BRIDGE INSPECTION REPORT

CAMP TWO BRIDGE

LITTLE RIVER ROAD OVER LITTLE RIVER

GREAT SMOKY MOUNTAINS NATIONAL PARK

LE

STRUCTURE NO. 5460-162P

INSPECTION TYPE: DAMAGE

INSPECTION DATE: 5/17/16

SUReport prepared by:

Federal Highway Administration FLH Office of Bridges and Structures 21400 Ridgetop Circle Sterling, VA 20166 703-404-6201 https://bridge.flhd.fhwa.dot.gov http:https://bridge.flhd.fhwa.dot.gov

STRUCTURE NO. 5460 162P

CAMP TWO BRIDGE INSPECTION DATE: 5/17/16

STRUCTURE SUMMARY

BRIDGE IDENTIFICATION AND DESCRIPTION

MAIN SPAN MATERIAL:

STEEL

MAIN SPAN TYPE: ............... STRINGER/MULTI-BEAM or GIRDER

# OF BEAMS, MAIN SPAN: .. 4

DECK TYPE:

CONCRETE CAST-IN-PLACE

WEARING SURFACE: .......... BITUMINOUS

ABUT. FOUNDATIONS: ........ SPREAD FTG ON BEARING MAT'L

PIER FOUNDATION(S): ........ SPREAD FTG ON BEARING MAT'L

ABUTMENT / PIER MAT'L: ... CONCRETE

PROJ./PLAN REF. NO: ......... 3B13, 3B15 / NONE

NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD

STRUCTURE HISTORY: ...... 1994-EXPANSION JOINTS REPLACED.

LOCATION

NO. OF MAIN SPANS:

NO. OF APPR. SPANS:

STRUCT. TOTAL LENGTH: ..

MAX. SPAN LENGTH:

DECK WIDTH:

CURB TO CURB WIDTH:

YEAR BUILT:

YEAR RECONSTRUCTED: ..

SKEW ANGLE:

FRACTURE CRITICAL:

100.8 FT (30.7 M)

50.4 FT (15.4 M)

26.0 FT (7.9 M)

24.0 FT (7.3 M)

1950 (EST.)

5 °

NO

GREAT SMOKY MOUNTAINS NATIONAL PARK MILE POINT: ..................... 8.60 (KM PT 13.84)

STATE: ................................. TENNESSEE LOCATION: 3.3 MILES TO NPS ROUTE 16

FACILITY CARRIED: ............ LITTLE RIVER ROAD

FEATURE INTERSECTED: .. LITTLE RIVER

STRUCTURE EVALUATION SUMMARY

This steel multi-beam bridge is in good to fair condition overall. However, there is moderate to severe scour along the west side of the pier footing, which undermines the apron and the footing full length x 1' high x 2'-9" back. The undermining should be repaired and engineered riprap should be placed along the footing to protect it from further scour.

Additional problems include moderate deterioration of the asphaltic plug joint over the pier, vertical separation cracks at the north end of both abutments, and moderate vine growth along the south side of the east abutment. Also, there is severe bulging and cracking of the bearing pads at the east abutment, with minor to moderate bulging of the bearing pads at the pier.

Corrective measures should be taken as outlined in this report to help prevent the possible development of more serious or costly problems in the future.

INSPECTION TEAM: G. GOODLIN, H. SALAD

CONDITION ASSESSMENT:

GARY J. GOODLIN, FIELD TEAM LEADER 703-404-6253

REPORT REVIEW:

MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252

REPORT APPROVAL: DATE: 9/30/16

JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5460 162P

226 PRIORITY OF IMPROVEMENT C

A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.

B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

ITEM

NO.

MAINTENANCE RECOMMENDATIONS

(GENERALLY NOT FLHP ELIGIBLE)

QTY. UNIT COST

UNIT

ESTIMATE

COST

PRELIM.

