Quote_Pricing_Sheet.xlsx
XLSX spreadsheet 24 KB Posted
- Solicitation number
- 6933A218Q000021
About this file
Attachment 1 - Quote Pricing Sheet
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Abstract
| QUOTE PRICING SHEET-ATTACHMENT 1 | |||||
| 6933A218Q000021 T.S. KENNEDY - Life Boat Annual service and fall renewal | |||||
| ITEM | DESCRIPTION OF SERVICES | Quantity | Unit | UnitPrice | Amount |
| Life Boat Annual service and Fassmer fall renewal | |||||
| 0001 | ANNUAL THOROUGH EXAMINATION |
Remove and/or secure, as necessary, the lifeboats/rescue boats listed below in order to conduct the annual thorough examination in accordance with the above references to the satisfaction of the regulatory authorities and the COTR.
| Provide the services of a technician qualified in accordance with SOLAS MSC.1/Circ.1277 to work on Fassmer, Umoe Schatt-Harding and Ned Deck equipment to perform the below on the listed davits in accordance with the attached Satatement of work: | 1 | LO | ||||
| 0001a | Lifeboat #1- Contractor is to provide labor, material and a technical expert to conduct the annual thorough examination in accordance with the above references to the satisfaction of the regulatory authorities and the COR using the specification listed below and as defined in the associated technical manuals. | 1 | EA | |||
| 0001b | Lifeboat #2- Contractor is to provide labor, material and a technical expert to conduct the annual thorough examination in accordance with the above references to the satisfaction of the regulatory authorities and the COR using the specification listed below and as defined in the associated technical manuals. | 1 | EA | |||
| 0001c | Lifeboat #3- Contractor is to provide labor, material and a technical expert to conduct the annual thorough examination in accordance with the above references to the satisfaction of the regulatory authorities and the COR using the specification listed below and as defined in the associated technical manuals. | 1 | EA | |||
| 0001d | Lifeboat #4- Contractor is to provide labor, material and a technical expert to conduct the annual thorough examination in accordance with the above references to the satisfaction of the regulatory authorities and the COR using the specification listed below and as defined in the associated technical manuals. | 1 | EA | |||
| 0001e | Lifeboat #5- Contractor is to provide labor, material and a technical expert to conduct the annual thorough examination in accordance with the above references to the satisfaction of the regulatory authorities and the COR using the specification listed below and as defined in the associated technical manuals. | 1 | EA | |||
| 0001f | Lifeboat #6- Contractor is to provide labor, material and a technical expert to conduct the annual thorough examination in accordance with the above references to the satisfaction of the regulatory authorities and the COR using the specification listed below and as defined in the associated technical manuals. | 1 | EA | |||
| 0001g | Lifeboat #7- Contractor is to provide labor, material and a technical expert to conduct the annual thorough examination in accordance with the above references to the satisfaction of the regulatory authorities and the COR using the specification listed below and as defined in the associated technical manuals. | 1 | EA | |||
| 0001h | Lifeboat #8- Contractor is to provide labor, material and a technical expert to conduct the annual thorough examination in accordance with the above references to the satisfaction of the regulatory authorities and the COR using the specification listed below and as defined in the associated technical manuals. | 1 | EA | |||
| 0001i | Fast rescue boat and davit- Contractor is to provide labor, material and a technical expert to conduct the annual thorough examination in accordance with the above references to the satisfaction of the regulatory authorities and the COR using the specification listed below and as defined in the associated technical manuals. | 1 | EA | |||
| 0001j | Life Raft Davit #1- Contractor is to provide labor, material and a technical expert to conduct the annual thorough examination in accordance with the above references to the satisfaction of the regulatory authorities and the COR using the specification listed below and as defined in the associated technical manuals. | 1 | EA | |||
| 0001k | Life Raft Davit #2- Contractor is to provide labor, material and a technical expert to conduct the annual thorough examination in accordance with the above references to the satisfaction of the regulatory authorities and the COR using the specification listed below and as defined in the associated technical manuals. | 1 | EA | |||
