This is a Request for Quotation (RFQ) for geotechnical drilling services issued by the Western Federal Lands Highway Division (WFLHD) of the Federal Highway Administration (FHWA). The solicitation number is 69056727Q000006, released on November 3, 2026, with technical questions due by November 12, 2026, at 1400 PST, and responses due November 17, 2026, at 1400 PST. This is a total small business set-aside acquisition using simplified commercial procedures under FAR 12.201-1, with NAICS code 238910 (site preparation services) and an industry size standard of $19 million. The product service code is F015.

The project involves geotechnical drilling for the Winchester Bridge Replacement project in Douglas County, Oregon. Required services include drilling two geotechnical borings to depths ranging from 50 to 130 feet, P-S suspension logging in the upper 100 feet of one boring, traffic control, asphalt coring, borehole completions per Oregon State requirements, and asphalt patching. Specific drilling methods must include hollow-stem auger or mud-rotary in overburden materials and HQ3 wireline core drilling in bedrock. The contractor must provide SPT sampling every 2.5 feet starting at 5 feet below ground surface to 20 feet, then every 5 feet thereafter (base ceiling of 44 SPT samples), and Shelby tube samples as directed (base ceiling of 4 samples). All work must be completed within six business days beginning late November or early December 2026. Key submittals include temporary traffic control plans, hammer efficiency test reports, driller resumes with state licensure, and an executed Douglas County Public Works right-of-way permit, all required 15 business days prior to mobilization. The contractor is responsible for environmental compliance, utility locates, water procurement permitting, and daily reporting. Quotations must include completed Standard Form 1449 and pricing schedule with unit prices and line-item quantities. All bids shall be submitted electronically in PDF format to WFL.Purchasing@dot.gov with acknowledgment of all amendments and confirmation of acceptance of government purchase orders.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Western Federal Lands Highway Division 610 E. Fifth Street

Vancouver, WA 98661 Phone 360-619-7700

Fax 360-619-7846

REQUEST FOR QUOTATION

Additional information as required in RFO 12.202(b)(1) is provided in the RFQ document attached herein.

All interested vendors shall refer to Section D for full-text FAR Provision 52.212-1, Instructions to Offerors, and its Addendum.

Solicitation Release Date: 11-03-2026

Technical Questions Due Date: 11-12-2026, at 1400 PST

Response Due Date: 11-17-2026, at 1400 PST

NOTICE: This solicitation and the resulting contract incorporate the latest updates from the Revolutionary Federal

Acquisition Regulation (FAR) Overhaul (RFO). Any standard FAR references within this document correspond directly to the associated text in the RFO. All provisions and clauses reflect the most recent RFO requirements and approved deviations. Offerors can review the complete RFO text at Revolutionary FAR Overhaul.

QUICK INDEX

Page Item

A-1 1449/Price Schedule

B-1 Statement of Work

C-1 Contract Clauses

D-1 Solicitation Provisions and

Instructions to Offerors

ATTACHMENTS

001 Boring Location Map

002 Table of Boring

003 Geotechnical Activities

Categorical Exclusion

004 FLH Soil Identification

Guidelines_2025

005 FLH Rock Identification

Guidelines_2025

006 Wage Determination

This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with

FAR 12.201-1, Simplified procedures. This announcement constitutes the only solicitation. Quotes are being requested and a written solicitation will not be issued.

Solicitation number 69056727Q000006 is issued as an (RFQ) for Geotechnical Drilling.

This acquisition is a TOTAL SMALL BUSINESS SET-

ASIDE and incorporates provisions and clauses by reference.

The full text of provisions and clauses may be accessed electronically at https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52.

The North American Industry Classification System

(NAICS) code is 238910 with an industry size standard of

$19M and the associated Product Service Code (PSC) is

F015.

chrome-extension://efaidnbmnnnibpcajpcglclefindmkaj/https:/www.acquisition.gov/sites/default/files/page_file_uploads/RFO.pdf https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52

WOMEN-OWNED SMALL

BUSINESS (WOSB)

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NUMBER 3.AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NUMBER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

REQUEST

FOR QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

REQUEST

FOR

PROPOSAL

(RFP)

SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE

. YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NORTH AMERICAN

INDUSTRY CLASSIFICATION

STANDARD (NAICS):

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

THE DEFENSE PRIORITIES

AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FREE ON

BOARD (FOB) DESTINATION

UNLESS BLOCK IS MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4.

FAR 52.212-3 AND 52.212-5 ARE ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED.

8(A)

ECONOMICALLY

DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH

AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND

ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS

SPECIFIED

DATED.

OFFER

ADDENDA

ADDENDA

69056727Q000006

Federal Highway Administration

FHWA WESTERN FED LANDS DIVISION

610 E FIFTH STREET

Vancouver WA 98661

Federal Highway Administration

FHWA WESTERN FED LANDS DIVISION

610 E FIFTH STREET

Vancouver WA 98661

11/17/2026 1400 PT WFL.Purchasing@dot.gov 360-619-7637

690567

690567

238910

$19

11/03/2026

Geotechnical Drilling for Project OR FLAP

DOUGLAS 251(2), Winchester Bridge Replacement.

See SOW for full requirements.