60.1,6 SEAL VERTICAL SEPARATIONS AT NORTH END OF BOTH ABUTMENTS. 30 LF

222.7 INSTALL TYPE 3 REFLECTIVE OBJECT MARKERS AT BRIDGE APPROACHES. 4 EA

59.11 REMOVE VINE GROWTH FROM EAST ABUTMENT. 1 LS

PRELIM. MAINTENANCE TOTAL :

ITEM

REHABILITATION/RECONSTRUCTION

QTY. UNIT

UNIT

COST ESTIMATES

PRELIM. COST

NO (TYPICALLY NEEDED WITHIN 5 YEARS)

REHAB. RECONSTR.

59.1 REPLACE BEARING PADS AT EAST ABUTMENT. 1 LS $20,000

60.9,17 REPAIR UNDERMINING AND PROTECT PIER FOOTING AND WEST

ABUTMENT WITH ENGINEERED RIPRAP.

1 LS $15,000

58.2 REPLACE ASPHALTIC PLUG JOINT OVER PIER. 1 LS $12,000

CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL, AND

DESIGN CONSTRUCTION ENGINEERING (70% TOTAL REHAB COST)

PLUS PARK LOCATION FACTOR.

1 LS $33,000

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :

PRELIMINARY ESTIMATE TOTAL* :

(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)

REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.

FIELD INSPECTION REPORT STRUCTURE NO. 5460 162P

CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223

N

NOT APPLICABLE

EXCELLENT CONDITION

VERY GOOD CONDITION - no problems noted.

GOOD CONDITION - some minor problems.

SATISFACTORY CONDITION - structural elements show some minor deterioration.

FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.

POOR CONDITION - advanced section loss, deterioration, spalling, or scour.

SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.

Fatigue cracks in steel or shear cracks in concrete may be present.

CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.

“IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.

FAILED CONDITION - out of service; beyond corrective action.

CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS

G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)

58. DECK 7

DECK SLAB1. G

EXPANSION JOINTS2. F

WEARING SURFACE3. G

RIDEABILITY4. G

CURBS, SIDEWALKS, AND MEDIAN5. N

PARAPETS AND/OR RAILINGS6. G

DRAINS AND DRAINAGE7. F

UTILITIES8. N

DEFLECTION AND/OR VIBRATION9. G

OTHER10. N

59. SUPERSTRUCTURE 7

BEARING DEVICES1. F

GIRDERS OR BEAMS2. G

ARCH(ES) OR SLAB(S)3. N

FLOOR BEAMS AND STRINGERS4. N

TRUSSES5. N

DIAPHRAGMS AND BRACING6. G

7. PAINT F

FASCIA(E)8. N

DEFLECTION AND/OR VIBRATION9. G

ALIGNMENT10. G

OTHER11.

60. SUBSTRUCTURE 6

ITEM REFERENCE AND REMARKS

ABUTMENTS

58.1 MINOR TRANSVERSE CRACKING OF DECK UNDERSIDE WITH

EFFLORESCENCE NEAR CENTER OF EAST SPAN AND UNDERSIDE

OF OVERHANGS.

58.2 MINOR DETERIORATION OF ASPHALTIC PLUG JOINT SYSTEM;

MODERATE DETERIORATION WITH JOINT MATERIAL EXPOSED OVER

PIER.

58.6 MINOR VERTICAL CRACKING OF BOTH FACES OF PARAPETS WITH

EFFLORESCENCE. MINOR MOSS GROWTH ON PARAPETS,

PRIMARILY ON NORTH PARAPET.

58.7 MODERATE DEBRIS ACCUMULATION AND VEGETATION GROWTH

ALONG BOTH CURBLINES, SEVERE ALONG SOUTH CURBLINE NEAR

WEST END.

59.1 SEVERE BULGING AND CRACKING OF BEARING PADS AT EAST

ABUTMENT; MINOR TO MODERATE AT PIER.

59.2,6,7 MINOR SPOT RUSTING OF BEAM BOTTOM FLANGES, COVER

PLATES, AND DIAPHRAGMS AT ISOLATED LOCATIONS.

