TRL Calculation.xls

XLS spreadsheet 625 KB Posted

Attached to
UAS BROAD AGENCY ANNOUNCEMENT Solicitation Number: 692M15-19-R-00020 Closure and Call 5 Closure
Solicitation number
692M15-19-R-00020
Issued by

About this file

This Broad Agency Announcement solicits proposals to support the Federal Aviation Administration's Unmanned Aircraft Systems Integration Office. The five-year BAA seeks to advance integration of unmanned aircraft systems through projects involving research, development, testing, and evaluation. White papers may be submitted at any time in response to specific Calls issued under the BAA. Call 001 is currently open, with questions to be directed to the contracting officer. Interested parties should monitor the Federal Aviation Administration Contract Opportunities website for amendments, future Calls, and additional details related to this solicitation.

TRL Calculation (xls)

View the file

Other files

File Type Posted
BAA 692M15-19-R-00020_Call 005 Questions and Answers.pdf PDF
TRL Calculation excel.xlsx XLSX spreadsheet
Call for White Papers 005 Sep 21 2023.pdf PDF
BAA 692M15-19-R-00020 Amendment 004.pdf PDF
BAA 692M15-19-R-00020 Amendment 004 Conformed Copy Sep 21 2023.pdf PDF
BAA 692M15-19-R-00020_Call 004 Questions and Answers - updated 10.28.2022.pdf PDF
BAA 692M15-19-R-00020_Call 004 Questions and Answers.pdf PDF
Call_for_White Papers_004 Final.pdf PDF
BAA 692M15-19-R-00020_Amd 003 Final Conformed Copy.pdf PDF
BAA 692M15-19-R-00020_Amendment 003.pdf PDF
Call_for_White Papers_004 Final.pdf PDF
BAA 692M15-19-R-00020_Call 003 Questions and Answers.pdf PDF
BAA 692M15-19-R-00020_Amendment 002.pdf PDF
Call_for_White Papers_003.pdf PDF
BAA 692M15-19-R-00020_Amd 002_Conformed Copy.pdf PDF
Copy of TRL Calculation PP v3.xlsx XLSX spreadsheet
Questions-Responses BAA 692M15-19-R-00020 Amen 01-Call 002-01.pdf PDF
Call_for_White Papers_002_UAS.pdf PDF
TRL Calculations Template.xls XLS spreadsheet
BAA 692M15-19-R-00020_Amd 001.pdf PDF
692M15-19-R-00020 White Paper Call 001.pdf PDF
UAS BAA 692M15-19-R-00020.pdf PDF
BAA Call 001 Questions and Answers 06202019.pdf PDF
UAS BAA 692M15-19-R-00020.pdf PDF
692M15-19-R-00020 White Paper Call 001.pdf PDF
BAA Call 001 Questions and Answers 06202019.pdf PDF
TRL Calculation.xls XLS spreadsheet
TRL Calculation.xls XLS spreadsheet
UAS BAA 692M15-19-R-00020.pdf PDF
692M15-19-R-00020 White Paper Call 001.pdf PDF
UAS BAA 692M15-19-R-00020.pdf PDF
692M15-19-R-00020 White Paper Call 001.pdf PDF
TRL Calculation.xls XLS spreadsheet
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

Main MenuTRL CalculatorRelease Notes
1
AFRL Hardware and Software Transition Readiness Level Calculator, Version 2.2
This worksheet summarizes the TRL Calculator results. It displays the TRL, MRL, and PRL computed elsewhere. You may select the technology types and TRL categories (elements) you wish to include here or on the Calculator worksheet. Choose Hardware, Software, or Both to fit your program. If you omit a category of readiness level, (TRL, MRL, or PRL) that calculation is removed from the summary. The box in front of each readiness level element is checked when that category is included in the summary.
You can enter program identification information here, too.

TRL documentation including discussions of TRL, MRL, and PRL is available from the Main Menu.