| 0001l | Life Raft Davit #3- Contractor is to provide labor, material and a technical expert to conduct the annual thorough examination in accordance with the above references to the satisfaction of the regulatory authorities and the COR using the specification listed below and as defined in the associated technical manuals. | 1 | EA | |||
| 0001m | Life Raft Davit #4- Contractor is to provide labor, material and a technical expert to conduct the annual thorough examination in accordance with the above references to the satisfaction of the regulatory authorities and the COR using the specification listed below and as defined in the associated technical manuals. | 1 | EA | |||
| 0002 | FALLS RENEWAL and WEIGHT TEST LIFEBOATS & LIFESAVING EQUIPMENT- 2.1.1. Contractor is to provide labor, material and technical expert to renew the falls on two lifeboats (Life Boats #5 and 6) and the rescue boat davit in accordance with the attached Satatement of work. All existing falls are to be properly disposed of, and all new falls are to be certificated and inspected by the COR and USCG before and during installation. Prior to commencement of work on lifeboat falls, the Contractor shall remove and cradle the boats for all or part of the following evolutions -- crane and labor to support the removal and reinstallation of the boats shall be included in the fixed price bid. | 1 | LO | |||
| 0002a | Contractor is to provide labor, material and technical expert to renew the fall wire rope on Lifeboat Davit #1, 02 Deck, Starboard, FWD and perform the associated recertification and weight test to the satisfactions of the regulatory authorities and the COR in accordance with the specification listed below and as defined in the associated technical manuals and references. The Boat and davit OEM service is provided by: Harding Safety, the davit is a Type SPG (L) 27/15 gravity pivot davit with type BE 11.5 winch. | 1 | EA | |||
| 0002b | Contractor is to provide labor, material and technical expert to renew the fall wire rope on Lifeboat Davit #2, 02 Deck, Port, FWD and perform the associated recertification and weight test to the satisfactions of the regulatory authorities and the COR in accordance with the specification listed below and as defined in the associated technical manuals and references. The Boat and davit OEM service is provided by: Harding Safety, the davit is a Type SPG (L) 27/15 gravity pivot davit with type BE 11.5 winch. | 1 | EA | |||
| 0002c | Contractor is to provide labor, material and technical expert to renew the fall wire rope on Lifeboat Davit #3, 02 Deck, Starboard, FWD and perform the associated recertification and weight test to the satisfactions of the regulatory authorities and the COR in accordance with the specification listed below and as defined in the associated technical manuals and references. The Boat and davit OEM service is provided by: Harding Safety, the davit is a Type SPG (L) 27/15 gravity pivot davit with type BE 11.5 winch. | 1 | EA | |||
| 0002d | Contractor is to provide labor, material and technical expert to renew the fall wire rope on Lifeboat Davit #4, 02 Deck, Port, FWD and perform the associated recertification and weight test to the satisfactions of the regulatory authorities and the COR in accordance with the specification listed below and as defined in the associated technical manuals and references. The Boat and davit OEM service is provided by: Harding Safety, the davit is a Type SPG (L) 27/15 gravity pivot davit with type BE 11.5 winch. | 1 | EA | |||
| 0002e | Contractor is to provide labor, material and technical expert to renew the fall wire rope on Lifeboat Davit #7, 02 Deck, Starboard, AFT and perform the associated recertification and weight test to the satisfactions of the regulatory authorities and the COR in accordance with the specification listed below and as defined in the associated technical manuals and references. The Boat and davit OEM service is provided by: Harding Safety, the davit is a Type SPG (L) 27/15 gravity pivot davit with type BE 11.5 winch. | 1 | EA | |||
| 0002f | Contractor is to provide labor, material and technical expert to renew the fall wire rope on Lifeboat Davit #8, 02 Deck, Port, AFT and perform the associated recertification and weight test to the satisfactions of the regulatory authorities and the COR in accordance with the specification listed below and as defined in the associated technical manuals and references. The Boat and davit OEM service is provided by: Harding Safety, the davit is a Type SPG (L) 27/15 gravity pivot davit with type BE 11.5 winch. | 1 | EA | |||
| 0002g | Contractor is to provide labor, material and technical expert to renew the fall wire rope on Life Raft Davit #1 Stbd, Main Deck, Forward, and perform the associated recertification and weight test to the satisfactions of the regulatory authorities and the COR in accordance with the specification listed below and as defined in the associated technical manuals and references. The davit OEM service is provided by: Harding Safety, the davit is an Edgewater Machine & Fabricators, Type SEC Davit. | 1 | EA | |||