60.1 MINOR EFFLORESCENCE ON BOTH ORIGINAL ABUTMENT

BREASTWALLS. MINOR VERTICAL CRACK AT NORTH END OF EAST

ABUTMENT; 3/16" WIDE SEPARATION BETWEEN MASONRY WALL

AND CONCRETE WALL, VOID WAS PROBED UP TO 12" DEEP. 1" TO

1.5" WIDE SEPARATION BETWEEN MASONRY WALL AND CONCRETE

WALL, AND BETWEEN BOULDER AND MASONRY WALL, AT NORTH

END OF WEST ABUTMENT.

60.3 MINOR TO MODERATE DEBRIS ACCUMULATION ON EAST ABUTMENT

BEARING SEAT. MINOR SPALLING ALONG EDGES OF ORIGINAL

BEARING SEAT AT EAST ABUTMENT.

60.6 MINOR DETERIORATION OF MASONRY MORTAR JOINTS AT

WINGWALLS. MINOR SEPARATION OF NORTHEAST WINGWALL

ALONG BACK OF BACKWALL AND BOTTOM OF APPROACH SLAB;

VOID CAN BE PROBED UP TO 14"D.

1. BREASTWALLS OR COLUMNS F

2. PILE BENTS N

3. CAPS AND/OR BEARING SEATS G

4. BACKWALLS AND/OR BULKHEADS G

5. FOUNDATIONS N

6. WINGWALLS G

7. WEEP HOLES G

8. EXPANSION JOINTS N

9. EROSION AND/OR SCOUR F

10. SETTLEMENT OR DEFLECTION G

11. SLOPE PROTECTION N

12. OTHER F

PIER(S)

(VEGETATION)

F13. WALLS AND/OR COLUMNS

N14. PILE BENTS

F15. CAPS AND/OR BEARING SEATS

G16. FOUNDATIONS (SPREAD FTG)

F17. EROSION AND/OR SCOUR

G18. SETTLEMENT OR DEFLECTION

G19. OTHER (APRON)

FIELD INSPECTION REPORT STRUCTURE NO. 5460 162P

AND REMARKSITEM REFERENCE

61. CHANNEL 7

G 1. ALIGNMENT

G2. EROSION AND/OR SCOUR

N 3. CHANNEL PROTECTION

G 4. WATERWAY OBSTRUCTIONS

N 5. OTHER

SUFF ADEQUACY OF OPENING 6.

7. MEDNORMAL VELOCITY

15 FT. 8. AVERAGE CLEAR OPENING

9. STREAM BED COMPOSITION :

ROCK, SAND, STONES

222. APPROACHES 7

OTHER 9.

ALIGNMENT 8.

SIGNS7.

SETTLEMENT6.

EROSION5.

SURFACING 4.

APPROACH GUARDRAIL 3.

RELIEF JOINTS 2.

APPROACH SLABS 1. N

N

G

G

G

G

N

F

N

223. RETAINING WALL N

OTHER6.

SETTLEMENT OR DEFLECTION5.

EROSION AND/OR SCOUR 4.

FOUNDATION 3.

WEEP HOLES 2.

WALL1.

36. TRAFFIC AND SAFETY FEATURES

APPROACH GUARDRAIL ENDSD.

APPROACH GUARDRAILSC.

TRANSITIONSB.

BRIDGE RAILINGSA. 1

TRAFFIC SAFETY RATING CODES

N

Does not meet standards or a safety feature is required and none is provided.

Meets currently acceptable standards.

Not applicable or a safety feature is not required.

60.9 VOID AT BOTTOM OF MASONRY AT NORTH SIDE OF WEST

ABUTMENT AT BOULDER FOUNDATION.

60.12 MODERATE VINE GROWTH ON SOUTH SIDE OF EAST ABUTMENT.

60.13 MINOR WIDESPREAD CRACKING AND MODERATE SPALLING OF PIER

WALLS NEAR ENDS.

60.15 MODERATE SPALLING ALONG TOP EDGE OF ORIGINAL PIER CAP.

MINOR FULL HEIGHT VERTICAL CRACKING OF NEW PIER CAP, ONE

UNDER EACH BEAM.