0Include Hardware Only
0Include Software Only
XInclude Hardware and Software
XTechnology Readiness Level0
1
XManufacturing Readiness Level0
XProgrammatic Readiness Level0
Green / Yellow set points:Here you can change the default values the spreadsheet uses to determine which color to award at a given level of question completion. System defaults are 100% for Green, and 67%
for Yellow. You can change these set points to any value above 75% for Green, and any value from 50% to 85% for Yellow; however, the Yellow
set point will always be at least 15% below the Green set point. Use the spinners to set your desired values. The defaults kick in if you try to set
a value less than the minimum values of 75% for Green and 50% for Yellow. Start with the "Up" arrow to change defaults.
Green set point is now at:100%Yellow set point is now at:67%7449
10.67
0.67
Summary of the Technology's Readiness to Transition
Program Name:Program Manager:
Date TRL Calculated:
Overall TRL Achieved00Overall TRL is an aggregate TRL that includes contributions from each one of the three readiness level elements you have checked above.
123456789
Green Level Achieved
TRL 0MRL 0PRL 00
0
0
If Green and Yellow are at the same level, only the Green result shows.Yellow Level Achieved
TRL 0MRL 0PRL 00
0
0
The Driver Is:Look-Up Table for Calculating Overall TRL Display Values
2345678910
123456789
TRL1000000000
MRL2000000000
TRL and MRL1TRL & MRL3000000000
1234567892PRL4000000000
3000000000Display Green?4TRL & PRL5000000000
000000000Display Yellow?7MRL & PRL6000000000
000000000Max GreenTRL, MRL & PRL7000000000
000000000Max YellowScore000000000
TRL and PRL123456789123456789max grnmax yel
5000000000Display Green?TRL100000000000000000000
000000000Display Yellow?MRL200000000000000000000
000000000Max GreenTRL & MRL300000000000000000000
000000000Max YellowPRL400000000000000000000
TRL, MRL and PRLTRL & PRL500000000000000000000
7000000000Display Green?MRL & PRL600000000000000000000
000000000Display Yellow?TRL, MRL & PRL700000000000000000000
000000000Max GreenDisplay Green?0000000000
000000000Max YellowDisplay Yellow?0000000000
MRL and PRLCumulative Score000000000
6000000000Display Green?
000000000Display Yellow?
000000000Max Green
000000000Max Yellow
TRL
1000000000Display Green?
000000000Display Yellow?
000000000Max Green
000000000Max Yellow
MRL
2000000000Display Green?
000000000Display Yellow?
000000000Max Green
000000000Max Yellow
PRL
4000000000Display Green?
000000000Display Yellow?
000000000Max Green
000000000Max Yellow

Use Omit Use Omit Use Omit TRL Calculator Release Notes Main Menu

TRL Calculator

AFRL Transition Readiness Level Calculator, version 2.2Summary202122232425262728293031323334
HW/SW?3BothPrevious3
Use Mfg?1YesHide Blanks?H/W?1Yes
Hide

