Amendment A001.pdf
PDF 12 MB Posted
- Solicitation number
- 69056725B000011
About this file
This is an Amendment of Solicitation/Modification of Contract issued by the Department of Transportation Federal Highway Administration for the project OR FS DSHUT601 60(1), Road 60 Improvements, MP 0-1.0. Amendment A001, effective February 4, 2026, modifies solicitation number 69056725B000011 (dated December 31, 2025) without extending the offer receipt deadline. The amendment removes the "Electronic Documentation" subsection and replaces it with a new "Masterworks" subsection, requiring contractors to use the Government's web-based Masterworks system to prepare Contractor's Daily Records (CDRs), measurement notes (pay notes), and other submittals. Contractors must attend mandatory training sessions on the Masterworks system and submit user account forms to gain access.
Key revisions include updates to the Davis-Bacon General Wage Decision from OR20250001 to OR20260001 (effective January 23, 2026); additions to Section 101.03 defining the abbreviation CDR; additions to Section 101.04 defining Masterworks and related terms; comprehensive revisions to Section 103.06 requiring all documents and drawings be submitted through Masterworks with specific file naming, format, and submission protocols; revisions to Section 109 regarding measurement of work and progress payments; updates to Section 153 on Contractor Quality Control; and revisions to Section 155 on Schedules for Construction Contracts, including requirements for Contractor's Daily Records. The amendment also includes updated plan sheets (C.1 and D.2) showing typical sections and construction plans for the road improvement project. Enclosed materials consist of pages A-2a, D-1 through D-20, E-1 through E-1a, E-4 through E-4a, E-16 through E-16a, E-17 through E-18, E-24, E-37 through E-37a, and plan sheets C.1 and D.2.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A001 02/04/2026 N/A OR FS DSHUT601 60(1), Road 60
Improvements, MP 0 - 1.0
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X 69056725B000011
9B. DATED (SEE ITEM 11)
12/31/2025
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A
N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
(__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
N/A
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
N/A
D OTHER (Specify type of modification and authority)
N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
OR FS DSHUT601 60(1), Road 60 Improvements, MP 0 - 1.0
See page 2
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
OR FS DSHUT601 60(1)
Road 60 Improvements, MP 0 – 1.0
Amendment No. A001, dated 02/04/2026
Solicitation No. 69056725B000011
REVISIONS ARE AS FOLLOWS:
NOTICE TO BIDDER
Page A-2a, Section IV. Specifications and Permits. Removes subsection “Electronic
Documentation” and adds subsection “Masterworks.”
MINIMUM WAGE SCHEDULE
Page D-1 through D-20. Updates Davis-Bacon General Wage Decision Number
OR20250001 to OR20260001 with a current effective date of 01/23/2026.
SPECIAL CONTRACT REQUIREMENTS
Page E-1, Subsection 101.03 Abbreviations. Adds definition for CDR.
Page E-1a, Subsection 101.04 Definitions. Adds definition for Masterworks.
Page E-4 to E-4a, Revises subsection 103.06 Electronic Documentation.
Page E-16 through E-16a, Revises Subsection 109.01 Measurement of Work.
Page E-17, Subsection 109.06 Pricing of Adjustments. Revises 109.06 (a)(3) Cost or pricing data and revises 109.06 (b)(3) Profit.
Page E-18, Subsection 109.08 Progress Payments. Revises Subsection (d) Government’s receiving report.
Page E-24, Updates Subsection 153.01 Description.
Page E-29, Updates Subsection 155.01 Description.
Page E-37 through E-37a, Revises Subsection 155.12 Contractor’s Daily Record of
Construction Operations.
PLANS
Plan sheet C.1 Revises sheet, Typical Section Main 01
Plan sheet D.2 Revises sheet, Plan and Plan 9+10 to 20+60
Road 60 Improvements, MP 0 – 1.0
Amendment No. A001, dated 02/04/2026
Solicitation No. 69056725B000011
ENCLOSURES
Pages:
A-2a
D-1 through D-20
E-1 through E-1a
E-4 through E-4a
E-16 through E-16a
E-17 through E-18
E-24
E-37 through E-37a
Plan Sheets:
C.1
D.2
A-2a
Notice to Bidders
Project: OR FS DSHUT601 60(1), Road 60 Improvements
Revised by Amendment A001 more information on the U.S. SBA’s Surety Bond Guarantee program, go online to https://www.sba.gov/funding-programs/surety-bonds.
Fraud Alert. Current and potential U.S. Department of Transportation (DOT) Contractors have recently been receiving fraudulent letters purporting to be issued by DOT. These fraudulent letters request that the Contractors resubmit their banking information to DOT. If you receive such a letter, please DO NOT complete the requested worksheet that is attached to the letters and DO
NOT release any information. To register or update information, Contractors are required to go directly through the System for Award Management (SAM) website and never through a third party. You can access SAM at https://www.sam.gov/SAM/ .
III. Post Award Information.
Insurance. Insurance requirements are described in Subsection 107.05.
Contractor Performance Evaluations. This office posts performance evaluations in the
Contractor Performance Assessment Reporting System (CPARS); for additional information, see https://cpars.gov/cparsweb/home. Upon receiving an email notice of evaluation availability, you will have 14-60 days to review the evaluation online and submit comments. If you are unable to access the system, call 360.619.7520 for assistance or for a copy of the evaluation.
IV. Specifications and Permits.
Specifications. This solicitation and subsequent contract are governed by the Federal Acquisition
Regulation (FAR), agency supplemental regulations, and the Standard Specifications for
Construction of Roads and Bridges on Federal Highway Projects, FP-14. An electronic version may be found at https://highways.dot.gov/federal-lands/specs.
Electronic Documentation. Requires all documents (including but not limited to correspondence, notifications, submittals, reports, and pay notes) to be submitted in a pdf format, or an approved fixed-layout electronic format. See Subsection 103.06.