A-1

STOCK RECORD (S/R)

STANDARD FORM 1449 (REV. 11/2021) BACK

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE RECEIVED (MM/DD/YYYY) 42d. TOTAL CONTAINERS

40. PAID BY

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32g. EMAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

PARTIAL FINAL

37. CHECK NUMBER

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER

36. PAYMENT

COMPLETE PARTIAL FINAL

ACCEPTED,

PAGE 2 OF 2A-1a

QTY Price Unit of Measure Sub Total

Lump Sum

230 Lnft 130 Lnft 2 Each

60 Each 2 Each

$ 216.00 Day

Hour Hour

1 Lump Sum 1 Lump Sum 1 Lump Sum

Each Hour

Lump Sum Hour Each

1 Lump Sum Day

Day

$ 216.00 Day

Lump Sum Lump Sum Lump Sum

TOTAL:

Signature Date

Company Name:

Company Address:

Name of Representative:

F la gg in g

Flagging Personnel Flagging Personnel Per Diem (Per Person Per Day at Government Rate for Area) Tracffic Control Signs and Devices Traffic Control Mobilization Light Plant Rental

Other:

Other:

Other

D ri ll in g

Crew Breaks Water Level Testing Utility Locate Site Prep Asphalt patch Offsite Cutting disposal Other: Support vehicle/equipment Other:

Downhole Suspension Logging (incl. travel)

SF Molalla River Bridge

Geotechnical Drilling Services Bid Sheet

D ri ll in g

Project Mobilization and Demobilization

Drilling/Coring (all methods) Installed casing for suspension logging, if needed

Pavement Core Samples (4 " min. diameter) Split Spoon Sampling (All Sizes) and SPTs Shelby Tube Sampling, if requested

Per Diem (Per Person Per Day at Government Rate for Area)

On Project Moves / Drill Crew Work / Water Standby Time - Drill Crew and Equipment Shipping Samples Pre-Drilling Site Meeting

A-2

B-1

STATEMENT OF WORK

OR FLAP DOUGLAS 251(2) Winchester Bridge Replacement Geotechnical Investigation

Douglas County, Oregon

I. INTRODUCTION

The Western Federal Lands Highway Division (WFLHD) of the Federal Highway Administration

(FHWA) is preparing a geotechnical subsurface exploration program for the Winchester Creek

Bridge in Douglas County, Oregon. The primary goal is to assess the subsurface conditions for designing a replacement bridge structure. Agency partners include the U.S. Forest Service.

The project is located at latitude N 43.6751° and longitude W 124.1788° in the northeast ¼ of the southwest ¼ of Section 7, Township 22 South, Range 12 West of the Bureau of Land Management

(BLM) Public Land Survey System (PLSS). Project impacts are limited to the existing roadway.

The project location is shown on

Attachment 001 – Boring Location Map.

The boring locations are underlain by embankment fill materials, alluvial deposits, estuarine deposits, and the Tyee Formation. The areas extending east and west of the existing abutments maintain an elevation of approximately 11 feet. The two borings will be advanced; one near the existing west bridge abutment (boring BH26-01), and one near the existing east bridge abutment

(boring BH26-02).

This requirement includes the following:

• Drilling 2 geotechnical borings through the existing bridge approaches.

• P-S suspension logging in the upper 100-ft of one boring.

• Traffic control, asphalt coring, borehole completions in accordance with State of Oregon requirements, and asphalt patching.

Boring depths will range from 50 to 130 feet below the existing ground surface (bgs). We anticipate the drilling methods will include hollow-stem auger (HSA) or mud-rotary drilling in the overburden materials transitioning to HQ3 coring in the underlying bedrock.

Temporary traffic control is required for this work. Submit a traffic control plan prior to start of work to allow for a single lane closure. The closure will be in place during daylight and operational hours and removed each night.

The Contractor is responsible for fully implementing all environmental commitments identified in this Statement of Work (SOW) and attachments.

The planned start date is late-November to early-December for all activities, and flexible depending on the selected contractor availability. We anticipate all work should be completed within 5 business days.

B-2

II. STATEMENT OF WORK FOR DRILLING (BASE)

The Federal Highway Administration (FHWA) Contracting Officer (CO) is the only representative that has the authority to revise or add work under the requirements of this solicitation Onsite representation for FHWA will be provided by the Contracting Officer Representative (COR).

The test borings coordinates for the investigation contained within this SOW are shown in

Attachment 002 – Table of Borings. Boring locations will be marked in the field by FHWA with white paint, wood staking, or some other physical mark in time to call in utility locates. The integrity of the boring location markings will be verified no later than during the on-site Pre-Drill

Meeting with the Contractor and subordinate parties (See Section I, Pre-Drill Meeting). The Table of Borings provides detailed information, including the boring location with GPS coordinates

(WGS84), estimated depths for each drilling method, maximum drilling depth, and expected numbers of in-situ tests. Access notes for the boring locations are also included.

A. Drill Type and Tooling

Provide the necessary drill rig(s) to complete the work and provide additional drill rigs as necessary to perform the specified work. WFLHD’s interpretation of the most practical means to access and advance the test boring for this project is using a truck mounted drill rig. However, the selection of the drill rig type is to be determined by the Contractor. Tracked or other equipment that leaves indentations in pavement is not allowed to track directly on the road without using protective mats.