Blank

RowsGreen set point is:100%Yellow set point is:67%Change set points on Summary sheet.Use Prg?1YesS/W?1Yes
Hardware and Software Calculator% Complete set point0Green set point100%Yellow set point67%
% Complete isTechnology Readiness Level AchievedTechnical:00Default % Complete:100Reset Range:1
now set at:123456789Rows in:RowNum1
100%
Program Name:0Program Manager:0
Date TRL Computed:31-Dec-99
TOP LEVEL VIEW -- Demonstration Environment (Start at top and pick the first correct answer)
Has an identical unit been successful an on operational mission (space or launch) in an identical configuration?Button0
Has an identical unit been demonstrated on an operational mission, but in a different configuration/system architecture?11-Button11
Has an identical unit been mission (flight) qualified but not operationally demonstrated (space or launch)?TRL 0TRL10
Has a prototype unit been demonstrated in the operational environment (space or launch)?
Has a prototype been demonstrated in a relevant environment, on the target or surrogate platform?1TRL1TRL2TRL3
Has a breadboard unit been demonstrated in a relevant (typical; not necessarily stressing) environment?2000
Has a breadboard unit been demonstrated in a laboratory (controlled) environment?3TRL4TRL5TRL6
Has analytical and experimental proof-of-concept been demonstrated?4000
Has a concept or application been formulated?5TRL7TRL8TRL9
Have basic principles been observed and reported?6000
None of the above7
Source: James W. Bilbro, NASA, Marshall SFC, May 20018
Comments:8
9
202122232425262728293031323334
H/SWQues
BothCatgry% CompleteTRL 1 (Check all that apply or use slider for % complete)TRLChk BoxScoreTech TRL 1PRL 1MRL 1Last ValueRowNum1Input Device Identifiers
Completion of this level is assumed. No questions need to be answered at TRL 1.TRLChk BoxScoreTech TRL 1PRL 1MRL 1Last ValueRowNum1Input Device Identifiers
BT0"Back of envelope" environment10100000037Scroll Bar 152Check Box 4
BT0Physical laws and assumptions used in new technologies defined10100000038Scroll Bar 151Check Box 5
ST0Have some concept in mind that may be realizable in software10100000039Scroll Bar 148Check Box 6
ST0Know what software needs to do in general terms10100000040Scroll Bar 149Check Box 8
BT0Paper studies confirm basic principles10100000041Scroll Bar 150Check Box 9
ST0Mathematical formulations of concepts that might be realizable in software10100000042Scroll Bar 157Check Box 10
ST0Have an idea that captures the basic principles of a possible algorithm10100000043Scroll Bar 156Check Box 11
BP0Initial scientific observations reported in journals/conference proceedings/technical reports10001000044Scroll Bar 153Check Box 12
BT0Basic scientific principles observed10100000045Scroll Bar 154Check Box 14
BP0Know who cares about technology, e.g., sponsor, money source10001000046Scroll Bar 155Check Box 18
BT0Research hypothesis formulated10100000047Scroll Bar 158Check Box 19
BP0Know who will perform research and where it will be done10001000048Scroll Bar 159Check Box 20
000000000049Scroll Bar 170Check Box 161
00000050Scroll Bar 848Check Box 852
00000051Scroll Bar 849Check Box 853
00000052Scroll Bar 850Check Box 854
00000053Scroll Bar 851Check Box 855
From Top Level1000
Comments:Max TRL1Max TechCt TechMax PRLCt PRLMax MRLCt MRL
131003000
202122232425262728293031323334
H/SWQues
BothCatgry% CompleteTRL 2 (Check all that apply or use slider for % complete)TRLChk BoxScoreTech TRL 2PRL 2MRL 2Last ValueRowNum2Input Device Identifiers
Completion of this level is assumed. No questions need to be answered at TRL 2.TRLChk BoxScoreTech TRL 2PRL 2MRL 2Last ValueRowNum2Input Device Identifiers
BP0Customer identified20002000064Scroll Bar 169Check Box 162
BT0Potential system or component application(s) have been identified20200000065Scroll Bar 166Check Box 163
BT0Paper studies show that application is feasible20200000066Scroll Bar 167Check Box 164
BP0Know what program the technology will support20002000067Scroll Bar 168Check Box 165
BT0An apparent theoretical or empirical design solution identified20200000068Scroll Bar 196Check Box 195
HT0Basic elements of technology have been identified20200000069Scroll Bar 181Check Box 177
BT0Desktop environment20200000070Scroll Bar 182Check Box 178
HT0Components of technology have been partially characterized20200000071Scroll Bar 183Check Box 179
HT0Performance predictions made for each element20200000072Scroll Bar 184Check Box 180
BP0Customer expresses interest in application20002000073Scroll Bar 194Check Box 185
ST0Some coding to confirm basic principles20200000074Scroll Bar 193Check Box 186
BT0Initial analysis shows what major functions need to be done20200000075Scroll Bar 190Check Box 187
HT0Modeling & Simulation only used to verify physical principles20200000076Scroll Bar 191Check Box 188
BP0System architecture defined in terms of major functions to be performed20002000077Scroll Bar 192Check Box 189
ST0Experiments performed with synthetic data20200000078Scroll Bar 325Check Box 309
BP0Requirement tracking system defined to manage requirements creep20002000079Scroll Bar 689Check Box 680
BT0Rigorous analytical studies confirm basic principles20200000080Scroll Bar 690Check Box 681
BP0Analytical studies reported in scientific journals/conference proceedings/technical reports20002000081Scroll Bar 692Check Box 691
BT0Individual parts of the technology work (No real attempt at integration)20200000082Scroll Bar 667Check Box 682