Masterworks. Requires the Contractor to use the Government’s web-based system Masterworks to prepare all “Inspector’s Daily Record of Construction Operations” (Contractors Daily Reports) and measurement notes (pay notes). Attend a training session on the use of Masterworks. The virtual training sessions will be either a video presentation or live training as determined by the
CO. Train additional staff. Submit a user account form to gain access to Masterworks. See
Subsection 103.06.
Material Sources. Material sources have not been identified for this project. Secure all permits and clearances for Contractor-located sites and sources. See Subsection 105.02(c).
Progress Schedules. This project includes new specifications for Prosecution and Progress and for Schedules for Construction Contracts. Carefully review Special Contract Requirements
Section 108 - Prosecution and Progress, and Section 155 – Schedules for Construction Contracts.
https://www.sba.gov/funding-programs/surety-bonds https://www.sam.gov/SAM/ https://cpars.gov/cparsweb/home https://highways.dot.gov/federal-lands/specs
D - 1
Revised by Amendment A001
General Wage Decision
Project: OR FS DSHUT601 60(1), Road 60 Improvements, MP 0 - 1.0
General Decision Number: OR20260001 01/23/2026
Superseded General Decision Number: OR20250001
State: Oregon
Construction Type: Highway
Counties: Oregon Statewide.
HIGHWAY CONSTRUCTION PROJECTS
Modification Number Publication Date
0 01/02/2026
1 01/23/2026
BROR0001-031 06/01/2025
Rates Fringes
BRICKLAYER.......................$ 49.60 25.15
CARP0096-005 06/01/2025
MILLWRIGHT.......................$ 59.35 22.38
CARP0196-003 01/01/2025
Piledriver.......................$ 55.79 15.81
CARP0503-020 06/01/2025
Carpenters:
CARPENTERS..................$ 53.94 16.81
DIVER STANDBY...............$ 67.58 19.40
DIVERS TENDERS..............$ 60.34 19.40
DIVERS......................$ 103.21 19.40
MANIFOLD AND/OR
DECOMPRESSION CHAMBER
OPERATORS...................$ 65.34 19.40
Employees may be required to perform any combination of work
D - 2
Project: OR FS DSHUT601 60(1), Road 60 Improvements, MP 0 - 1.0 within the Diving team/crew, (except for Dive Supervisor) provided they are paid at the highest rate of pay that they received during their shift.
* ELEC0048-006 01/01/2025
CLACKAMAS, CLATSOP, COLUMBIA, HOOD RIVER, MULTNOMAH, TILLAMOOK,
WASCO, WASHINGTON, SHERMAN AND YAMHILL (NORTH) COUNTIES
CABLE SPLICER....................$ 69.85 30.44
ELECTRICIAN......................$ 63.50 29.73
HOURLY ZONE PAY:
Hourly Zone Pay shall be paid on jobs located outside of the free zone computed from the city center of the following listed cities:
Portland, The Dalles, Hood River, Tillamook, Seaside and
Astoria
Zone Pay:
Zone 1: 31-50 miles $1.50/hour
Zone 2: 51-70 miles $3.50/hour
Zone 3: 71-90 miles $5.50/hour
Zone 4: Beyond 90 miles $9.00/hour
*These are not miles driven. Zones are based on Delorrne
Street Atlas USA 2006 plus.
ELEC0112-001 06/01/2025
BAKER, GILLIAM, GRANT, MORROW, UMATILLA, UNION, WALLOWA, AND
WHEELER COUNTIES
CABLE SPLICER....................$ 63.00 27.87
ELECTRICIAN......................$ 60.00 27.78
ELEC0280-003 01/01/2025
BENTON, CROOK, DESCHUTES, JEFFERSON, LANE (EAST OF A LINE
RUNNING NORTH AND SOUTH FROM THE NORTHEAST CORNER OF COOS
COUNTY TO THE SOUTHEAST CORNER OF LINCOLN COUNTY), LINN,
MARION, POLK AND YAMHILL (SOUTHERN HALF) COUNTIES
D - 3
CABLE SPLICER....................$ 60.80 22.24
ELECTRICIAN......................$ 56.46 23.05
ELEC0291-006 12/01/2024
MALHEUR COUNTY
CABLE SPLICER....................$ 46.81 19.86
ELECTRICIAN......................$ 42.55 19.86
* ELEC0659-004 01/01/2026
DOUGLAS (EAST OF A LINE RUNNING NORTH AND SOUTH FROM THE NE
CORNER OF COOS COUNTY TO THE SE CORNER OF LINCOLN COUNTY),
HARNEY, JACKSON, JOSEPHINE, KLAMATH AND LAKE COUNTIES
CABLE SPLICER....................$ 64.58 1.5%+22.34
ELECTRICIAN......................$ 47.04 21.84
ZONE PAY: BASE POINTS ARE FROM THE DOWNTOWN POST OFFICE IN
GRANTS PASS, KLAMATH FALLS, ROSEBURG AND MEDFORD.
ZONE 1: 0-20 MILES $0.00 PER HOUR
ZONE 2: > 20-30 MILES $1.50 PER HOUR
ZONE 3: >30-40 MILES $3.30 PER HOUR
ZONE 4: >40-50 MILES $5.00 PER HOUR
ZONE 5: >50-60 MILES $6.80 PER HOUR
ZONE 6: >60 MILES $9.50 PER HOUR
*THESE ARE NOT MILES DRIVEN. zONES ARE BASED ON DELORNE
STREET ATLAS USA 5.0.
