This is a Bid Tabulation Report for the Historic Columbia River Highway State Trail project located in Hood River County, Oregon, within the Columbia River Gorge National Scenic Area. The project is managed by Western Federal Lands, with a bid opening date of 10/17/2025. Seven construction contractors submitted bids, ranging from $5,850,091.50 (JAL Construction, Inc.) to $9,179,177.00 (Hooker Creek, Inc.), with the Engineer's estimate at $6,885,094.50.

The detailed bid tabulation covers approximately 70 line items across multiple construction categories, including site preparation, excavation, concrete work, bridge construction, erosion control, traffic management, signage, and trail infrastructure. Key components include micropile installation, structural concrete, reinforcing steel, mechanically stabilized earth walls, aggregate base, asphalt concrete pavement, stone masonry, pedestrian railing, and various temporary traffic control measures. Bid prices vary significantly between contractors for individual line items, reflecting differences in unit pricing strategies across different aspects of the trail construction project.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID TABULATION REPORT

Project No. : OR FLAP DOT CRGNSA 100(9) Project Name: Historic Columbia River Highway State Trail, Perham Creek to Mitchell Point

Contractor Responsive? Base Schedule A Hooker Creek, Inc. $9,179,177.00

LEGACY CONTRACTING, INC. $8,043,373.50

Farline Bridge $6,890,934.00 MJ Hughes Construction $6,431,000.50 Conway Construction Co $6,202,519.00 Crestline Construction Co. LLC $6,020,679.00 JAL Construction, Inc. $5,850,091.50 Engineer's Estimate $6,885,094.50

Project No. : OR FLAP DOT

CRGNSA 100(9)

Project Name: Historic Columbia River Highway State Trail, Perham Creek to Mitchell Point

Division: Western Federal Lands

Schedule: A Schedule Type: Base Lead Designer:

Solicitation No. : 69056725B000012 Opened at: WFLHD Vancouver, WA

Opened by: Marino Chea

State: OR County: Hood River Federal Land: Columbia River

Gorge National Scenic Area

Bid Open Date and Time: 10/17/2025

Contract Awarded to: Award Date:

Contractor Comment Bid Amount Responsive Hooker Creek, Inc., 1015 Anderson St., Red Bluff, CA, 96080

$9,179,177.00

LEGACY CONTRACTING, INC.,

PO Box "I", Stayton, OR, 97383

$8,043,373.50

Farline Bridge, 1445 Miller DR, Stayton, OR, 97383

$6,890,934.00

MJ Hughes Construction, 11510 NE 87th Ave, Vancouver,WA, 98662

$6,431,000.50

Conway Construction Co, 6620 NW Whitney Rd. Suite 100, Vancouver, WA, 98665

$6,202,519.00

I certify that this Bid Tabulation reflects the offers received for this solicitation

Signed:

Title:

Date:

Contracting Officer

10/21/2025

Crestline Construction Co. LLC, 3600 Crates Way #100, The Dalles, OR 97058

$6,020,679.00

JAL Construction, Inc., PO Box 6269, Bend, OR 99708

$5,850,091.50

Engineer's Estimate $6,885,094.50

Project No. : OR FLAP DOT CRGNSA 100(9) Project Name: Historic Columbia River Highway State Trail, Perham Creek to Mitchell Point

Schedule: A Schedule Type: Base

Line Item Number

Pay Item Number Description Contractor Quantity Unit Unit Price Amount

A0020 15101-0000 MOBILIZATION Hooker Creek, Inc. $960,000.00

LEGACY

CONTRACTING, INC. $786,540.00

Conway Construction Co $785,771.00

Farline Bridge $689,000.00 Crestline Construction Co. LLC $600,000.00

MJ Hughes Construction $600,000.00

JAL Construction, Inc. $580,000.00 Engineer's Estimate ALL LPSM LPSM $1,140,000.00

A0040 15201-0000 CONSTRUCTION

SURVEY AND

STAKING

Hooker Creek, Inc. $145,000.00

LEGACY

CONTRACTING, INC. $135,000.00

MJ Hughes Construction $120,000.00

Conway Construction Co $90,000.00

JAL Construction, Inc. $90,000.00 Crestline Construction Co. LLC $69,000.00

Farline Bridge $68,800.00 Engineer's Estimate ALL LPSM LPSM $107,000.00

A0060 15301-0000 CONTRACTOR

QUALITY CONTROL

Hooker Creek, Inc. $300,000.00 Conway Construction Co $225,500.00

LEGACY

CONTRACTING, INC. $210,000.00

MJ Hughes Construction $200,000.00

A0060 15301-0000 CONTRACTOR

QUALITY CONTROL

Crestline Construction Co. LLC $184,000.00

Farline Bridge $180,000.00 JAL Construction, Inc. $95,000.00 Engineer's Estimate ALL LPSM LPSM $107,000.00

A0080 15401-0000 CONTRACTOR

TESTING

Hooker Creek, Inc. $200,000.00 MJ Hughes Construction $175,000.00

Conway Construction Co $100,500.00

LEGACY

CONTRACTING, INC. $97,800.00

JAL Construction, Inc. $60,000.00 Crestline Construction Co. LLC $52,500.00

Farline Bridge $50,000.00 Engineer's Estimate ALL LPSM LPSM $134,000.00

A0100 15501-0000 CONSTRUCTION

SCHEDULE

MJ Hughes Construction $120,000.00

LEGACY

CONTRACTING, INC. $74,950.00

Crestline Construction Co. LLC $21,000.00

Conway Construction Co $20,000.00

Farline Bridge $15,000.00 Hooker Creek, Inc. $10,000.00 JAL Construction, Inc. $10,000.00 Engineer's Estimate ALL LPSM LPSM $11,000.00

A0120 15703-2500 SOIL EROSION

CONTROL,

MULCHING,

HYDRAULIC

METHOD

Hooker Creek, Inc. 5.000 $6,000.00 $30,000.00 JAL Construction, Inc. 5.000 $5,740.00 $28,700.00

LEGACY

CONTRACTING, INC. 5.000 $3,685.00 $18,425.00

MJ Hughes Construction 5.000 $3,650.00 $18,250.00

Farline Bridge 5.000 $3,375.00 $16,875.00 Crestline Construction Co. LLC 5.000 $2,500.00 $12,500.00

Conway Construction Co 5.000 $2,200.00 $11,000.00

Engineer's Estimate 5.000 ACRE $3,500.00 $17,500.00

A0140 15703-3000 SOIL EROSION

CONTROL, WOOD

STRAND (4-INCH

DEPTH)

Farline Bridge 1.300 $68,700.00 $89,310.00 MJ Hughes Construction 1.300 $67,700.00 $88,010.00

Crestline Construction Co. LLC 1.300 $45,000.00 $58,500.00

A0140 15703-3000 SOIL EROSION

CONTROL, WOOD

STRAND (4-INCH

DEPTH)

LEGACY

CONTRACTING, INC. 1.300 $22,500.00 $29,250.00

Conway Construction Co 1.300 $22,000.00 $28,600.00

Hooker Creek, Inc. 1.300 $18,700.00 $24,310.00 JAL Construction, Inc. 1.300 $16,500.00 $21,450.00 Engineer's Estimate 1.300 ACRE $22,500.00 $29,250.00

A0160 15705-0100 SOIL EROSION

CONTROL, SILT

FENCE

Hooker Creek, Inc. 2,050.000 $8.50 $17,425.00 Conway Construction Co 2,050.000 $5.80 $11,890.00

Crestline Construction Co. LLC 2,050.000 $5.00 $10,250.00

Farline Bridge 2,050.000 $5.00 $10,250.00 JAL Construction, Inc. 2,050.000 $5.00 $10,250.00

LEGACY

CONTRACTING, INC. 2,050.000 $5.00 $10,250.00

MJ Hughes Construction 2,050.000 $4.50 $9,225.00

Engineer's Estimate 2,050.000 LNFT $10.00 $20,500.00

A0180 15705-1400 SOIL EROSION

CONTROL, FIBER

ROLL (SEDIMENT

WATTLE)

Crestline Construction Co. LLC 3,800.000 $8.00 $30,400.00

Hooker Creek, Inc. 3,800.000 $7.00 $26,600.00 Conway Construction Co 3,800.000 $6.00 $22,800.00

JAL Construction, Inc. 3,800.000 $6.00 $22,800.00

LEGACY

CONTRACTING, INC. 3,800.000 $6.00 $22,800.00

MJ Hughes Construction 3,800.000 $5.50 $20,900.00

Farline Bridge 3,800.000 $5.00 $19,000.00 Engineer's Estimate 3,800.000 LNFT $8.00 $30,400.00

A0200 15706-0200 SOIL EROSION

CONTROL, CHECK

DAM (TEMPORARY,

FIBER ROLL)

Conway Construction Co 40.000 $165.00 $6,600.00

Crestline Construction Co. LLC 40.000 $155.00 $6,200.00

Hooker Creek, Inc. 40.000 $155.00 $6,200.00

LEGACY

CONTRACTING, INC. 40.000 $110.00 $4,400.00

JAL Construction, Inc. 40.000 $100.00 $4,000.00 MJ Hughes Construction 40.000 $100.00 $4,000.00

