This document contains a Technical Readiness Level worksheet and information on a Broad Agency Announcement from the Federal Aviation Administration.
The Technical Readiness Level worksheet provides questions to determine an applicant's level of prototype development for a proposed project, ranging from levels 5 through 10. It requires answers to all questions and verifies responses against the applicant's whitepaper. Also included is a Broad Agency Announcement from the FAA seeking proposals for unmanned aircraft systems integration projects. Interested parties can submit white papers at any time during the five-year period of the announcement in response to specific calls. Call 001 is currently open for submissions. The contracting officer's contact information is provided for any questions. Proposers should monitor the FAACO website for updates and amendments to the announcement.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Worksheet
TECHNICAL READINESS LEVEL WORK SHEET
| Applicant Name: | |
| Prototype: | |
| Please answer ALL of the following questions to determine your Technical Readiness Level:* | Yes/No |
| 1. Do you have a prototype available for this project? | |
| 2. Was the prototype tested successfully for the application you are proposing to demonstrate? | |
| 3. Was the prototype tested in a relevant environment? | |
| 4. Was the prototype tested in a relevant end-to-end environment (for example from ground to airspace)? | |
| 5. Is this prototype partially integrated with existing system(s)? | |
| 6. Was the prototype developed to address full-scale realistic problems? | |
| 7. Was the engineering feasibility of this prototype fully demonstrated in actual system application? | |
| 8. Was the prototype previously demonstrated in an operational environment (ground and/or airspace)? | |
| 9. Is the prototype at or near scale of the operational system, with most functions available for demonstration and test? | |
| 10. Is the prototype well integrated with actual collateral and ancillary systems? | |
| 11. Was the actual system completed and "mission qualified" through test and demonstration in |
an operational environment (ground or airspace)?
| 12. Was the actual system "mission proven" through successful mission operations (ground or airspace)? | |
| 13. Is this prototype commercially available? | |
| Is this prototype within TRL 5-7: | No |
| *Note: Answer ALL of the questions or this TRL Calculation requirement will not be met. |
| The questions above address Technical Readiness Levels (TRL) five through ten; not all of the answers have to be "Yes" to meet the preferred |
| TRL range. Your responses will be verified with the Whitepaper. |
Options
| Yes |
| No |
Analysis
| Count TRL 5-7 "Yes" | 0 |
| Count TRL 8-10 "Yes" | 0 |
| TRL 5-7 Decision | No |