ELEC0932-004 01/01/2024
COOS, CURRY, LINCOLN, DOUGLAS AND LANE COUNTIES (AREA LYING
WEST OF A LINE NORTH AND SOUTH FROM THE N.E. CORNER OF COOS
COUNTY TO THE S.E. CORNER OF LINCOLN COUNTY)
ELECTRICIAN......................$ 50.03 24.00
D - 4
Project: OR FS DSHUT601 60(1), Road 60 Improvements, MP 0 - 1.0
ENGI0701-005 01/01/2024
ZONE 1:
POWER EQUIPMENT OPERATORS (See Footnote C)
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 56.66 16.90
GROUP 1A....................$ 58.82 16.90
GROUP 1B....................$ 60.98 16.90
GROUP 2.....................$ 54.75 16.90
GROUP 3.....................$ 53.60 16.90
GROUP 4.....................$ 50.27 16.90
GROUP 5.....................$ 49.03 16.90
GROUP 6.....................$ 45.81 16.90
Zone Differential (add to Zone 1 rates):
Zone 2 - $3.00
Zone 3 - $6.00
For the following metropolitan counties: MULTNOMAH;
CLACKAMAS; MARION; WASHINGTON; YAMHILL; AND COLUMBIA;
CLARK; AND COWLITZ COUNTY, WASHINGTON WITH MODIFICATIONS AS
INDICATED:
All jobs or projects located in Multnomah, Clackamas and
Marion Counties, West of the western boundary of Mt. Hood
National Forest and West of Mile Post 30 on Interstate 84 and West of Mile Post 30 on State Highway 26 and West of
Mile Post 30 on Highway 22 and all jobs or projects located in Yamhill County, Washington County and Columbia County and all jobs or porjects located in Clark & Cowlitz County, Washington except that portion of Cowlitz County in the Mt.
St. Helens ""Blast Zone"" shall receive Zone I pay for all classifications.
All jobs or projects located in the area outside the identified boundary above, but less than 50 miles from the
Portland City Hall shall receive Zone II pay for all
All jobs or projects located more than 50 miles from the
Portland City Hall, but outside the identified border above, shall receive Zone III pay for all classifications.
For the following cities: ALBANY; BEND; COOS BAY; EUGENE;
GRANTS PASS; KLAMATH FALLS; MEDFORD; ROSEBURG
All jobs or projects located within 30 miles of the
D - 5
Project: OR FS DSHUT601 60(1), Road 60 Improvements, MP 0 - 1.0 respective city hall of the above mentioned cities shall receive Zone I pay for all classifications.
All jobs or projects located more than 30 miles and less than
50 miles from the respective city hall of the above mentioned cities shall receive Zone II pay for all
All jobs or projects located more than 50 miles from the respective city hall of the above mentioned cities shall receive Zone III pay for all classifications.
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
Group 1
Concrete Batch Plan and or Wet mix three (3) units or more
Crane, Floating one hundred and fifty (150) ton but less than two hundred and fifty (250) ton.
Crane, two hundred (200) ton through two hundred ninety-nine
(299) ton with two-hundred-foot (200’) boom or less
(including jib, inserts and/or attachments)
Crane, ninety (90) ton through one hundred ninety-nine (199) ton with over two hundred (200’) boom Including jib, inserts and/or attachments)
Crane, Tower Crane with one hundred seventy-five-foot (175’) tower or less and with less than two-hundred-foot (200’) jib
Crane, Whirley ninety (90) ton and over Helicopter when used in erecting work
Tunnel Boring Machine
Tunnel, Micro Boring Tunnel Machine
Group 1A
Crane, floating two hundred fifty (250) ton and over
Crane, two hundred (200) ton through two hundred ninety-nine
(299) ton, with over two-hundred-foot (200’) boom
(including jib, inserts and/or attachments)
Crane, three hundred (300) ton through three hundred ninety-nine (399) ton
Crane, Tower Crane with over one hundred seventy-five-foot
(175’) tower or over two hundred foot (200’) jib
Crane, tower Crane on rail system or 2nd tower or more in work radius
Group 1B
Crane, three hundred (300) ton through three hundred ninety-nine (399) ton, with over two hundred- foot (200’) boom (including jib, inserts and/or attachments)
Floating crane, three hundred fifty (350) ton and over
Crane, four hundred (400) ton and over
Group 2
D - 6
Project: OR FS DSHUT601 60(1), Road 60 Improvements, MP 0 - 1.0
Asphalt Plant (any type)
Asphalt Roto-Mill, pavement profiler eight foot (8’) lateral cut and over
Auto Grader or ‘Trimmer’
Blade, Robotic
Bulldozer, Robotic Equipment (any type)
Bulldozer, over one hundred twenty thousand (120,000) lbs.
and above
Canal Trimmer
Concrete Batch Plant and/or Wet Mix one (1) and two (2) drum
Concrete Canal Liner Operator
Concrete Diamond Head Profiler
Concrete, Automatic Slip Form Paver
Crane, Boom Truck fifty (50) ton and with over one hundred fifty-foot (150’) boom and over
Crane, Floating (derrick barge) thirty (30) ton but less than one hundred fifty (150) ton
Crane, Cableway twenty-five (25) ton and over
Crane, Floating Clamshell three (3) cu. Yds. And over
Crane, ninety (90) ton through one hundred ninety-nine (199) ton up to and including two hundred- foot (200’) boom
(including jib inserts and/or attachments)
Crane, fifty (50) ton through eighty-nine (89) ton with over one hundred fifty-foot (150’) boom
(including jib inserts and/or attachments)
Crane, Whirley under ninety (90) ton
Crusher Plant
Drone
Excavator over one hundred thirty thousand (130,000) lbs.
Heavy Equipment Robotics Operator or Mechanic
Loader one hundred twenty thousand (120,000) lbs. and above
Master environmental Maintenance Mechanic
Remote Controlled Earth Moving Equipment
Shovel, Dragline, Clamshell, five (5) cu. Yds. And over
Underwater Equipment remote or otherwise, when used in construction work
Wheel Excavator any size
Group 3
Bulldozer, over seventy thousand (70,000) lbs. up to and including one hundred twenty thousand (120,000) lbs.
