Amendment_0003_-_WV_ERFO_FS_2016-1(7).pdf

PDF 192 KB Posted

Attached to
Monongahela National Forest - WV ERFO FS 2016-1(7)
Solicitation number
693C73-19-B-000010
Issued by

About this file

Bid Opening date is rescheduled to March 21, 2019, at 2:00 p.m. EST.

View the file

Other files

File Type Posted
Results_of_Bid_-_WV_ERFO_FS_2016-1(7).ppt PPT presentation
Amendment_0002_-_WV_ERFO_FS_2016-1(7).pdf PDF
Amendment_0001_-_WV_ERFO_FS_2016-1(7).pdf PDF
ADV_Bidder's_Qualifications_Form.doc DOC document
IFB_Solicitation_-_WV_ERFO_FS_2016-1(7).pdf PDF
Plans_-_WV_ERFO_FS_2016-1(7).pdf PDF
FP14_Eng.pdf PDF
VETS-4212_-_Form_-_2018.pdf PDF
Boring_Log.pdf PDF
NEPA_CE.pdf PDF
Synopsis_-_WV_ERFO_FS_2016-1(7).doc DOC document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

693C7319B000010 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Sterling VA 20166-6511

EFLHD-CO

21400 Ridgetop Circle Construction Office Eastern Federal Lands Highway Div.

Federal Highway Administration

Sterling VA 20166-6511

EFLHD-AC

21400 Ridgetop Circle Acquisitions Office Eastern Federal Lands Highway Div.

Federal Highway Administration

SEE BLOCK 1403/18/20190003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

02/14/2019

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

WV ERFO FS 2016-1(7) - Monongahela National Forest

The purpose of this Amendment is:

1) Provide a summary of responses to questions/clarifications asked by potential bidders.

2) Reschedule the Bid Opening date to March 21, 2019, at 2:00 p.m. EST.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Amendment No. 0003

Amendment Info

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Amendment No. 0003

WV ERFO FS 2016-1(7)

Monongahela National Forest Removal and Replacement of Rattle Snake Bridge and

Replacement of Pipe Culverts Solicitation: 693C73-19-B-000010

The purpose of this Amendment is:

1) Provide a summary of responses to questions/clarifications asked by potential bidders.

2) Reschedule the Bid Opening date to March 21, 2019, at 2:00 p.m. EST.

Questions / Clarifications

Bidders can send written questions or inquiries for clarification to: eflhd.contracts@dot.gov.

Questions can be submitted at any time, but questions submitted within 7 days of the proposal due date may not be answered in time for the bidder to properly incorporate the responses into their bids.

The following questions and issues were submitted via email. The Government response or clarification is provided. Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised and some questions have not been included.

The Government’s direct response to the sender may also have been updated below for better clarity.

Permeability testing. Very low coulombs rating at 226. This qualifies it as very low permeability. Test was prepared by BASF. We do not use fly ash as it:

• Is becoming very difficult to find an adequate supply of fly ash due to coal fire plant reductions in our region.

• Is a natural retarder in concrete, which is counter intuitive in the use of prestressed concrete with its high early strength requirement to get beams detentioned and out of the form.

Response: The use of silica fume at 7-10% of the total cementitious material is an acceptable alternative for the supplemental cementitious material requirements found in Table 552-1A or Table 552-2B of Subsection 552.03 of the Special Contract Requirements (SCRs).

mailto:eflhd.contracts@dot.gov

Amendment 3 Info.pdf
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0003

File details come from the government source that posted it.