Farline Bridge 40.000 $60.00 $2,400.00 Engineer's Estimate 40.000 EACH $435.00 $17,400.00

A0220 15706-0200 SOIL EROSION

CONTROL, CHECK

DAM (TEMPORARY,

FILTER ROCK)

MJ Hughes Construction 13.000 $700.00 $9,100.00

Hooker Creek, Inc. 13.000 $600.00 $7,800.00 Crestline Construction Co. LLC 13.000 $550.00 $7,150.00

LEGACY

CONTRACTING, INC. 13.000 $500.00 $6,500.00

JAL Construction, Inc. 13.000 $400.00 $5,200.00 Farline Bridge 13.000 $350.00 $4,550.00 Conway Construction Co 13.000 $315.00 $4,095.00

Engineer's Estimate 13.000 EACH $440.00 $5,720.00

A0240 15706-1100 SOIL EROSION

CONTROL, INLET

PROTECTION TYPE

A

Hooker Creek, Inc. 6.000 $280.00 $1,680.00 Crestline Construction Co. LLC 6.000 $250.00 $1,500.00

JAL Construction, Inc. 6.000 $150.00 $900.00

LEGACY

CONTRACTING, INC. 6.000 $105.00 $630.00

Conway Construction Co 6.000 $100.00 $600.00

Farline Bridge 6.000 $100.00 $600.00 MJ Hughes Construction 6.000 $85.00 $510.00

Engineer's Estimate 6.000 EACH $180.00 $1,080.00

A0260 15706-1300 SOIL EROSION

CONTROL, INLET

PROTECTION TYPE

C

Hooker Creek, Inc. 1.000 $300.00 $300.00 JAL Construction, Inc. 1.000 $250.00 $250.00 Crestline Construction Co. LLC 1.000 $225.00 $225.00

Conway Construction Co 1.000 $190.00 $190.00

LEGACY

CONTRACTING, INC. 1.000 $185.00 $185.00

Farline Bridge 1.000 $100.00 $100.00 MJ Hughes Construction 1.000 $85.00 $85.00

Engineer's Estimate 1.000 EACH $240.00 $240.00

A0280 15706-1600 SOIL EROSION

CONTROL,

STABILIZED

CONSTRUCTION

EXIT

Conway Construction Co 2.000 $15,000.00 $30,000.00

Hooker Creek, Inc. 2.000 $4,500.00 $9,000.00

LEGACY

CONTRACTING, INC. 2.000 $3,500.00 $7,000.00

Farline Bridge 2.000 $3,000.00 $6,000.00 MJ Hughes Construction 2.000 $2,500.00 $5,000.00

Crestline Construction Co. LLC 2.000 $1,850.00 $3,700.00

A0280 15706-1600 SOIL EROSION

CONTROL,

STABILIZED

CONSTRUCTION

EXIT

JAL Construction, Inc. 2.000 $1,500.00 $3,000.00

Engineer's Estimate 2.000 EACH $5,500.00 $11,000.00

A0300 20101-0000 CLEARING AND

GRUBBING

Hooker Creek, Inc. 2.500 $92,000.00 $230,000.00

LEGACY

CONTRACTING, INC. 2.500 $90,000.00 $225,000.00

Farline Bridge 2.500 $65,000.00 $162,500.00 Conway Construction Co 2.500 $50,000.00 $125,000.00

MJ Hughes Construction 2.500 $50,000.00 $125,000.00

JAL Construction, Inc. 2.500 $20,000.00 $50,000.00 Crestline Construction Co. LLC 2.500 $13,800.00 $34,500.00

Engineer's Estimate 2.500 ACRE $65,000.00 $162,500.00

A0320 20220-1000 REMOVAL,

INDIVIDUAL TREE

MJ Hughes Construction 10.000 $2,300.00 $23,000.00

JAL Construction, Inc. 10.000 $2,000.00 $20,000.00 Hooker Creek, Inc. 10.000 $1,900.00 $19,000.00 Crestline Construction Co. LLC 10.000 $1,500.00 $15,000.00

Farline Bridge 10.000 $1,250.00 $12,500.00 Conway Construction Co 10.000 $1,200.00 $12,000.00

LEGACY

CONTRACTING, INC. 10.000 $1,150.00 $11,500.00

Engineer's Estimate 10.000 EACH $1,300.00 $13,000.00

A0340 20301-0100 REMOVAL OF

BOLLARD

Hooker Creek, Inc. 2.000 $670.00 $1,340.00

LEGACY

CONTRACTING, INC. 2.000 $300.00 $600.00

MJ Hughes Construction 2.000 $250.00 $500.00

Conway Construction Co 2.000 $230.00 $460.00

Crestline Construction Co. LLC 2.000 $215.00 $430.00

JAL Construction, Inc. 2.000 $200.00 $400.00 Farline Bridge 2.000 $110.00 $220.00 Engineer's Estimate 2.000 EACH $500.00 $1,000.00

A0360 20301-0200 REMOVAL OF

BOULDER

Crestline Construction Co. LLC 16.000 $1,200.00 $19,200.00

LEGACY

CONTRACTING, INC. 16.000 $450.00 $7,200.00

MJ Hughes Construction 16.000 $250.00 $4,000.00

A0360 20301-0200 REMOVAL OF

BOULDER

Farline Bridge 16.000 $200.00 $3,200.00 Hooker Creek, Inc. 16.000 $170.00 $2,720.00 JAL Construction, Inc. 16.000 $150.00 $2,400.00 Conway Construction Co 16.000 $50.00 $800.00

Engineer's Estimate 16.000 EACH $400.00 $6,400.00 A0380 20301-1100 REMOVAL OF GATE Conway Construction

Co 1.000 $1,000.00 $1,000.00

Hooker Creek, Inc. 1.000 $1,000.00 $1,000.00 JAL Construction, Inc. 1.000 $1,000.00 $1,000.00 MJ Hughes Construction 1.000 $750.00 $750.00

LEGACY

CONTRACTING, INC. 1.000 $600.00 $600.00

Crestline Construction Co. LLC 1.000 $425.00 $425.00

Farline Bridge 1.000 $350.00 $350.00 Engineer's Estimate 1.000 EACH $850.00 $850.00

A0400 20301-2400 REMOVAL OF SIGN Hooker Creek, Inc. 2.000 $1,000.00 $2,000.00

LEGACY

CONTRACTING, INC. 2.000 $600.00 $1,200.00

Conway Construction Co 2.000 $250.00 $500.00

JAL Construction, Inc. 2.000 $250.00 $500.00 MJ Hughes Construction 2.000 $250.00 $500.00

Crestline Construction Co. LLC 2.000 $215.00 $430.00

Farline Bridge 2.000 $110.00 $220.00 Engineer's Estimate 2.000 EACH $230.00 $460.00

A0420 20302-0700 REMOVAL OF

FENCE

LEGACY

CONTRACTING, INC. 1,500.000 $10.00 $15,000.00

JAL Construction, Inc. 1,500.000 $7.00 $10,500.00 Hooker Creek, Inc. 1,500.000 $6.00 $9,000.00 Conway Construction Co 1,500.000 $5.00 $7,500.00

Crestline Construction Co. LLC 1,500.000 $5.00 $7,500.00

MJ Hughes Construction 1,500.000 $4.00 $6,000.00

Farline Bridge 1,500.000 $3.00 $4,500.00 Engineer's Estimate 1,500.000 LNFT $5.00 $7,500.00

A0440 20315-0000 SAWCUTTING

PAVEMENT

MJ Hughes Construction 950.000 $17.00 $16,150.00

LEGACY

CONTRACTING, INC. 950.000 $10.00 $9,500.00

A0440 20315-0000 SAWCUTTING

PAVEMENT

Crestline Construction Co. LLC 950.000 $7.00 $6,650.00

Hooker Creek, Inc. 950.000 $4.50 $4,275.00 Conway Construction Co 950.000 $3.50 $3,325.00

JAL Construction, Inc. 950.000 $3.00 $2,850.00 Farline Bridge 950.000 $2.00 $1,900.00 Engineer's Estimate 950.000 LNFT $6.50 $6,175.00

A0460 20401-0000 ROADWAY

EXCAVATION

Crestline Construction Co. LLC 2,400.000 $73.00 $175,200.00

Farline Bridge 2,400.000 $65.00 $156,000.00 Hooker Creek, Inc. 2,400.000 $65.00 $156,000.00 JAL Construction, Inc. 2,400.000 $55.00 $132,000.00 MJ Hughes Construction 2,400.000 $48.00 $115,200.00

LEGACY

CONTRACTING, INC. 2,400.000 $40.00 $96,000.00

Conway Construction Co 2,400.000 $38.00 $91,200.00

Engineer's Estimate 2,400.000 CUYD $75.00 $180,000.00

A0480 20466-0000 CONSERVE AND

STOCKPILE TOPSOIL

MJ Hughes Construction 250.000 $150.00 $37,500.00

Hooker Creek, Inc. 250.000 $52.00 $13,000.00 JAL Construction, Inc. 250.000 $30.00 $7,500.00 Conway Construction Co 250.000 $15.00 $3,750.00

Crestline Construction Co. LLC 250.000 $15.00 $3,750.00

Farline Bridge 250.000 $12.00 $3,000.00

LEGACY

CONTRACTING, INC. 250.000 $6.00 $1,500.00

Engineer's Estimate 250.000 CUYD $27.00 $6,750.00

A0500 20702-0100 GEOTEXTILE

FILTER, CLASS 1,

TYPE A (MITCHELL

CREEK BRIDGE)

JAL Construction, Inc. 200.000 $10.00 $2,000.00 MJ Hughes Construction 200.000 $10.00 $2,000.00

Farline Bridge 200.000 $7.00 $1,400.00 Crestline Construction Co. LLC 200.000 $6.00 $1,200.00

LEGACY

CONTRACTING, INC. 200.000 $6.00 $1,200.00

Hooker Creek, Inc. 200.000 $5.50 $1,100.00 Conway Construction Co 200.000 $5.00 $1,000.00

Engineer's Estimate 200.000 SQYD $5.00 $1,000.00

A0520 20702-0100 GEOTEXTILE

FILTER, CLASS 1,

TYPE A (PERHAM

CREEK BRIDGE)

LEGACY

CONTRACTING, INC. 135.000 $20.00 $2,700.00

JAL Construction, Inc. 135.000 $10.00 $1,350.00 MJ Hughes Construction 135.000 $10.00 $1,350.00

Hooker Creek, Inc. 135.000 $8.00 $1,080.00 Farline Bridge 135.000 $7.00 $945.00 Crestline Construction Co. LLC 135.000 $6.00 $810.00

Conway Construction Co 135.000 $5.00 $675.00

Engineer's Estimate 135.000 SQYD $5.00 $675.00

A0540 20801-0000 STRUCTURE

EXCAVATION

(MITCHELL CREEK

BRIDGE)

Conway Construction Co 255.000 $200.00 $51,000.00

Crestline Construction Co. LLC 255.000 $133.00 $33,915.00

Hooker Creek, Inc. 255.000 $129.00 $32,895.00

LEGACY

CONTRACTING, INC. 255.000 $100.00 $25,500.00

MJ Hughes Construction 255.000 $100.00 $25,500.00

Farline Bridge 255.000 $40.00 $10,200.00 JAL Construction, Inc. 255.000 $25.00 $6,375.00 Engineer's Estimate 255.000 CUYD $140.00 $35,700.00

A0560 20801-0000 STRUCTURE

EXCAVATION

(PERHAM CREEK

BRIDGE)

Conway Construction Co 50.000 $500.00 $25,000.00

Hooker Creek, Inc. 50.000 $330.00 $16,500.00

LEGACY

CONTRACTING, INC. 50.000 $250.00 $12,500.00

Crestline Construction Co. LLC 50.000 $133.00 $6,650.00

Farline Bridge 50.000 $100.00 $5,000.00 MJ Hughes Construction 50.000 $100.00 $5,000.00

JAL Construction, Inc. 50.000 $25.00 $1,250.00 Engineer's Estimate 50.000 CUYD $110.00 $5,500.00

A0580 20803-0000 STRUCTURAL

BACKFILL

(MITCHELL CREEK

BRIDGE)

Hooker Creek, Inc. 118.000 $560.00 $66,080.00 Conway Construction Co 118.000 $350.00 $41,300.00

LEGACY

CONTRACTING, INC. 118.000 $300.00 $35,400.00

MJ Hughes Construction 118.000 $160.00 $18,880.00

Crestline Construction Co. LLC 118.000 $133.00 $15,694.00

Farline Bridge 118.000 $100.00 $11,800.00

A0580 20803-0000 STRUCTURAL

BACKFILL

(MITCHELL CREEK

BRIDGE)

JAL Construction, Inc. 118.000 $100.00 $11,800.00

Engineer's Estimate 118.000 CUYD $210.00 $24,780.00

A0600 20803-0000 STRUCTURAL

BACKFILL (PERHAM

CREEK BRIDGE)

Hooker Creek, Inc. 27.000 $1,440.00 $38,880.00 Conway Construction Co 27.000 $650.00 $17,550.00

LEGACY

CONTRACTING, INC. 27.000 $300.00 $8,100.00

MJ Hughes Construction 27.000 $190.00 $5,130.00

Crestline Construction Co. LLC 27.000 $133.00 $3,591.00

Farline Bridge 27.000 $100.00 $2,700.00 JAL Construction, Inc. 27.000 $100.00 $2,700.00 Engineer's Estimate 27.000 CUYD $300.00 $8,100.00

A0620 20810-0000 SHORING AND

BRACING

(MITCHELL CREEK

BRIDGE)

LEGACY

CONTRACTING, INC. $405,850.00

Farline Bridge $250,000.00 Hooker Creek, Inc. $250,000.00 Conway Construction Co $173,000.00

MJ Hughes Construction $150,000.00

JAL Construction, Inc. $80,000.00 Crestline Construction Co. LLC $45,000.00

Engineer's Estimate ALL LPSM LPSM $230,000.00

A0640 20810-0000 SHORING AND

BRACING (PERHAM

CREEK BRIDGE)

LEGACY

CONTRACTING, INC. $205,860.00

Hooker Creek, Inc. $120,000.00 JAL Construction, Inc. $86,150.00 Farline Bridge $85,000.00 MJ Hughes Construction $75,000.00

Crestline Construction Co. LLC $45,000.00

Conway Construction Co $42,000.00

Engineer's Estimate ALL LPSM LPSM $60,000.00

A0660 25101-0100 PLACED RIPRAP,

METHOD A, CLASS

Conway Construction Co 5.000 $650.00 $3,250.00

Farline Bridge 5.000 $500.00 $2,500.00 Hooker Creek, Inc. 5.000 $500.00 $2,500.00

LEGACY

CONTRACTING, INC. 5.000 $310.00 $1,550.00

A0660 25101-0100 PLACED RIPRAP,

METHOD A, CLASS

JAL Construction, Inc. 5.000 $250.00 $1,250.00 Crestline Construction Co. LLC 5.000 $215.00 $1,075.00

MJ Hughes Construction 5.000 $140.00 $700.00

Engineer's Estimate 5.000 CUYD $270.00 $1,350.00

A0680 25101-0200 PLACED RIPRAP,

METHOD A, CLASS

Hooker Creek, Inc. 20.000 $260.00 $5,200.00 JAL Construction, Inc. 20.000 $250.00 $5,000.00 Crestline Construction Co. LLC 20.000 $215.00 $4,300.00

Conway Construction Co 20.000 $210.00 $4,200.00

Farline Bridge 20.000 $175.00 $3,500.00

LEGACY

CONTRACTING, INC. 20.000 $160.00 $3,200.00

MJ Hughes Construction 20.000 $140.00 $2,800.00

Engineer's Estimate 20.000 CUYD $270.00 $5,400.00

A0700 25101-0400 PLACED RIPRAP,

METHOD A, CLASS

4 (PERHAM CREEK

BRIDGE)

Conway Construction Co 75.000 $250.00 $18,750.00

JAL Construction, Inc. 75.000 $250.00 $18,750.00 Crestline Construction Co. LLC 75.000 $215.00 $16,125.00

Hooker Creek, Inc. 75.000 $200.00 $15,000.00

LEGACY

CONTRACTING, INC. 75.000 $170.00 $12,750.00

Farline Bridge 75.000 $150.00 $11,250.00 MJ Hughes Construction 75.000 $140.00 $10,500.00

Engineer's Estimate 75.000 CUYD $310.00 $23,250.00

A0720 25101-0500 PLACED RIPRAP,

METHOD A, CLASS

5 (MITCHELL CREEK

BRIDGE)

Hooker Creek, Inc. 245.000 $290.00 $71,050.00 Crestline Construction Co. LLC 245.000 $215.00 $52,675.00

JAL Construction, Inc. 245.000 $200.00 $49,000.00

LEGACY

CONTRACTING, INC. 245.000 $180.00 $44,100.00

Conway Construction Co 245.000 $175.00 $42,875.00

Farline Bridge 245.000 $150.00 $36,750.00 MJ Hughes Construction 245.000 $140.00 $34,300.00

Engineer's Estimate 245.000 CUYD $310.00 $75,950.00 A0740 25125-0000 BOULDER JAL Construction, Inc. 20.000 $2,000.00 $40,000.00

Conway Construction Co 20.000 $1,400.00 $28,000.00

A0740 25125-0000 BOULDER MJ Hughes Construction 20.000 $1,250.00 $25,000.00

LEGACY

CONTRACTING, INC. 20.000 $1,000.00 $20,000.00

Farline Bridge 20.000 $750.00 $15,000.00 Hooker Creek, Inc. 20.000 $670.00 $13,400.00 Crestline Construction Co. LLC 20.000 $255.00 $5,100.00

Engineer's Estimate 20.000 EACH $460.00 $9,200.00

A0760 25501-1000 MECHANICALLY

STABILIZED EARTH

WALL, WELDED

WIRE FACE

Hooker Creek, Inc. 6,341.000 $175.00 $1,109,675.00 Farline Bridge 6,341.000 $150.00 $951,150.00 JAL Construction, Inc. 6,341.000 $140.00 $887,740.00 Crestline Construction Co. LLC 6,341.000 $120.00 $760,920.00