Crane, Boom Truck fifty (50) ton and over with less than one hundred fifty-foot (150?) boom
Crane, fifty (50) ton through eighty-nine (89) ton with one hundred fifty-foot (150?) boom or less
(including jib inserts and/or attachments)
Crane, Shovel, Dragline or Clamshell three (3) cu. yds. but less than five (5) cu. Yds.
Excavator over eighty-five thousand (85,000) lbs. through one hundred thirty thousand
(130,000) lbs.
Loader sixty thousand (60,000) lbs. and less than one hundred
D - 7 twenty thousand (120,000) lbs.
Group 4
Asphalt, Screed
Asphalt Paver
Asphalt Roto-Mill, pavement profiler, under eight foot (8?)
lateral cut
Asphalt, Recycle Machine
Asphalt, Material Transfer Vehicle Operator
Back Filling Machine
Backhoe, Robotic, track and wheel type up to and including twenty thousand (20,000) lbs. with any attachments
Blade (any type)
Boatman, Licensed
Boring Machine
Bulldozer over twenty thousand (20,000) lbs. and more than one hundred (100) horse up to seventy thousand (70,000) lbs.
Cable-Plow (any type)
Cableway up to twenty-five (25) ton
Cat Drill (John Henry)
Challenger
Chippers
Combination Heavy Duty Mechanic-Welder, when required to do both
Compactor, multi-engine
Compactor, Robotic
Compactor with blade self-propelled
Concrete, Breaker
Concrete, Grout Plant
Concrete, Mixer Mobile
Concrete, Paving Road Mixer
Concrete, Reinforced Tank Banding Machine
Crane, Boom Truck twenty (20) ton and under fifty (50) ton
Crane, Bridge Locomotive, Gantry and Overhead
Crane, Carry Deck, Spider Crane, and similar types
Crane, Chicago Boom and similar types
Crane, Derrick Operator, under one hundred (100) ton
Crane, Floating Clamshell, Dragline, etc. under three (3) cu.
yds. Or less than thirty (30) ton
Crane, under fifty (50) ton
Crane, Quick Tower under one-hundred-foot (100’) in height and less than one hundred fifty foot
(150’) jib (on rail included)
Diesel-Electric Engineer (Plant or Floating)
Directional Drill over twenty thousand (20,000) lbs. pullback
Drill Cat Operator
Drill Doctor and/or Bit Grinder
Drill, Oscillator
Driller, Percussion, Diamond, Core, Cable, Rotary and similar type
D - 8
Project: OR FS DSHUT601 60(1), Road 60 Improvements, MP 0 - 1.0
Excavator Operator over twenty thousand (20,000) lbs. through eighty-five thousand (85,000) lbs.
Generator Operator
Grade Setter/layout from plans
Grade-all
Guardrail Machines, i.e., punch, auger, etc.
Hammer Operator (Piledriver)
Hoist, stiff leg, guy derrick or similar type, fifty (50) ton and over
Hoist, two (2) drums or more
Hydro Axe (loader mounted or similar type)
Jack Operator, Elevating Barges, Barge Operator, self-unloading
Loader Operator, front end and overhead, twenty-five thousand
(25,000) lbs. and less than sixty thousand (60,000) lbs.
Log Skidders
Mechanic, Heavy Duty
Piledriver Operator (not crane type)
Pipe, Bending, Cleaning, Doping and Wrapping Machines
Rail, Ballast Tamper Multi-Purpose
Rubber-tired Dozers and Pushers
Scraper, all types
Side-Boom
Skip Loader, Drag Box
Stump Grinder (loader mounted or similar type)
Surface Heater and Planer
Tractor, rubber-tired, over fifty (50) HP Flywheel
Trenching Machine three-foot (3’) depth and deeper (Assistant to the Operator required)
Truck, Crane Oiler-Driver 250 tons and over
Tub Grinder (used for wood debris)
Tunnel Boring Machine Mechanic ‘ hyperbaric pay: additional ten dollars ($10.00) per hour, incudes prep and decompress
Tunnel, Mucking Machine
Tunnel, Segment Plant
Tunnel, Separation Plant
Tunnel, Shaef Loader
Tunnel, Shield Operator
Ultra-High-Pressure Water Jet Cutting Tool System Operator
Vacuum Blasting Machine Operator
Water pulls, Water Wagons
Welder; Heavy Duty
Group 5
Asphalt, Extrusion Machine
Asphalt, Roller (any asphalt mix)
Asphalt, Roto-Mill pavement profiler ground man
Bulldozer, twenty thousand (20,000) lbs. or less, or one hundred (100) horse or less
Cement Pump
D - 9
Project: OR FS DSHUT601 60(1), Road 60 Improvements, MP 0 - 1.0
Chip Spreading Machine
Churn Drill and Earth Boring Machine
Compactor, self-propelled without blade
Compressor, (any power) one thousand two hundred fifty
(1,250) cu. ft. and over, total capacity
Concrete, Batch Plant Quality control
Concrete, Combination Mixer and compressor operator, gunite work
Concrete, Curb Machine, Mechanical Berm, Curb and/or Curb and
Gutter
Concrete, Finishing Machine
Concrete, Grouting Machine
Concrete, Internal Full Slab Vibrator Operator
Concrete, Joint Machine
Concrete, Mixer single drum, any capacity
Concrete, Paving Machine eight foot (8’) or less (Assistance to the Operator required)
Concrete, Placing Boom
Concrete, Planer
Concrete, Pump
Concrete, Pump Truck
Concrete, Pumpcrete Operator (any type)
Concrete, Slip Form Pumps, power driven hydraulic lifting device for concrete forms
Concrete, Spreader
Concrete, Tele belt
Concrete, Treated Base Roller Operator, Oiling
Conveyored Material Hauler
Crane, Boom Truck under twenty (20) tons
Crane, Boom Type lifting device, five (5) ton capacity or less
Drill, Directional type less than twenty thousand (20,000) lbs. pullback
Drill, Mud Mixer
Elevating Grader Operator, Tractor towed requiring Operator or Grader
Elevating Loader Operator (any type)
Elevator to move personnel or materials
Forklift, over ten (10) ton or Robotic
Helicopter Hoist
Hoist Operator, single drum
Hydraulic Backhoe track type up to and including twenty thousand (20,000) lbs.
