This is a Questions and Answers (Q&A) document for a federal highway construction project.

The document addresses 11 technical and general inquiries regarding Project No. OR FS DSHUT601 60(1), Road 60 Improvements, MP 0 to 1.0. Questions 1-4 and 6 were answered on 12/12/25, with responses directing vendors to await the formal Invitation for Bids (IFB) containing Special Contract Requirements (SCRs), plans, and physical data upon project advertisement in early 2026. Question 5 confirmed the anticipated advertisement date of early 2026. To receive solicitation notifications, vendors should use the "Follow" function on SAM.gov and add their company to the Interested Vendors List.

Questions 7-11, answered between 1/30/26 and 2/10/26, provided technical clarifications on project specifications and requirements. These included: the placement sequence for crushed aggregate in full-depth reclamation work prior to pulverization; confirmation that pilot car work will be addressed by Amendment A003; clarification that the fixed July 2, 2026 completion date and turf establishment timing requirements (September 15-November 15) will be reconciled by Amendment A003; confirmation that unsuitable material removal and replacement costs will be addressed by Amendment A003; and notification that the Government will not provide digital design files (LandXML, DXF, CAD) and contractors are responsible for all construction surveying per SCRs 102.02A and 152.

View the file

Other files

File Type Posted
Bid Tabulation_OR FS DSHUT601 60(1).pdf PDF
BidSum_OR FS DSHUT601 60(1).pdf PDF
Amendment A003.pdf PDF
QA_2-11-2026.pdf PDF
Amendment A002.pdf PDF
Amendment A001.pdf PDF
QA_1-30-2026.pdf PDF
orf-dshut60-1_plan.pdf PDF
WFLHD Construction Contract Administration_FY 23 V2.pdf PDF
IFB_69056725B000011_OR FS DSHUT601 60(1).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project No. OR FS DSHUT601 60(1)

Project Road 60 Improvements, MP 0 to 1.0

# General Technical Question Answer Date

1 X

Please advise what the requirements will be for the surveyor as to responsibilities?

Will the surveyor be required to provide as builts and topo for this project?

Please wait for the solicitation documents

(Invitation for Bids that includes the Special

Contract Requirements [SCRs], plans, and physical data) that will be posted when this project goes on advertisement.

12/12/25

2 X Please advise what substitutions will be allowed for erosion control.

Please wait for the solicitation documents

(Invitation for Bids that includes the Special

Contract Requirements [SCRs], plans, and physical data) that will be posted when this project goes on advertisement.

12/12/25

3 X Please advise if seed from McPheeters Turf will suffice for “Turf Establishment”.

Please wait for the solicitation documents

(Invitation for Bids that includes the Special

Contract Requirements [SCRs], plans, and physical data) that will be posted when this project goes on advertisement.

12/12/25

4 X Please advise if Mobile/Portable traffic signals will suffice for traffic control?

Please wait for the solicitation documents

(Invitation for Bids that includes the Special

Contract Requirements [SCRs], plans, and physical data) that will be posted when this project goes on advertisement.

12/12/25

5 X Please advise if there is by chance a date that we should start looking for the solicitation.

We are anticipating advertisement in early

2026.

12/12/25

6 X How do we receive this and future solicitations?

To get notifications about this project, in

SAM.gov, you can click on “Follow” and/or add your company to the Interested

Vendors List.

12/12/25

Check General or Technical

7 X

Clarification question regarding the full depth of reclamation. On sheet C.1, the typical section shows the full depth reclamation including the

2" crushed aggregate. Does the 2" aggregate get placed prior to the pulverization so that its mixed in or is it meant to be placed after the

Pulverization?

The 2-inch Crushed Aggregate layer should be placed and spread upon the existing roadway prior to pulverization. The intent is for the new aggregate to be incorporated into the pulverized asphalt and subbase material during the reclamation process to create a homogenous, stabilized base section of the specified 6-inch depth. Please note that payment for the crushed aggregate is incidental to Pay Item Number

"30402-5300 - FULL DEPTH RECLAMATION,

METHOD 2, 6-INCH DEPTH," per Section

304 of the Special Contract Requirements

(SCRs) and the Standard Specifications for

Construction of Roads and Bridges on

Federal Highway Projects FP-14 Manual.

1/30/26

8 X

Section 156.07 of SCR’s mentions communication between TCS, Flaggers and Pilot

Car. The work required by this project will necessitate the use of a pilot car, but no bid item for pilot car exists. Will FHWA be adding a pilot car bid item by addendum?

This will be addressed by Amendment

A003.

2/10/26

9 X

The Project has a fixed completion date currently set at July 2nd, 2026. Section 625.03 states “Apply turf establishment to finished slopes and ditches between September 15 and

November 15.” These dates conflict with fixed completion date shown. How will this discrepancy be addressed?

This will be addressed by Amendment

A003.

2/10/26

10 X

Section 304.03 states “Before pulverizing, remove and dispose of unsuitable material as directed by the C.O. Replace unsuitable material with crushed aggregate according to Subsection

304.04”, this is work that cannot be identified at time of the bid, how will this work be paid for?

This will be addressed by Amendment

A003.

2/10/26

11 X

Will the Government make available digital design files (LandXML, DXF, CAD, etc.) to the selected contractor to support Automated

Machine Guidance (AMG) and construction surveying/model development?

No. Per SCR 102.02A, digital design files do not exist and will not be provided. Per SCR

152, the Contractor is responsible for all construction surveying.