Results of Bid Opening - MS NP GUIS 15(4).pdf
PDF 118 KB Posted
- Attached to
- Gulf Islands National Seashore
- Solicitation number
- 693C73-25-B-000008
About this file
This document is a Bid Opening Results for the Gulf Islands National Seashore Project (MS NP GUIS 15(4), Solicitation No. 693C73-25-B-000008) conducted by the Federal Highway Administration's Eastern Federal Lands Highway Division on April 10, 2025. Five construction companies submitted bids, with total project costs ranging from $9,123,205 (Central Southern Construction Corp.) to $13,096,745 (W.L. Bass Construction, Inc.), compared to the Engineer's Estimate of $8,435,000. The project involves constructing paved shoulders, boardwalks, culvert replacement, and guardrail replacement in Jackson County, Mississippi, with work divided into three schedules (A, B, and C) and a potential total performance period of 759 calendar days if all schedules are awarded.
One bidder, Gideon Contracting, LLC, was marked as nonresponsive. The other bidders included Central Southern Construction Corp. ($9,123,205), Cycle Construction Company, LLC ($11,998,955), Kovilic Construction Company, Inc. ($10,502,350), McKenzie Construction & Site Development, LLC ($12,161,406), and W.L. Bass Construction, Inc. ($13,096,745). The solicitation was specifically for Small Business Concerns, with work involving installation of a bottomless box culvert, grading, paving shoulders, microsurfacing, and related miscellaneous infrastructure improvements at Gulf Islands National Seashore.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Federal Highway Administration Eastern Federal Lands Highway Division
Bid Opening for
Gulf Islands National Seashore
PROJECT: MS NP GUIS 15(4)
SOLICITATION NO. 693C73-25-B-000008
April 10, 2025 at 2:00 p.m. EDT
Ashburn, Virginia
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BID OPENING for SOLICITATION NO. 693C73-25-B-000008 Project: MS NP GUIS 15(4)
April 10, 2025, 2:00 p.m. EDT
BIDDERS BID TOTALS TOTAL PRICE
Central Southern Construction Corp. SCHEDULE A $6,428,150.00 SCHEDULE B (Government Option 1) $1,785,900.00 SCHEDULE C (Government Option 2) $909,155.00
SCHEDULE A + SCHEDULE B + SCHEDULE C =
$9,123,205.00
Cycle Construction Company, LLC SCHEDULE A $8,424,095.00 SCHEDULE B (Government Option 1) $1,655,450.00 SCHEDULE C (Government Option 2) $1,919,140.00
SCHEDULE A + SCHEDULE B + SCHEDULE C =
$11,998,955.00
If the Government awards the contract as Schedules A + B + C, the performance period to complete all contract work will be 759 calendar days. If separate: Schedule A will be 333 calendar days, Schedule B will be 367 calendar days, and Schedule C will be 59 calendar days.
BID OPENING for SOLICITATION NO. 693C73-25-B-000008 Project: MS NP GUIS 15(4)
April 10, 2025, 2:00 p.m. EDT
BIDDERS BID TOTALS TOTAL PRICE
Gideon Contracting, LLC SCHEDULE A SCHEDULE B (Government Option 1) SCHEDULE C (Government Option 2)
SCHEDULE A + SCHEDULE B + SCHEDULE C =
Nonresponsive
Kovilic Construction Company, Inc. SCHEDULE A $6,413,050.00 SCHEDULE B (Government Option 1) $1,762,150.00 SCHEDULE C (Government Option 2) $2,327,150.00
SCHEDULE A + SCHEDULE B + SCHEDULE C =
$10,502,350.00
If the Government awards the contract as Schedules A + B + C, the performance period to complete all contract work will be 759 calendar days. If separate: Schedule A will be 333 calendar days, Schedule B will be 367 calendar days, and Schedule C will be 59 calendar days.
BID OPENING for SOLICITATION NO. 693C73-25-B-000008 Project: MS NP GUIS 15(4)
April 10, 2025, 2:00 p.m. EDT
BIDDERS BID TOTALS TOTAL PRICE
McKenzie Construction & Site Development, LLC
SCHEDULE A
$7,295,845.56 SCHEDULE B (Government Option 1) $4,221,410.79 SCHEDULE C (Government Option 2) $644,150.01
SCHEDULE A + SCHEDULE B + SCHEDULE C =
$12,161,406.36
W.L. Bass Construction, Inc. SCHEDULE A $8,241,475.00 SCHEDULE B (Government Option 1) $3,466,400.00 SCHEDULE C (Government Option 2) $1,388,870.00
SCHEDULE A + SCHEDULE B + SCHEDULE C =
$13,096,745.00
Engineer’s Estimate SCHEDULE A $5,485,000.00 SCHEDULE B (Government Option 1) $1,350,000.00 SCHEDULE C (Government Option 2) $1,600,000.00
SCHEDULE A + SCHEDULE B + SCHEDULE C =
$8,435,000.00
If the Government awards the contract as Schedules A + B + C, the performance period to complete all contract work will be 759 calendar days. If separate: Schedule A will be 333 calendar days, Schedule B will be 367 calendar days, and Schedule C will be 59 calendar days.
| Slide Number 1 |
| �FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-25-B-000008� Project: MS NP GUIS 15(4)�April 10, 2025, 2:00 p.m. EDT� |
| �FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-25-B-000008� Project: MS NP GUIS 15(4)�April 10, 2025, 2:00 p.m. EDT� |
| �FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-25-B-000008� Project: MS NP GUIS 15(4)�April 10, 2025, 2:00 p.m. EDT� |
File details come from the government source that posted it. Updated .