LEGACY

CONTRACTING, INC. 6,341.000 $105.00 $665,805.00

Conway Construction Co 6,341.000 $100.00 $634,100.00

MJ Hughes Construction 6,341.000 $75.00 $475,575.00

Engineer's Estimate 6,341.000 SQFT $140.00 $887,740.00

A0780 25501-1000 MECHANICALLY

STABILIZED EARTH

WALL, WELDED

WIRE FACE

(MITCHELL CREEK

BRIDGE)

Hooker Creek, Inc. 500.000 $245.00 $122,500.00 MJ Hughes Construction 500.000 $170.00 $85,000.00

Farline Bridge 500.000 $150.00 $75,000.00 JAL Construction, Inc. 500.000 $140.00 $70,000.00 Crestline Construction Co. LLC 500.000 $120.00 $60,000.00

LEGACY

CONTRACTING, INC. 500.000 $120.00 $60,000.00

Conway Construction Co 500.000 $114.00 $57,000.00

Engineer's Estimate 500.000 SQFT $160.00 $80,000.00

A0800 30101-2000 AGGREGATE BASE

GRADING D

Hooker Creek, Inc. 2,500.000 $110.00 $275,000.00 MJ Hughes Construction 2,500.000 $105.00 $262,500.00

Conway Construction Co 2,500.000 $68.00 $170,000.00

JAL Construction, Inc. 2,500.000 $60.00 $150,000.00 Crestline Construction Co. LLC 2,500.000 $56.00 $140,000.00

Farline Bridge 2,500.000 $50.00 $125,000.00

LEGACY

CONTRACTING, INC. 2,500.000 $41.00 $102,500.00

Engineer's Estimate 2,500.000 TON $51.00 $127,500.00

A0840 40301-0100 ASPHALT

CONCRETE

PAVEMENT, TYPE 1

Hooker Creek, Inc. 1,700.000 $210.00 $357,000.00 Crestline Construction Co. LLC 1,700.000 $165.00 $280,500.00

Farline Bridge 1,700.000 $155.00 $263,500.00 JAL Construction, Inc. 1,700.000 $155.00 $263,500.00 Conway Construction Co 1,700.000 $136.00 $231,200.00

MJ Hughes Construction 1,700.000 $135.00 $229,500.00

LEGACY

CONTRACTING, INC. 1,700.000 $130.00 $221,000.00

Engineer's Estimate 1,700.000 TON $200.00 $340,000.00

A0860 41201-0000 TACK COAT LEGACY

CONTRACTING, INC. 3.000 $2,350.00 $7,050.00

MJ Hughes Construction 3.000 $900.00 $2,700.00

Hooker Creek, Inc. 3.000 $850.00 $2,550.00 Conway Construction Co 3.000 $800.00 $2,400.00

Farline Bridge 3.000 $625.00 $1,875.00 JAL Construction, Inc. 3.000 $625.00 $1,875.00 Crestline Construction Co. LLC 3.000 $150.00 $450.00

Engineer's Estimate 3.000 TON $1,000.00 $3,000.00

A0880 41801-2000 ASPHALT

CONCRETE

PAVEMENT PATCH,

TYPE 2

MJ Hughes Construction 340.000 $200.00 $68,000.00

LEGACY

CONTRACTING, INC. 340.000 $160.00 $54,400.00

Crestline Construction Co. LLC 340.000 $111.00 $37,740.00

Farline Bridge 340.000 $75.00 $25,500.00 Hooker Creek, Inc. 340.000 $70.00 $23,800.00 JAL Construction, Inc. 340.000 $50.00 $17,000.00 Conway Construction Co 340.000 $25.00 $8,500.00

Engineer's Estimate 340.000 SQYD $220.00 $74,800.00

A0900 55201-0200 STRUCTURAL

CONCRETE, CLASS

A (AE) (MITCHELL

CREEK BRIDGE)

Farline Bridge 84.000 $3,000.00 $252,000.00 Crestline Construction Co. LLC 84.000 $2,900.00 $243,600.00

LEGACY

CONTRACTING, INC. 84.000 $2,850.00 $239,400.00

JAL Construction, Inc. 84.000 $2,685.00 $225,540.00 Hooker Creek, Inc. 84.000 $2,400.00 $201,600.00 Conway Construction Co 84.000 $2,300.00 $193,200.00

A0900 55201-0200 STRUCTURAL

CONCRETE, CLASS

A (AE) (MITCHELL

CREEK BRIDGE)

MJ Hughes Construction 84.000 $1,300.00 $109,200.00

Engineer's Estimate 84.000 CUYD $1,700.00 $142,800.00

A0920 55201-0200 STRUCTURAL

CONCRETE, CLASS

A (AE) (PERHAM

CREEK BRIDGE)

Crestline Construction Co. LLC 87.000 $3,950.00 $343,650.00

Hooker Creek, Inc. 87.000 $3,200.00 $278,400.00 Farline Bridge 87.000 $2,850.00 $247,950.00

LEGACY

CONTRACTING, INC. 87.000 $2,850.00 $247,950.00

Conway Construction Co 87.000 $2,800.00 $243,600.00

JAL Construction, Inc. 87.000 $2,350.00 $204,450.00 MJ Hughes Construction 87.000 $1,900.00 $165,300.00

Engineer's Estimate 87.000 CUYD $1,600.00 $139,200.00

A0940 55201-0200 STRUCTURAL

CONCRETE, CLASS

A (AE) (PILASTERS,

MITCHELL CREEK

BRIDGE)

Farline Bridge 5.000 $13,000.00 $65,000.00 MJ Hughes Construction 5.000 $10,500.00 $52,500.00

Hooker Creek, Inc. 5.000 $7,400.00 $37,000.00 JAL Construction, Inc. 5.000 $7,200.00 $36,000.00 Crestline Construction Co. LLC 5.000 $6,825.00 $34,125.00

LEGACY

CONTRACTING, INC. 5.000 $6,000.00 $30,000.00

Conway Construction Co 5.000 $3,800.00 $19,000.00

Engineer's Estimate 5.000 CUYD $10,000.00 $50,000.00

A0960 55201-0200 STRUCTURAL

CONCRETE, CLASS

A (AE) (PRECAST

PILASTERS)

Farline Bridge 2.000 $25,000.00 $50,000.00 Crestline Construction Co. LLC 2.000 $15,750.00 $31,500.00

JAL Construction, Inc. 2.000 $14,200.00 $28,400.00 MJ Hughes Construction 2.000 $10,500.00 $21,000.00

Hooker Creek, Inc. 2.000 $7,800.00 $15,600.00

LEGACY

CONTRACTING, INC. 2.000 $6,850.00 $13,700.00

Conway Construction Co 2.000 $5,500.00 $11,000.00

Engineer's Estimate 2.000 CUYD $8,000.00 $16,000.00

A0980 55202-1000 STRUCTURAL

CONCRETE, CLASS

D (AE), FOR

APPROACH SLABS,

TYPE 1 (PERHAM

CREEK BRIDGE)

Farline Bridge 48.000 $1,805.00 $86,640.00 Crestline Construction Co. LLC 48.000 $1,660.00 $79,680.00

JAL Construction, Inc. 48.000 $795.00 $38,160.00 MJ Hughes Construction 48.000 $600.00 $28,800.00

A0980 55202-1000 STRUCTURAL

CONCRETE, CLASS

D (AE), FOR

APPROACH SLABS,

TYPE 1 (PERHAM

CREEK BRIDGE)

Hooker Creek, Inc. 48.000 $500.00 $24,000.00 Conway Construction Co 48.000 $450.00 $21,600.00

LEGACY

CONTRACTING, INC. 48.000 $430.00 $20,640.00

Engineer's Estimate 48.000 SQYD $550.00 $26,400.00

A1000 55210-0000 PRECAST

STRUCTURAL

CONCRETE

(PILASTERS AND

CORBEL, PERHAM

CREEK BRIDGE)

LEGACY

CONTRACTING, INC. 15.000 $13,050.00 $195,750.00

MJ Hughes Construction 15.000 $13,000.00 $195,000.00

Farline Bridge 15.000 $9,500.00 $142,500.00 Conway Construction Co 15.000 $8,400.00 $126,000.00

Hooker Creek, Inc. 15.000 $8,300.00 $124,500.00 Crestline Construction Co. LLC 15.000 $5,250.00 $78,750.00

JAL Construction, Inc. 15.000 $5,025.00 $75,375.00 Engineer's Estimate 15.000 CUYD $5,500.00 $82,500.00

A1020 55211-0000 PRECAST

STRUCTURAL

CONCRETE (ARCH

CULVERT,

MITCHELL CREEK

BRIDGE)

Farline Bridge 92.000 $5,000.00 $460,000.00 Conway Construction Co 92.000 $4,200.00 $386,400.00

Hooker Creek, Inc. 92.000 $4,100.00 $377,200.00 JAL Construction, Inc. 92.000 $3,865.00 $355,580.00 MJ Hughes Construction 92.000 $3,500.00 $322,000.00

Crestline Construction Co. LLC 92.000 $3,465.00 $318,780.00

LEGACY

CONTRACTING, INC. 92.000 $3,450.00 $317,400.00

Engineer's Estimate 92.000 SQYD $2,200.00 $202,400.00

A1040 55302-3500 PRECAST,

PRESTRESSED

CONCRETE SLAB

(PERHAM CREEK

BRIDGE)

