Bid Tabulations_WA FLAP JEFFER 134309(2).pdf

PDF 519 KB Posted

Attached to
WA FLAP JEFFER 134309(2), Two Trout Creek Culvert Replacement
Solicitation number
69056725B000014
Issued by

About this file

This is a Bid Tabulation Report for a federal construction project involving culvert replacement work in Washington State. The project, identified as WA FLAP JEFFER 134309(2) for the Two Trout Creek Culvert Replacement, was solicited under Solicitation No. 69056725B000014 and opened on April 21, 2026, by the Federal Highway Administration (FHWA) in Jefferson County, Western Federal Lands Division. Two contractors submitted bids: Conway Construction Co at $3,057,355.00 and Highline Construction LLC at $2,499,980.00, compared to the Engineer's Estimate of $2,080,000.00. The report was generated on April 22, 2026, by Haydar Mohammad and was certified by Marino Chea, the official who opened the bids. The project lead designer is Thinh Phan.

The detailed line-item breakdown comprises approximately 40 pay items covering mobilization, survey and staking, quality control, testing, erosion control measures, clearing and grubbing, excavation, riprap placement, roadway aggregate and reconditioning, and the primary work item of precast reinforced concrete box culvert installation (18-foot span, 12-foot rise) at 52 linear feet. Additional work includes guardrail systems, temporary traffic control measures, temporary stream diversion, turf establishment, plantings, and environmental design elements such as rock weirs, log barriers, root wads, fish passage boulders, bank stabilization, and streambed material installation. Unit prices vary significantly between contractors on major items; for example, the precast concrete box culvert ranges from $15,000 to $35,000 per linear foot, and temporary stream diversion ranges from $35,000 to $331,500 in lump sum pricing. The report does not indicate which contractor was awarded the contract or final award details at the time of report generation.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID TABULATION REPORT

Project No. : WA FLAP JEFFER 134309(2) Project Name: Two Trout Creek Culvert Replacement

Contractor Responsive? Base Schedule A Conway Construction Co $3,057,355.00 Highline Construction LLC $2,499,980.00 Engineer's Estimate $2,080,000.00

Report Generated on 04/22/2026 2:03 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

Generated by : Haydar Mohammad

Project No. : WA FLAP JEFFER 134309(2)

Project Name: Two Trout Creek Culvert Replacement

Division: Western Federal Lands

Schedule: A Schedule Type: Base Lead Designer: Thinh Phan Solicitation No. : 69056725B000014 Opened at: FHWA Opened by: Marino Chea State: WA County: Jefferson Federal Land: Bid Open Date and Time: 04/21/2026

Contract Awarded to: Award Date:

Contractor Comment Bid Amount Responsive Conway Construction Co, 6620 NW Whitney Rd. Suite 100, Vancouver, WA, 98665

$3,057,355.00

Highline Construction LLC, 5977 Guide Meridian, Bellingham, WA, 98226

$2,499,980.00

Engineer's Estimate $2,080,000.00

I certify that this Bid Tabulation reflects the offers received for this solicitation

Signed:

Title:

Date:

Project No. : WA FLAP JEFFER 134309(2) Project Name: Two Trout Creek Culvert Replacement

Schedule: A Schedule Type: Base

Line Item Number

Pay Item Number Description Contractor Quantity Unit Unit Price Amount

A0020 15101-0000 MOBILIZATION Conway Construction Co $330,360.00

Highline Construction

LLC $249,000.00

Engineer's Estimate ALL LPSM LPSM $286,730.00

A0040 15201-0000 CONSTRUCTION

SURVEY AND

STAKING

Highline Construction

LLC $58,000.00

Conway Construction Co $50,000.00

Engineer's Estimate ALL LPSM LPSM $70,500.00

Report Generated on 04/22/2026 2:03 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0060 15301-0000 CONTRACTOR

QUALITY CONTROL

Highline Construction

LLC $130,000.00

Conway Construction Co $50,000.00

Engineer's Estimate ALL LPSM LPSM $57,000.00

A0080 15401-0000 CONTRACTOR

TESTING

Conway Construction Co $50,000.00

Highline Construction

LLC $25,000.00

Engineer's Estimate ALL LPSM LPSM $43,000.00

A0100 15501-0000 CONSTRUCTION

SCHEDULE

Conway Construction Co $50,000.00

Highline Construction

LLC $16,500.00

Engineer's Estimate ALL LPSM LPSM $25,000.00

A0120 15705-0100 SOIL EROSION

CONTROL, SILT

FENCE

Highline Construction

LLC 1,000.000 $10.00 $10,000.00

Conway Construction Co 1,000.000 $7.50 $7,500.00

Engineer's Estimate 1,000.000 LNFT $15.00 $15,000.00

A0140 15705-1400 SOIL EROSION

CONTROL, FIBER

ROLL

Highline Construction

LLC 450.000 $7.00 $3,150.00

Conway Construction Co 450.000 $6.00 $2,700.00

Engineer's Estimate 450.000 LNFT $14.50 $6,525.00

A0160 15706-0200 SOIL EROSION

CONTROL, CHECK

DAM (Fiber Roll)