ST0Know what hardware software will be hosted on20200000083Scroll Bar 668Check Box 683
BT0Know what output devices are available20200000084Scroll Bar 669Check Box 684
BP0Investment Strategy Sheet20002000085Scroll Bar 670Check Box 685
BP0Know capabilities and limitations of researchers and research facilities20002000086Scroll Bar 676Check Box 686
BT0Know what experiments you need to do (research approach)20200000087Scroll Bar 675Check Box 687
BP0Qualitative idea of risk areas (cost, schedule, performance)20002000088Scroll Bar 672Check Box 688
BP0Have rough idea of how to market technology (Who's interested, how will they find out about it?)20002000089Scroll Bar 673Check Box 679
0090Scroll Bar 838Check Box 844
0091Scroll Bar 842Check Box 845
0092Scroll Bar 841Check Box 846
0093Scroll Bar 839Check Box 847
0094Scroll Bar 840Check Box 843
000000000095Scroll Bar 674Check Box 671
000000000096Scroll Bar 678Check Box 677
From Top Level10
Comments:Max TRL2Max TechCt TechMax PRLCt PRLMax MRLCt MRL
2717010000
202122232425262728293031323334
H/SWQues
BothCatgry% CompleteTRL 3 (Check all that apply or use slider for % complete)
Completion of this level is assumed. No questions need to be answered at TRL 3.TRLChk BoxScoreTech TRL 3PRL 3MRL 3Last ValueRowNum3Input Device Identifiers
BT0Academic environment303000000107Scroll Bar 324Check Box 310
HT0Predictions of elements of technology capability validated by Analytical Studies303000000108Scroll Bar 321Check Box 311
ST0Analytical studies verify predictions, produce algorithms303000000109Scroll Bar 322Check Box 312
HT0Science known to extent that mathematical and/or computer models and simulations are possible303000000110Scroll Bar 323Check Box 313
HP0Preliminary system performance characteristics and measures have been identified and estimated300030000111Scroll Bar 330Check Box 314
ST0Outline of software algorithms available303000000112Scroll Bar 329Check Box 315
HT0Predictions of elements of technology capability validated by Modeling and Simulation303000000113Scroll Bar 326Check Box 316
ST0Preliminary coding verifies that software can satisfy an operational need303000000114Scroll Bar 327Check Box 317
HM0No system components, just basic laboratory research equipment to verify physical principles300000300115Scroll Bar 328Check Box 318
BT0Laboratory experiments verify feasibility of application303000000116Scroll Bar 331Check Box 319
HT0Predictions of elements of technology capability validated by Laboratory Experiments303000000117Scroll Bar 332Check Box 320
BP0Customer representative identified to work with development team300030000118Scroll Bar 342Check Box 333
BP0Customer participates in requirements generation300030000119Scroll Bar 341Check Box 334
BT0Cross technology effects (if any) have begun to be identified303000000120Scroll Bar 338Check Box 335
HM0Design techniques have been identified/developed300000300121Scroll Bar 339Check Box 336
BT0Paper studies indicate that system components ought to work together303000000122Scroll Bar 340Check Box 337
BP0Customer identifies transition window(s) of opportunity300030000123Scroll Bar 362Check Box 361
BT0Metrics established303000000124Scroll Bar 347Check Box 343
BP0Scaling studies have been started300030000125Scroll Bar 348Check Box 344
ST0Experiments carried out with small representative data sets303000000126Scroll Bar 349Check Box 345
ST0Algorithms run on surrogate processor in a laboratory environment303000000127Scroll Bar 350Check Box 346
HM0Current manufacturability concepts assessed300000300128Scroll Bar 360Check Box 351
ST0Know what software is presently available that does similar task (100% = Inventory completed)303000000129Scroll Bar 359Check Box 352
ST0Existing software examined for possible reuse303000000130Scroll Bar 356Check Box 353
HM0Producibility needs for key breadboard components identified300000300131Scroll Bar 357Check Box 354
ST0Know limitations of presently available software (Analysis of current software completed)303000000132Scroll Bar 358Check Box 355
BT0Scientific feasibility fully demonstrated303000000133Scroll Bar 372Check Box 363
BT0Analysis of present state of the art shows that technology fills a need303000000134Scroll Bar 369Check Box 364
BP0Risk areas identified in general terms300030000135Scroll Bar 370Check Box 365
BP0Risk mitigation strategies identified300030000136Scroll Bar 371Check Box 366
BP0Rudimentary best value analysis performed, not including cost factors300030000137Scroll Bar 373Check Box 367
0000000000138Scroll Bar 374Check Box 368
0000000000139Scroll Bar 384Check Box 375
0000000000140Scroll Bar 383Check Box 376
0000000000141Scroll Bar 380Check Box 377
00142Scroll Bar 862Check Box 859
00143Scroll Bar 863Check Box 860
00144Scroll Bar 864Check Box 861
From Top Level10
Comments:Max TRL3Max TechCt TechMax PRLCt PRLMax MRLCt MRL
322008040
202122232425262728293031323334
H/SWQues
BothCatgry% CompleteTRL 4 (Check all that apply or use slider for % complete)TRLChk BoxScoreTech TRL 4PRL 4MRL 4Last ValueRowNum4Input Device Identifiers
BT0Cross technology issues (if any) have been fully identified404000000154Scroll Bar 381Check Box 378
HM0Ad hoc and available laboratory components are surrogates for system components400000400155Scroll Bar 382Check Box 379
HT0Individual components tested in laboratory/by supplier (contractor's component acceptance testing)404000000156Scroll Bar 404Check Box 403
