This document contains questions and answers regarding Solicitation 6933A220Q000014 for upgrading the electrical distribution systems at offshore platforms located at the James River Reserve Fleet in Fort Eustis, Virginia. Key details include that the contractor will be responsible for stripping out and disposing of unused equipment in all existing switchgears. New switchgears will have only four switching ways and protection settings will match those of platforms 3 and 6. The government will provide and install an Adalet plug for the existing marine cable on platforms 4 and 5. The contractor must submit engineered construction drawings showing all modifications and equipment, though these do not require an engineer's stamp. Remote monitoring of phases, voltage, amps and wattage is listed as an option but an existing system may not support medium to high voltage monitoring.

View the file

Other files for this federal contract opportunity

Other files attached to Upgrade Offshore Electrical Platforms, newest first.
File Type Posted
Cost Estimate Pricing Sheet.xls XLS spreadsheet
QUOTATION SUBMISSION INSTRUCTIONS.pdf PDF
Combined synopsis-solicitation.pdf PDF
Statement of Work - JRRF Off-Shore Electrical Distribution System Modifications (final) 2.10.20.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS

SOLICITATION 6933A220Q0000014

JAMES RIVER RESERVE FLEET

FY20 UPGRADE OFFSHORE ELECTRICAL PLATFORMS

1. For Bid purposes please confirm the new cable to splice from existing feeds to new switch shall be 15kV 4/0 AWG. Yes, the new cable shall be 15kV 4/0 cable from existing feeds to the new switchgear.

2. For Bid Purposes please confirm that the installation of the 2 Adalet couplers will be installed in the existing switchgear. The Adalet connector, (1) One only, feed to ship unit feed will be installed in the existing switchgear and switched by means of termination to new switchgear.

3. For bid purposes please confirm that the contractor is responsible for stripping out the interiors of ALL the switchgear and disposing. The only remailing items should be existing meters and wiring, existing panel and transformers, overhead insulated bus, heaters, and CPT fuses.

Yes, the contractor is responsible for stripping out the interiors and unused equipment in

ALL the existing switchgear and disposing.

4. For bid purposes please acknowledge that the existing switchgear 120V receptacles will be outfitted with new devices and in-use covers.

Yes, all existing switchgear 120V receptacles will be outfitted with new devices and in-use covers.

5. Please confirm that the new switchgears shall only have 4 ways

The new switchgears shall have only 4 switching ways.

6. Please confirm that the protection settings for the new gear shall match the existing set up on platform #3 and #6.

Yes, all protections settings and 50G realy trip settings shall be identical to unit platforms

#3 and #6.

7. Please provide more details for the option of remote monitoring. Internet of Things is more of a methodology rather than a specific model of monitoring.

If available, remote power monitoring shall be accessible via a website or server side software, and be able to monitor phases, voltage, amps and wattage of incoming feeds to switchgear. This can be either through cellular updating with wired or wireless devices on feeds, or by line-of sight back to facility.

8. Is there an existing system that can be utilized for this monitoring?

We have not researched, procured, designed or used this technology before with Medium to High Voltage power. We do already have Remote Monitoring Software and System for secondary voltages (440 VAC – 120 VAC in use) by Monnit, LLC onboard ships and the facility http://www.monnit.com If this technology is not available, then since it is listed as an option, it shouldn’t be included.

9. Is the contractor required to provide an engineered set of construction drawings and specifications? If so, do these need to be stamped by an Electrical Engineer. If not what type of details are required.

Yes, this is included in the Documentation portion of the Statement of Work. All modifications to the existing platform stations and wiring should be placed on an engineered set of construction drawings. The drawings should show all enclosures, terminations, wire sizes and notes listing what has changed to existing platform and what equipment parts were used. It does not have to be stamped by an Electrical Engineer.

10. Please confirm that the government will furnish and install the Adalet plug to the existing marine cable.

Yes, the government will furnish and install Adalet plug to existing marine cable which feeds ship units on Platforms #4 and #5.