This document is an Amendment (No. 0001) to a federal solicitation for the Gulf Islands National Seashore project in Jackson County, Mississippi. The amendment, issued by the Federal Highway Administration's Eastern Federal Lands Highway Division, revises the Title Sheet (A01) and Utility Plan Sheets (U01-U02), while maintaining the original bid opening date of April 1, 2025, at 2:00 p.m. EDT. The project, designated as MS NP GUIS 15(4), involves constructing paved shoulders, boardwalks, replacing a culvert, and installing guardrails, with a total project length of 2.49 miles.
The solicitation is specifically set aside for Small Business Concerns, with an estimated project cost between $5 million and $10 million. The work includes installing a bottomless box culvert, grading, paving shoulders, microsurfacing, and other miscellaneous tasks. Bidders must be registered in the System for Award Management (SAM) database, and all solicitation documents can be downloaded from www.sam.gov. Interested parties are required to follow specific security protocols when attending bid openings, including presenting a valid photo ID and being escorted by government employees.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Results of Bid Opening - MS NP GUIS 15(4).pdf | ||
| Amendment 0005 - MS NP GUIS 15(4).pdf | ||
| Amendment 0004 - MS NP GUIS 15(4).pdf | ||
| Amendment 0003 - MS NP GUIS 15(4).pdf | ||
| Amendment 0002 - MS NP GUIS 15(4).pdf | ||
| VETS-4212 Form.pdf | ||
| Categorical Exclusion Form (NEPA).pdf | ||
| MS NP GUIS 15(4)_Culvert Sizing and Scour Protection Design Evaluation and Recommendations Report_FINAL_adv.pdf | ||
| IFB Solicitation - MS NP GUIS 15(4).pdf | ||
| ADV_Bidders Qualifications Form.doc | DOC document | |
| Plans - MS NP GUIS 15(4).pdf | ||
| GUIS 15(4) - Final Geotechnical Report.pdf | ||
| FP14_Eng.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
693C7325B000008 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ASHBURN VA 20147
ATTN: Construction
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
ASHBURN VA 20147
ATTN: Acquisitions
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
See Block 1403/13/20250001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
02/26/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
MS NP GUIS 15(4)
The purpose of this Amendment is to:
1. Provide a revised Title Sheet (A01).
2. Provide revised Utility Plan Sheets (U01-U02).
3. The bid opening date of April 1, 2025, at 2:00 p.m. EDT remains unchanged.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment No. 001
Info Page 1 of 1
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0001
Project MS NP GUIS 15(4)
Gulf Islands National Seashore
Solicitation: 693C73-25-B-000008
The purpose of this Amendment is to:
1. Provide a revised Title Sheet (A01).
2. Provide revised Utility Plan Sheets (U01-U02).
3. The bid opening date of April 1, 2025, at 2:00 p.m. EDT remains unchanged.
Title Sheet
Symbols And Abbreviations
Location Map
Typical Sections
Tabulation of Quantities
Standards And Details
DESCRIPTION
INDEX TO SHEETS
PLANS FOR PROPOSED
PLANS PREPARED BY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VIRGINIA
DESCRIPTION OF PROJECT
IMPROVEMENT:
PROJECT LENGTH: 2.49 Miles
ADT (2024)
ADT (2044)
%Truck
D
V (MPH)
51/49
SPECIFICATIONS:
BRIDGE:
DESIGN DESIGNATION:
e(max)
C/A None
1,343
Project Manager
Cycle #(miles)
Administration
Federal Highway
U.S. Department of Transportation
SHEET
NO
A01
A02-A03
A04
D01
S01-S30
LANE MILES:
U.S. DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICE
PROJECT MS NP GUIS 15(4)
and Bridges on Federal Highway Projects", FP-14.
"Standard Specifications for Construction of Roads
ROAD:
WIDTH SURFACE BASE
ROAD:
WIDTH
22'
SURFACE BASE SUBGRADE
GULF ISLANDS NATIONAL SEASHORE
4.54 Miles
N
HOLLY
SPRINGS TUPELO
P A
R K
W A
Y
T R
A C
E
DELTA
N
ATCH
EZ
NATCHEZ
JACKSON
MERIDIAN
GULFPORT
VICKSBURG
MS NP GUIS 15(4)
KEY MAP
STATE OF MISSISSIPPI
SCALE IN MILES
0 60 120
Hattiesburg
Mobile
Grand Bay Moss Point
Pascagoula
Springs
Ocean
Gulfport
BiloxiBeach
Long
Tillmans Corner
New Orleans
Waveland
MS NP GUIS 15(4)
Wiggins Poplarville
Lumberton
Purvis
Picayune
Pass Christian
LucedaleLouisiana
Mississippi
Alabama
N
Gulf of Mexico
SCALE IN MILES
0 20 40
Base
6" Aggregate N/A
5%
JACKSON COUNTY, MISSISSIPPI
DHV (2044) 131
12%
B01-B06
Park Road 4" ACP
A05
A06-A08
Survey Control Data
Alignment Chain Description
R01-R18 Bridge Plans
N01-N08
Erosion And Sediment Control Plans
Construction Plan And Profile
Schedules And SummariesC03-C08
Lead Designer
BRADLEY PROCTOR
Highway Design Manager
T01-T37
C01-C02
M02-M05
Traffic Control Plans
Roadway Cross Sections
A 482+00.00 - 508+42.10 0.50 Cycle #5
P01-P03 Pavement Markings And Signing Plan
Erosion And Sediment Control NarrativeM01
K01 Drainage Profile
Station to Station Length RIP Milepost/Description Schedule
Park Road, Route 0015
SHEILA M. FORONDA
N/A
E01-E04 Boardwalk Plan And Profile
REPLACEMENT OF THE CULVERT AT PARK ROAD
CONSTRUCTION OF PAVED SHOULDERS, BOARDWALKS, AND
other miscellaneous work.
culvert, grading, paving shoulders, micro surfacing, and
This work includes the installation of a bottomless box boardwalks, culvert replacement, and guardrail replacement.
This project consists of the construction of paved shoulders, CHRIS BURNELL
MARCH 2025
Construction Plan
Construction Plan
D02
D03-D04
B Southbound Boardwalk 4000+14.34 - 4008+10.25 0.15 N/A
B Northbound Boardwalk 5000+18.03 - 5003+36.78 0.06 N/A
B Alligator Pond Boardwalk 6100+11.17 - 6101+71.38 0.03 N/A
Utility PlanU01-U02
1.55400+00.00 - 482+00.00Park Road, Route 0015C
C Park Road (Entrance), Route 0015 30+82.00 - 36+00.00 0.10
C Park Road (Exit), Route 0015 950+00.00 - 955+07.00 0.10
Cycle #5
Cycle #5
Cycle #5
Shoulder Cross Slope SummaryC09 www.ms811.org
811 or 1-800-227-6477
Call Mississippi811 prior to digging:
with new U01-U02 sheets.
AMD #1 - Revised Utility Plan sheets. Removed U01-U04 and replaced
BDP 3/11/25
DESCRIPTION BY DATE
REVISIONS
NO.
AMENDMENT NO. 1 1
:0
P
M
M a r c h
A
T it le S h e e t fh fl fi le s e rv e .f lh d .f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \g u is
\1 (4
H
W Y
D
E S
\C A
D D
\A -G
U
IS
(4 tt l.
d g n
PROJECT
NUMBER
SHEET
A01
NPS Drwg No. 635/186839 PMIS No. 237156
MS NP GUIS 15(4)
bradley.proctor Cloud
AMENDMENT NO. 1
with new U01-U02 sheets.
AMD #1 - Revised Utility Plan sheets. Removed U01-U04 and replaced
NO. DATE BY REVISIONS
3/11/25
BDP
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
SCHEDULE A
GULF ISLANDS NATIONAL SEASHORE
CONSTRUCTED BY OTHERS
FOR INFORMATION ONLY
:1
M a r c h
U ti li ty P la n fh fl fi le s e rv e .f lh d .f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \g u is
\1 (4
H
W Y
D
E S
\C A
D D
\U -G
U
IS
(4 u tl re lo c a te
.d g n
UTILITY PLAN
PROJECT
U01
MS NP GUIS 15(4)
AMENDMENT NO. 1
with new U01-U02 sheets.
AMD #1 - Revised Utility Plan sheets. Removed U01-U04 and replaced
NO. DATE BY REVISIONS
3/11/25
BDP
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
SCHEDULE A
GULF ISLANDS NATIONAL SEASHORE
CONSTRUCTED BY OTHERS
FOR INFORMATION ONLY
:1
M a r c h
U ti li ty P la n
-2 fh fl fi le s e rv e .f lh d .f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \g u is
\1 (4
H
W Y
D
E S
\C A
D D
\U -G
U
IS
(4 u tl re lo c a te
.d g n
UTILITY PLAN
PROJECT
U02
MS NP GUIS 15(4)
File details come from the government source that posted it. Updated .