Supply all necessary equipment to drill the proposed test borings, including:

• HSA drilling (4.25-inch ID), casing advancer, or mud rotary (3 7/8-inch OD)

• HQ3 wireline core drilling system (must be triple barrel coring)

• Standard SPT 2-inch OD, and oversized 2.5-inch O.D. or 3-inch O.D. split spoon samplers when coarse material is encountered, and

• A vacuum truck

Use a vacuum truck to clear the upper 5 feet of soils in all proposed borings. The COR will ensure no utilities are present in the upper 5 feet before continuing with the exploration. Advance the geotechnical borings using HSA drilling or casing advancer methods in the overburden soils and

HQ3 coring methods in the underlying bedrock to the drill depths indicated by the COR. Other drilling methods using drilling fluids, such as mud-rotary or casing advancer, may be used after groundwater is encountered. If heave or disturbance of the soil occurs due to hydrostatic pressures below groundwater level, the driller must flood the hollow center of the augers with water or an approved drilling fluid to maintain an adequate head of water so that drilling may continue.

Alternatively, or if adding water does not sufficiently limit heave, the driller should use mud rotary wash drilling techniques. HQ3 wireline coring is required in the borehole when bedrock is encountered. Provide waxed or plastic rock core boxes.

Supply a table, awning, and all required equipment for drill inspection and test boring logging.

B-3

Supply environmentally safe drill fluid additive or biodegradable lost circulation material (LCM) to be used in the event coring water does not circulate or drilling/coring fluids leak into the river.

B. Sampling Intervals

Drill and advance the borings in accordance with this SOW and the drilling methods listed above.

When in soils, collect SPT samples every 2.5 feet starting at 5 feet bgs to 20 feet bgs, and then every 5 feet until the maximum number of SPT samples listed in Attachment 002 Table of Borings or until transitioning to HQ3 core methods as directed by the COR. When advancing drill tooling in rock and the subsurface material is characterized as highly weathered, very weak to weak rock, take SPT samples between core runs to gauge the relative density of the rock material.

C. Driven Samples (SPT)

Collect driven samples using the standard SPT 2-inch split spoon sampler unless otherwise directed by the COR. Alternate use of the 2.5-inch and/or 3-inch diameter split barrel samplers in gravels, cobbles and boulder materials or where sample recovery with the standard SPT sampler is poor.

The Contractor must provide sampling tooling including split barrel samplers with a ball check and vent, and metal or plastic sample catchers in the barrel shoes. Replace or repair the driving shoe on the split barrel samplers if it becomes dented or distorted or has excessive wear. Replace the sample catchers when they become worn, broken, or no longer function.

Do not exceed the quantity of SPT samples listed on the quote sheet, unless authorized by the

Contracting Officer through a contract modification. The ceiling quantities for the base and option items are as follows:

Base item ceiling quantity for driven SPT samples is 44 SPT samples.

D. Shelby Tube Samples

Collect Shelby tube samples as indicated by the Table of Borings when a soft, saturated silt or clay layer is encountered. Additional Shelby tube samples may also be required as directed by the by the COR. The total number of Shelby tube samples that are taken under this contract must not exceed the number of Shelby tube samples listed on the quote sheet, unless authorized by the contracting officer through a contract modification.

• Base item ceiling quantity: 4 Shelby Tube samples

E. Drill Rig Automatic Hammer Efficiency

Use a drill rig equipped with an automatic trip hammer to complete the borings. Prior to mobilization, provide the most recent hammer efficiency reports for the drill rig. Reports that are older than 1 year at the time of contract execution will not be accepted. If reports are older than 1

B-4 year, have the drill rigs tested and submit the efficiency reports prior to the end of this contract performance period.

F. Drill Depths

Drill the borehole to the depths listed on the Table of Borings, or as directed by the by the COR.

The combined total boring footage should be exceeded with prior approval from the CO. Top of bedrock could be as shallow as 20 feet or as deep as 100 feet bgs. Recover cored bedrock samples to a depth of 20 feet below the elevation of when competent bedrock was first encountered, or to a minimum depth of 50 feet bgs. When doing P-S suspension logging, drill the hole to 130 feet to allow proper space for the suspension logging instrument.

G. Shared Ceiling Price for Drilling Methods

The following line items on the quote sheet have a shared ceiling price equal to the sum of the subtotals of all line items below:

• HSA drilling (4.25-inch ID);

• Casing advancer

• Mud rotary wash (3 7/8-inch OD); and

• HQ3 core drilling.

The Government will not be obligated to pay the Contractor any amount more than the ceiling price, and the Contractor shall not be obligated to continue performance if to do so would exceed the ceiling price, unless and until the Contracting Officer modifies the contract to revise the ceiling price.

The depths for each type of drilling method may exceed the estimated quantity shown in the quote sheet, provided that the shared ceiling price is not exceeded.

H. Suspension Logging

Perform P-S suspension logging in one of the borings (likely BH26-01), to be confirmed based on drilling conditions. Measure the Vs (shear wave) and Vp (compression wave) velocities at intervals/resolutions of 0.5 or 1 meter in the upper 100 feet (30 m) below the ground surface. Use a dual-receiver system to measure travel times between receivers, minimizing "borehole effects."

Drill the boring deeper to accommodate the suspension logger instrument, logging the boring and retrieving samples/cores throughout this depth (i.e., not a burn-down section). For initial planning purposes, we estimate that an additional 30 feet below the measured depth should be adequate (i.e., 130-ft total drill depth).