HM0Piece parts and components in a pre-production form exist400000400157Scroll Bar 389Check Box 385
HT0M&S used to simulate some components and interfaces between components404000000158Scroll Bar 390Check Box 386
ST0Formal system architecture development begins404000000159Scroll Bar 391Check Box 387
BP0Customer publishes requirements document400040000160Scroll Bar 392Check Box 388
BT0Overall system requirements for end user's application are known404000000161Scroll Bar 402Check Box 393
BP0System performance metrics have been established400040000162Scroll Bar 401Check Box 394
ST0Analysis provides detailed knowledge of specific functions software needs to perform404000000163Scroll Bar 398Check Box 395
BP0Laboratory requirements derived from system requirements are established400040000164Scroll Bar 399Check Box 396
HM0Available components assembled into system breadboard400000400165Scroll Bar 400Check Box 397
HT0Laboratory experiments with available components show that they work together (lab kludge)404000000166Scroll Bar 411Check Box 464
ST0Requirements for each function established404000000167Scroll Bar 410Check Box 465
ST0Algorithms converted to pseudocode404000000168Scroll Bar 407Check Box 466
ST0Analysis of data requirements and formats completed404000000169Scroll Bar 408Check Box 467
ST0Stand-alone modules follow preliminary system architecture plan404000000170Scroll Bar 409Check Box 468
HT0Hardware in the loop/computer in the loop tools to establish component compatibility404000000171Scroll Bar 416Check Box 469
SM0Designs verified through formal inspection process400000400172Scroll Bar 415Check Box 470
BP0S&T exit criteria established400040000173Scroll Bar 412Check Box 471
BT0Technology demonstrates basic functionality in simplified environment404000000174Scroll Bar 413Check Box 472
SP0Able to estimate software program size in lines of code and/or function points400040000175Scroll Bar 414Check Box 482
HM0Scalable technology prototypes have been produced400000400176Scroll Bar 417Check Box 473
BP0Draft conceptual designs have been documented400040000177Scroll Bar 418Check Box 474
HM0Design techniques identified/defined to where small applications may be analyzed/simulated400000400178Scroll Bar 423Check Box 475
BT0Controlled laboratory environment404000000179Scroll Bar 422Check Box 476
BP0Initial cost drivers identified400040000180Scroll Bar 419Check Box 477
ST0Experiments with full scale problems and representative data sets404000000181Scroll Bar 420Check Box 478
BM0Integration studies have been started400000400182Scroll Bar 421Check Box 479
BP0CAIV targets set400040000183Scroll Bar 433Check Box 480
ST0Individual functions or modules demonstrated in a laboratory environment404000000184Scroll Bar 424Check Box 481
HM0Key manufacturing processes identified400000400185Scroll Bar 425Check Box 445
BP0Scaling documents and diagrams of technology have been completed400040000186Scroll Bar 426Check Box 446
ST0Some ad hoc integration of functions or modules demonstrates that they will work together404000000187Scroll Bar 427Check Box 447
HM0Key manufacturing processes assessed in laboratory400000400188Scroll Bar 432Check Box 448
BP0Draft Systems Engineering Master Plan (SEMP)400040000189Scroll Bar 431Check Box 449
BT0Low fidelity technology “system” integration and engineering completed in a lab environment404000000190Scroll Bar 428Check Box 450
HM0Mitigation strategies identified to address manufacturability / producibility shortfalls400000400191Scroll Bar 429Check Box 451
BP0Customer commits to transition through ATD commissioning and/or MOU400040000192Scroll Bar 430Check Box 452
BT0Functional work breakdown structure developed404000000193Scroll Bar 438Check Box 453
BP0Integrated Product Team (IPT) formally established with charter400040000194Scroll Bar 437Check Box 463
BP0Customer representative is member of IPT400040000195Scroll Bar 434Check Box 454
BP0Formal risk management program initiated400040000196Scroll Bar 435Check Box 455
BP0Preliminary Failure Mode and Effects Analysis (FMEA) or Risk Waterfall analysis performed400040000197Scroll Bar 436Check Box 456
BP0Technology availability dates established400040000198Scroll Bar 443Check Box 457
0000000000199Scroll Bar 442Check Box 458
0000000000200Scroll Bar 439Check Box 459
00201Scroll Bar 865Check Box 870
00202Scroll Bar 866Check Box 871
00203Scroll Bar 869Check Box 872
00204Scroll Bar 868Check Box 873
00205Scroll Bar 867Check Box 874
From Top Level10
Comments:Max TRL4Max TechCt TechMax PRLCt PRLMax MRLCt MRL
46200160100
202122232425262728293031323334
H/SWQues
BothCatgry% CompleteTRL 5 (Check all that apply or use sliders)TRLChk BoxScoreTech TRL 5PRL 5MRL 5Last ValueRowNum5Input Device Identifiers
BT0Cross technology effects (if any) identified and established through analysis505000000215Scroll Bar 440Check Box 460
HM0Pre-production hardware available500000500216Scroll Bar 441Check Box 461
BT0System interface requirements known505000000217Scroll Bar 444Check Box 462
BP0System requirements flow down through work breakdown structure (systems engineering begins)500050000218Scroll Bar 147Check Box 28
ST0System software architecture established505000000219Scroll Bar 146Check Box 29
HM0Targets for improved yield established500000500220Scroll Bar 143Check Box 30