Farline Bridge 225.000 $1,500.00 $337,500.00 Hooker Creek, Inc. 225.000 $1,400.00 $315,000.00 MJ Hughes Construction 225.000 $985.00 $221,625.00

LEGACY

CONTRACTING, INC. 225.000 $950.00 $213,750.00

JAL Construction, Inc. 225.000 $920.00 $207,000.00 Crestline Construction Co. LLC 225.000 $870.00 $195,750.00

Conway Construction Co 225.000 $830.00 $186,750.00

Engineer's Estimate 225.000 LNFT $900.00 $202,500.00

A1060 55401-1000 REINFORCING

STEEL (MITCHELL

CREEK BRIDGE)

Hooker Creek, Inc. 8,809.000 $5.00 $44,045.00

LEGACY

CONTRACTING, INC. 8,809.000 $4.25 $37,438.25

A1060 55401-1000 REINFORCING

STEEL (MITCHELL

CREEK BRIDGE)

Crestline Construction Co. LLC 8,809.000 $4.00 $35,236.00

JAL Construction, Inc. 8,809.000 $3.25 $28,629.25 MJ Hughes Construction 8,809.000 $2.75 $24,224.75

Conway Construction Co 8,809.000 $2.00 $17,618.00

Farline Bridge 8,809.000 $2.00 $17,618.00 Engineer's Estimate 8,809.000 LB $2.25 $19,820.25

A1080 55401-1000 REINFORCING

STEEL (PERHAM

CREEK BRIDGE)

Hooker Creek, Inc. 15,953.000 $5.00 $79,765.00

LEGACY

CONTRACTING, INC. 15,953.000 $4.25 $67,800.25

Crestline Construction Co. LLC 15,953.000 $4.00 $63,812.00

JAL Construction, Inc. 15,953.000 $3.25 $51,847.25 MJ Hughes Construction 15,953.000 $2.75 $43,870.75

Conway Construction Co 15,953.000 $2.00 $31,906.00

Farline Bridge 15,953.000 $2.00 $31,906.00 Engineer's Estimate 15,953.000 LB $2.25 $35,894.25

A1100 55601-0500 BRIDGE RAILING,

CONCRETE

(ORNAMENTAL

RAIL, PERHAM

CREEK BRIDGE)

Hooker Creek, Inc. 202.000 $2,600.00 $525,200.00 Conway Construction Co 202.000 $1,400.00 $282,800.00

MJ Hughes Construction 202.000 $1,250.00 $252,500.00

LEGACY

CONTRACTING, INC. 202.000 $1,200.00 $242,400.00

Farline Bridge 202.000 $1,180.00 $238,360.00 JAL Construction, Inc. 202.000 $950.00 $191,900.00 Crestline Construction Co. LLC 202.000 $895.00 $180,790.00

Engineer's Estimate 202.000 LNFT $1,300.00 $262,600.00

A1120 56401-1000 BEARING DEVICE,

ELASTOMERIC

(PERHAM CREEK

BRIDGE)

Hooker Creek, Inc. 12.000 $800.00 $9,600.00 Crestline Construction Co. LLC 12.000 $525.00 $6,300.00

JAL Construction, Inc. 12.000 $450.00 $5,400.00 MJ Hughes Construction 12.000 $450.00 $5,400.00

Conway Construction Co 12.000 $350.00 $4,200.00

Farline Bridge 12.000 $193.00 $2,316.00

LEGACY

CONTRACTING, INC. 12.000 $50.00 $600.00

Engineer's Estimate 12.000 EACH $320.00 $3,840.00

A1140 56702-0000 MICROPILE

(MITCHELL CREEK

BRIDGE)

LEGACY

CONTRACTING, INC. 28.000 $19,500.00 $546,000.00

Hooker Creek, Inc. 28.000 $17,000.00 $476,000.00 JAL Construction, Inc. 28.000 $13,700.00 $383,600.00 Crestline Construction Co. LLC 28.000 $13,125.00 $367,500.00

Farline Bridge 28.000 $12,000.00 $336,000.00 MJ Hughes Construction 28.000 $10,500.00 $294,000.00

Conway Construction Co 28.000 $10,000.00 $280,000.00

Engineer's Estimate 28.000 EACH $11,000.00 $308,000.00

A1160 56702-0000 MICROPILE

(PERHAM CREEK

BRIDGE)

LEGACY

CONTRACTING, INC. 12.000 $25,450.00 $305,400.00

Hooker Creek, Inc. 12.000 $22,000.00 $264,000.00 Farline Bridge 12.000 $20,000.00 $240,000.00 Crestline Construction Co. LLC 12.000 $18,375.00 $220,500.00

JAL Construction, Inc. 12.000 $17,500.00 $210,000.00 MJ Hughes Construction 12.000 $15,000.00 $180,000.00

Conway Construction Co 12.000 $14,500.00 $174,000.00

Engineer's Estimate 12.000 EACH $16,000.00 $192,000.00

A1180 56705-0000 MICROPILE LOAD

VERIFICATION TEST

(MITCHELL CREEK

BRIDGE)

Hooker Creek, Inc. 1.000 $21,000.00 $21,000.00

LEGACY

CONTRACTING, INC. 1.000 $20,000.00 $20,000.00

JAL Construction, Inc. 1.000 $17,300.00 $17,300.00 MJ Hughes Construction 1.000 $16,000.00 $16,000.00

Conway Construction Co 1.000 $15,500.00 $15,500.00

Crestline Construction Co. LLC 1.000 $15,225.00 $15,225.00

Farline Bridge 1.000 $15,000.00 $15,000.00 Engineer's Estimate 1.000 EACH $13,000.00 $13,000.00

A1200 56705-0000 MICROPILE LOAD

VERIFICATION TEST

(PERHAM CREEK

BRIDGE)

Hooker Creek, Inc. 1.000 $21,000.00 $21,000.00 MJ Hughes Construction 1.000 $20,500.00 $20,500.00

Farline Bridge 1.000 $20,000.00 $20,000.00

LEGACY

CONTRACTING, INC. 1.000 $20,000.00 $20,000.00

Crestline Construction Co. LLC 1.000 $19,425.00 $19,425.00

Conway Construction Co 1.000 $19,200.00 $19,200.00

A1200 56705-0000 MICROPILE LOAD

VERIFICATION TEST

(PERHAM CREEK

BRIDGE)

JAL Construction, Inc. 1.000 $17,300.00 $17,300.00

Engineer's Estimate 1.000 EACH $13,000.00 $13,000.00

A1220 56706-0000 MICROPILE PROOF

LOAD TEST

(MITCHELL CREEK

BRIDGE)

Farline Bridge 2.000 $5,500.00 $11,000.00 Crestline Construction Co. LLC 2.000 $5,000.00 $10,000.00

MJ Hughes Construction 2.000 $5,000.00 $10,000.00

Conway Construction Co 2.000 $4,800.00 $9,600.00

Hooker Creek, Inc. 2.000 $2,300.00 $4,600.00

LEGACY

CONTRACTING, INC. 2.000 $2,000.00 $4,000.00

JAL Construction, Inc. 2.000 $1,825.00 $3,650.00 Engineer's Estimate 2.000 EACH $4,000.00 $8,000.00

A1240 56706-0000 MICROPILE PROOF

LOAD TEST

(PERHAM CREEK

BRIDGE)

Farline Bridge 2.000 $5,500.00 $11,000.00 Crestline Construction Co. LLC 2.000 $5,000.00 $10,000.00

MJ Hughes Construction 2.000 $5,000.00 $10,000.00

Conway Construction Co 2.000 $4,800.00 $9,600.00

Hooker Creek, Inc. 2.000 $2,300.00 $4,600.00

LEGACY

CONTRACTING, INC. 2.000 $2,000.00 $4,000.00

JAL Construction, Inc. 2.000 $1,825.00 $3,650.00 Engineer's Estimate 2.000 EACH $4,000.00 $8,000.00

A1260 60201-0600 18-INCH PIPE

CULVERT

JAL Construction, Inc. 70.000 $350.00 $24,500.00 Conway Construction Co 70.000 $260.00 $18,200.00

Hooker Creek, Inc. 70.000 $235.00 $16,450.00 Crestline Construction Co. LLC 70.000 $225.00 $15,750.00

MJ Hughes Construction 70.000 $220.00 $15,400.00

LEGACY

CONTRACTING, INC. 70.000 $205.00 $14,350.00

Farline Bridge 70.000 $100.00 $7,000.00 Engineer's Estimate 70.000 LNFT $220.00 $15,400.00

A1280 60201-0800 24-INCH PIPE

CULVERT

Hooker Creek, Inc. 35.000 $305.00 $10,675.00 MJ Hughes Construction 35.000 $280.00 $9,800.00

Conway Construction Co 35.000 $260.00 $9,100.00

A1280 60201-0800 24-INCH PIPE

CULVERT

Crestline Construction Co. LLC 35.000 $225.00 $7,875.00

JAL Construction, Inc. 35.000 $225.00 $7,875.00

LEGACY

CONTRACTING, INC. 35.000 $225.00 $7,875.00

Farline Bridge 35.000 $100.00 $3,500.00 Engineer's Estimate 35.000 LNFT $270.00 $9,450.00