60.16 MINOR TO MODERATE SCALING ALONG PIER FOOTING.

60.17 MODERATE TO SEVERE SCOUR ALONG WEST SIDE OF PIER

FOOTING. APRON UNDERMINED FULL WIDTH, WITH FOOTING

UNDERMINED (FULL LENGTH X 1'H X 2'-9" BACK).

222.1 APPROACH SLABS PAVED OVER WITH ASPHALT.

222.3 NUTS ARE LOOSE OR MISSING ON PLATES AT NORTHEAST

TERMINAL END. MINOR COLLISION DAMAGE AT NORTHWEST AND

SOUTHEAST APPROACH GUARDRAIL, AND NORTHEAST TERMINAL

END.

222.4 MINOR TRANSVERSE CRACK IN APPROACH PAVEMENT OVER FREE

END OF EAST APPROACH SLAB, FULL WIDTH.

222.7 OBJECT MARKERS ARE MISSING AT BRIDGE APPROACHES.

222.8 SHARP CURVE IN ROADWAY AT WEST APPROACH; RESTRICTS

SIGHT DISTANCE.

STRUCTURE NO. 5460 162P

INSPECTION DATE: 5/17/16

TRUCK TYPE

TONS

INVENTORY RATING (NORMAL TRAFFIC)

METRIC TONS METRIC TONSTONS

OPERATING RATING (MAXIMUM LOAD)

H

HS

TYPE 3

TYPE 3S2

TYPE 3-3

DESIGN LOADING:

DATE OF LOAD RATING CALCULATION:

LOAD RATING CONTROLLED BY:

REMARKS:

CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

RATING IS BASED ON DESIGN LOAD OF STRUCTURE.

X

STRUCTURE LOAD RATING

CAMP TWO BRIDGE

H20 (M18)

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5460 162P

STRUCTURE IDENTIFICATION

(201) PARK: GREAT SMOKY MOUNTAINS NATIONAL PARK (1) STATE: ....................................... 474 - TENNESSEE (TN)

(202) STRUCTURE NAME: .......... CAMP TWO BRIDGE (2) STATE HWY. AGENCY DIST:

(203) STRUCTURE KIND: ............1 - BRIDGE (3) COUNTY CODE: ........................ 009 - BLOUNT

(4) CITY/PLACE CODE:

(204) STRUCTURE NUMBER: ..... 5460-162P

(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:

(206) ROUTE CODE NUMBER: ... 14 (6) FEATURES INTERSECTED:....... LITTLE RIVER

(207) ROAD SECTION NO: ..........162P (7) FACILITY CARRIED: .................. LITTLE RIVER ROAD

(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5460162P0000000

(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ 3.3 MILES TO NPS ROUTE 16

(210) OPERATING UNIT: ............. S. DIST. (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)

(211) PROJECT NO(S): ................ 3B13, 3B15 (11) MILE POINT: ............................. 8.60 (KM PT 13.84)

(212) DRAWING NUMBERS: ....... NONE (27) YEAR BUILT:

(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED:

(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD

(37) HISTORICAL DESIGNATION: .. 3 - POSSIBLY ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL: ..

(43B) MAIN STR. TYPE:

(45) NO. OF MAIN SPANS:

(48) MAX. SPAN LENGTH:

(49) STRUCTURE LENGTH:

(216A) ABUTMENT #1 FDN:

(216B) ABUTMENT #2 FDN:

(217A) PREDOM. PIER FDN.: ..

(217B) SECOND. PIER FDN: ...

(107) DECK TYPE:

3 - STEEL

02 - STRINGER/MULTI-BEAM or GIRDER

50.4 FT (15.4 M)

100.8 FT (30.7 M)

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

1 - CONCRETE CAST-IN-PLACE

(44A) APPR. STR. MATERIAL: ........ 0 - OTHER

(44B) APPR. STR. TYPE: ................ 00 - OTHER

(46) NO. OF APPROACH SPANS: .. 0

(108) WEAR SURFACE/PROTECT SYSTEM:

A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS

B) TYPE MEMBRANE: ................. 0 - NONE

C) TYPE PROTECTION:

0 - NONE

YES(218) IS SALT USED?:

LOAD RATING AND POSTING

(31) DESIGN LOAD:

