Amendment_0002_-_WV_ERFO_FS_2016-1(7).pdf

PDF 286 KB Posted

Attached to
Monongahela National Forest - WV ERFO FS 2016-1(7)
Solicitation number
693C73-19-B-000010
Issued by

About this file

The Bid Opening date of March 19, 2019, at 2:00 p.m. EST will remain the same.

View the file

Other files

File Type Posted
Results_of_Bid_-_WV_ERFO_FS_2016-1(7).ppt PPT presentation
Amendment_0003_-_WV_ERFO_FS_2016-1(7).pdf PDF
Amendment_0001_-_WV_ERFO_FS_2016-1(7).pdf PDF
ADV_Bidder's_Qualifications_Form.doc DOC document
IFB_Solicitation_-_WV_ERFO_FS_2016-1(7).pdf PDF
Plans_-_WV_ERFO_FS_2016-1(7).pdf PDF
FP14_Eng.pdf PDF
VETS-4212_-_Form_-_2018.pdf PDF
Boring_Log.pdf PDF
NEPA_CE.pdf PDF
Synopsis_-_WV_ERFO_FS_2016-1(7).doc DOC document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

693C7319B000010 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Sterling VA 20166-6511

EFLHD-CO

21400 Ridgetop Circle Construction Office Eastern Federal Lands Highway Div.

Federal Highway Administration

Sterling VA 20166-6511

EFLHD-AC

21400 Ridgetop Circle Acquisitions Office Eastern Federal Lands Highway Div.

Federal Highway Administration

SEE BLOCK 1403/12/20190002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

02/14/2019

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

WV ERFO FS 2016-1(7) - Monongahela National Forest

The purpose of this Amendment is to:

1) Revise the Special Contract Requirements (J Pages) Table 552-1B to correct the composition portion of the supplemental cementitious material.

2) Provide additional clarification to the Amendment 1 summary of responses to questions/clarifications asked by potential bidders.

3) Include Additional bidder questions to the list of questions/clarifications asked by

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 6

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

693C7319B000010/0002 potential bidders.

The Bid Opening date of March 19, 2019, at 2:00 p.m. EST will remain the same.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Amendment No. 0002

Amendment Info

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

WV ERFO FS 2016-1(7)

Monongahela National Forest Removal and Replacement of Rattle Snake Bridge and

Replacement of Pipe Culverts Solicitation: 693C73-19-B-000010

The purpose of this Amendment is to:

1) Revise the Special Contract Requirements (J Pages) Table 552-1B to correct the composition portion of the supplemental cementitious material.

2) Provide additional clarification to the Amendment 1 summary of responses to questions/clarifications asked by potential bidders.

3) Include Additional bidder questions to the list of questions/clarifications asked by potential bidders.

The Bid Opening date of March 19, 2019, at 2:00 p.m. EST will remain the same.

Questions / Clarifications

Bidders can send written questions or inquiries for clarification to: eflhd.contracts@dot.gov.

Questions can be submitted at any time, but questions submitted within 7 days of the proposal due date may not be answered in time for the bidder to properly incorporate the responses into their bids.

The following questions and issues were submitted via email. The Government response or clarification is provided. Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised and some questions have not been included.

The Government’s direct response to the sender may also have been updated below for better clarity.

The yellow highlighted portions of these responses below provide revisions and/or additional clarification to the original response.

mailto:eflhd.contracts@dot.gov

1. What will be allowable at the bridge site for crossing the creek? (armored ford, culverts, pumping)

Contractors were concerned with some of the dewatering plans being more costly than other alternatives such as pumping or temporary culverts? Will they have to build what is specified in the dewatering plan?

Response: The Contractor may propose an alternative temporary diversion method to the CO for approval as stated in the notes on the Erosion and Sediment Control plans and in accordance with Subsection 157.10 of the Special Contract Requirements. Alternative proposals can be submitted to the CO for approval during construction.

2. Are there any waste sites available in the project area?

Response: No. Please refer to Subsection 203.05 of the FP (standard specifications book) for material disposal.

3. Will all the material from the MP 0.7 be wasted or does it have a secondary purpose?

Response: Dispose of excavated material in accordance with Subsection 203.05 of the FP.