Highline Construction

LLC 17.000 $250.00 $4,250.00

Conway Construction Co 17.000 $150.00 $2,550.00

Engineer's Estimate 17.000 EACH $350.00 $5,950.00

A0180 20103-0000 CLEARING AND

GRUBBING

Highline Construction

LLC 950.000 $27.00 $25,650.00

Conway Construction Co 950.000 $12.00 $11,400.00

Engineer's Estimate 950.000 SQYD $40.00 $38,000.00

A0200 20301-1900 REMOVAL OF PIPE

CULVERT

Highline Construction

LLC 2.000 $3,500.00 $7,000.00

Conway Construction Co 2.000 $750.00 $1,500.00

Engineer's Estimate 2.000 EACH $8,000.00 $16,000.00

A0220 20401-0000 ROADWAY

EXCAVATION

Highline Construction

LLC 1,500.000 $130.00 $195,000.00

Conway Construction Co 1,500.000 $40.00 $60,000.00

Engineer's Estimate 1,500.000 CUYD $95.00 $142,500.00

A0240 20702-0000 STABILIZATION

GEOTEXTILE

Conway Construction Co 1,600.000 $5.00 $8,000.00

Report Generated on 04/22/2026 2:03 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0240 20702-0000 STABILIZATION

GEOTEXTILE

Highline Construction

LLC 1,600.000 $3.00 $4,800.00

Engineer's Estimate 1,600.000 SQYD $15.00 $24,000.00

A0260 25101-0300 PLACED RIPRAP,

CLASS 3

Highline Construction

LLC 50.000 $250.00 $12,500.00

Conway Construction Co 50.000 $225.00 $11,250.00

Engineer's Estimate 50.000 CUYD $415.00 $20,750.00

A0280 30201-2000 ROADWAY

AGGREGATE,

METHOD 2

Highline Construction

LLC 470.000 $165.00 $77,550.00

Conway Construction Co 470.000 $90.00 $42,300.00

Engineer's Estimate 470.000 CUYD $120.00 $56,400.00

A0300 30302-6000 ROADWAY

RECONDITIONING

Highline Construction

LLC 250.000 $229.00 $57,250.00

Conway Construction Co 250.000 $30.00 $7,500.00

Engineer's Estimate 250.000 LNFT $75.00 $18,750.00

A0320 60220-0000 PRECAST

REINFORCED

CONCRETE BOX

CULVERT (18 Feet Span, 12 Feet Rise)

Conway Construction Co 52.000 $35,000.00 $1,820,000.00

Highline Construction

LLC 52.000 $15,000.00 $780,000.00

Engineer's Estimate 52.000 LNFT $14,500.00 $754,000.00

A0340 61701-4500 GUARDRAIL

SYSTEM MGS, TYPE

2, CLASS A, STEEL

POSTS

Highline Construction

LLC 225.000 $76.00 $17,100.00

Conway Construction Co 225.000 $35.00 $7,875.00

Engineer's Estimate 225.000 LNFT $55.00 $12,375.00

A0360 61702-1500 TERMINAL SYSTEM,

TYPE MGS

TANGENT

Highline Construction

LLC 4.000 $6,680.00 $26,720.00

Conway Construction Co 4.000 $3,500.00 $14,000.00

Engineer's Estimate 4.000 EACH $5,250.00 $21,000.00 A0380 62201-0350 BACKHOE LOADER Highline Construction

LLC 60.000 $260.00 $15,600.00

Conway Construction Co 60.000 $190.00 $11,400.00

Engineer's Estimate 60.000 HOUR $180.00 $10,800.00 A0400 62201-2050 ROLLER Highline Construction

LLC 8.000 $260.00 $2,080.00

Conway Construction Co 8.000 $210.00 $1,680.00

Engineer's Estimate 8.000 HOUR $150.00 $1,200.00 A0420 62201-3750 CHAIN SAW Conway Construction

Co 20.000 $115.00 $2,300.00

Highline Construction

LLC 20.000 $105.00 $2,100.00

Report Generated on 04/22/2026 2:03 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0420 62201-3750 CHAIN SAW Engineer's Estimate 20.000 HOUR $145.00 $2,900.00 A0440 62301-0000 GENERAL LABOR Conway Construction

Co 100.000 $105.00 $10,500.00

Highline Construction

LLC 100.000 $104.00 $10,400.00

Engineer's Estimate 100.000 HOUR $120.00 $12,000.00

A0460 62502-0000 TURF

ESTABLISHMENT

Highline Construction

LLC 800.000 $25.00 $20,000.00

Conway Construction Co 800.000 $5.00 $4,000.00

Engineer's Estimate 800.000 SQYD $13.00 $10,400.00 A0480 62603-0000 PLANTINGS Conway Construction

Co $135,000.00

Highline Construction

LLC $37,500.00

Engineer's Estimate ALL LPSM LPSM $40,000.00

A0500 62801-0000 TEMPORARY

STREAM

DIVERSION

Highline Construction

LLC $331,500.00

Conway Construction Co $35,000.00

Engineer's Estimate ALL LPSM LPSM $25,000.00

A0520 62901-0000 ROLLED EROSION

CONTROL

PRODUCT (Woven Coir Fabric)