ST0External interfaces described as to source, format, structure, content, and method of support505000000221Scroll Bar 144Check Box 31
ST0Analysis of internal interface requirements completed505000000222Scroll Bar 145Check Box 32
HM0Trade studies and lab experiments define key manufacturing processes500000500223Scroll Bar 276Check Box 267
BT0Interfaces between components/subsystems are realistic (Breadboard with realistic interfaces)505000000224Scroll Bar 275Check Box 268
HM0Significant engineering and design changes500000500225Scroll Bar 272Check Box 269
ST0Coding of individual functions/modules completed505000000226Scroll Bar 273Check Box 270
HM0Prototypes have been created500000500227Scroll Bar 274Check Box 271
HM0Tooling and machines demonstrated in lab500000500228Scroll Bar 483Check Box 502
BT0High fidelity lab integration of system completed, ready for test in realistic/simulated environments505000000229Scroll Bar 484Check Box 503
HM0Design techniques have been defined to the point where largest problems defined500000500230Scroll Bar 485Check Box 504
HP0Form, fit, and function for application addressed in conjunction with end user development staff500050000231Scroll Bar 486Check Box 505
HT0Fidelity of system mock-up improves from breadboard to brassboard505000000232Scroll Bar 487Check Box 506
BM0Quality and reliability considered, but target levels not yet established500000500233Scroll Bar 488Check Box 507
HM0Some special purpose components combined with available laboratory components500000500234Scroll Bar 489Check Box 508
HP0Three view drawings and wiring diagrams have been submitted500050000235Scroll Bar 490Check Box 509
BT0Laboratory environment modified to approximate operational environment505000000236Scroll Bar 491Check Box 510
HM0Initial assesment of assembly needs performed500000500237Scroll Bar 142Check Box 94
HP0Detailed design drawings have been completed500050000238Scroll Bar 141Check Box 95
HM0Sigma levels needed to satisfy CAIV targets defined500000500239Scroll Bar 138Check Box 97
BP0Draft SEMP addresses integration500050000240Scroll Bar 139Check Box 98
BP0Draft SEMP addresses test and evaluation500050000241Scroll Bar 140Check Box 99
BP0Draft SEMP addresses mechanical and electrical interfaces500050000242Scroll Bar 286Check Box 277
HM0Production processes have been reviewed with Manufacturing and Producibility office(s)500000500243Scroll Bar 285Check Box 278
BP0Draft SEMP addresses performance; translate measured to expected final performance500050000244Scroll Bar 282Check Box 279
BP0Risk management plan documented500050000245Scroll Bar 283Check Box 280
ST0Functions integrated into modules505000000246Scroll Bar 284Check Box 281
BP0Configuration management plan in place500050000247Scroll Bar 492Check Box 497
ST0Individual functions tested to verify that they work505000000248Scroll Bar 493Check Box 498
ST0Individual modules and functions tested for bugs505000000249Scroll Bar 494Check Box 499
ST0Integration of modules/functions demonstrated in a laboratory environment505000000250Scroll Bar 495Check Box 500
SP0Formal inspection of all modules/components completed as part of configuration management500050000251Scroll Bar 496Check Box 501
BP0Configuration management plan documented500050000252Scroll Bar 693Check Box 701
BP0Draft Test & Evaluation Master Plan (TEMP)500050000253Scroll Bar 694Check Box 702
ST0Algorithms run on processor with characteristics representative of target environment505000000254Scroll Bar 695Check Box 703
HP0Preliminary hardware technology “system” engineering report (Draft SEMP) completed500050000255Scroll Bar 696Check Box 704
BP0Customer commits to transition via POM process500050000256Scroll Bar 697Check Box 705
BP0Draft Transition Plan with Business Case500050000257Scroll Bar 698Check Box 706
HP0Failure Mode and Effects Analysis (FMEA) performed500050000258Scroll Bar 699Check Box 707
BP0Value analysis includes analysis of multiple technology and non-material alternatives500050000259Scroll Bar 700Check Box 708
BT0IPT develops requirements matrix with thresholds and objectives505000000260Scroll Bar 709Check Box 717
BT0Physical work breakdown structure available505000000261Scroll Bar 710Check Box 718
BP0Value analysis includes life-cycle cost analysis500050000262Scroll Bar 711Check Box 719
0000000000263Scroll Bar 712Check Box 720
0000000000264Scroll Bar 713Check Box 721
0000000000265Scroll Bar 714Check Box 722
0000000000266Scroll Bar 715Check Box 723
0000000000267Scroll Bar 716Check Box 724
00268Scroll Bar 887Check Box 891
00269Scroll Bar 888Check Box 892
00270Scroll Bar 889Check Box 893
00271Scroll Bar 890Check Box 894
From Top Level10
Comments:Max TRL5Max TechCt TechMax PRLCt PRLMax MRLCt MRL
49180190120
202122232425262728293031323334
H/SWQues
BothCatgry% CompleteTRL 6 (Check all that apply or use sliders)TRLChk BoxScoreTech TRL 6PRL 6MRL 6Last ValueRowNum6Input Device Identifiers
BT0Cross technology issue measurement and performance characteristic validations completed606000000281Scroll Bar 511Check Box 516
HM0Quality and reliability levels established600000600282Scroll Bar 512Check Box 517
BM0Frequent design changes occur600000600283Scroll Bar 513Check Box 518
HP0Draft design drawings are nearly complete600060000284Scroll Bar 514Check Box 519
BT0Operating environment for eventual system known606000000285Scroll Bar 515Check Box 520
BP0Collection of actual maintainability, reliability, and supportability data has been started600060000286Scroll Bar 521Check Box 526
