
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
BC BC
DRAWN BY
Carlos Pena-MarshNR of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-133418
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
GULF ISLANDS NATIONAL SEASHORE
PARK ROAD RECONSTRUCTION
April 2025
6'-0"
5'-5"
4'-6"
4'-0" O.C Max.
"8
1'-3
M a x
10'-0" O.C Max.
2'-0" (Typ.)
8" 8"
2'-0" (Typ.)
1'-4" (Typ.)
8" 8"4" 4"
1'-4" (Typ.)
4"4"
R13
/2
/2
M
P R
O J E
C T
S \g u is
\1 (4
B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \1
\0 P
R O
J E
C T
S .d
(Typ.) (See Note 2 - Note 4) dia. helical pile "2 concrete beam (Typ.)
Precast "Max. 8" x 10
TYPICAL SECTION
BOARDWALK DETAIL
CONCRETE
As shown
Scale: 1" = 1'-0"
" = 1'-0"4 3Scale:
tread (Typ.)
Precast concrete
Min. 4" x 24"
TIMBER RAIL ELEVATION
R G
U
IS
(4
E a s t
S ta rk B a y o u B
W D
T S
.D G
N A
C T
U A
L F
IL
E
9.
8.
7.
6.
5.
4.
3.
2.
1.
and connection to boardwalk.
Coordinate with CO for interperative sign location, dimensions, D1.5 when applicable.
Weld according to current AASHTO/AWS, Bridge Welding Code thread.
bolt and washer between connections and centered on concrete construction. Handbracket system must contain a minimum 2
Design and submit handbracket system for CO approval prior to helical pile corrosion for 50 year service life.
corrosion. Provide enough sacrifical zinc anodes to provent
Install sacrifical zinc anodes on helical piles to protect from correlations. See Geotechnical Report for details.
Verify each helical pile capacity using the installation torque below for estimated helical length.
axial load of 11.0 kips and a lateral load of 4.1 kips. See table wall thickness of 0.361-inches. Install helical piles to resist an according to ASTM A123 Grade 75 and maintain a minimum to construction. Provide hot dip galvanized helical piles
Design and submit drawings of helical pile for CO approval prior construction.
concrete helical pile connection for CO approval prior to concrete boardwalk, precast concrete beams, and precast
Design and submit drawings of concrete boardwald threads, concrete tread (Typ.)
Min. 4" x 24" Precast concrete beam (Typ.)
Precast " Min. 8" x 10 angle plate
" Min. thick8 top rail (Typ.)
2" x 6" Timber
Post (Typ.)
4" x 6" Timber
(See Note 5)
Railing Handbracket post (Typ.)
4" x 6" Timber
-inch spacing between deck members. 8 Provide rail (Typ.)
2" x 6" Timber top spacer rail (Typ.)
2" x 4" Timber steel cable (Typ.)
Ø Stainless"2 cable (Typ.)
Ø Stainless steel"2
TOP RAIL CONNECTION DETAIL
No Scale
TOP RAIL SPLICE CONNECTION
No Scale top rail
2" x 6" Timber top rail
2" x 6" Timber post
4" x 6" Timber post
4" x 6" Timber spacer rail (Typ.)
2" x 4" Timber
CL
CL
SECTION A-A
No Scale
AA
See "TOP RAIL SPLICE CONNECTION"
CONNECTION DETAIL"
See "TOP RAIL space rail when necessary
Splice timber top rail and
" Stainless steel lag bolt8 top rail (Typ.)
2" x 6" Timber spacer rail (Typ.)
2" x 4" Timber post
4" x 6" Timber
SECTION B-B
No Scale
BB
" Stainless steel lag bolt8 top rail (Typ.)
2" x 6" Timber spacer rail (Typ.)
2" x 4" Timber post
4" x 6" Timber
Scale: 1" = 1'-0"
HELICAL PILE DETAIL
CONCRETE BOARDWALK
helical pile connection
Precast concrete beam
Precast concrete
Timber stringer
3" x 12"
(Typ.)
helical pile connection
Precast concrete
Boardwalk Name Begin Station End Station Pile Length
Estimated Helical
50 feet4005+89.39 4006+09.39
Concrete Boardwalk - Helical Pile Length
Southbound Boardwalk manuufacturers recommendation.
Tension stainless steel cable using turnbuckles or
Notes revisionBC3/27/25 1
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
186839
237156 MS MS NP GUIS 15(4)
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
BC BC
DRAWN BY
Carlos Pena-MarshNR of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-133418
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
GULF ISLANDS NATIONAL SEASHORE
PARK ROAD RECONSTRUCTION
April 2025
7'-0"
5'-8"
1'-3"1'-3"
4'-0" O.C Max.
M in
M in
M a x
O
.C
T y p
4'-6"
M a x
O
.C
T y p
"8
1"8
1"8
1"8
5"
"2
5"
"2
"4
2"4
M in
6"
M in
| MS NP GUIS 15(4) - Plans REV (R09, R10, R11, R13).pdf |
| 0_0PROJECTS |
| 0_0PROJECTS |
| 0_0PROJECTS |
| 0_0PROJECTS |
| MS NP GUIS _15(4)_Amendment 4_plans.pdf |
| Amendment 4 |
| B01 |
| B-Sheet |
| B01-B04-GUIS 15(4)_typ |
| C Sheets |
| C-Sheet |
| C01-C11-GUIS15(4)_Qnty |
| C01-C11-GUIS15(4)_Qnty |
| C01-C11-GUIS15(4)_Qnty |
| C01-C11-GUIS15(4)_Qnty |
| C Sheets |
| C-Sheet |
| C01-C11-GUIS15(4)_Qnty |
| C01-C11-GUIS15(4)_Qnty |
File details come from the government source that posted it. Updated .