Hydraulic Backhoe wheel type (any make)
Laser Screed
Lime Spreader, construction job site
Loaders, rubber-tired type, less than twenty-five thousand
(25,000) lbs.
Pavement Grinder and/or Grooving Machine (riding type)
Pipe, cast in place Pipe Laying Machine
Pulva-Mixer or similar types
Pump Operator, more than five (5) pumps (any size)
Rail, Ballast Compactor, Regulator, or Tamper machines
D - 10
Project: OR FS DSHUT601 60(1), Road 60 Improvements, MP 0 - 1.0
Rail, Car Mover
Rail, Clip Applicator
Rail, High Rail Self Loader Truck
Rail, Locomotive, forty (40) ton and over
Rail, Lo-Railer
Rail, Shuttle Car Operator
Rail, Speedswing
Rail, Track Liner
Service Oiler (Greaser)
Sweeper Self-Propelled, Construction Job Site
Tractor, Rubber-Tired, fifty (50) HP flywheel and under
Trenching Machine Operator, maximum digging capacity three-foot (3’) depth
Truck, All Terrain or Track type
Truck, Barrel type
Truck, Crane Oiler-Driver 100-249 tons
Truck, Heavy Haul, specialized transporter, hydraulic, electric, or similar
Truck, Off Road Trucks, Articulated and Non-articulated
Trucks over forty (40) ton
Truck, Vacuum
Truck, Water
Tunnel, Locomotive, Dinkey
Tunnel, Power Jumbo setting slip forms, etc.
Group 6
Air Filtration Equipment
Asphalt, Pugmill (any type)
Asphalt, Raker
Asphalt, Truck Mounted Asphalt Spreader, with Screed
Assistant to the Operator
Auger Oiler
Bell Man (any type of communication)
Boatman
Bobcat, skid steed (less than one (1) yard)
Broom, self-propelled, construction job site
Compressor Operator (any power) under 1,250 cu. ft. total capacity
Concrete Curing Machine (riding type)
Concrete Saw
Conveyor Operator or Assistant
Crane, Tugger
Crusher Feederman
Crusher Oiler
Deckhand
Drill Assistant
Drill, Directional Locator
Forklift
Grade Checker
Guardrail Punch Oiler
Heavy Duty Repairman Assistant
Helicopter Radioman (ground)
D - 11
Project: OR FS DSHUT601 60(1), Road 60 Improvements, MP 0 - 1.0
Hydraulic Pipe Press
Hydrographic Seeder Machine, straw, pulp or seed
Hydrostatic Pump Operator
Material Handler
Mixer Box (CTB, dry batch, etc.)
Oiler
Parts Man (Tool Room)
Plant Oiler
Pump (any power)
Rail, Brakeman, Switchman, Motorman
Rail, Tamping Machine, mechanical, self-propelled
Rigger
Roller grading (not asphalt)
Truck, Crane Oiler-Driver under 100 tons
Truck, Off-Road Trucks, Articulated and Non-Articulated
Trucks forty (40) ton and under
Truck, over highway, examples: material and equipment
Welder’s Assistant
Welding Machine
Wire Mat or Brooming Machine
IRON0029-004 07/07/2025
IRONWORKER.......................$ 48.31 34.52
LABO0737-001 06/01/2024
Mason Tender/Hod Carrier
Tenders to Bricklayers, Tile Setters, Marble
Setters and Terrazzo
Workers, Topping for
Cement Finishers and
Mortar Mixers...............$ 43.79 17.05
LABO0737-008 06/01/2024
LABORERS (SEE FOOTNOTE C)
Laborers:
GROUP 1.....................$ 39.00 17.30
GROUP 2.....................$ 40.41 17.30
GROUP 3.....................$ 34.39 17.30
D - 12
Project: OR FS DSHUT601 60(1), Road 60 Improvements, MP 0 - 1.0
Zone Differential (Add to Zone 1 rates):
Zone 2 - $0.85
Zone 3 - 2.00
Zone 4 - 3.00
Zone 5 - 5.00
ZONE 1 - All jobs or projects located within 30 miles of the respective City Hall
ZONE 2 - More than 30 miles and less than 40 miles from the
ZONE 3 - More than 40 miles and less than 50 miles from the
ZONE 4 - More than 50 miles and less than 80 miles from the
ZONE 5 - More than 80 miles from the respective City Hall.