4 - H20 (M18) (41) LOAD RESTRICTION:

A - OPEN, NO RESTRICTION

(66) INVENTORY RATING: ...... 25.0 TONS (23.0 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED

(64) OPERATING RATING: ...... 42.0 TONS (38.1 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 5/16 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO

INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE

(B) UNDERWATER: .............. NO

(221) SPECIAL STUDY DATE:

INSP. EVERY: MONTHS - LAST INSP. :

(C) SPECIAL INSPECTION: .. NO

INSP. EVERY: MONTHS - LAST INSP. :

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5460 162P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE: ............................. 35°40'06.60" (51) CURB TO CURB WIDTH: ........... 24.0 FT (7.3 M)

(17) LONGITUDE: ......................... 83°40'59.50" (52) DECK WIDTH: ............................ 26.0 FT (7.9 M)

(19) DETOUR LENGTH: ............... 55 MI (89 KM) (32) APPR. ROADWAY WIDTH: ........ 22.0 FT (6.7 M)

(28A) LANES ON STRUCT: .......... 02 (213) APPR. PAVEMENT WIDTH: ..... 20.0 FT (6.1 M)

(28B) LANES UNDER STRUCT: ... 00 LEFT SHOULDER: .................. 1.0 FT (0.3 M)

(42A) SERVICE ON: ..................... 1 - HIGHWAY RIGHT SHOULDER: ................ 1.0 FT (0.3 M)

(42B) SERVICE UNDER: .............. 5 - WATERWAY (33) BRIDGE MEDIAN: ....................... 0 - NO MEDIAN

(29) AVG. DAILY TRAFFIC: .......... 2384 (34) SKEW ANGLE: ............................ 5 °

(30) YEAR OF ADT: ...................... 2010 (35) DECK FLARE?: ........................... NO

(114) FUTURE ADT: ..................... 2622 (47) TOTAL HORIZ. CLEARANCE: .... 24.0 FT (7.3 M)

(115) YEAR OF FUTURE ADT: ..... 2030 (50) SIDEWALKS:

(101) PARALLEL STRUCTURE: ... N - NONE LEFT : ...................................... 0.0 FT (0.0 M)

(38) NAVIGATION CONTROL?: ... 0 RIGHT : ................................... 0.0 FT (0.0 M)

(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M) (214) BRIDGE RAIL TYPE:

(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M) RAIL CONFIGURATION: ......... 2 - MOUNTED ON PARAPET

(111) ABUT. OR PIER PROT: ....... MATERIAL: .............................. 6 - ALUMINUM

DESIGN TYPE: ........................ 1 - CONTINUOUS RAIL

LATERAL UNDERCLEARANCE:

(55) RIGHT: ....................... 0.0 FT (0.0 M) (215) BRIDGE RAIL HEIGHT: ............ 2.83 FT (0.86 M)

(56) LEFT: ......................... 0.0 FT (0.0 M) (53) MIN. VRT. CLEAR. OVER DECK: 99.99 FT (99.99 M)

(54) MIN. VRT. UNDERCLEARANCE: 0.00 FT (0.00 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:

(59) SUPERSTRUCTURE:

(60) SUBSTRUCTURE:

(61) CHANNEL:

(62) CULVERT: ........................... N

(222) APPROACHES:

(223) RETAINING WALL: ........... N

(36) TRAFFIC SAFETY FEAT: ... 1010

(75A) TYPE OF WORK:

(75B) WORK DONE BY:

(76) IMPROVEMENT LENGTH: ..

(67) STRUCTURAL EVALUATION:

(68) DECK GEOMETRY:

(69) UNDERCLEARANCES:

(71) WATERWAY ADEQUACY:

(72) APPROACH ALIGNMENT:

(113) SCOUR CRITICAL:

(225) PURPOSE OF IMPROVEMENT:

(226) PRIORITY OF IMPROVEMENT:

(227) MAINTENANCE COST:

(228) REHAB./RECONSTR. COST: ...

(229) CONSTRUCTION COST:

N

4 - Stable; action required to pro

2 - REHAB/RECONSTRUCTION

C - MODERATE

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

1994-EXPANSION JOINTS REPLACED.

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIG. INFO.:

http:83�40'59.50 http:35�40'06.60

APPENDIX STRUCTURE NO. 5460 162P

PHOTOGRAPHS STRUCTURE NO. 5460 162P

FLOW

PHOTO #1 - LOOKING WEST TOWARD CADES COVE

PHOTO #2 - NORTH (DOWNSTREAM) SIDE

PHOTO #3 - GENERAL TOPSIDE VIEW LOOKING WEST

PHOTO #4 - GENERAL UNDERSIDE VIEW LOOKING EAST, EAST SPAN

SHOWN

PHOTO #5 - TYPICAL TRANSVERSE CRACKING OF DECK UNDERSIDE,

BAY #2 OF EAST SPAN SHOWN

PHOTO #6 - DETERIORATION OF ASPHALTIC PLUG JOINT SYSTEM

OVER PIER; NOTE EXPOSED JOINT MATERIAL

PHOTO #7 - CLOSE-UP VIEW OF ASPHALTIC

PLUG JOINT SYSTEM OVER PIER

PHOTO #8 - TYPICAL DEBRIS ACCUMULATION

AND VEGETATION GROWTH ALONG

CURBLINES, NORTH CURBLINE SHOWN

PHOTO #9 - HEAVY ACCUMULATION OF DEBRIS

AND VEGETATION GROWTH ALONG SOUTH

CURBLINE AT WEST END

PHOTO #10 - TYPICAL BULGING AND

CRACKING OF BEARING PADS AT EAST

ABUTMENT, BEAM #1 BEARING SHOWN

PHOTO #11 - TYPICAL SPOT RUSTING OF BEAM BOTTOM FLANGES,

BEAM #2 IN WEST SPAN SHOWN

PHOTO #12 - GENERAL VIEW OF WEST ABUTMENT; NOTE VOID AT

BOTTOM OF MASONRY AT NORTH SIDE AT BOULDER FOUNDATION

PHOTO #13 - GENERAL VIEW OF EAST

ABUTMENT

PHOTO #14 - VINE GROWTH ON SOUTH SIDE

OF EAST ABUTMENT

PHOTO #15 - SEPARATION BETWEEN EAST

ABUTMENT MASONRY WALL AND CONCRETE

WALL

CAMP TWO BRIDGE INSPECTION DATE: 5/17/16

STRUCTURE NO. 5460 162P

PHOTO #16 - SPALLING ALONG EDGES OF

ORIGINAL BEARING SEAT AT EAST ABUTMENT

PHOTOGRAPHS

PHOTO #17 - SEPARATION OF NORTHEAST WINGWALL ALONG BACK

OF BACKWALL AND BOTTOM OF APPROACH SLAB

PHOTO #18 - SEPARATION OF MASONRY WALL AND CONCRETE AT

EAST ABUTMENT BREASTWALL

STRUCTURE NO. 5460 162PPHOTOGRAPHS

PHOTO #19 - GENERAL VIEW OF PIER, EAST FACE

PHOTO #20 - SCOUR AT UPSTREAM SIDE OF PIER FOOTING

PHOTO #21 - SCOUR ALONG WEST SIDE OF PIER FOOTING

PHOTO #22 - UNDERMINING ALONG WEST SIDE OF PIER FOOTING

PHOTO #23 - COLLISION DAMAGE TO SOUTHEAST APPROACH

GUARDRAIL

PHOTO #24 - MISSING NUTS ON BASE PLATE AT NORTHEAST TERMINAL

END, SECOND POST FROM END

PHOTO #25 - NUTS LOOSE ON BASE PLATE AT

NORTHEAST TERMINAL END

PHOTO #26 - TYPICAL TRANSVERSE CRACK IN

APPROACH PAVEMENT OVER FREE END OF

EAST APPROACH SLAB, WESTBOUND LANE

SHOWN

PHOTO #27 - VIEW FROM BRIDGE LOOKING UPSTREAM

PHOTO #28 - VIEW FROM BRIDGE LOOKING DOWNSTREAM