AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO.

PAGE OF PAGES

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

Items 8 and 15, and returning is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required.)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO THE AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14.

E. IMPORTANT: Contractor is not, is required to sign this document and return

ORDER NO. IN ITEM 10A.

1 7

0003 07/14/2021

AAQ-610 Grants & R&D FAA William J. Hughes Technical Center Building 300, Fourth Floor Atlantic City International Airport

AAQ610-AFN

Karen Thorngren Atlantic City NJ 08405

AAQ-610 Facilities & Grants FAA William J. Hughes Technical Center Fourth Floor, Bldg 300 Atlantic City International Airport

AAQ610-AFN

Karen Thorngren Atlantic City NJ 08405 x

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By ___________ x x

692M15-21-R-00022 copies to the issuing office.

06/23/2021

(x)

A. The purpose of this amendment is to correct the CLIN numbering in SIR Table B-1 to match

Attachment A - Pricing Spreadsheet per the attached revised SIR Page 5 of 109 and Page 6 of

109.

B. SIR Paragraph L.11.3, Paragraph 4 is revised to add, "to include Program Management" to the last sentence, add "Only labor categories contained on Attachment B - Labor Category

Descriptions and Qualifications shall be used in the pricing of CLIN X001" and "In addition to this requirement, the Offeror may submit an Excel spreadsheet with these calculations to facilitate in the Government’s review" per the attached revised SIR Page 101 of 109.

C. The tab numbering in SIR Paragraph L.11.2 Price Proposal is corrected to match

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. CONTRACT AUTHORITY 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Karen C. Thorngren

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 7

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

692M15-21-R-00022/0003

Attachment A - Pricing Spreadsheet and the contract start date is corrected to read

September 20, 2021 per the attached revised SIR

Page 100 of 109.

D. SIR Paragraph L.11.2 Price Proposal, subparagraph 3, has been modified per the attached revised SIR Page 100 of 109.

E. SIR Attachment B-Labor Category Descriptions and Qualifications has been modified per the attached.

Period of Performance: 09/20/2021 to 09/19/2026

This is a Cost Reimbursable with no fee CLIN. Any General and Administrative Expense (G&A) percentage to be charged must be included in the price proposal. An estimated Not to Exceed (NTE) value is entered in the attached pricing spreadsheet (Attachment A) for proposal purposes.

Table B-1 – Contract Line Item Structure for Period of Performance (5 years)

CLIN CLIN Description Ceiling Amounts

0001 Operations & Maintenance – Ordering Period 1 To be determined at the task order level

0002 Materials – Ordering Period 1 To be determined at the task order level

0003 Special Projects – Ordering Period 1 To be determined at the task order level

0004 Travel – Ordering Period 1 To be determined at the task order level

00051001 Operations & Maintenance – Ordering Period 2 To be determined at the task order level

00061002 Materials – Ordering Period 2 To be determined at the task order level

00071003 Special Projects – Ordering Period 2 To be determined at the task order level

00081004 Travel – Ordering Period 2 To be determined at the task order level

00092001 Operations & Maintenance – Ordering Period 3 To be determined at the task order level

00102002 Materials – Ordering Period 3 To be determined at the task order level

00112003 Special Projects – Ordering Period 3 To be determined at the task order level

00122004 Travel – Ordering Period 3 To be determined at the task order level

00133001 Operations & Maintenance – Ordering Period 4 To be determined at the task

Amendment 0003 order level 00143002 Materials – Ordering Period 4 To be determined at the task order level

00153003 Special Projects – Ordering Period 4 To be determined at the task order level

00163004 Travel – Ordering Period 4 To be determined at the task order level

00174001 Operations & Maintenance – Ordering Period 5 To be determined at the task order level

00184002 Materials – Ordering Period 5 To be determined at the task order level

00194003 Special Projects – Ordering Period 5 To be determined at the task order level

00204004 Travel – Ordering Period 5 To be determined at the task order level

Clause List

The remainder of this page has been intentionally left blank.

SIR will be adequate for its price evaluation; however, the Government reserves the right to request additional information other than certified cost and pricing data, if it is determined necessary to ensure a fair and reasonable price.

L.11.1 - Price Volume Content

The Offeror must provide the following information on the first page of the Offeror’s price proposal:

a. Solicitation number.

b. Name and address of Offeror, point of contact information for an authorized negotiator, CAGE code(s), and DUNS Number(s).

c. Total proposed price.

d. Name, address, telephone, and email address of the Government cognizant contract audit office for the prime and each subcontractor/team member, if available.

e. Name, address, telephone, and email address of the Government cognizant contract administration office for the prime and each subcontractor/team member, if available.

The following documents and information must be included in the Offeror’s pricing proposal:

a. Fully completed Attachment A – Pricing Spreadsheet;

b. Price Narrative to support the information included in Attachment A – Pricing Spreadsheet; and

c. Any exceptions, deviations, or assumptions made regarding the SIR.

Please see the following sections for further descriptions of the information required in the Price Proposal.

L.11.2 Price Proposal

The Offeror must complete each individual tab within Attachment A – Pricing Spreadsheet of this SIR. The Offeror must complete all tabs within the attachment that contain cells shaded in grey. The Offeror is advised that a submission with discrepancies or omissions may be considered incomplete and eliminated from further evaluation.

Attachment A is comprised of instructions and multiple worksheets, described as follows:

1. Tab CA.1 – CLIN Summary: Summary of Offeror’s CLIN pricing. The Offeror must fill in the grey shaded cells with proposed pricing for CLIN X001. Materials CLIN X002 and Travel CLIN X004 prices are populated with the Government NTE estimated amounts. The NTE amounts already include indirect expenses to be applied to the actual expenses incurred. Materials and travel are non-fee bearing costs. Special Projects CLIN X004 amounts are linked to the totals on the C.2 Special Projects Tab. The Total Evaluated Price (TEP) will automatically calculate the sum of CLINs X001 through X004.

2. Tab CA.2 – Special Projects: This worksheet provides the Government estimated materials and labor hours based on historical level-of-effort for special projects. This tab is for informational purposes only. The Offeror’s proposed fully burdened labor rates, which are required on Tab C.3 – Rates, are linked to this tab and will populate once the Offeror completes Tab C.3 – Rates. The totals for each contract year will sum the Government estimated labor hours multiplied by the Offeror’s proposed fully burdened labor rates and the Government estimated materials amounts.

3. Tab CA.3 – Rates: The Offeror must provide fully burdened labor rates by filling in the grey shaded cells with proposed direct labor rates, indirect rates, profit, escalation rates, and overtime rates for each of the requested labor categories. The fully burdened labor rates must include all direct labor, indirect costs (such as fringe benefits, overhead, and G&A) and profit. Each Offeror must assume a contract start date of September 1 20, 2021 for the Base Year. Only one rate per labor category will be allowed, whether the work is performed by the prime contractor or any of its subcontractors. The methodology used to develop the fully burdened labor rates must reconcile to the narrative supporting the rate buildup, discussed in further detail in Section L.11.3 below. Subcontractor rates used in the prime Offeror’s proposal must match the rates in the respective subcontractor’s proposal submission. The Labor Categories and Minimum Qualifications are included as Attachment B – Labor Category Description and Qualifications.

L.11.3 Price Proposal Narrative

The Offeror must provide a narrative that addresses the following areas:

1. Rationale used for development of the proposed labor rates and labor overtime rates. The Offeror must explain the rationale and methodologies used to buildup and develop the rates, including blended rates, if applicable. The fully burdened rates in Attachment A – Pricing Spreadsheet must be traceable to the rationale and methodology described.

2. Rationale used for the development of proposed escalation. Direct labor rates must be specifically identified and supported by written discussion of the escalation and escalation methodology applied.

3. Identify all proposed indirect rates, to include allocation bases, and describe the company’s accounting practices for application of the rates. Offerors must also identify and provide any indirect cost rate that would be applied to materials and travel costs.

4. A Basis of Estimate (BOE) information for CLIN X001. The BOE must clearly identify and explain in detail the logic, rationale, assumptions, contingencies and calculations used to estimate the resources required to arrive at the proposed price. Additionally, each BOE must identify by number the corresponding section or sections of the Statement of Work (SIR Section C) it is associated with, as well as address each of the activities and deliverables specified within that section. Offerors must individually address all sections and subsections of SIR Section C- Statement of Work being proposed under CLIN X001, to include Program Management.