Excavated material that meets the requirements of unclassified borrow in accordance with Subsection 704.06 of the FP may be used for embankment construction in accordance with Subsection 204.02 of the FP.

4. Are there any borrow sites?

Response: No.

5. Will the contractors need a compaction technician on site for all material being placed?

Response: Compaction testing must be performed by a qualified and certified tester, and must be performed in accordance with Subsections 106.04, 153.02, and 204.11 of the FP.

6. How tight are the constraints on the field office, prices are very high for what they told me on site?

Response: The field office facilities and services must meet the requirements stated in the Section 637 of the Special Contract Requirements and the FP.

7. Item 60202-0400 and 60202-0700 both call for “Arch or Elliptical pipe culvert” are these supposed to be round pipes as first choice or only arch or elliptical?

Response: Round pipe culverts are not allowed; arch pipe culverts are required. Alternate elliptical pipe culverts that comply with the plans and specifications can be submitted for approval after contract award. Please refer to the drainage plan sheets K01 and K02 for dimension of pipe culverts.

8. There was confusion on the bid timeline, some folks thought it was the 7th some the 8th some the 12th. I looked in the solicitation and found the 19th?

Response: Please refer to the date listed on the SF-1442 of the Solicitation for the bid date.

The following questions and issues were received after Amendment 1 and the Government response or clarification is provided.

9. Section 552 of the Document modifies the concrete to contain Ground Granulated Blast Furnace Slag which we do not have available to us. We are unable to provide concrete with theses specifications.

Government are calling for Furnace slag in the beams… We don’t have furnace slag and they are calling for 20-50% cement replacement… Then they want Chloride Ion tests to be submitted which I don’t have ….

Response: Table 552-1B was posted incorrectly; the amended Table 552-1B now utilizes fly ash, rather than slag, as a portion of the supplemental cementitious material. Subsection

552.03 permits the Contractor to conform to Table 552-1A which requires slag or the amended Table 552-1B which requires fly ash.

Chloride permeability testing is not required.

Amendment No. 0002 J-12

SCR _Changes Page 1 of 1

Special Contract Requirement (J Pages) changes

Delete Table 552-1B of the Special Contract Requirements, page J-12 and substitute the following:

Table 552-1B Composition of Concrete

Class of

Concrete

Minimum Compressive

Strength @ 28-Days, f’c, psi (MPa)

Total Cementitious

Range

Fly Ash, Class F, % of Total Cementitious

Material

Maximum Water/

Cementitious Material

Ratio

Slump (Tolerance from

Target), AASHTO

T 119

Shrinkage Reducing

Admixture

Coarse Aggregate Size Number

AASHTO M 43 (1)

A 4500 (31.0) – – 0.45 5, 56, 57

A(AE) 4500 (31.0) – 20-30 0.45 ± 1.0 inches (25 millimeters) 5, 56, 57

C 4500 (31.0) – – 0.45 7, 78

C(AE) 4500 (31.0) – – 0.45 7, 78

D(AE) (2) 5000 (34.5)

517 – 658 pounds per cubic foot (8282 – 10,540 kilograms per cubic meter)

20-30 0.38 - 0.40 ± 1.0 inches (25 millimeters)

1.5 gallons per cubic yard

(7.5 liters per cubic meter)

5, 56, 57

P (Prestressed) (3) See plans – 20-30 0.40 ± 1.0 inches (25 millimeters) 6,7,67,68,78

P(AE) (3) See plans – 20-30 0.40 ± 1.0 inches (25 millimeters) 6,7,67,68,78

S (Seal) – – – 0.54 5, 56, 57

(1) Meet the processing requirements of AASHTO M 43, Table 1 – Standard Sizes of Processed Aggregate.

(2) The maximum water-soluble chloride ion (Cl-) content is 0.15 percent by mass of cement. Determine the water-soluble chloride ion content of concrete made with mix ingredients at an age between 28 and 48 days according to ASTM C1218. Submit test results with the concrete mix design for approval.

(3) The maximum water-soluble chloride ion (Cl-) content is 0.06 percent by mass of cement. Determine the water-soluble chloride ion content of concrete made with mix ingredients at an age between 28 and 48 days according to ASTM C1218. Submit test results with the concrete mix design for approval.

Amendment 2 Info.pdf
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0002

File details come from the government source that posted it.