| 0002h | Contractor is to provide labor, material and technical expert to renew the fall wire rope on Life Raft Davit #2 Port, Main Deck, Forward, and perform the associated recertification and weight test to the satisfactions of the regulatory authorities and the COR in accordance with the specification listed below and as defined in the associated technical manuals and references. The davit OEM service is provided by: Harding Safety, the davit is an Edgewater Machine & Fabricators, Type SEC Davit. | 1 | EA | |||
| 0002i | Contractor is to provide labor, material and technical expert to renew the fall wire rope on Life Raft Davit #3 Stbd, Main Deck, Forward, and perform the associated recertification and weight test to the satisfactions of the regulatory authorities and the COR in accordance with the specification listed below and as defined in the associated technical manuals and references. The davit OEM service is provided by: Harding Safety, the davit is an Edgewater Machine & Fabricators, Type SEC Davit. | 1 | EA | |||
| 0002j | Contractor is to provide labor, material and technical expert to renew the fall wire rope on Life Raft Davit #3 Port, Main Deck, Forward, and perform the associated recertification and weight test to the satisfactions of the regulatory authorities and the COR in accordance with the specification listed below and as defined in the associated technical manuals and references. The davit OEM service is provided by: Harding Safety, the davit is an Edgewater Machine & Fabricators, Type SEC Davit. | 1 | EA | |||
| 0003 | GEAR BOX CLEANING, FLUSH AND OIL RENEWAL WITH AN OEM RECOMMENDED ENVIRONMENTALLY ACCEPTABLE LUBRICANT (EAL).-Remove and/or secure, as necessary, the lifeboats/rescue boats listed below in order to conduct the oil change on each of the gear boxes associated with the launching and retrieval system in accordance with the attached Satatement of work. The gear box shall be thoroughly cleaned, and flushed of any residual oil and refilled with an environmentally acceptable lubricant (EAL) approved by the COR and acceptable to the OEM. (Certification from the OEM is required for compatibility with seals and gaskets). To provide consistency with other EAL installed on the ship the contractor should provide Terresolve Technologies products when available. | 1 | EA | $ - 0 | ||
| 0003a | Lifeboat Davit #1- Remove and/or secure, as necessary, the lifeboats/rescue boats listed below in order to conduct the oil change on each of the gear boxes associated with the launching and retrieval system. The gear box shall be thoroughly cleaned, and flushed of any residual oil and refilled with an environmentally acceptable lubricant (EAL) approved by the COR and acceptable to the OEM. (Certification from the OEM is required for compatibility with seals and gaskets). | 1 | EA | |||
| 0003b | Lifeboat Davit #2- Remove and/or secure, as necessary, the lifeboats/rescue boats listed below in order to conduct the oil change on each of the gear boxes associated with the launching and retrieval system. The gear box shall be thoroughly cleaned, and flushed of any residual oil and refilled with an environmentally acceptable lubricant (EAL) approved by the COR and acceptable to the OEM. (Certification from the OEM is required for compatibility with seals and gaskets). | 1 | EA | |||
| 0003c | Lifeboat Davit #3- Remove and/or secure, as necessary, the lifeboats/rescue boats listed below in order to conduct the oil change on each of the gear boxes associated with the launching and retrieval system. The gear box shall be thoroughly cleaned, and flushed of any residual oil and refilled with an environmentally acceptable lubricant (EAL) approved by the COR and acceptable to the OEM. (Certification from the OEM is required for compatibility with seals and gaskets). | 1 | EA | |||
| 0003d | Lifeboat Davit #4- Remove and/or secure, as necessary, the lifeboats/rescue boats listed below in order to conduct the oil change on each of the gear boxes associated with the launching and retrieval system. The gear box shall be thoroughly cleaned, and flushed of any residual oil and refilled with an environmentally acceptable lubricant (EAL) approved by the COR and acceptable to the OEM. (Certification from the OEM is required for compatibility with seals and gaskets). | 1 | EA | |||
| 0003e | Lifeboat Davit #5- Remove and/or secure, as necessary, the lifeboats/rescue boats listed below in order to conduct the oil change on each of the gear boxes associated with the launching and retrieval system. The gear box shall be thoroughly cleaned, and flushed of any residual oil and refilled with an environmentally acceptable lubricant (EAL) approved by the COR and acceptable to the OEM. (Certification from the OEM is required for compatibility with seals and gaskets). | 1 | EA | |||
