Amendment_0001_-_WV_ERFO_FS_2016-1(7).pdf
PDF 327 KB Posted
- Solicitation number
- 693C73-19-B-000010
About this file
Bid Opening date of March 19, 2019 at 2:00 p.m. EST remains the same.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Results_of_Bid_-_WV_ERFO_FS_2016-1(7).ppt | PPT presentation | |
| Amendment_0003_-_WV_ERFO_FS_2016-1(7).pdf | ||
| Amendment_0002_-_WV_ERFO_FS_2016-1(7).pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| IFB_Solicitation_-_WV_ERFO_FS_2016-1(7).pdf | ||
| Plans_-_WV_ERFO_FS_2016-1(7).pdf | ||
| FP14_Eng.pdf | ||
| VETS-4212_-_Form_-_2018.pdf | ||
| Boring_Log.pdf | ||
| NEPA_CE.pdf | ||
| Synopsis_-_WV_ERFO_FS_2016-1(7).doc | DOC document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
693C7319B000010 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Sterling VA 20166-6511
EFLHD-CO
21400 Ridgetop Circle Construction Office Eastern Federal Lands Highway Div.
Federal Highway Administration
Sterling VA 20166-6511
EFLHD-AC
21400 Ridgetop Circle Acquisitions Office Eastern Federal Lands Highway Div.
Federal Highway Administration
SEE BLOCK 1403/08/20190001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
02/14/2019
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
WV ERFO FS 2016-1(7) - Monongahela National Forest
The purpose of this Amendment is to provide a summary of responses to questions/clarifications asked by potential bidders.
The Bid Opening date of March 19, 2019, at 2:00 p.m. EST., will remain the same.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment No. 0001
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0001
WV ERFO FS 2016-1(7)
Monongahela National Forest Removal and Replacement of Rattle Snake Bridge and
Replacement of Pipe Culverts Solicitation: 693C73-19-B-000010
The purpose of this Amendment is to provide a summary of responses to questions/clarifications asked by potential bidders.
The Bid Opening date of March 19, 2019, at 2:00 p.m. EST., will remain the same.
Questions / Clarifications
Bidders can send written questions or inquiries for clarification to: eflhd.contracts@dot.gov.
Questions can be submitted at any time, but questions submitted within 7 days of the proposal due date may not be answered in time for the bidder to properly incorporate the responses into their bids.
The following questions and issues were submitted via email. The Government response or clarification is provided. Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised and some questions have not been included.
The Government’s direct response to the sender may also have been updated below for better clarity.
1. What will be allowable at the bridge site for crossing the creek? (armored ford, culverts, pumping)
Contractors were concerned with some of the dewatering plans being more costly than other alternatives such as pumping or temporary culverts? Will they have to build what is specified in the dewatering plan?
Response: The Contractor has the option to propose an alternate temporary diversion method, subject to the approval of the CO per Subsection 157.10 of the Special Contract Requirements. Any proposed changes will not be considered during advertisement - any alternative proposal can be submitted to the CO for approval during construction.
2. Are there any waste sites available in the project area?
Response: No, please refer to Subsection 203.05 of the FP for material disposal.
Amendment Info
Amendment No. 0001
3. Will all the material from the MP 0.7 be wasted or does it have a secondary purpose?
Response: Excavated material will not be salvaged, Contractor will dispose material as required in Subsection 203.05 of the FP. The Contractor has the option to use the material as unclassified borrow if it conforms with Subsection 704.06 of the FP (standard specifications book).
4. Are there any borrow sites?
Response: No.
5. Will the contractors need a compaction technician on site for all material being placed?
Response: Perform compaction according to Subsection 204.11 of the FP.
6. How tight are the constraints on the field office, prices are very high for what they told me on site?
Response: The field office is facility for the use of Government personnel. Please refer to the Section 637 of the Special Contract Requirements for field office requirements.
7. Item 60202-0400 and 60202-0700 both call for “Arch or Elliptical pipe culvert” are these supposed to be round pipes as first choice or only arch or elliptical?
Response: Round pipe culverts are not allowed; arch pipe culverts are required. Alternate elliptical pipe culverts that comply with the plans and specifications can be submitted for approval after contract award. Please refer to the drainage plan sheets K01 and K02 for dimension of pipe culverts.
8. There was confusion on the bid timeline, some folks thought it was the 7th some the 8th some the 12th. I looked in the solicitation and found the 19th?
Response: Please refer to the date listed on the SF-1442 of the Solicitation for the bid date.
Amendment Info
File details come from the government source that posted it.