Amendment A001.pdf
PDF 238 KB Posted
- Attached to
- Geotechnical Drilling Services for Project OR FLAP DOUGLAS 251(2), Winchester Bridge Replacement
- Solicitation number
- 69056727Q000006
About this file
This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) issued by the Department of Transportation Federal Highway Administration on November 4, 2026, for Solicitation No. 69056727Q000006, dated November 3, 2026.
The amendment addresses Geotechnical Drilling Services for Project OR FLAP DOUGLAS 251(2), Winchester Bridge Replacement. The modification deletes and replaces Price Schedule page A-2 in its entirety. The replacement price schedule is a bid sheet for Winchester Creek Bridge geotechnical drilling services that includes line items organized into two primary categories: Drilling and Flagging. The Drilling section encompasses project mobilization and demobilization, drilling/coring activities, installed casing for suspension logging, pavement core samples, split spoon sampling and standard penetration tests, Shelby tube sampling, per diem for personnel at $216.00 per day (government rate), on-project crew work and standby time, shipping samples, pre-drilling site meetings, downhole suspension logging, and miscellaneous other work. The Flagging section includes flagging personnel, per diem for flagging personnel at $216.00 per day, traffic control signs and devices, traffic control mobilization, and light plant rental. All line items specify quantities and units of measure (lump sum, linear feet, each, day, or hour) with blank price columns for contractor completion. The amendment requires offerors to acknowledge receipt prior to the specified solicitation deadline by completing and returning the amendment, acknowledging receipt on each offer copy, or submitting separate written notification referencing the solicitation and amendment numbers.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A001 11/04/2026 N/A
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X 69056727Q000006
9B. DATED (SEE ITEM 11)
11/03/2026
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A
N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
(__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
N/A
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
N/A
D OTHER (Specify type of modification and authority)
N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Geotechnical Drilling Services for Project OR FLAP DOUGLAS 251(2), Winchester Bridge Replacement
Price Schedule, Page A-2. Price Schedule page A-2 is deleted in its entirety and replaced.
ENCLOSURES: Page A-2
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
QTY Price Unit of
Measure Sub Total
Lump Sum $ -
180 Lnft $ -
130 lnft $ -
2 Each $ -
44 Each $ -
4 Each $ -
$ 216.00 Day $ -
Hour $ -
Hour $ -
1 Lump Sum $ -
1 Lump Sum $ -
1 Lump Sum $ -
Day $ -
Each $ -
Each $ -
QTY Price Unit of
Measure Sub Total
Each $ -
Hour $ -
Lump Sum $ -
Hour $ -
Each $ -
1 Lump Sum $ -
Day $ -
Day $ -
$ 216.00 Day $ -
Lump Sum $ -
Lump Sum $ -
Lump Sum $ -
TOTAL:
Downhole Suspension Logging (incl. travel)
Winchester Creek Bridge
Geotechnical Drilling Services Bid Sheet
D ri lli n g
Project Mobilization and Demobilization
Drilling/Coring (all methods)
Installed casing for suspension logging, if needed
Pavement Core Samples (4 " min. diameter)
Split Spoon Sampling (All Sizes) and SPTs
Shelby Tube Sampling, if requested
Per Diem (Per Person Per Day at Government
Rate for Area)
On Project Moves / Drill Crew Work / Water
Standby Time - Drill Crew and Equipment
Shipping Samples
Pre-Drilling Site Meeting
Other:
Other:
Other
Geotechnical Drilling Services
D ri lli n g
Crew Breaks
Water Level Testing
Utility Locate
Site Prep
Asphalt patch
Offsite Cutting disposal
Other: Support vehicle/equipment
Other:
Fl ag gi n g
Flagging Personnel
Flagging Personnel Per Diem (Per Person Per
Day at Government Rate for Area)
Tracffic Control Signs and Devices
Traffic Control Mobilization
Light Plant Rental
Signature Date
Company Name:
Company Address:
Name of Representative:
A-2
File details come from the government source that posted it. Updated .