Coordinate drilling method, fluid type(s), and actual drill depths and diameter with the P-S suspension logging subcontractor, based on their requirements. Open-hole or uncased measurements are preferred. If casing is proposed or required due to subsurface conditions, submit

B-5 the casing material type, diameter, and grout specifications to the COR prior to performing P-S suspension logging testing.

Post-process the data and review waveforms for signal quality, filter noise, and pick first-arrival times for P- and S-waves. Compute Vp and Vs profiles as a function of depth. Calculate the harmonic mean shear wave velocity for the top 100 feet (Vs,30) using the formula:

Provide a technical report including:

• Introduction: Description of the site and methodology.

• Plots: Graphical plots of Vp and Vs versus depth.

• Tabulated Data: ASCII or Excel format of the velocity data.

• Summary: Calculated Vs,30 value and identification of the seismic site class. Discuss any anomalous data or issues encountered in the field.

• Calibration Records: Documentation confirming the equipment is within current service/calibration intervals.

I. Boring Location Access

The borings are located on the roadway approximately 10-feet from the edge of the bridge deck and can be accessed with a truck mounted rig to place the drill directly on the boring locations.

Construction of pioneer roads/trails will not be required.

J. Pre-Drill Meeting

Hold a pre-drill meeting onsite with the COR, WFLHD staff and Douglas County staff prior to start of drilling (same mobilization). At the pre-drill meeting the COR, Contractor, WFLHD staff, and Douglas County staff will review the boring locations and access with the Contractor. We anticipate this pre-drill meeting will require one (1) hour onsite, and may either be done the day before drilling commences or the first day of drilling.

During the pre-drill meeting the location of borings may be modified based on site conditions to minimize environmental impacts and/or to address utility conflicts and safety hazards that cannot be mitigated. Do not offset borings more than 5 feet from the staked location discussed during the

B-6 pre-drill meeting without prior approval from the COR. Coordinate the pre-drill meeting with the

COR at least 2 weeks prior to the meeting date.

The COR will provide a copy of environmental documents at the pre-drill meeting.

Notify the COR of any impacts to the public traffic a minimum of 7 days prior to start of impact.

K. Utility Locate

A public one call utility locate is necessary for this drill project. The boring locations will be marked in the field prior to that date (refer to Attachment 002 Table of Borings). The Contractor must complete the utility locate request a minimum of 72 hours prior to the pre-drill kickoff meeting and commencement of drilling.

• www.digline.com,

• 1-800-342-1585

• 811 from anywhere in Oregon.

The Contractor will provide the utility ticket number(s) to the COR within 24 hours of completing the utility locate notification.

The Contractor will utilize a vacuum truck to clear the upper 5 feet of soils in each boring. The

COR will ensure no utilities which are not able to be located by the public one call utility locate are present in the borehole before continuing with the exploration.

L. Water for Drilling

Procurement of a water source for drilling is the responsibility of the Contractor and should be identified at least 14 days prior to the start of drilling. Water draws from the river must be permitted by the regional Oregon Watermaster, see website for contact information for District 15

(https://www.oregon.gov/owrd/aboutus/contactus/pages/regionalofficesandwatermastersdirectory

.aspx). No water is to return to Winchester Creek.

M. Traffic Control

Traffic control is anticipated for this project. Provide a traffic control plan following the most current edition of the Manual on Uniform Traffic Control Devices (MUTCD) standards, as well as State and local requirements to safely allow for a single lane closure. Monitor the queues during operations for a maximum 20-minute hold delay. Road Access Permits

The borings are within Douglas County right of way and obtaining a Douglas County Public

Works (DCPW) Right of Way Permit will be the responsibility of the Contractor, including any associated fees. See website for more information on obtaining a DCPW Right of Way Permit

(https://www.douglascountyor.gov/368/Right-of-Way-Activity-Permits). WFL will provide pertinent information to the Contractor, as necessary, to complete the permit application.

http://www.digline.com/ https://www.oregon.gov/owrd/aboutus/contactus/pages/regionalofficesandwatermastersdirectory.aspx https://www.oregon.gov/owrd/aboutus/contactus/pages/regionalofficesandwatermastersdirectory.aspx https://www.douglascountyor.gov/368/Right-of-Way-Activity-Permits

B-7

N. Environmental Compliance Summary

The proposed exploration plan has been environmentally cleared by a Programmatic Agreement prepared by WFLHD.

The Contractor will follow the Geotechnical Activities Categorical Exclusion (Attachment 003) that include:

Follow all local and State regulations for backfilling a completed test boring, disposing of drill cuttings and containing and/or limiting any runoff from drilling fluids. Utilize best-management-practices for erosion control and use containers or tubs when recirculating drilling fluid is required.

• To minimize the amount of ground disturbance, locate staging and stockpiling areas in previously disturbed sites, including the roadway and gravel pullouts if available. Restore staging and stockpiling areas to pre-construction conditions following construction.

• Provide construction equipment and vehicles that are mechanically operating properly and do not excessively produce engine exhaust. Limit equipment idling to only what is necessary for safety and/or mechanical reasons. Equipment and vehicles will also be checked for leaking oil and fluids. Provide leak absorption kits on site.

• Provide and implement a construction spill prevention, control, and countermeasures plan.

• No unsecured fuel storage containers are allowed on the project site. Fuel will be delivered to the site only in trucks designed for fuel hauling, or in DOT approved fuel safety cans secured to vehicles.

