Results_of_Bid_-_WV_ERFO_FS_2016-1(7).ppt

PPT presentation 220 KB Posted

Attached to
Monongahela National Forest - WV ERFO FS 2016-1(7)
Solicitation number
693C73-19-B-000010
Issued by

About this file

Results of Bid

View the file

Other files

File Type Posted
Amendment_0003_-_WV_ERFO_FS_2016-1(7).pdf PDF
Amendment_0002_-_WV_ERFO_FS_2016-1(7).pdf PDF
Amendment_0001_-_WV_ERFO_FS_2016-1(7).pdf PDF
ADV_Bidder's_Qualifications_Form.doc DOC document
IFB_Solicitation_-_WV_ERFO_FS_2016-1(7).pdf PDF
Plans_-_WV_ERFO_FS_2016-1(7).pdf PDF
FP14_Eng.pdf PDF
VETS-4212_-_Form_-_2018.pdf PDF
Boring_Log.pdf PDF
NEPA_CE.pdf PDF
Synopsis_-_WV_ERFO_FS_2016-1(7).doc DOC document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BID OPENING for SOLICITATION NO. 693C73-19-B-000010, PROJECT NUMBER: WV ERFO FS 2016-1(7)

March 21, 2019, 2:00 p.m. local time The period of performance for the completion of Schedule A is 200 calendar days

BIDDERBID TOTALDAYSTOTAL PRICE
Estes Bros. Const., Inc.Schedule A
$893,183.22Calendar Days
Schedule A

$893,183.22

Kovilic Construction Co., Inc.Schedule A
$1,297,850.00Calendar Days
Schedule A

$1,297,850.00

Pavkov ContractingSchedule A
$1,280,145.00Calendar Days
Schedule A

$1,280,145.00

Varner Construction, LLC
Schedule A
$886,728.00Calendar Days
Schedule A

$886,728.00

Engineer’s EstimateSchedule A
$1,000,000.00Calendar Days
Schedule A

$1,000,000.00