This is a pricing template spreadsheet for vendors to provide costs for dry docking services for the PF204 patrol boat. The template breaks down pricing into 17 major service categories including drydocking, plate renewal, structural repairs, ultrasonic testing, zinc replacements, hull cleaning/painting, fuel tank cleaning/inspection, rudder work, propeller maintenance, shaft maintenance, window sealing, hatch gasket replacement, exhaust piping replacement, void testing, sea valve renewal, and miscellaneous repairs. The sheet includes columns for materials costs, labor hours, labor rates, and total costs, with a pre-populated supplemental material and labor amount of $118,475.00.

The related contract opportunity is being issued by the Maritime Administration (MARAD) for dry docking services to be performed in the Hampton Roads area within 45 days of vessel delivery. The contractor must be located within the specified geographic area including the James River, Elizabeth River branches, York River, Mobjack Bay and tributaries. MARAD will deliver and retrieve the vessel from the contractor's facility and will have an on-site representative during most production days.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Vendor Pricing Sheet

VENDOR PRICE SHEET
PF204 DRYDOCKING
ITEMDESCRIPTION OF SERVICESMaterialsLabor HoursLabor Hour RateTotalNotes
1SERVICES- 0
2DRYDOCKING- 0
3PLATE RENEWAL AND STRUCTURAL REPAIRS- 0
3.6.1.3.1.UNDERWATER PLATE- 0
3.6.1.3.2.ABOVE DEEP LOAD LINE- 0
3.6.1.3.2.1REM0VE DOCKING LIGHT COVERS- 0
4ULTRASONIC TESTING- 0
5ZINCS REPLACEMENTS- 0
6HULL CLEANING AND PAINTING- 0
7FUEL TANK CLEANING AND INSPECTION- 0
8REMOVE, INSPECT, AND REINSTALL RUDDERS- 0
9REMOVE, INSPECT, AND REINSTALL BOTH PROPELLERS- 0
10REMOVE, INSPECT, AND REINSTALL BOTH PROPELLER SHAFTS- 0
11RESEAL CABIN WINDOWS- 0
12RE-GASKET MAIN DECK HATCHES- 0
13RESERVED
14REPLACE PORT AND STARBOARD ENGINES EXHAUST FIXED PIPING- 0
15AIR TEST INACCESSIBLE VOIDS- 0
16RENEW SEA VALVES AND HOSES- 0
17MISCELLANEOUS ITEMS AND REPAIRS- 0
17.1REPLACE GFE SHAFT DRIVE SAVERS- 0
17.2REPLACE GFE DRIPLESS SHAFT SEALS- 0
17.3APPLY PROPSPEED TO PROPELLERS, SHAFTS, AND RUDDERS- 0
18SUPPLIMENTAL MATERIAL AND LABOR$ 118,475.00Include a labor rate in cell E28 for $118.475.00 in Supplemental Material and Labor
Total$ - 0$ 118,475.00