A1300 60210-0600 END SECTION FOR

18-INCH PIPE

CULVERT

Conway Construction Co 2.000 $1,000.00 $2,000.00

LEGACY

CONTRACTING, INC. 2.000 $1,000.00 $2,000.00

Crestline Construction Co. LLC 2.000 $900.00 $1,800.00

Hooker Creek, Inc. 2.000 $850.00 $1,700.00 Farline Bridge 2.000 $750.00 $1,500.00 JAL Construction, Inc. 2.000 $400.00 $800.00 MJ Hughes Construction 2.000 $325.00 $650.00

Engineer's Estimate 2.000 EACH $1,400.00 $2,800.00 A1320 60403-0000 INLET (DITCH) Hooker Creek, Inc. 1.000 $7,000.00 $7,000.00

LEGACY

CONTRACTING, INC. 1.000 $5,000.00 $5,000.00

Crestline Construction Co. LLC 1.000 $4,100.00 $4,100.00

Conway Construction Co 1.000 $3,600.00 $3,600.00

MJ Hughes Construction 1.000 $3,200.00 $3,200.00

JAL Construction, Inc. 1.000 $3,000.00 $3,000.00 Farline Bridge 1.000 $1,750.00 $1,750.00 Engineer's Estimate 1.000 EACH $3,500.00 $3,500.00

A1340 60901-5600 CURB, STONE, TYPE

2, 14-INCH DEPTH

Crestline Construction Co. LLC 10.000 $1,050.00 $10,500.00

MJ Hughes Construction 10.000 $950.00 $9,500.00

Farline Bridge 10.000 $850.00 $8,500.00 JAL Construction, Inc. 10.000 $850.00 $8,500.00 Hooker Creek, Inc. 10.000 $510.00 $5,100.00

LEGACY

CONTRACTING, INC. 10.000 $450.00 $4,500.00

Conway Construction Co 10.000 $250.00 $2,500.00

Engineer's Estimate 10.000 LNFT $200.00 $2,000.00

A1360 61401-0000 LEAN CONCRETE

BACKFILL

(MITCHELL CREEK

BRIDGE)

Hooker Creek, Inc. 42.000 $750.00 $31,500.00 Farline Bridge 42.000 $557.00 $23,394.00

LEGACY

CONTRACTING, INC. 42.000 $450.00 $18,900.00

MJ Hughes Construction 42.000 $425.00 $17,850.00

Conway Construction Co 42.000 $400.00 $16,800.00

Crestline Construction Co. LLC 42.000 $300.00 $12,600.00

JAL Construction, Inc. 42.000 $300.00 $12,600.00 Engineer's Estimate 42.000 CUYD $480.00 $20,160.00

A1380 61901-0000 FENCE (TYPE 1-4W) LEGACY

CONTRACTING, INC. 700.000 $105.00 $73,500.00

Hooker Creek, Inc. 700.000 $65.00 $45,500.00 Conway Construction Co 700.000 $45.00 $31,500.00

JAL Construction, Inc. 700.000 $32.00 $22,400.00 MJ Hughes Construction 700.000 $32.00 $22,400.00

Crestline Construction Co. LLC 700.000 $30.00 $21,000.00

Farline Bridge 700.000 $28.00 $19,600.00 Engineer's Estimate 700.000 LNFT $40.00 $28,000.00

A1400 61902-1400 GATE, METAL, 16

FEET WIDTH

Hooker Creek, Inc. 1.000 $35,000.00 $35,000.00 Crestline Construction Co. LLC 1.000 $21,000.00 $21,000.00

Conway Construction Co 1.000 $15,500.00 $15,500.00

Farline Bridge 1.000 $8,800.00 $8,800.00

LEGACY

CONTRACTING, INC. 1.000 $8,000.00 $8,000.00

JAL Construction, Inc. 1.000 $7,500.00 $7,500.00 MJ Hughes Construction 1.000 $6,500.00 $6,500.00

Engineer's Estimate 1.000 EACH $9,000.00 $9,000.00

A1420 61904-0000 BOLLARD POST

(COLLAPSIBLE)

Hooker Creek, Inc. 1.000 $9,500.00 $9,500.00

LEGACY

CONTRACTING, INC. 1.000 $3,560.00 $3,560.00

Crestline Construction Co. LLC 1.000 $3,500.00 $3,500.00

JAL Construction, Inc. 1.000 $2,500.00 $2,500.00 Conway Construction Co 1.000 $2,000.00 $2,000.00

Farline Bridge 1.000 $1,100.00 $1,100.00

A1420 61904-0000 BOLLARD POST

(COLLAPSIBLE)

MJ Hughes Construction 1.000 $850.00 $850.00

Engineer's Estimate 1.000 EACH $1,900.00 $1,900.00

A1440 62002-0000 STONE MASONRY

(MITCHELL CREEK

BRIDGE)

LEGACY

CONTRACTING, INC. 140.000 $5,800.00 $812,000.00

Crestline Construction Co. LLC 140.000 $1,855.00 $259,700.00

JAL Construction, Inc. 140.000 $1,820.00 $254,800.00 MJ Hughes Construction 140.000 $1,800.00 $252,000.00

Farline Bridge 140.000 $1,650.00 $231,000.00 Conway Construction Co 140.000 $1,550.00 $217,000.00

Hooker Creek, Inc. 140.000 $730.00 $102,200.00 Engineer's Estimate 140.000 SQYD $2,200.00 $308,000.00

A1460 62010-0000 STONE MASONRY

(FLUSH BASALT

BAND, 18-INCH)

Hooker Creek, Inc. 10.000 $610.00 $6,100.00 Crestline Construction Co. LLC 10.000 $375.00 $3,750.00

MJ Hughes Construction 10.000 $375.00 $3,750.00

Conway Construction Co 10.000 $355.00 $3,550.00

LEGACY

CONTRACTING, INC. 10.000 $320.00 $3,200.00

JAL Construction, Inc. 10.000 $310.00 $3,100.00 Farline Bridge 10.000 $210.00 $2,100.00 Engineer's Estimate 10.000 LNFT $400.00 $4,000.00

A1480 62010-0000 STONE MASONRY

(FLUSH BASALT

BAND, 24-INCH)

Hooker Creek, Inc. 23.000 $610.00 $14,030.00 Crestline Construction Co. LLC 23.000 $400.00 $9,200.00

Conway Construction Co 23.000 $380.00 $8,740.00

MJ Hughes Construction 23.000 $375.00 $8,625.00

LEGACY

CONTRACTING, INC. 23.000 $350.00 $8,050.00

JAL Construction, Inc. 23.000 $345.00 $7,935.00 Farline Bridge 23.000 $245.00 $5,635.00 Engineer's Estimate 23.000 LNFT $450.00 $10,350.00

A1500 62010-0000 STONE MASONRY

(FLUSH BASALT

BAND, 36-INCH)

Hooker Creek, Inc. 44.000 $670.00 $29,480.00 Crestline Construction Co. LLC 44.000 $461.00 $20,284.00

MJ Hughes Construction 44.000 $425.00 $18,700.00

Conway Construction Co 44.000 $410.00 $18,040.00

A1500 62010-0000 STONE MASONRY

(FLUSH BASALT

BAND, 36-INCH)

JAL Construction, Inc. 44.000 $400.00 $17,600.00

LEGACY

CONTRACTING, INC. 44.000 $380.00 $16,720.00

Farline Bridge 44.000 $300.00 $13,200.00 Engineer's Estimate 44.000 LNFT $490.00 $21,560.00

A1520 62102-0000 MARKER

(GOVERNMENT

FURNISHED TRAIL

MEDALLION)

LEGACY

CONTRACTING, INC. 14.000 $1,650.00 $23,100.00

Hooker Creek, Inc. 14.000 $640.00 $8,960.00 Crestline Construction Co. LLC 14.000 $600.00 $8,400.00

MJ Hughes Construction 14.000 $500.00 $7,000.00

Conway Construction Co 14.000 $400.00 $5,600.00

Farline Bridge 14.000 $320.00 $4,480.00 JAL Construction, Inc. 14.000 $250.00 $3,500.00 Engineer's Estimate 14.000 EACH $1,100.00 $15,400.00

A1540 62201-0250 DUMP TRUCK, 10

CUBIC YARD

MINIMUM

CAPACITY

Conway Construction Co 30.000 $225.00 $6,750.00

Crestline Construction Co. LLC 30.000 $195.00 $5,850.00

Farline Bridge 30.000 $175.00 $5,250.00 MJ Hughes Construction 30.000 $175.00 $5,250.00

Hooker Creek, Inc. 30.000 $170.00 $5,100.00

LEGACY

CONTRACTING, INC. 30.000 $165.00 $4,950.00

JAL Construction, Inc. 30.000 $150.00 $4,500.00 Engineer's Estimate 30.000 HOUR $190.00 $5,700.00

A1560 62201-3400 HYDRAULIC

EXCAVATOR, 1

CUBIC YARD

MINIMUM

CAPACITY WITH

THUMB

ATTACHMENT

Hooker Creek, Inc. 40.000 $266.00 $10,640.00 Conway Construction Co 40.000 $210.00 $8,400.00