BP0Design to cost goals identified600060000287Scroll Bar 522Check Box 527
HM0Investment needs for process and tooling determined600000600288Scroll Bar 523Check Box 528
BT0M&S used to simulate system performance in an operational environment606000000289Scroll Bar 524Check Box 529
BP0Final Test & Evaluation Master Plan (TEMP)600060000290Scroll Bar 525Check Box 530
HT0Factory acceptance testing of laboratory system in laboratory setting606000000291Scroll Bar 531Check Box 536
BT0Representative model / prototype tested in high-fidelity lab / simulated operational environment606000000292Scroll Bar 532Check Box 537
BT0Realistic environment outside the lab, but not the eventual operating environment606000000293Scroll Bar 533Check Box 538
BP0Final Systems Engineering Master Plan (SEMP)600060000294Scroll Bar 534Check Box 539
ST0Inventory of external interfaces completed606000000295Scroll Bar 535Check Box 540
BP0Technology Transition Agreement has been updated600060000296Scroll Bar 541Check Box 546
BP0Scaling issues that remain are identified and supporting analysis is complete600060000297Scroll Bar 542Check Box 547
ST0Analysis of timing constraints completed606000000298Scroll Bar 543Check Box 548
ST0Analysis of database structures and interfaces completed606000000299Scroll Bar 544Check Box 549
BP0Have begun to establish an interface control process600060000300Scroll Bar 545Check Box 550
HP0Draft production planning has been reviewed by end user and developer600060000301Scroll Bar 551Check Box 556
HM0Critical manufacturing processes prototyped600000600302Scroll Bar 552Check Box 557
HM0Most pre-production hardware is available600000600303Scroll Bar 553Check Box 558
BP0Technology Transition Agreement has been coordinated and approved by end user600060000304Scroll Bar 554Check Box 559
ST0Prototype implementation includes functionality to handle large scale realistic problems606000000305Scroll Bar 555Check Box 560
ST0Algorithms parially integrated with existing hardware / software systems606000000306Scroll Bar 561Check Box 566
HM0Materials, process, design, and integration methods have been employed600000600307Scroll Bar 562Check Box 567
ST0Individual modules tested to verify that the module components (functions) work together606000000308Scroll Bar 563Check Box 568
BP0Technology ”system” specification complete600060000309Scroll Bar 564Check Box 569
HM0Components are functionally compatible with operational system600000600310Scroll Bar 565Check Box 570
ST0Representative software system or prototype demonstrated in a laboratory environment606000000311Scroll Bar 571Check Box 576
BT0Laboratory system is high-fidelity functional prototype of operational system606000000312Scroll Bar 572Check Box 577
BP0Formal configuration management program defined to control change process600060000313Scroll Bar 573Check Box 578
BM0Integration demonstrations have been completed600000600314Scroll Bar 574Check Box 579
BP0Final Technical Report600060000315Scroll Bar 575Check Box 580
HM0Production issues have been identified and major ones have been resolved600000600316Scroll Bar 581Check Box 586
ST0Limited software documentation available606000000317Scroll Bar 582Check Box 587
SP0Verification, Validation and Accreditation (VV&A) initiated600060000318Scroll Bar 583Check Box 588
HM0Process and tooling are mature600000600319Scroll Bar 584Check Box 589
HM0Production demonstrations are complete600000600320Scroll Bar 585Check Box 590
SP0"Alpha" version software has been released600060000321Scroll Bar 591Check Box 596
BT0Engineering feasibility fully demonstrated606000000322Scroll Bar 592Check Box 597
BP0Final Transition Plan with Business Case600060000323Scroll Bar 593Check Box 598
BP0Acquisition program milestones established600060000324Scroll Bar 594Check Box 599
BP0Value analysis includes business case600060000325Scroll Bar 595Check Box 600
BP0Technical alternatives include "do nothing case"600060000326Scroll Bar 725Check Box 732
BP0Formal requirements document available600060000327Scroll Bar 726Check Box 733
0000000000328Scroll Bar 727Check Box 734
0000000000329Scroll Bar 728Check Box 735
0000000000330Scroll Bar 729Check Box 736
0000000000331Scroll Bar 730Check Box 737
0000000000332Scroll Bar 731Check Box 738
00333Scroll Bar 895Check Box 899
00334Scroll Bar 896Check Box 900
00335Scroll Bar 897Check Box 901
00336Scroll Bar 898Check Box 902
From Top Level10
Comments:Max TRL6Max TechCt TechMax PRLCt PRLMax MRLCt MRL
48170200110
202122232425262728293031323334
H/SWQues
BothCatgry% CompleteTRL 7 (Check all that apply or use sliders)TRLChk BoxScoreTech TRL 7PRL7MRL 7Last ValueRowNum7Input Device Identifiers
HM0Materials, processes, methods, and design techniques have been identified700000700346Scroll Bar 231Check Box 197
HM0Materials and manufacturing process and procedures initially demonstrated700000700347Scroll Bar 230Check Box 198
HT0M&S used to simulate some unavailable elements of system, but these instances are rare707000000348Scroll Bar 227Check Box 199
HM0Prototype system built on "soft" tooling700000700349Scroll Bar 228Check Box 200
BT0Each system/software interface tested individually under stressed and anomolous conditions707000000350Scroll Bar 229Check Box 204
ST0Algorithms run on processor(s) in operating environment707000000351Scroll Bar 234Check Box 201