Only labor categories contained on Attachment B - Labor Category Descriptions and Qualifications shall be used i n the pricing of CLIN X001.

Each BOE must address and show by cost element the factors and calculations used to arrive at the proposed price.

The cost elements should only include labor categories, hours and rates.

The Offeror must incorporate tables into their narrative to show the calculations of all the elements required in the development of their BOE (labor categories, hours and rates). In addition to this requirement, the Offeror may submit an Excel spreadsheet with these calculations to facilitate in the Government’s review.

The Government reserves the right to request any additional data, supporting schedules, or other information that will facilitate the Government's evaluation of the price proposal.

L.11.4 Exceptions, Deviations, and Assumptions

The Offeror’s price proposal must include any exceptions, deviations, and assumptions section that identifies and explains in detail any exceptions, deviations, or assumptions taken with the requirements of the SIR. Any exceptions, deviations, and/or assumptions taken must contain sufficient amplification and justification to permit evaluation. All exceptions, deviations, assumptions, and benefits to the FAA must be fully explained for each exception taken. Exceptions and deviations will not, of themselves, automatically cause a proposal to be termed unacceptable. However, the Government advises the Offeror that taking exception to or deviating from any term or condition of the SIR may make an offer unacceptable, and the proposal un-awardable.

If no exceptions, deviations, or assumptions are taken, the proposal must affirmatively state that none have been taken.

T he remainder of this page has been intentionally left blank.

ATTACHMENT B - LABOR CATEGORY DESCRIPTION AND QUALIFICATIONS

Program Manager* – This candidate must have a 4-year BachelorsBachelor’s of Science Degree in engineering from from an accredited college or university with at least ten years of program management experience. This candidate provides overall program management support and management of personnel working in a technical research environment. Candidate must be proficient in Government contracting, engineering and design standards, planning tools (i.e. work breakdown structures, Gantt charts, critical path analyses, PERT charts, etc.), budgeting, scheduling, and technical report development.

Pavement Technician 1 – This candidate shall have formal technical training to provide expertise in a key area needed to support task areas such as applied research, design, development, testing, process improvement, or other fields of tasking. Candidate shall have at least one-year of experience in airport/aircraft related instrumentation systems or procedures in civil engineering work.

Pavement Technician 2 - This candidate shall have formal technical training to provide expertise in a key area needed to support task areas such as applied research, design, development, testing, process improvement, or other fields of tasking. Candidate shall have at least 3-years of experience in airport/aircraft related instrumentation systems or procedures in civil engineering work.

Pavement Technician 3 - This candidate shall have formal technical training to provide expertise in a key area needed to support task areas such as applied research, design, development, testing, process improvement, or other fields of tasking. Candidate shall have at least 6-years of experience in airport/aircraft related instrumentation systems or procedures in civil engineering work.

Pavement Technician 4* - This candidate shall have formal technical training to provide expertise in a key area needed to support task areas such as applied research, design, development, testing, process improvement, or other fields of tasking. Candidate shall have at least 10-years of experience in airport/aircraft related instrumentation systems or procedures in civil engineering work.

Heavy Vehicle Simulator Operator – This candidate shall have at least 5-years of experience in operating and maintaining Heavy Vehicle Simulator (HVS) or similar type of equipment, possess in depth knowledge of electrical, mechanical and hydraulic systems, and provide assistance in performing Heavy Weight Deflectometer (HWD) tests on the pavement test sections constructed at the FAA facility and perform maintenance as required by the maintenance schedule on both HVS and HWD equipment. Heavy Vehicle Simulator Operator is expected to assist other technician task as required when heavy vehicle operation is not required.

System/Network Administrator* – This candidate shall have a 4-year Bachelors of Science degree in computer science, information technology, or information system from an accredited college or university with at least 15 years’ experience in information systems, with the focus on servers, operating system, and network administration, security, and system engineering. Must have experience with servers/operating system/network and security infrastructure design and installation, information security regulations and configuration; must be proficient with IIS, SQL Server, operating systems and local area networks.

*- Key Personnel

692M15-21-R-00022 Amendment 0003
692M15-21-R-00022 Amendment 0003 Pgs 5 & 6
692M15-21-R-00022 Amendment 0003 Pgs 100 & 101
692M15-21-R-00022 Amendment 0003 Atch B

File details come from the government source that posted it. Updated .