JAL Construction, Inc. 40.000 $200.00 $8,000.00

LEGACY

CONTRACTING, INC. 40.000 $200.00 $8,000.00

MJ Hughes Construction 40.000 $200.00 $8,000.00

Crestline Construction Co. LLC 40.000 $195.00 $7,800.00

Farline Bridge 40.000 $180.00 $7,200.00 Engineer's Estimate 40.000 HOUR $210.00 $8,400.00

A1580 62201-3750 CHAIN SAW Hooker Creek, Inc. 40.000 $200.00 $8,000.00 Conway Construction Co 40.000 $100.00 $4,000.00

Crestline Construction Co. LLC 40.000 $100.00 $4,000.00

A1580 62201-3750 CHAIN SAW JAL Construction, Inc. 40.000 $100.00 $4,000.00 MJ Hughes Construction 40.000 $100.00 $4,000.00

LEGACY

CONTRACTING, INC. 40.000 $99.00 $3,960.00

Farline Bridge 40.000 $75.00 $3,000.00 Engineer's Estimate 40.000 HOUR $120.00 $4,800.00

A1600 62410-0000 PLACING

MANUFACTURED

TOPSOIL (12-INCH

DEPTH, MITCHELL

CREEK BRIDGE)

Hooker Creek, Inc. 90.000 $93.00 $8,370.00 JAL Construction, Inc. 90.000 $60.00 $5,400.00 MJ Hughes Construction 90.000 $55.00 $4,950.00

Farline Bridge 90.000 $53.00 $4,770.00 Crestline Construction Co. LLC 90.000 $41.00 $3,690.00

Conway Construction Co 90.000 $40.00 $3,600.00

LEGACY

CONTRACTING, INC. 90.000 $25.00 $2,250.00

Engineer's Estimate 90.000 SQYD $40.00 $3,600.00

A1620 62410-0000 PLACING

MANUFACTURED

TOPSOIL (12-INCH

DEPTH, PERHAM

CREEK BRIDGE)

Hooker Creek, Inc. 85.000 $98.00 $8,330.00 JAL Construction, Inc. 85.000 $60.00 $5,100.00 MJ Hughes Construction 85.000 $55.00 $4,675.00

Farline Bridge 85.000 $53.00 $4,505.00 Crestline Construction Co. LLC 85.000 $41.00 $3,485.00

Conway Construction Co 85.000 $40.00 $3,400.00

LEGACY

CONTRACTING, INC. 85.000 $25.00 $2,125.00

Engineer's Estimate 85.000 SQYD $40.00 $3,400.00

A1640 62410-0000 PLACING

MANUFACTURED

TOPSOIL (4-INCH

DEPTH)

MJ Hughes Construction 9,900.000 $18.00 $178,200.00

Farline Bridge 9,900.000 $17.00 $168,300.00 Hooker Creek, Inc. 9,900.000 $16.00 $158,400.00

LEGACY

CONTRACTING, INC. 9,900.000 $15.00 $148,500.00

Crestline Construction Co. LLC 9,900.000 $14.00 $138,600.00

JAL Construction, Inc. 9,900.000 $10.00 $99,000.00 Conway Construction Co 9,900.000 $8.00 $79,200.00

Engineer's Estimate 9,900.000 SQYD $15.00 $148,500.00

A1660 62510-2000 SEEDING,

HYDRAULIC

METHOD

(GOVERNMENT

FURNISHED SEED)

MJ Hughes Construction 3.600 $3,500.00 $12,600.00

LEGACY

CONTRACTING, INC. 3.600 $3,400.00 $12,240.00

Farline Bridge 3.600 $3,375.00 $12,150.00 Hooker Creek, Inc. 3.600 $2,550.00 $9,180.00 JAL Construction, Inc. 3.600 $2,250.00 $8,100.00 Crestline Construction Co. LLC 3.600 $1,120.00 $4,032.00

Conway Construction Co 3.600 $1,000.00 $3,600.00

Engineer's Estimate 3.600 ACRE $2,400.00 $8,640.00

A1680 62515-2000 MULCHING,

HYDRAULIC

METHOD

Hooker Creek, Inc. 5.000 $6,000.00 $30,000.00 JAL Construction, Inc. 5.000 $5,240.00 $26,200.00 MJ Hughes Construction 5.000 $3,500.00 $17,500.00

LEGACY

CONTRACTING, INC. 5.000 $3,400.00 $17,000.00

Farline Bridge 5.000 $3,375.00 $16,875.00 Crestline Construction Co. LLC 5.000 $2,500.00 $12,500.00

Conway Construction Co 5.000 $2,200.00 $11,000.00

Engineer's Estimate 5.000 ACRE $8,000.00 $40,000.00

A1700 62901-0700 ROLLED EROSION

CONTROL

PRODUCT, TYPE 2.C

Crestline Construction Co. LLC 380.000 $10.00 $3,800.00

LEGACY

CONTRACTING, INC. 380.000 $9.00 $3,420.00

Hooker Creek, Inc. 380.000 $8.50 $3,230.00 Conway Construction Co 380.000 $8.20 $3,116.00

Farline Bridge 380.000 $8.00 $3,040.00 MJ Hughes Construction 380.000 $8.00 $3,040.00

JAL Construction, Inc. 380.000 $7.00 $2,660.00 Engineer's Estimate 380.000 SQYD $8.25 $3,135.00

A1720 63302-0000 SIGN SYSTEM

(WITH CONCRETE

TRAIL SIGN

SUPPORT)

Conway Construction Co 11.000 $2,358.00 $25,938.00

Hooker Creek, Inc. 11.000 $1,650.00 $18,150.00 Crestline Construction Co. LLC 11.000 $1,200.00 $13,200.00

Farline Bridge 11.000 $500.00 $5,500.00 MJ Hughes Construction 11.000 $350.00 $3,850.00

JAL Construction, Inc. 11.000 $250.00 $2,750.00

A1720 63302-0000 SIGN SYSTEM

(WITH CONCRETE

TRAIL SIGN

SUPPORT)

LEGACY

CONTRACTING, INC. 11.000 $55.00 $605.00

Engineer's Estimate 11.000 SQFT $800.00 $8,800.00

A1740 63316-1000 REMOVE AND

RESET SIGN

Crestline Construction Co. LLC 1.000 $3,300.00 $3,300.00

MJ Hughes Construction 1.000 $1,000.00 $1,000.00

Hooker Creek, Inc. 1.000 $650.00 $650.00

LEGACY

CONTRACTING, INC. 1.000 $600.00 $600.00

Conway Construction Co 1.000 $500.00 $500.00

Farline Bridge 1.000 $500.00 $500.00 JAL Construction, Inc. 1.000 $500.00 $500.00 Engineer's Estimate 1.000 EACH $550.00 $550.00

A1760 63501-1000 TEMPORARY

TRAFFIC CONTROL,

TRAFFIC CONTROL

SUPERVISOR

MJ Hughes Construction $325,000.00

Hooker Creek, Inc. $242,000.00 Conway Construction Co $170,000.00

LEGACY

CONTRACTING, INC. $165,000.00

JAL Construction, Inc. $85,000.00 Farline Bridge $35,000.00 Crestline Construction Co. LLC $2,000.00

Engineer's Estimate ALL LPSM LPSM $75,000.00

A1780 63502-0300 TEMPORARY

TRAFFIC CONTROL,

ARROW BOARD,

TYPE C

Hooker Creek, Inc. 1.000 $15,002.00 $15,002.00 Crestline Construction Co. LLC 1.000 $14,200.00 $14,200.00

LEGACY

CONTRACTING, INC. 1.000 $6,680.00 $6,680.00

Conway Construction Co 1.000 $6,500.00 $6,500.00

Farline Bridge 1.000 $6,000.00 $6,000.00 MJ Hughes Construction 1.000 $3,000.00 $3,000.00

JAL Construction, Inc. 1.000 $2,000.00 $2,000.00 Engineer's Estimate 1.000 EACH $14,000.00 $14,000.00

A1800 63502-0500 TEMPORARY

TRAFFIC CONTROL,

BARRICADE TYPE 2

Crestline Construction Co. LLC 2.000 $230.00 $460.00

LEGACY

CONTRACTING, INC. 2.000 $205.00 $410.00

Farline Bridge 2.000 $145.00 $290.00 Hooker Creek, Inc. 2.000 $120.00 $240.00

A1800 63502-0500 TEMPORARY

TRAFFIC CONTROL,

BARRICADE TYPE 2

Conway Construction Co 2.000 $100.00 $200.00

JAL Construction, Inc. 2.000 $100.00 $200.00 MJ Hughes Construction 2.000 $50.00 $100.00

Engineer's Estimate 2.000 EACH $220.00 $440.00

A1820 63502-0600 TEMPORARY

TRAFFIC CONTROL,

BARRICADE TYPE 3

Crestline Construction Co. LLC 4.000 $515.00 $2,060.00

Hooker Creek, Inc. 4.000 $280.00 $1,120.00

LEGACY

CONTRACTING, INC. 4.000 $275.00 $1,100.00

Conway Construction Co 4.000 $250.00 $1,000.00

JAL Construction, Inc. 4.000 $200.00 $800.00 Farline Bridge 4.000 $175.00 $700.00 MJ Hughes Construction 4.000 $150.00 $600.00

