This Statement of Work outlines requirements for an HVAC replacement project at Building #2410 of Joint Base Cape Cod (JBCC) in Sandwich, MA, managed by the Volpe National Transportation Systems Center. The project involves replacing an inoperable rooftop HVAC unit at a facility used for GPS and PNT system testing, supporting both the USAF and FAA.
The scope includes removing and replacing a natural gas-fired HVAC Rooftop Unit (RTU-1), installing associated electrical power and control connections, and conducting system airflow balancing. The contractor must provide all labor, equipment, tools, and materials, plus maintain a weekly updated construction schedule. The work will be performed at Building #2410 on Connery Ave, requiring secure facility access arrangements. The project includes seven detailed drawing sheets covering architectural, mechanical, and electrical specifications dated 2024-12-05. Evaluation will be based on past performance from the previous 10 years and lowest price, with acceptance criteria specified in Division 01 77 00 Closeout Procedures.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Transportation Volpe National Transportation Systems Center
JBCC Building #2410 HVAC Replacement Project Statement of Work
Introduction/Background The Volpe National Transportation Systems Center (Volpe Center) has a property lease agreement of approximately 180 acres located at Joint Base Cape Cod (JBCC) in Sandwich, MA consisting of one building (Building #2410) and an aircraft runway that are used for demonstration & testing of backup Global Positioning System (GPS) capabilities and a complimentary Positioning, Navigation, and Timing (PNT) system.
Scope of Work In support of the United States Air Force (USAF) and Federal Aviation Administration (FAA), the Volpe Center requires Construction services to replace the inoperable rooftop heating, ventilation, and air conditioning (HVAC) unit. This service entails executing construction renovation tasks as per drawings and specifications for Building #2410.
General Construction (CLIN 00100) includes the following:
• Remove and replace a natural gas-fired, HVAC Rooftop Unit (RTU-1);
• Install all associated electric power and control connections.
• Conduct HVAC system airflow balancing;
• The following drawings, dated 2024-12-05, are applicable and provided herein:
o Sheet 01 RTU-1_G-000_COVER-INDEX SHEET.
o Sheet 02 RTU-1_G-001, ARCH GENERAL NOTES, SYMBOLS, & ABBREVIATIONS.
o Sheet 03 RTU-1_G-002 DEMOLITION, ELECTRICAL, MECHANICAL GENERAL NOTES, SYMBOLS, & ABBREVIATIONS.
o Sheet 04 RTU-1_A-101 ROOF PLAN & PHOTOS.
o Sheet 05 RTU-1_M-101 HVAC FLOOR PLAN.
o Sheet 06 RTU-1_E-101 ELECTRCIAL FLOOR PLAN.
o Sheet 07 RTU-1_E-201 POWER PANEL SCHEDULES.
Work Requirements/Schedule
The contractor shall provide all labor, equipment, tools and materials necessary to perform the tasks stated herein and must be able to travel to JBCC and provide necessary documentation to gain access to secure sites. Contractor shall provide a Construction Schedule at the Pre-Construction Meeting and maintain the schedule with weekly updates for use in weekly Progress Meetings stipulated in specification Division 01 31 00, Project Management and Coordination.
Place of Performance
All work will be performed at Building #2410 of JBCC located on Connery Ave, Sandwich, MA 02542.
The JBCC is a secure Federal military facility and public access is limited. Access is open to those who have business with entities on base and arrangements for access must be made prior to arrival at the base.
Additional Government Furnished Information
• Construction Specifications, dated 2024-12-05 o All of Division 1, “General Requirements” o All of Division 23, “Mechanical” o All of Division 26, “Electrical”
Other Requirements
Evaluation of proposals will be based on past performance and lowest price. Please submit recommendations from previous projects over the past 10 years.
Acceptance Criteria
Acceptance criteria and procedures are specified in the construction specification Division 01 77 00, Closeout Procedures.