• Construction workers and supervisors will be informed of the occurrence and status of special-status species (including federally listed species) and would be advised of the potential impacts on the species and potential penalties for taking or harming a special status species. Contract provisions would require the cessation of construction activities if a special-status species is discovered in the project action area. This would allow modification of the contract to include protection measures determined necessary to protect the discovery.

• The Contractor would be required to keep all waste and contaminants contained and removed daily from the work site. Food and other wildlife attractants would be contained to minimize risk of nest predators (i.e., corvids). Other mitigation measures to prevent human-wildlife conflict will include the following: feeding or approaching wildlife will be prohibited; a litter control program will be implemented during construction to eliminate the accumulation of trash; and all food items will be stored inside vehicles, trailers, or wildlife-resistant receptacles except during actual use to prevent attracting wildlife.

• Store chemicals in water-tight containers a minimum of 150 feet from waters and storm drain inlets. Keep containers closed, sealed, and secured when not being actively used. Use secondary containment for storage areas to capture leaks or spills.

• Conduct machinery maintenance and refueling 150 feet or greater from any wetlands or surface waters. Refueling of equipment may occur within 150 feet of waterbodies if spill prevention measures are in place and if approved by the COR.

• If active bird nests or bat colonies are identified during clearing operations, or if nesting, denning, hibernating or animals living within the worksite are identified, suspend work immediately and notify the COR within 1 hour and obtain approval before restarting.

B-8

• Notify the COR if bear, fox, wolverine, fish, or wolf are encountered in the project area.

Notify the COR if the bears and foxes are seeking human food.

• Store all food, toiletries, and other potential attractants (e.g., petroleum products, antifreeze, personal hygiene items) in wildlife-proof containers or enclosed construction equipment, except during actual use.

• Provide temporary portable toilets for construction staff use. Do not place within 50 feet of surface waters. Secure toilets to prevent tipping over from winds.

• Report wildlife collisions or roadkill at the project to COR within 1 hour of discovery.

• Contractor will have on hand equipment and materials to allow measures to be taken in the event a confined aquifer is breached. COR and the Contractor will define the materials and actions required to plug the aquifer, address excess water on the surface, prohibit any water or sediment from reaching surface waters, reduce erosion, and reduce environmental damage. All materials and equipment needed to stop artesian flow will be on site prior to drilling. Contractor will have the means to measure groundwater temperature to determine if geothermal conditions are present. Potential materials would include inflatable packers, cement grout, silt fencing, 100% natural and biodegradable fiber wattles, and equipment needed to place all

• Visually monitor the drilling operation. If visible turbidity or a sheen in the discharge is observed, stop all drilling activities and notify the COR immediately. Once monitoring results show turbidity is no longer visible, drilling activities may resume and continue to monitor.

• Bio-filter bags will be placed on the bridge deck around the borehole and drilling area to prevent drilling fluids from discharging into the river. All drill fluids, cuttings, waste, and materials cored through or used to repair the bridge deck will be contained and transported off site for disposal.

O. Western Federal Highways Division Contact Information

The COR for this project is WFLHD Acting Functional Manager, Mark Swank. When Mark is unavailable for issues needing immediate attention, the alternate contact is WFLHD Geotechnical

Engineer, Nico Ferreira.

Mark Swank

Phone: 360-210-6640

Email: mark.swank@dot.gov

Nico Ferreira

Phone: (564) 653-8389

Email: nicholas.ferreira@dot.gov

IV. SUBMITTALS AND DELIVERABLES

A. Pre-Mobilization Submittals

Provide the following submittals for review and approval at least 15 business days prior to mobilization to the site:

mailto:mark.swank@dot.gov mailto:nicholas.ferreira@dot.gov

B-9

• Temporary traffic control plan (TTCP)

• Hammer efficiency test reports for all drills used on the project.

• Driller and Driller Helper resumes, including State Licensure

• Executed DCPW access permit

Provide a drilling schedule. Allow 4 business days for the approval or rejection of the schedule. If rejected, submit corrected schedule within 2 business days after the date of the rejection of the schedule. If rejected, schedule a meeting within 3 business days to discuss corrections. Rejected submittals time for approval starts over when documents are returned for revision.

The approved copy of the initial drilling schedule with supporting documents becomes the baseline drilling schedule. Implement and execute the work under the contract according to the baseline drilling schedule.

B. Project Deliverables

Provide daily reports including all line-item quantities for each day of work. Provide each day’s report to the WFL field representative within 24 hours of the day reported.

Submit project deliverables in accordance with the schedule listed in Table 2.

Table 2 – Project Deliverables and Due Dates (BASE).

Deliverable Due Date

Drill Crew Daily Report Submit hard copy to within 24 hours of shift completion. Email scanned reports to COR weekly.

Disturbed Samples and Split

Spoon Samples

Ship or hand-deliver to WFLHD within 14 calendar days of drilling completion.

Rock Core Ship or hand-deliver to WFLHD within 14 calendar days of drilling completion.

Utility Locate Ticket Number(s) Email to COR within 24 hours of submitting to One-Call.

P-S Suspension Logging Report Email to COR within 2 weeks of in-situ measurement.

Ship or hand deliver soil and rock core samples to:

Attn: Nico Ferreira

WFLHD Material Laboratory

610 East 5th Street

Vancouver, Washington 98661

V. SCHEDULE

Work is planned to begin in late November or early December 2026. All field work should be completed within six (6) business days including mobilizations. Once the contract is awarded, submit a schedule to be approved by the COR.

B-10

VI. ATTACHMENTS

Attachment 001 – Boring Location Map

Attachment 002 – Table of Borings

Attachment 003 – Geotechnical Activities Categorical Exclusions

Attachment 004 – 2025 FLH Soil Description and Identification Guidelines

Attachment 005 – 2025 FLH Rock Characterization Guidelines

Attachment 006 – Wage Determination

Google Earth© kmz file available upon request.

C-1

CLAUSES

FAR AND TAR CLAUSES INCORPORATED BY REFERENCE AND FULL TEXT

52.203-17 Contractor Employee Whistleblower Rights (Nov 2023)

52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or

Statements (Jan 2017)

52.204-13 System for Award Management – Maintenance (OCT 2018)(DEVIATION

NOV 2025)

52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Nov

2015)(DEVIATION SEP 2025)

52.212-4 Contract Terms and Conditions – Commercial Products and Commercial

Services (NOV 2023)(DEVIATION SEP 2025)

52.217-8 Option to Extend Services (Nov 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The

Contracting Officer may exercise the option by written notice to the Contractor within the task order period.

(End of clause)

52.219-6 Notice of Total Small Business Set-Aside (Nov 2020)(DEVIATION NOV

2025)

52.219-28 Postaward Small Business Program Representation (Jan 2025)(DEVIATION

NOV 2025))

52.222-3 Convict Labor (June 2003)(DEVIATION OCT 2025)

52.222-35 Equal Opportunity for Veterans. (JUN 2020)(DEVIATION OCT 2025)

52.222-36 Equal Opportunity for Workers with Disabilities (Jun 2020)(DEVIATION

OCT 2025)

52.222-41 Service Contract Labor Standards (Aug 2018)(DEVIATION OCT 2025)

52.222-42 Statement of Equivalent Rates for Federal Hires (May 2014)

52.222-44 Fair Labor Standards Act and Service Contract Labor Standards-Price

Adjustment (May 2014 )(DEVIATION OCT 2025)

C-2

52.222-55 Minimum Wages Under Executive Order 14026 (Jan 2022)(DEVIATION

52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2022)(DEVIATION

52.222-90 Addressing DEI Discrimination by Federal Contractors. (DEVIATION APR

2026)

(a) Definitions. As used in this clause—

Program participation means membership or participation in, or access or admission to: training, mentoring, or leadership development programs; educational opportunities; clubs; associations;

or similar opportunities that are sponsored or established by the contractor or subcontractor.

Racially discriminatory diversity, equity, and inclusion (DEI) activities means disparate treatment based on race or ethnicity in the recruitment, employment (e.g., hiring, promotions), contracting (e.g., vendor agreements), program participation, or allocation or deployment of an entity's resources.

(b) In connection with the performance of work under this contract, the Contractor agrees as follows:

(1) The Contractor will not engage in any racially discriminatory DEI activities;

(2) The Contractor will furnish all information and reports, including providing access to books, records, and accounts, as required by the Contracting Officer, for purposes of ascertaining compliance with this clause;

(3) In the event of the Contractor's or a subcontractor's noncompliance with this clause, this contract may be canceled, terminated, or suspended in whole or in part, and the Contractor or subcontractor may be declared ineligible for further Government contracts;

(4) The Contractor will report any subcontractor's known or reasonably knowable conduct that may violate this clause to the Contracting Officer and take any appropriate remedial actions directed by the Contracting Officer; and

(5) The Contractor will inform the Contracting Officer if a subcontractor sues the Contractor and the suit puts at issue, in any way, the validity of this clause.

(6) The Contractor recognizes that compliance with the requirements of this clause are material to the Government's payment decisions for purposes of 31 U.S.C. 3729(b)(4).

(c) The Contractor must include the substance of this clause, including this paragraph (c), in subcontracts at any tier, including those for commercial products and commercial services, except those where the place of delivery or performance is outside the United States.

(End of clause)

52.223-23 Sustainable Products and Services (MAY 2024) (DEVIATION FEB

2025)(DEVIATION DEC 2025))

52.225-1 Buy American-Supplies (Oct 2022)(DEVIATION NOV 2025)

52.226-7 Drug-Free Workplace (May 2024)

C-3

52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving (May

2024)

52.232-33 Payment by Electronic Funds Transfer-System for Award Management

(Oct 2018)

52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Mar

2023)

52.233-3 Protest After Award (Aug 1996) (DEVIATION SEP 2025)

52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004) (DEVIATION SEP

2025).

52.240-91 Security Prohibitions and Exclusions (DEVIATION SEP 2025)

(a) Definitions. As used in this clause—

American Security Drone Act-covered foreign entity means an entity included on a list that the

Federal Acquisition Security Council (FASC) develops and maintains and publishes in the

System for Award Management (SAM) at https://www.sam.gov (section 1822 of Pub. L. 118-31, 41 U.S.C. 3901 note prec.).

Backhaul means intermediate links between the core network, or backbone network, and the small subnetworks at the edge of the network (e.g., connecting cell phones/towers to the core telephone network). Backhaul can be wireless (e.g., microwave) or wired (e.g., fiber optic, coaxial cable, Ethernet).

Covered application means the social networking service TikTok or any successor application or service developed or provided by ByteDance Limited or an entity owned by ByteDance Limited.