Engineer's Estimate 4.000 EACH $330.00 $1,320.00

A1840 63502-1200 TEMPORARY

TRAFFIC CONTROL,

TUBULAR MARKER,

TYPE 28-INCH

Crestline Construction Co. LLC 5.000 $200.00 $1,000.00

Hooker Creek, Inc. 5.000 $60.00 $300.00 Farline Bridge 5.000 $50.00 $250.00 JAL Construction, Inc. 5.000 $50.00 $250.00 Conway Construction Co 5.000 $34.00 $170.00

LEGACY

CONTRACTING, INC. 5.000 $33.00 $165.00

MJ Hughes Construction 5.000 $15.00 $75.00

Engineer's Estimate 5.000 EACH $37.00 $185.00

A1860 63502-1300 TEMPORARY

TRAFFIC CONTROL,

DRUM

JAL Construction, Inc. 120.000 $250.00 $30,000.00 Crestline Construction Co. LLC 120.000 $175.00 $21,000.00

Hooker Creek, Inc. 120.000 $170.00 $20,400.00

LEGACY

CONTRACTING, INC. 120.000 $65.00 $7,800.00

Farline Bridge 120.000 $55.00 $6,600.00 Conway Construction Co 120.000 $50.00 $6,000.00

MJ Hughes Construction 120.000 $15.00 $1,800.00

Engineer's Estimate 120.000 EACH $110.00 $13,200.00

A1880 63502-2000 TEMPORARY

TRAFFIC CONTROL,

PORTABLE

CHANGEABLE

MESSAGE SIGN

(TRAILER-

MOUNTED)

Hooker Creek, Inc. 1.000 $39,000.00 $39,000.00 Conway Construction Co 1.000 $30,000.00 $30,000.00

Farline Bridge 1.000 $20,000.00 $20,000.00 JAL Construction, Inc. 1.000 $20,000.00 $20,000.00 Crestline Construction Co. LLC 1.000 $14,200.00 $14,200.00

LEGACY

CONTRACTING, INC. 1.000 $11,500.00 $11,500.00

MJ Hughes Construction 1.000 $10,000.00 $10,000.00

Engineer's Estimate 1.000 EACH $23,000.00 $23,000.00

A1900 63502-2100 TEMPORARY

TRAFFIC CONTROL,

CRASH CUSHION

(TRUCK MOUNTED)

Hooker Creek, Inc. 1.000 $242,000.00 $242,000.00 Conway Construction Co 1.000 $65,000.00 $65,000.00

LEGACY

CONTRACTING, INC. 1.000 $37,500.00 $37,500.00

MJ Hughes Construction 1.000 $23,000.00 $23,000.00

JAL Construction, Inc. 1.000 $20,000.00 $20,000.00 Farline Bridge 1.000 $10,000.00 $10,000.00 Crestline Construction Co. LLC 1.000 $7,250.00 $7,250.00

Engineer's Estimate 1.000 EACH $17,000.00 $17,000.00

A1920 63503-1000 TEMPORARY

TRAFFIC CONTROL,

PLASTIC FENCE

LEGACY

CONTRACTING, INC. 5,600.000 $9.50 $53,200.00

Hooker Creek, Inc. 5,600.000 $7.25 $40,600.00 Crestline Construction Co. LLC 5,600.000 $5.00 $28,000.00

Farline Bridge 5,600.000 $5.00 $28,000.00 JAL Construction, Inc. 5,600.000 $5.00 $28,000.00 Conway Construction Co 5,600.000 $4.00 $22,400.00

MJ Hughes Construction 5,600.000 $2.25 $12,600.00

Engineer's Estimate 5,600.000 LNFT $6.75 $37,800.00

A1940 63504-1000 TEMPORARY

TRAFFIC CONTROL,

CONSTRUCTION

SIGN

Hooker Creek, Inc. 520.000 $65.00 $33,800.00 Conway Construction Co 520.000 $48.00 $24,960.00

JAL Construction, Inc. 520.000 $45.00 $23,400.00

LEGACY

CONTRACTING, INC. 520.000 $44.00 $22,880.00

Crestline Construction Co. LLC 520.000 $42.00 $21,840.00

Farline Bridge 520.000 $38.00 $19,760.00

A1940 63504-1000 TEMPORARY

TRAFFIC CONTROL,

CONSTRUCTION

SIGN

MJ Hughes Construction 520.000 $20.00 $10,400.00

Engineer's Estimate 520.000 SQFT $42.00 $21,840.00

A1960 63701-0000 FIELD OFFICE MJ Hughes Construction 15.000 $7,000.00 $105,000.00

LEGACY

CONTRACTING, INC. 15.000 $6,900.00 $103,500.00

Conway Construction Co 15.000 $4,000.00 $60,000.00

Hooker Creek, Inc. 15.000 $3,300.00 $49,500.00 Crestline Construction Co. LLC 15.000 $3,250.00 $48,750.00

Farline Bridge 15.000 $3,000.00 $45,000.00 JAL Construction, Inc. 15.000 $2,500.00 $37,500.00 Engineer's Estimate 15.000 EACH $4,000.00 $60,000.00

A1980 64603-0000 FIXTURE (FALLEN

TREE TRUNK)

JAL Construction, Inc. 4.000 $2,000.00 $8,000.00 Farline Bridge 4.000 $1,500.00 $6,000.00 Conway Construction Co 4.000 $1,300.00 $5,200.00

LEGACY

CONTRACTING, INC. 4.000 $900.00 $3,600.00

Hooker Creek, Inc. 4.000 $750.00 $3,000.00 MJ Hughes Construction 4.000 $650.00 $2,600.00

Crestline Construction Co. LLC 4.000 $555.00 $2,220.00

Engineer's Estimate 4.000 EACH $410.00 $1,640.00

A2000 64603-0000 FIXTURE (TRAIL

SIGN SUPPORT,

TYPE I)

Hooker Creek, Inc. 1.000 $21,000.00 $21,000.00

LEGACY

CONTRACTING, INC. 1.000 $18,500.00 $18,500.00

JAL Construction, Inc. 1.000 $10,000.00 $10,000.00 Farline Bridge 1.000 $9,200.00 $9,200.00 Crestline Construction Co. LLC 1.000 $3,880.00 $3,880.00

Conway Construction Co 1.000 $3,800.00 $3,800.00

MJ Hughes Construction 1.000 $1,000.00 $1,000.00

Engineer's Estimate 1.000 EACH $5,000.00 $5,000.00

A2020 64603-0000 FIXTURE (TRAIL

SIGN SUPPORT,

TYPE II)

Hooker Creek, Inc. 1.000 $37,000.00 $37,000.00

LEGACY

CONTRACTING, INC. 1.000 $18,500.00 $18,500.00

JAL Construction, Inc. 1.000 $11,000.00 $11,000.00 Farline Bridge 1.000 $9,500.00 $9,500.00

A2020 64603-0000 FIXTURE (TRAIL

SIGN SUPPORT,

TYPE II)

Conway Construction Co 1.000 $5,500.00 $5,500.00

Crestline Construction Co. LLC 1.000 $3,225.00 $3,225.00

MJ Hughes Construction 1.000 $1,000.00 $1,000.00

Engineer's Estimate 1.000 EACH $4,500.00 $4,500.00

A2040 64603-0300 FIXTURE, BENCH

(BASALT)

JAL Construction, Inc. 2.000 $12,500.00 $25,000.00 Crestline Construction Co. LLC 2.000 $10,000.00 $20,000.00

MJ Hughes Construction 2.000 $10,000.00 $20,000.00

Farline Bridge 2.000 $9,125.00 $18,250.00 Conway Construction Co 2.000 $6,500.00 $13,000.00

Hooker Creek, Inc. 2.000 $5,300.00 $10,600.00

LEGACY

CONTRACTING, INC. 2.000 $3,140.00 $6,280.00

Engineer's Estimate 2.000 EACH $7,000.00 $14,000.00

A2060 64604-3000 FIXTURE,

PEDESTRIAN

RAILING (42"

WOOD, BROWN)

Hooker Creek, Inc. 590.000 $240.00 $141,600.00 Farline Bridge 590.000 $180.00 $106,200.00

LEGACY

CONTRACTING, INC. 590.000 $175.00 $103,250.00

Crestline Construction Co. LLC 590.000 $150.00 $88,500.00

MJ Hughes Construction 590.000 $150.00 $88,500.00

Conway Construction Co 590.000 $120.00 $70,800.00

JAL Construction, Inc. 590.000 $70.00 $41,300.00 Engineer's Estimate 590.000 LNFT $170.00 $100,300.00

A2080 64604-3000 FIXTURE,

PEDESTRIAN

RAILING (42"

WOOD, WHITE)

Hooker Creek, Inc. 380.000 $460.00 $174,800.00

LEGACY

CONTRACTING, INC. 380.000 $241.00 $91,580.00

Farline Bridge 380.000 $180.00 $68,400.00 Crestline Construction Co. LLC 380.000 $150.00 $57,000.00

MJ Hughes Construction 380.000 $150.00 $57,000.00

Conway Construction Co 380.000 $125.00 $47,500.00

JAL Construction, Inc. 380.000 $70.00 $26,600.00 Engineer's Estimate 380.000 LNFT $190.00 $72,200.00