Attachment II Price Sheet.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- PF204 Patrol Boat Dry Docking
- Solicitation number
- 6933A225Q000003
About this file
This is a pricing template spreadsheet for vendors to provide costs for dry docking services for the PF204 patrol boat. The template breaks down pricing into 17 major service categories including drydocking, plate renewal, structural repairs, ultrasonic testing, zinc replacements, hull cleaning/painting, fuel tank cleaning/inspection, rudder work, propeller maintenance, shaft maintenance, window sealing, hatch gasket replacement, exhaust piping replacement, void testing, sea valve renewal, and miscellaneous repairs. The sheet includes columns for materials costs, labor hours, labor rates, and total costs, with a pre-populated supplemental material and labor amount of $118,475.00.
The related contract opportunity is being issued by the Maritime Administration (MARAD) for dry docking services to be performed in the Hampton Roads area within 45 days of vessel delivery. The contractor must be located within the specified geographic area including the James River, Elizabeth River branches, York River, Mobjack Bay and tributaries. MARAD will deliver and retrieve the vessel from the contractor's facility and will have an on-site representative during most production days.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Vendor Pricing Sheet
| VENDOR PRICE SHEET | ||||||
| PF204 DRYDOCKING | ||||||
| ITEM | DESCRIPTION OF SERVICES | Materials | Labor Hours | Labor Hour Rate | Total | Notes |
| 1 | SERVICES | - 0 | ||||
| 2 | DRYDOCKING | - 0 | ||||
| 3 | PLATE RENEWAL AND STRUCTURAL REPAIRS | - 0 | ||||
| 3.6.1.3.1. | UNDERWATER PLATE | - 0 | ||||
| 3.6.1.3.2. | ABOVE DEEP LOAD LINE | - 0 | ||||
| 3.6.1.3.2.1 | REM0VE DOCKING LIGHT COVERS | - 0 | ||||
| 4 | ULTRASONIC TESTING | - 0 | ||||
| 5 | ZINCS REPLACEMENTS | - 0 | ||||
| 6 | HULL CLEANING AND PAINTING | - 0 | ||||
| 7 | FUEL TANK CLEANING AND INSPECTION | - 0 | ||||
| 8 | REMOVE, INSPECT, AND REINSTALL RUDDERS | - 0 | ||||
| 9 | REMOVE, INSPECT, AND REINSTALL BOTH PROPELLERS | - 0 | ||||
| 10 | REMOVE, INSPECT, AND REINSTALL BOTH PROPELLER SHAFTS | - 0 | ||||
| 11 | RESEAL CABIN WINDOWS | - 0 | ||||
| 12 | RE-GASKET MAIN DECK HATCHES | - 0 | ||||
| 13 | RESERVED | |||||
| 14 | REPLACE PORT AND STARBOARD ENGINES EXHAUST FIXED PIPING | - 0 | ||||
| 15 | AIR TEST INACCESSIBLE VOIDS | - 0 | ||||
| 16 | RENEW SEA VALVES AND HOSES | - 0 | ||||
| 17 | MISCELLANEOUS ITEMS AND REPAIRS | - 0 | ||||
| 17.1 | REPLACE GFE SHAFT DRIVE SAVERS | - 0 | ||||
| 17.2 | REPLACE GFE DRIPLESS SHAFT SEALS | - 0 | ||||
| 17.3 | APPLY PROPSPEED TO PROPELLERS, SHAFTS, AND RUDDERS | - 0 | ||||
| 18 | SUPPLIMENTAL MATERIAL AND LABOR | $ 118,475.00 | Include a labor rate in cell E28 for $118.475.00 in Supplemental Material and Labor | |||
| Total | $ - 0 | $ 118,475.00 |