Highline Construction

LLC 600.000 $13.00 $7,800.00

Conway Construction Co 600.000 $10.00 $6,000.00

Engineer's Estimate 600.000 SQYD $9.00 $5,400.00

A0540 63501-1000 TEMPORARY

TRAFFIC CONTROL,

TRAFFIC CONTROL

SUPERVISOR

Conway Construction Co $70,000.00

Highline Construction

LLC $19,000.00

Engineer's Estimate ALL LPSM LPSM $60,000.00

A0560 63501-2000 TEMPORARY

TRAFFIC CONTROL,

TRAFFIC SIGNAL

SYSTEM

Conway Construction Co $35,000.00

Highline Construction

LLC $18,750.00

Engineer's Estimate ALL LPSM LPSM $55,000.00

A0580 63502-1050 TEMPORARY

TRAFFIC CONTROL,

TUBULAR MARKER

Highline Construction

LLC 120.000 $30.00 $3,600.00

Conway Construction Co 120.000 $15.00 $1,800.00

Engineer's Estimate 120.000 EACH $45.00 $5,400.00

A0600 63502-1300 TEMPORARY

TRAFFIC CONTROL,

DRUM

Highline Construction

LLC 12.000 $100.00 $1,200.00

Conway Construction Co 12.000 $60.00 $720.00

Engineer's Estimate 12.000 EACH $160.00 $1,920.00

Report Generated on 04/22/2026 2:03 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0620 63502-1600 TEMPORARY

TRAFFIC CONTROL,

WARNING LIGHT

TYPE B

Highline Construction

LLC 6.000 $50.00 $300.00

Conway Construction Co 6.000 $45.00 $270.00

Engineer's Estimate 6.000 EACH $160.00 $960.00

A0640 63503-0400 TEMPORARY

TRAFFIC CONTROL,

PORTABLE TRAFFIC

BARRIER

Highline Construction

LLC 200.000 $150.00 $30,000.00

Conway Construction Co 200.000 $50.00 $10,000.00

Engineer's Estimate 200.000 LNFT $85.00 $17,000.00

A0660 63504-1000 TEMPORARY

TRAFFIC CONTROL,

CONSTRUCTION

SIGN

Conway Construction Co 220.000 $35.00 $7,700.00

Highline Construction

LLC 220.000 $30.00 $6,600.00

Engineer's Estimate 220.000 SQFT $62.00 $13,640.00

A0680 63506-0500 TEMPORARY

TRAFFIC CONTROL,

FLAGGER

Highline Construction

LLC 100.000 $105.00 $10,500.00

Conway Construction Co 100.000 $90.00 $9,000.00

Engineer's Estimate 100.000 HOUR $120.00 $12,000.00

A0700 64703-3010 ENVIRONMENTAL

DESIGN, ROCK

WEIR

Conway Construction Co 5.000 $8,500.00 $42,500.00

Highline Construction

LLC 5.000 $5,300.00 $26,500.00

Engineer's Estimate 5.000 EACH $3,500.00 $17,500.00

A0720 64703-4000 ENVIRONMENTAL

DESIGN, LOG

BARRIER

Highline Construction

LLC 2.000 $3,200.00 $6,400.00

Conway Construction Co 2.000 $650.00 $1,300.00

Engineer's Estimate 2.000 EACH $4,000.00 $8,000.00

A0740 64703-5000 ENVIRONMENTAL

DESIGN, ROOT

WAD

Highline Construction

LLC 12.000 $3,600.00 $43,200.00

Conway Construction Co 12.000 $1,100.00 $13,200.00

Engineer's Estimate 12.000 EACH $3,800.00 $45,600.00

A0760 64703-6000 ENVIRONMENTAL

DESIGN, FISH

PASSAGE BOULDER

Highline Construction

LLC 3.000 $1,000.00 $3,000.00

Conway Construction Co 3.000 $350.00 $1,050.00

Engineer's Estimate 3.000 EACH $500.00 $1,500.00

A0780 64703-7000 ENVIRONMENTAL

DESIGN, BAFFLE

(Sediment Retention Sill)

Highline Construction

LLC 3.000 $20,000.00 $60,000.00

Conway Construction Co 3.000 $15,000.00 $45,000.00

Engineer's Estimate 3.000 EACH $1,500.00 $4,500.00

Report Generated on 04/22/2026 2:03 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0800 64703-8000 ENVIRONMENTAL

DESIGN, BANK

STABILIZATION

(Untreated Timber Pile)

Highline Construction

LLC 12.000 $2,800.00 $33,600.00

Conway Construction Co 12.000 $2,000.00 $24,000.00

Engineer's Estimate 12.000 EACH $3,800.00 $45,600.00

A0820 64704-1000 ENVIRONMENTAL

DESIGN,

STREAMBED

MATERIAL

Highline Construction

LLC 360.000 $308.00 $110,880.00

Conway Construction Co 360.000 $175.00 $63,000.00

Engineer's Estimate 360.000 CUYD $195.00 $70,200.00

Report Generated on 04/22/2026 2:03 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]