SP0VV&A in process with the verification step that software specifications are met completed700070000352Scroll Bar 233Check Box 202
HM0Process tooling and inspection / test equipment demonstrated in production environment700000700353Scroll Bar 232Check Box 203
HM0Machines and tooling proven700000700354Scroll Bar 259Check Box 264
HM0Design changes decrease significantly700000700355Scroll Bar 260Check Box 258
BT0Operational environment, but not the eventual platform, e.g., test-bed aircraft707000000356Scroll Bar 263Check Box 255
BM0Maintainability, reliability, and supportability data is above 60% of total needed data700000700357Scroll Bar 262Check Box 256
HP0Draft design drawings are complete.700070000358Scroll Bar 261Check Box 257
HM0Materials, processes, methods, and design techniques are moderately developed and verified700000700359Scroll Bar 265Check Box 266
BP0Scaling is complete.700070000360Scroll Bar 222Check Box 206
HM0Pre-production hardware is available; quantities may be limited700000700361Scroll Bar 221Check Box 207
HT0Components are representative of production components707000000362Scroll Bar 218Check Box 208
HP0Design to cost goals validated700070000363Scroll Bar 219Check Box 209
HM0Initial sigma levels established700000700364Scroll Bar 220Check Box 213
HM0Manufacturing processes generally well understood700000700365Scroll Bar 226Check Box 210
SM0Most software bugs removed700000700366Scroll Bar 225Check Box 211
HM0Production planning is complete.700000700367Scroll Bar 223Check Box 212
BT0Most functionality available for demonstration in simulated operational environment707000000368Scroll Bar 224Check Box 214
BT0Operational/flight testing of laboratory system in representational environment707000000369Scroll Bar 248Check Box 235
HM0Prototype improves to pre-production quality700000700370Scroll Bar 817Check Box 820
SP0"Beta" version software has been released700070000371Scroll Bar 818Check Box 821
BT0Fully integrated prototype demonstrated in actual or simulated operational environment707000000372Scroll Bar 819Check Box 822
BT0System prototype successfully tested in a field environment.707000000373Scroll Bar 757Check Box 758
HM0Ready for Low Rate Initial Production (LRIP)700000700374Scroll Bar 749Check Box 759
0000000000375Scroll Bar 750Check Box 760
0000000000376Scroll Bar 751Check Box 761
0000000000377Scroll Bar 752Check Box 762
0000000000378Scroll Bar 753Check Box 763
0000000000379Scroll Bar 754Check Box 764
0000000000380Scroll Bar 755Check Box 765
0000000000381Scroll Bar 756Check Box 766
From Top Level10
Comments:Max TRL7Max TechCt TechMax PRLCt PRLMax MRLCt MRL
3010050150
202122232425262728293031323334
H/SWQues
BothCatgry% CompleteTRL 8 (Check all that apply or use sliders)TRLChk BoxScoreTech TRL 8PRL 8MRL 8Last ValueRowNum8Input Device Identifiers
BT0Components are form, fit, and function compatible with operational system808000000391Scroll Bar 247Check Box 236
HM0Cost estimates <125% cost goals (e.g., design to cost goals met for LRIP)800000800392Scroll Bar 244Check Box 237
BT0System is form, fit, and function design for intended application and weapon system platform808000000393Scroll Bar 245Check Box 238
BT0Form, fit, and function demonstrated in eventual platform/weapon system808000000394Scroll Bar 246Check Box 242
HM0Machines and tooling demonstrated in production environment800000800395Scroll Bar 252Check Box 239
BT0Interface control process has been completed808000000396Scroll Bar 251Check Box 240
SP0Most software user documentation completed and under configuration control800080000397Scroll Bar 249Check Box 241
BP0Most training documentation completed and under configuration control800080000398Scroll Bar 250Check Box 243
BP0Most maintenance documentation completed and under configuration control800080000399Scroll Bar 253Check Box 254
BT0Final architecture diagrams have been submitted808000000400Scroll Bar 601Check Box 603
HM0Manufacturing processes demonstrated by pilot line, LRIP, or similar item production800000800401Scroll Bar 602Check Box 604
HM0Manufacturing processes demonstrate acceptable yield and producibility levels800000800402Scroll Bar 775Check Box 776
ST0Software thoroughly debugged808000000403Scroll Bar 767Check Box 777
BT0All functionality demonstrated in simulated operational environmenet808000000404Scroll Bar 768Check Box 778
HM0Manufacturing process controlled to 4-sigma or appropriate quality level800000800405Scroll Bar 769Check Box 779
HM0All materials are in production and readily available800000800406Scroll Bar 770Check Box 780
BT0System qualified through test and evaluation on actual platform (DT&E completed)808000000407Scroll Bar 771Check Box 781
BM0Maintainability, reliability, and supportability data collection has been completed800000800408Scroll Bar 772Check Box 782
SP0VV&A validation step completed, software works in real world800080000409Scroll Bar 773Check Box 783
BT0DT&E completed, system meets specifications808000000410Scroll Bar 774Check Box 784
SP0VV&A accreditation step completed, software authorized for use in intended weapon system800080000411Scroll Bar 785Check Box 793
HM0Ready for Full Rate Production800000800412Scroll Bar 786Check Box 794
0000000000413Scroll Bar 787Check Box 795
0000000000414Scroll Bar 788Check Box 796
0000000000415Scroll Bar 789Check Box 797
0000000000416Scroll Bar 790Check Box 798
0000000000417Scroll Bar 791Check Box 799

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .