This is a Vendor Questions and Answers document for the Winchester Bridge Replacement project under solicitation number 69056727Q000006, Project Number OR FLAP DOUGLAS 251(2).
A vendor raised a discrepancy regarding conflicting project specifications across solicitation documents. The Bid Sheet (RFQ page 4) specifies 230 linear feet of drilling/coring, 60 split spoon samples and standard penetration tests (SPTs), and 2 Shelby Tube samples. However, the Statement of Work (page 7) and Attachment 002 (Table of Borings) indicate different quantities: 60 feet of auger, 100 feet of HQ core, 180 feet maximum depth, 44 SPTs, and 4 Shelby Tube samples. The vendor sought clarification on which quantities should be used for pricing purposes. The government's response, dated November 3, 2026, confirmed that a corrected bid sheet will be issued through an Amendment, indicating vendors should await the amended bid sheet before submitting pricing.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VENDOR QUESTIONS AND ANSWERS
Solicitation No.:
Project No.:
Project Name:
# General Technical Question Answer Date
1 X
The Bid Sheet (RFQ PDF page 4) is headed "SF Molalla River Bridge" and lists 230 Lnft of Drilling/Coring, 60 Split Spoon Sampling and SPTs, and 2 Shelby Tube samples. The Statement of Work (PDF page 7) reads "Base item ceiling quantity for driven SPT samples is 44 SPT samples" and "Base item ceiling quantity: 4 Shelby Tube samples", and Attachment 002, Table of Borings, totals 60 ft of auger, 100 ft of HQ core, 180 ft maximum depth, 44 SPTs and 4 Shelby samples.
Is the Bid Sheet the correct one for this project, and which quantities should offerors price: the Bid Sheet's (230 / 60 / 2) or the Statement of Work and Table of Borings' (180 / 44 / 4)? If a corrected Bid Sheet will be issued, we will price that.
A new bid sheet will be provided. This will be addressed under an Amendment. 3-Nov-2026
Winchester Bridge Replacement
OR FLAP DOUGLAS 251(2)
69056727Q000006