| 0003f | Lifeboat Davit #6- Remove and/or secure, as necessary, the lifeboats/rescue boats listed below in order to conduct the oil change on each of the gear boxes associated with the launching and retrieval system. The gear box shall be thoroughly cleaned, and flushed of any residual oil and refilled with an environmentally acceptable lubricant (EAL) approved by the COR and acceptable to the OEM. (Certification from the OEM is required for compatibility with seals and gaskets). | 1 | EA | |||
| 0003g | Lifeboat Davit #7- Remove and/or secure, as necessary, the lifeboats/rescue boats listed below in order to conduct the oil change on each of the gear boxes associated with the launching and retrieval system. The gear box shall be thoroughly cleaned, and flushed of any residual oil and refilled with an environmentally acceptable lubricant (EAL) approved by the COR and acceptable to the OEM. (Certification from the OEM is required for compatibility with seals and gaskets). | 1 | EA | |||
| 0003h | Lifeboat Davit #8- Remove and/or secure, as necessary, the lifeboats/rescue boats listed below in order to conduct the oil change on each of the gear boxes associated with the launching and retrieval system. The gear box shall be thoroughly cleaned, and flushed of any residual oil and refilled with an environmentally acceptable lubricant (EAL) approved by the COR and acceptable to the OEM. (Certification from the OEM is required for compatibility with seals and gaskets). | 1 | EA | |||
| 0003i | Fast rescue boat and davit- Remove and/or secure, as necessary, the Fast rescue boat listed below in order to conduct the oil change on each of the gear boxes associated with the launching and retrieval system. The gear box shall be thoroughly cleaned, and flushed of any residual oil and refilled with an environmentally acceptable lubricant (EAL) approved by the COR and acceptable to the OEM. (Certification from the OEM is required for compatibility with seals and gaskets). | 1 | EA | |||
| 0003j | Life Raft Davit #1- Conduct the oil change on each of the gear boxes associated with the launching and retrieval system. The gear box shall be thoroughly cleaned, and flushed of any residual oil and refilled with an environmentally acceptable lubricant (EAL) approved by the COR and acceptable to the OEM. (Certification from the OEM is required for compatibility with seals and gaskets). | 1 | EA | |||
| 0003k | Life Raft Davit #2- Conduct the oil change on each of the gear boxes associated with the launching and retrieval system. The gear box shall be thoroughly cleaned, and flushed of any residual oil and refilled with an environmentally acceptable lubricant (EAL) approved by the COR and acceptable to the OEM. (Certification from the OEM is required for compatibility with seals and gaskets). | 1 | EA | |||
| 0003l | Life Raft Davit #3- Conduct the oil change on each of the gear boxes associated with the launching and retrieval system. The gear box shall be thoroughly cleaned, and flushed of any residual oil and refilled with an environmentally acceptable lubricant (EAL) approved by the COR and acceptable to the OEM. (Certification from the OEM is required for compatibility with seals and gaskets). | 1 | EA | |||
| 0003m | Life Raft Davit #4- Conduct the oil change on each of the gear boxes associated with the launching and retrieval system. The gear box shall be thoroughly cleaned, and flushed of any residual oil and refilled with an environmentally acceptable lubricant (EAL) approved by the COR and acceptable to the OEM. (Certification from the OEM is required for compatibility with seals and gaskets). | 1 | EA | |||
| 0004 | Supplemental expenses are not specifically expected, however it is requested that a stabilized labor rate be provided applicable to any emergent work related to this statement of work. For pricing purposes, the bidder shall provide a stabilized rate, with extended pricing, for a total of 40 man-hours of supplemental labor. This funding, if required, shall be tasked by the COR via a Change Order. No other party but the COR or CO (Contracting Officer) may task changes or supplementals. | 40 | HR | |||
| 0005 | Supplemental Material- Supplemental expenses are not specifically expected, however it is requested that the bidder make allowance for up to $5,000 in supplemental material charges, with NO BURDEN. Invoices for these materials shall be provided to the COR upon request. This funding, if required, will be tasked by the COTR via Change Order. No other party but the COR or CO (Contracting Officer) may task changes or supplementals. | 1 | EA | $ 5,000.00 | $ 5,000.00 | |
| Total | $ 5,000.00 |
File details come from the government source that posted it.