Covered article, as defined in 41 U.S.C. 4713(k), means:

(1) Information technology, as defined in 40 U.S.C. 11101, including cloud computing services of all types;

(2) Telecommunications equipment or telecommunications service, as those terms are defined in section 3 of the Communications Act of 1934 (47 U.S.C. 153);

(3) The processing of information on a Federal or non-Federal information system, subject to the requirements of the Controlled Unclassified Information program (see 32 CFR part 2002); or

(4) Hardware, systems, devices, software, or services that include embedded or incidental information technology.

Covered foreign country means The People’s Republic of China.

Covered telecommunications equipment or services means—

(1) Telecommunications equipment produced by Huawei Technologies Company or ZTE

Corporation (or any subsidiary or affiliate of such entities);

(2) For the purpose of public safety, security of Government facilities, physical security surveillance of critical infrastructure, and other national security purposes, video surveillance and telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities);

(3) Telecommunications or video surveillance services provided by such entities or using such equipment; or

C-4

(4) Telecommunications or video surveillance equipment or services produced or provided by an entity that the Secretary of Defense, in consultation with the Director of National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the government of a covered foreign country.

Critical technology means—

(1) Defense articles or defense services included on the United States Munitions List set forth in the International Traffic in Arms Regulations under subchapter M of chapter I of title 22, Code of Federal Regulations;

(2) Items included on the Commerce Control List set forth in Supplement No. 1 to part 774 of the Export Administration Regulations under subchapter C of chapter VII of title 15, Code of

Federal Regulations, and controlled—

(i) Pursuant to multilateral regimes, including for reasons relating to national security, chemical and biological weapons proliferation, nuclear nonproliferation, or missile technology; or

(ii) For reasons relating to regional stability or surreptitious listening;

(3) Specially designed and prepared nuclear equipment, parts and components, materials, software, and technology covered by part 810 of title 10, Code of Federal Regulations (relating to assistance to foreign atomic energy activities);

(4) Nuclear facilities, equipment, and material covered by part 110 of title 10, Code of Federal

Regulations (relating to export and import of nuclear equipment and material);

(5) Select agents and toxins covered by part 331 of title 7, Code of Federal Regulations, part 121 of title 9 of such Code, or part 73 of title 42 of such Code; or

(6) Emerging and foundational technologies controlled pursuant to section 1758 of the Export

Control Reform Act of 2018 (50 U.S.C. 4817).

FASC-prohibited unmanned aircraft system means an unmanned aircraft system manufactured or assembled by an American Security Drone Act—covered foreign entity.

FASCSA order means any of the following orders issued under the Federal Acquisition Supply

Chain Security Act (FASCSA) requiring removing covered articles from executive agency information systems or excluding one or more named sources or named covered articles from executive agency procurement actions, as described in 41 CFR 201-1.303(d) and (e):

(1) The Secretary of Homeland Security may issue FASCSA orders that apply to civilian agencies, to the extent not covered by paragraph (2) or (3) of this definition. This type of

FASCSA order may be referred to as a Department of Homeland Security (DHS) FASCSA order.

(2) The Secretary of Defense may issue FASCSA orders that apply to the Department of Defense

(DoD) and national security systems other than sensitive compartmented information systems.

This type of FASCSA order may be referred to as a DoD FASCSA order.

(3) The Director of National Intelligence (DNI) may issue FASCSA orders that apply to the intelligence community and sensitive compartmented information systems, to the extent not covered by paragraph (2) of this definition. This type of FASCSA order may be referred to as a

DNI FASCSA order.

Information technology, as defined in 40 U.S.C. 11101(6)—

(1) Means any equipment or interconnected system or subsystem of equipment, used in the automatic acquisition, storage, analysis, evaluation, manipulation, management, movement, control, display, switching, interchange, transmission, or reception of data or information by the executive agency, if the equipment is used by the executive agency directly or is used by a contractor under a contract with the executive agency that requires the use—

C-5

(i) Of that equipment; or

(ii) Of that equipment to a significant extent in the performance of a service or the furnishing of a product;

(2) Includes computers, ancillary equipment (including imaging peripherals, input, output, and storage devices necessary for security and surveillance), peripheral equipment designed to be controlled by the central processing unit of a computer, software, firmware and similar procedures, services (including support services), and related resources; but

(3) Does not include any equipment acquired by a Federal contractor incidental to a Federal contract.

Intelligence community, as defined by 50 U.S.C. 3003(4), means the following—

(1) The Office of the Director of National Intelligence;

(2) The Central Intelligence Agency;

(3) The National Security Agency;

(4) The Defense Intelligence Agency;

(5) The National Geospatial-Intelligence Agency;

(6) The National Reconnaissance Office;

(7) Other offices within the Department of Defense for the collection of specialized national intelligence through reconnaissance programs;

(8) The intelligence elements of the Army, the Navy, the Air Force, the Marine Corps, the Coast

Guard, the Federal Bureau of Investigation, the Drug Enforcement Administration, and the

Department of Energy;

(9) The Bureau of Intelligence and Research of the Department of State;

(10) The Office of Intelligence and Analysis of the Department of the Treasury;

(11) The Office of Intelligence and Analysis of the Department of Homeland Security; or

(12) Such other elements of any department or agency as may be designated by the President, or designated jointly by the Director of National Intelligence and the head of the department or agency concerned, as an element of the intelligence community.

Interconnection arrangements means arrangements governing the physical connection of two or more networks to allow the use of another’s network to hand off traffic where it is ultimately delivered (e.g., connecting a customer of telephone provider A to a customer of telephone company B) or sharing data and other information resources.

Kaspersky Lab-covered article means any hardware, software, or service that—

(1) Is developed or provided by a Kaspersky Lab-covered entity;

(2) Includes any hardware, software, or service developed or provided in whole or in part by a

Kaspersky Lab-covered entity; or

(3) Contains components using any hardware or software developed in whole or in part by a

Kaspersky Lab-covered entity.

Kaspersky Lab-covered entity means—

(1) Kaspersky Lab;

(2) Any successor entity to Kaspersky Lab, including any change in name, e.g., “Kaspersky”;

(3) Any entity that controls, is controlled by, or is under common control with Kaspersky Lab; or

(4) Any entity of which Kaspersky Lab has a majority ownership.

National security system, as defined in 44 U.S.C. 3552, means any information system (including any telecommunications system) used or operated by an agency or by a contractor of an agency, or other organization on behalf of an agency—

C-6

(1) The function, operation, or use of which involves intelligence activities; involves cryptologic activities related to national security; involves command and control of military forces; involves equipment that is an integral part of a weapon or weapons system; or is critical to the direct fulfillment of military or intelligence missions, but does not include a system that is to be used for routine administrative and business applications (including payroll, finance, logistics, and personnel management applications); or

(2) Is protected at all times by procedures established for information that have been specifically authorized under criteria established by an Executive order or an Act of Congress to be kept classified in the interest of national defense or foreign policy.

Roaming means cellular communications services (e.g., voice, video, data) received from a visited network when unable to connect to the facilities of the home network either because signal coverage is too weak or because traffic is too high.

Sensitive compartmented information means classified information concerning or derived from intelligence sources, methods, or analytical processes, which is required to be handled within formal access control systems established by the Director of National Intelligence.

Sensitive compartmented information system means a national security system authorized to process or store sensitive compartmented information.

Source means a non-Federal supplier, or potential supplier, of products or services, at any tier.

Subsidiary means an entity in which more than 50 percent of the entity is owned directly by a parent corporation or through another subsidiary of a parent corporation.

Substantial or essential component means any component necessary for the proper function or performance of a piece of equipment, system, or service.

Unmanned aircraft means an aircraft that is operated without the possibility of direct human intervention from within or on the aircraft (49 U.S.C. 44801(11)).

Unmanned aircraft system means an unmanned aircraft and associated elements (including communication links and the components that control the unmanned aircraft) that are required for the operator to operate safely and efficiently in the national airspace system (49 U.S.C.

44801(12)).

(b) Prohibitions on providing or using specific products or services in performance of contract.

Unless a waiver or exception applies, the Contractor is prohibited from providing any products or services to the Government or using in the performance of the contract any of the following:

(1) A covered application on any information technology owned or managed by the Government, or on any information technology used or provided by the Contractor under this contract, including equipment provided by the Contractor’s employees (section 102 of Division R of the

Consolidated Appropriations Act, 2023 (Pub. L. 117-328));

(2) A Kaspersky Lab-covered article (Section 1634 of Division A of the National Defense

Authorization Act for Fiscal Year 2018 (Pub. L. 115-91));

(3) Covered telecommunications equipment or services used as a substantial or essential component of any system, or as critical technology as part of any system (paragraphs (a)(1)(A) of section 889 of the John S. McCain National Defense Authorization Act for Fiscal Year 2019

(Pub. L. 115-232)). This does not prohibit contractors from providing—

(i) A service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or

(ii) Telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.

C-7

(c) Prohibition on unmanned aircraft systems manufactured or assembled by American Security

Drone Act—covered foreign entities.

(1) Prohibition. The Contractor is prohibited from—

(i) Delivering any FASC-prohibited unmanned aircraft system, which includes unmanned aircraft (i.e., drones) and associated elements (sections 1823 and 1826 of American Security

Drone Act of 2023, within the National Defense Authorization Act for Fiscal Year 2024, Pub. L.

118-31, Div. A, Title XVIII, Subtitle B, 41 U.S.C. 3901 note prec.);

(ii) On or after December 22, 2025, operating a FASC-prohibited unmanned aircraft system in the performance of the contract (section 1824 of Pub. L. 118-31); and

(iii) On or after December 22, 2025, using Federal funds to procure or operate a FASC-prohibited unmanned aircraft system (section 1825 of Pub. L. 118-31).

(2) Procedures. The Contractor shall search SAM for the FASC-maintained list of American

Security Drone Act—covered foreign entities before proposing, or using in performance of the contract, any unmanned aircraft system. Also, the Contractor shall ensure any effort or expenditure associated with a FASC-prohibited unmanned aircraft system is consistent with a corresponding exemption, exception, or waiver determination expressly stated in the contract.

(3) Exemptions, exceptions, and waivers. The prohibitions in paragraph (c) of this clause do not apply where the agency has determined an exemption, exception, or waiver applies, and the contract indicates that such a determination has been made. See sections 1823 through 1825 and

1832 of Public Law 118-31 for statutory requirements pertaining to exemptions, exceptions, and waivers.

(d) Prohibition on using or providing specific products or services or conducting certain transactions regardless of connection to contract.

(1) Certain telecommunications and video surveillance…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .