This cost estimate pricing sheet provides line item pricing for upgrading the electrical distribution system at the James River Reserve Fleet located at Fort Eustis, Virginia. The upgrades include replacing the original primary switchgear stations to the same standard outlined in the attached statement of work. Specific line items on the cost estimate include deliverables, switching station components, auxiliary equipment, installation, testing, and other work. However, all pricing fields in the cost estimate form are currently blank, indicating this is a template or preliminary pricing sheet rather than a finalized proposal. The related federal contract opportunity is a solicitation from the Department of Transportation to complete the upgrades to the remaining original distribution system primary switchgear stations at the specified location, with site visits required.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers.pdf | ||
| QUOTATION SUBMISSION INSTRUCTIONS.pdf | ||
| Combined synopsis-solicitation.pdf | ||
| Statement of Work - JRRF Off-Shore Electrical Distribution System Modifications (final) 2.10.20.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Sheet
| FORM MA-434 | U. S. DEPARTMENT OF TRANSPORTATION | ESTIMATE | CHANGE NO. | SHEET NO. | ||||||
| (12-95) | MARITIME ADMINISTRATION | Preliminary | ||||||||
| DESIGN | ESTIMATED BY | |||||||||
| COST ESTIMATE - WORK SHEET | JRRF Power Station Upgrades | |||||||||
| ITEM | TITLE | DATE | 43894.64431469907 | |||||||
| Summary Sheet | 43894.64431469907 | |||||||||
| @ per/hr | ||||||||||
| SUB | $0 | |||||||||
| ITEM | Work Content | Material | Labor Hrs | Labor $ | Sub-Total | Engr | Misc Mat'l | Misc Labr | Total | |
| Part 1 | General | |||||||||
| 1.4 | Deliverables | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 1.4.1 | Manufacturers Catalog Data | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 1.4.2 | Drawings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 1.4.3 | Reports | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Subtotal | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Part 2 | Products | |||||||||
| 2.1 | Product Coordination | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 2.2 | Switching Station | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 2.2.1 | Incoming Sections | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 2.2.1.1 | Conductor Termination | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 2.2.2 | Primary Switches | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 2.2.3 | Auxiliary Section | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 2.2.3.1 | Control Power Transformer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 2.2.3.2 | Primary Protection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 2.2.3.3 | Secondary Protection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 2.2.4 | Control Devices | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 2.2.4.1 | Instrument Transformer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 2.2.4.2 | Heaters | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 2.2.4.3 | Pilot and Indicating Lights | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 2.2.5 | Insulated Phase Barriers | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 2.2.6 | Finish | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 2.2.7 | Corrosion Protection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 2.2.8 | Terminal Boards | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 2.2.9 | Wire Marking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 2.2.10 | Surge Arrestor | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 2.3 | Nameplates | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 2.4 | Warning Signs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 2.5 | Source Quality Control | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Subtotal | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Part 3 | Execution | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 3.1 | Installation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 3.2 | Grounding | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 3.2.1 | Grounding and Bonding Equipment | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 3.3 | Installation of Equipment and Assemblies | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 3.3.1 | Medium Voltage Switches | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 3.4 | Field Quality Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 3.4.1 | Performance of Acceptance Tests | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 3.4.2 | Field Dielectric Tests | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 3.4.3 | Follow-up Verification | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Subtotal | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Grand Total | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |