QA_12-01-2025.pdf

PDF 97 KB Posted

Attached to
ID BOUNDARY 5806(3)B, Riverside Road Improvements B
Solicitation number
69056725R000018
Issued by

About this file

This document is a Questions and Answers (Q&A) file for the Riverside Road Improvements B project, with the project number ID BOUNDARY 5806(3)B. The Q&A addresses three technical questions from potential contractors. The first two questions relate to bidding eligibility and solicitation procedures, with responses directing interested parties to the Western Federal Lands Highway Division's SAM.gov site for MATOC (Multiple Award Task Order Contract) opportunities.

The third question concerns a specific technical specification for steel sign panels, with the response advising contractors to bid according to the plans and solicitation documents. The project appears to be limited to pre-approved MATOC contractors for Idaho, Montana, and surrounding areas, with a response date of 11/24/25 for the first two questions and 12/1/25 for the technical specification question.

View the file

Other files

File Type Posted
BidTab_ID BOUNDARY 5806(3).pdf PDF
Proposal Summary_ID BOUNDARY 5806 (3)B.pdf PDF
Amendment A002.pdf PDF
QA_12-05-2025.pdf PDF
Lab Trailer Blank Check In Form.docx DOCX document
WFLHD Lab Trailers - Appendix B.docx DOCX document
QA_11-24-2025.pdf PDF
A001_Physical Data Files.zip ZIP file
Amendment A001.pdf PDF
Physical Data.zip ZIP file
id-a2158063_plans.pdf PDF
RFP_ID BOUNDARY 5806(3)B_69056725R000018.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project No.: ID BOUNDARY 5806(3)B

Project: Riverside Road Improvements B

# General Technical Question Answer Date

1 X

We have seen the notice for this project. How do we get prequalified to bid as a Prime

Contractor?

This project is being solicited to our Idaho, Montana, and Surrounding Areas Multiple

Award Task Order Contract (MATOC) contractors. The contractors that can bid as a Prime Contractor have already been determined:

https://highways.dot.gov/federal-lands/business/construction-contracting/idaho-montana-and-surrounding-areas-idiq-matoc. Please look for future MATOC contract opportunities on SAM.gov.

11/24/25

2 X

This is the first notice we have seen about this project, why is it not posted on the local plan centers requesting prime contractors?

Per FAR 2.101, The Governmentwide point of entry (GPE) is located at https://www.sam.gov; this is where

Western Federal Lands Highway Division posts all contract opportunities.

11/24/25

3 X

Line Item No. A0134 SIGN, STEEL PANEL, TYPE 3

SHEETING calls for the sign panels to be made from steel per bid item and spec. No.

718.03. Sign panels are usually made from

aluminum.

Please review and advise if this is really what is required or can aluminum panels be used.

Please bid according to the plans and solicitation documents.

12/1/25