AC-805579_HWY-37_Computations_Structural.pdf

PDF 505 KB Posted

Attached to
PR ER DOT PRMNT RPR(14) - Landslide Repairs in Utuado
Solicitation number
693C73-23-R-000001
Issued by

About this file

This document provides details on a federal contract opportunity for landslide repair work in Puerto Rico. The Federal Highway Administration, on behalf of the Puerto Rico Highway and Transportation Authority, is seeking design-build proposals for repairs to 46 landslides, pavement washouts, and other damages along various roads in the municipality of Utuado, Puerto Rico caused by Hurricanes Irma and Maria. Work includes design and construction of earth retaining structures, drainage structures, pavement rehabilitation and reconstruction, temporary traffic control, and other miscellaneous work. The project will be completed in multiple work schedules or contract options with an estimated total value between $20-30 million. A two-phased selection process will begin with a Request for Qualifications due on June 30, 2022, followed by a Request for Proposal sent to shortlisted firms. Annual representations and certifications must be completed along with registration in the System for Award Management database. Subcontracting plans are required for contracts exceeding $750,000 or $1.5 million for construction.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Submitted by:

Barrett Hale & Alamo, LLC

Calle Del Parque #207

San Juan, PR 00912

PO Box 6425

San Juan, PR 00914-6425

Phone 787.982.7050

Fax 787.982.7056

STRUCTURAL COMPUTATIONS FOR

SHEET PILES RETAINING WALL

ER-HWY-37

AC-802544

PR-111, Km. 44.9

MUNICIPALITY OF UTUADO

LANDSLIDE AND ROAD DAMAGE

EVALUATION AND REPAIR

RECOMMENDATIONS

EMERGENGY RELIEF PROGRAM

PUERTO RICO HIGHWAY AND

TRANSPORTATION AUTHORITY

July 3, 2019

PR-111, Km. 44.9, AC-802544

SHEET PILES RETAINING WALL

CALCULATIONS

TABLE OF CONTENTS

DESCRIPTION SHEET NO.

Title Page

Table of Contents

Design Criteria and Assumptions

Sheet Pile analysis and design

Quantity Estimate Details

End of Calculations

Design Criteria

And

Assumptions

A. OBJECTIVE

Repair to road damaged by a landslide at PR-111 Km. 44.9, the solution is to build a

Sheet Piles retaining wall, It will design base with a cantilever steel sheet piles will carry the soil lateral loads to the bottom of the soil. For this analysis and design we use the Pro Sheet program.

B. DESIGN BASES

1. Codes and Criteria

a. AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS FOR HIGHWAY

BRIDGES 5th EDITION WITH 2010.

b. P.R.H.T.A. STANDARDS SPECIFICATIONS FOR ROAD & BRIDGE

CONSTRUCTION- 2005

c. P.R.H.T.A. HIGHWAY DESIGN MANUAL

2. Analysis Assumptions

a. Select Granular Backfill Material

b. Steel AZ Sheet Piles

3. References

a. Manual Of Steel Construction

4. Design Loads

a. LIVE LOAD: ......................................... 250 psf Surcharge Pressure

d. SEISMIC LOADING DATA

e. Earthquake Acc. . Coeff.………………………... 0.38g

f. WIND LOAD………………………………… Fastest mile of wind ASCE 7-95

e. TEMPERATURE RANGE…………………… 100 F/40

Sheet Pile

Analysis And

Design

SHEET PILING SECTION INPUT

SHEET PILING SOIL INPUT

SHEET PILING PILE CHECK OUTPUT

Quantity Computations

For Sheet Pile Retaining Wall

PR-111, Km. 44.9

Computed By: F. Lazo

Date: 7/3/2019

Project No. ER-HWY-37

Project Name: AC-802544, PR-111 Km. 44.90

Item No.: 206-1

Unit: CuM

Item No.: 207-1

Unit: CuM

RESULT OF 1.1 x UNCLASIFIED EXCAVATION FOR STRUCTURE

435 x 1.1 = 479 CU. METERS

Item No.: SP615-1

Unit: SqM

SHEET PILING SPEC 615

143.66

AREA= 144 SqM

Item No.: 602-1

Unit: Lbs

REINFORCING STEEL(GRADE 60) SPEC 602

From Bar schedule is 200 LBS per meter.

43 meter X 200 Lbs = 8,600. Lbs

Item No.: 605-1

Unit: LnM

6.0 IN DIAM. PVC DRAIN PIPE SPEC 605

Lengh of the project

50 meters

Item No.: SP615-1

Unit: SqM

SHEET PILING SPEC 615

143.66

AREA= 144 SqM