BASEPOINTS:
ALBANY ASTORIA BAKER CITY
BEND BURNS COOS BAY
EUGENE GRANTS PASS HERMISTON
KLAMATH FALLS MEDFORD PENDLETON
PORTLAND ROSEBURG SALEM
THE DALLES
LABORER CLASSIFICATIONS
GROUP 1: Applicator (including Pot Tender for same) applying protective material by hand or nozzle on utility lines or storage tanks on project, Asphalt Plant; Asphalt Spreader;
Batch Weighman; Broomers; Brush Burners and Cutters; Choker
Setter; Choker Splicer; Clary Power Spreader; Clean-up
Laborer; Clean up Nozzleman (concrete, rock, etc);
Concrete Laborer; Crusher Feeder; Curing, Concrete;
Demolition, wrecking, and moving; Dopping and Wrapping
Pipe; Dumpman (for Grading Crew); Erosion Control
Specialist; Fine Graders; Fence Builders; Form Strippers;
Guard Rail, Median Rail, Barriers, Reference Post, Guide
Post, Right of Way Marker; Remote Control (Dry Pack
Machine, Jackhammer, Chipping Guns, Compaction, Paving
Breakers, Hand Held Concrete Saw, Demo Saw, Core Drill);
Precast Concrete Setter; Pressure Washer; Railroad Track
Laborer; Ribbon Setter; Rip Rap Map; Sand Blasting (Wet);
Scaffold Tender; Self Propelled Concrete Buggy; Sewer
Laborer; Sign Erector; Signalman; Scissor and Manlift;
Skipman; Slopers; Sprayman; Stake Chaser; Stake Setter;
Tamper; Timber Faller and Bucker; Tool Operators (Hand
Held, Walk Behind)
D - 13
Project: OR FS DSHUT601 60(1), Road 60 Improvements, MP 0 - 1.0
GROUP 2: Asbestos Removal; Asphalt Rakers, Bit Grinder, Concrete Core Drill, Concrete Pump Nozzleman, Concrete Saw
Operator (Walk Behind, Walk Saw, Rail Mounted, Wire); Drill
Operator; Grade Checker; Gunite Nozzleman; Hazardous Waste
Laborer; High Scalers; Laser Bean (Pipe Laying); Loop
Installation; Manhole Builder; Mold Remediation Laborer;
Nippers and Timberman; Pipelayer; Powderman; Power Saw
Operators (Bucking and Falling); Pumpcrete Nozzleman; Sand
Blasting (Dry); Sewer Timberman; Tugger Operator;
Vibrators; Water Blaster
GROUP 3: Final Clean-up(detailed clean-up, limited to cleaning up floors, ceilings, walls, windows-prior to acceptance by the owner); Fire Watch; Landscaper; Traffic
Flagger
FOOTNOTE C:
HANDLING OF HAZARDOUS WAST MATERIALS - Personnel in all craft classifications subject to working inside a federally designated Hazardous Waste perimeter shall be eligible for compensation in accordance with the following group schedule relative to the level of Hazardous Waste as outline in the specific Hazardous Waste Project Site Safety
Plan:
H-1 Base Wage Rate when on a hazardous waste site when not outfitted with protective clothing.
H-2 Class ""C"" Suit - Basic hourly wage rate plus $1.00 per hour, fringes plus $0.15.
H-3 Class ""B"" Suit - Basic hourly wage rate plus $1.50 per
H-4 Class ""A"" Suit -Basic hourly wage rate plus $2.00 per
PAIN0010-005 07/01/2025
PAINTER
HIGHWAY & PARKING LOT
STRIPER.....................$ 41.19 17.09
PAIN0010-008 01/01/2025
D - 14
PAINTER..........................$ 40.25 16.67
PLAS0555-001 06/01/2025
Cement Masons: (ZONE 1)
CEMENT MASONS DOING BOTH
COMPOSITION/POWER
MACHINERY AND
SUSPENDED/HANGING SCAFFOLD..$ 48.05 20.31
CEMENT MASONS ON
SUSPENDED, SWINGING AND/OR
HANGING SCAFFOLD............$ 47.09 20.31
CEMENT MASONS...............$ 46.13 20.31
COMPOSITION WORKERS AND
POWER MACHINERY OPERATORS...$ 47.09 20.31
Zone Differential for Cement Mason - Add to Basic Hourly Rate
FOR THE FOLLOWING CITIES: (Reference City)
Bend, Portland, Pendleton, Medford, Corvallis, Salem, Eugene, The Dalles, Vancouver
When a contractor takes current employees to a project that is located more than 59 miles from the City Hall of the
Reference City that is closest to the contractor's place of business, Zone Pay is to be paid for the distance between the City Hall of the identified Reference City and the project site, per the following:
Zone A - 60-79 miles - additional $3.00 hourly premium above the base rate of all classification as listed in Schedule ""A"".
Zone B - 80-99 miles - additional $5.00 hourly premium above the base rate of all classifications as listed in Schedule
""A""
Zone C -100 or more miles - additional $10.00 hourly premium above the base rate of all classifications as listed in
Schedule ""A""
TEAM0037-004 06/01/2025
TRUCK DRIVERS (See Footnote C):
D - 15
Truck drivers:
GROUP 1.....................$ 35.41 18.30
GROUP 2.....................$ 35.57 18.30
GROUP 3.....................$ 35.74 18.30
GROUP 4.....................$ 36.08 18.30
GROUP 5.....................$ 36.35 18.30
GROUP 6.....................$ 36.57 18.30
GROUP 7.....................$ 36.82 18.30
Zone Differential (add to Zone 1 rates):
Zone 2 - $0.65
Zone 3 - 1.15
Zone 4 - 1.70
Zone 5 - 2.75
Zone 1 - All jobs or projects located within 30 miles of the
Zone 2 - More than 30 miles and less than 40 miles from the
Zone 3 - More than 40 miles and less than 50 miles from the
Zone 4 - More than 50 miles and less than 80 miles from the
Zone 5 - More than 80 miles from the respective City Hall
BASEPOINTS:
ALBANY ASTORIA BAKER
BEND BINGEN BROOKINGS
BURNS COOS BAY CORVALLIS
EUGENE GOLDENDALE GRANTS PASS
HERMISTON HOOD RIVER KLAMATH FALLS
LAGRANDE LAKEVIEW LONGVIEW
MADRAS MEDFORD MCMINNVILLE
OREGON CITY NEWPORT ONTARIO
PENDLETON PORTLAND PORT ORFORD
REEDSPORT ROSEBURG SALEM
THE DALLES TILLAMOOK VANCOUVER
TRUCK DRIVER CLASSIFICATIONS
GROUP 1: A-frame or hydra-lift truck w/load bearing surface;
Articulated dump truck; Battery rebuilders; Bus or manhaul driver; Concrete buggies (power operated); Concrete pump truck; Dump trucks, side, end and bottom dumps, including semi-trucks and trains or combinations thereof: up to and
D - 16
Project: OR FS DSHUT601 60(1), Road 60 Improvements, MP 0 - 1.0 including 10 cu. yds.; Lift jitneys, fork lifts (all sizes in loading, unloading and transporting material on job site); Loader and/or leverman on concrete dry batch plant
(manually operated); Lubrication man, fuel truck driver, tireman, wash rack, steam cleaner or combination; Pilot car; Pickup truck; Slurry truck driver or leverman; Solo flat bed and misc. body truck, 0-10 tons; Team drivers;
Tireman; Transit mix and wet or dry mix trucks: 5 cu yds.
and under; Water wagons (rated capacity) up to 3,000 gallons
GROUP 2: Boom truck/hydra-lift or retracting crane;
Challenger; Dumpsters or similar equipment-all sizes; Dump trucks/articulated dumps 6 cu to 10 cu.; Flaherty spreader driver or leverman; Low bed equipment, flat bed semi-truck and trailer or doubles transporting equipment or wet or dry materials; Lumber carrier, driver-straddle carrier (used in loading, unloading and transporting of materials on job site); Oil distributor driver or leverman; Transit mix and wet or dry mix trucks: over 5 cy yds and including 7 cu.
yds; Vacuum trucks; Water Wagons (rated capacity) over
3,000 to 5,000 gallons
GROUP 3: Ammonia nitrate distributor driver; Dump trucks, side, end and bottom dumps, including semi-trucks and trains or combinations thereof: over 10 cu. yds. and including 30 cu. yds., includes articulated dump trucks;
Self-Propelled street sweeper; Transit mix and wet or dry mix trucks, over 7 cu. yds. and including 11 cu. yds.;
truck mechanic-Welder-Body repairman; Utility and clean-up truck; Water wagons (rated capacity) 5,000 to 10,000 gallons.
GROUP 4: Asphalt Bruner; Dump trucks, side, end and bottom dumps, including semi-trucks and trains or combinations thereof: over 30 cu. yds. and including 50 cu. yds.
includes articulated dump trucks; Fire guard; Transit Mix and Wet or Dry Mix Trucks, over 11 cu. yds. and including
15 cu. yds.; Water Wagon (rated capacity) over 10,000 gallons to 15,000 gallons
GROUP 5: Composite Crewman; Dump trucks, side, end and bottom dumps, including semi-trucks and trains or combinations thereof: over 50 cu. yds. and including 60 cu. yds., includes articulated dump trucks
GROUP 6: Bulk cement spreader w/o auger; Dry Pre-Batch concrete mix trucks; Dump trucks, side, end and bottom dumps, including semi-trucks and trains of combinations thereof: over 60 cu. yds. and including 80 cu. yds. and includes articulated dump trucks; Skid truck
GROUP 7: Dump trucks, side, end and bottom dumps, including
D - 17
Project: OR FS DSHUT601 60(1), Road 60 Improvements, MP 0 - 1.0 semi-trucks and trains or combinations thereof: over 80
cu. yds. and including 100 cu. yds. includes articulated dump trucks; Industrial lift truck (mechanical tailgate)
FOOTNOTE C:
HANDLING OF HAZARDOUS WAST MATERIALS -(LABORERS, POWER
EQUIPMENT OPERATORS, AND TRUCK DRIVERS): Personnel in all craft classifications subject to working inside a federally designated Hazardous Waste perimeter shall be eligible for compensation in accordance with the following group schedule relative to the level of Hazardous Waste as outline in the specific Hazardous Waste Project Site Safety
Plan:
H-1 Base Wage Rate when on a hazardous waste site when not outfitted with protective clothing.
H-2 Class ""C"" Suit - Basic hourly wage rate plus $1.00 per
H-3 Class ""B"" Suit - Basic hourly wage rate plus $1.50 per
H-4 Class ""A"" Suit -Basic hourly wage rate plus $2.00 per
SUOR1991-003 04/01/1991
Timber Sales Roads:
LABORERS....................$ 8.35 4.30
OPERATING ENGINEERS.........$ 10.37 4.15
POWER SAW, DRILLER,
POWDERMAN...................$ 9.12 4.30
TEAMSTERS...................$ 9.74 3.74
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal
Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including
D - 18
Project: OR FS DSHUT601 60(1), Road 60 Improvements, MP 0 - 1.0 preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject to the Davis-
Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022.
Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon
Related Acts regardless of when they were awarded. If a contract is subject to
Executive Order 13658, the contractor must pay all covered workers at least
$13.30 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in 2025. The applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than ""SU"", ""UAVG"", ‘SA’, or ‘SC’ denotes that a union rate was prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local
0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.
Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.
Union Average Rate Identifiers https://www.dol.gov/agencies/whd/government-contracts http://www.dol.gov/whd/govcontracts
D - 19
Project: OR FS DSHUT601 60(1), Road 60 Improvements, MP 0 - 1.0
The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE: UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio. The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The ""SU"" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example:
SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.
‘SU’ wage rates typically remain in effect until a new survey is conducted.
However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The ""SA"" identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-
(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the ‘SA’ identifier took effect under state law in the state from which the rates were adopted.
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on a wage determination matter
D - 20
d) an initial conformance (additional classification and rate) determination
On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of
Construction Wage Determinations. Requests can be submitted via email to BCWD-
Office@dol.gov or by mail to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29
CFR Part 7). Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals
Board). Write to:
Administrative Review Board
U.S. Department of Labor
Washington, DC 20210.
END OF GENERAL DECISION
mailto:davisbaconinfo@dol.gov mailto:BCWD-Office@dol.gov mailto:BCWD-Office@dol.gov mailto:dba.reconsideration@dol.gov
E-1
Special Contract Requirements
Project: OR FS DSHUT601 60(1), Road 60 Improvements, MP 0 - 1.0
Revised by Amendment A001
DIVISION 100
GENERAL REQUIREMENTS
Section 101. — TERMS, FORMAT, AND DEFINITIONS
11/08/21– FP-14
101.03 Abbreviations. Add the following to paragraph (a):
AMS-STD — Aerospace Material Specification Standard
CDR – Contractor’s Daily Record
OHWM or OHW — Ordinary High-Water Mark
SAE — Society of Automotive Engineers
101.04 Definitions. Add the following:
Holidays — Holidays occur on the following days:
• 1st day of January — New Years’ Day;
• 3rd Monday of January — Martin Luther King, Jr. Day;
• 3rd Monday of February — Presidents' Day;
• Last Monday of May — Memorial Day;
• 19th day of June — Juneteenth National Independence Day;
• 4th day of July — Independence Day;
• 1st Monday of September — Labor Day;
• 2nd Monday of October — Columbus Day;
• 11th day of November — Veterans’ Day;
• 4th Thursday of November — Thanksgiving Day;
• 25th day of December — Christmas Day;
• Other days declared holidays by the Congress or the President; and
• If a holiday occurs on a Saturday, the preceding Friday is also a legal holiday. If a holiday occurs on a Sunday, the Monday following is also a legal holiday.
In-Water Work — Work below the ordinary high-water mark (OHW M or OHW).
E-1a
Project: OR FS DSHUT601 60(1), Road 60 Improvements, MP 0 - 1.0
Revised by Amendment A001
Masterworks — A web-based system used by the Government, Contractors, and Subcontractors on this Government contract to prepare CDRs, measurement notes (pay notes and field measurement documentation), and transmit submittals, and documents and drawings.
Pneumatic Roller — Self-propelled compaction device with smooth pneumatic tires staggered in position to provide overlap between the front and rear tires.
E-4 DIVISION 100
Project: OR FS DSHUT601 60(1), Road 60 Improvements, MP 0 - 1.0
Revised by Amendment A001
103.06 Electronic Documentation. (Added Subsection).
After award of the contract, provide all written documents in pdf format, or an approved fixed-layout electronic format.
In addition to electronic documents, provide paper copies of the following documents and as requested by the CO:
(a) Documents required under Section 102;
(b) Drawings required under Subsection 104.03;
(c) Weight records required under Subsection 109.03;
(d) Receiving records required under Subsection 109.04;
(e) Final voucher and release of claims required under Subsection 109.09;
(f) WFLHD 470 forms required under Section 153; and
(g) Construction schedules required under Section 155.
Provide documents in their native file format (the format produced by the software that the document was created in) upon request.
Provide a resolution quality where color, text, and lines are clearly discernible. Submit each document in an individual file. Name files with a unique document name that includes the document date, document description, and project number, in the following format or as requested by the CO:
MMDDYYYY_item description_project number; where: MMDDYYYY = month, day, and year.
Deliver electronic documents to the email address identified at the preconstruction conference or otherwise amended in writing by the CO. Limit the size of emailed documents to 20MB. If a document cannot be split or reduced below 20MB, then the CO will provide guidance on how to deliver the documents electronically, or a paper copy may be required. Documents delivered on removable media (compact disc, USB memory stick, etc.) will not be accepted. Documents delivered after 5:00 p.m. local time will be considered received at 7:00 a.m. on the following business day.
The CO will reject without review any documents that are unreadable or corrupted, illegible, or include malicious content.
Provide one paper copy of each document upon request, unless more paper copies are specified.
E-4a
Project: OR FS DSHUT601 60(1), Road 60 Improvements, MP 0 - 1.0
Revised by Amendment A001
Provide all documents and drawings using Masterworks.
In addition to electronic documents, provide paper copies of the following documents and as requested by the CO:
(a) ESCP/SWPPP of Record required under Subsection 107.01A; and
(b) Final voucher and release of claims required under Subsection 109.09.
Obtain Masterworks user accounts by completing and signing Form Masterworks 001, Masterworks Access for A/E Staff and Construction Contractors. An electronic version of the form is available at:
https://highways.dot.gov/federal-lands/estimates/forms
Complete and electronically submit Form Masterworks-001 for each individual requiring
Masterworks access. Allow at least 7 days for system access.
Contact the CO to schedule a training session on the use of Masterworks. The virtual training session will be either a video presentation or live training as determined by the CO. The Contractor is responsible for training additional staff that were not present during the original training session.
Maintain active Masterworks accounts for all Contractor staff who use Masterworks. Notify the
CO within 24 hours after an account holder is reassigned or no longer employed by the Contractor and submit a Form Masterworks-001 requesting their account be disabled.
Provide documents and drawings in their native file format (the format produced by the software that the document and drawing was created in) upon request.
Documents and drawings include but are not limited to correspondence, submittals, measurement notes, reports, plans, diagrams, qualifications, certifications, payrolls, schedules, invoices, mix designs, job-mix formulas, test results, notifications, requests, permits, and agreements.
Provide a resolution quality with color, text, and lines clearly discernible. Submit each document and drawing in an individual file. Name files with a unique document name.
Documents and drawings delivered after 5:00 pm local time will be considered received on the next business day.
The CO will reject documents that are unreadable, corrupted, illegible, or include malicious content.
https://highways.dot.gov/federal-lands/estimates/forms
E-16 DIVISION 100
Project: OR FS DSHUT601 60(1), Road 60 Improvements, MP 0 - 1.0
Revised by Amendment A001
Section 109. — MEASUREMENT AND PAYMENT
10/06/25– FP-14
109.01 Measurement of Work. Amend as follows:
Delete the third paragraph and substitute the following:
Take measurements as described in Subsection 109.02 unless otherwise modified by the
Measurement Subsection of the Section controlling the work being performed. For individual pay items, the decimal precision for measurement of quantities will be determined by the CO.
Delete Table 109-1.
Delete the fifth paragraph.
Add the following:
Prepare, sign, and submit electronic measurement notes (pay notes and supporting field documentation) using Masterworks. Assign measurement note quantities to the correct funding source and account description for the work performed as designated in the plans. Unacceptable measurement notes will be rejected and returned. Correct rejected measurement notes and resubmit them using Masterworks.
Delete the text of this Subsection and substitute the following:
Take and record measurements and perform calculations to…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .