This is a Questions and Answers document for a federal highway construction project. Project No. OR FS DSHUT601 60(1) concerns Road 60 Improvements spanning mile post 0 to 1.0. The document addresses inquiries submitted by potential bidders regarding project requirements and solicitation procedures, with responses dated December 12, 2025, and January 30, 2026.
Questions 1-4 address technical specifications concerning surveyor responsibilities, erosion control substitutions, turf seed requirements, and traffic control methods. All four responses direct bidders to await the formal Invitation for Bids, which will include Special Contract Requirements (SCRs), plans, and physical data upon project advertisement. Question 5 confirms the anticipated advertisement timeline as early 2026. Question 6 instructs interested vendors to register for notifications through SAM.gov by clicking "Follow" and adding their company to the Interested Vendors List. Question 7, dated January 30, 2026, provides technical clarification on full depth reclamation methodology, specifying that the 2-inch crushed aggregate layer must be placed and spread upon the existing roadway prior to pulverization to be incorporated into the pulverized asphalt and subbase material, creating a homogenous 6-inch stabilized base section. The document notes that payment for crushed aggregate is incidental to Pay Item Number 30402-5300 per Section 304 of the SCRs and the FP-14 Manual standards.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project No. OR FS DSHUT601 60(1)
Project Road 60 Improvements, MP 0 to 1.0
# General Technical Question Answer Date
1 X
Please advise what the requirements will be for the surveyor as to responsibilities?
Will the surveyor be required to provide as builts and topo for this project?
Please wait for the solicitation documents
(Invitation for Bids that includes the Special
Contract Requirements [SCRs], plans, and physical data) that will be posted when this project goes on advertisement.
12/12/25
2 X Please advise what substitutions will be allowed for erosion control.
Please wait for the solicitation documents
(Invitation for Bids that includes the Special
Contract Requirements [SCRs], plans, and physical data) that will be posted when this project goes on advertisement.
12/12/25
3 X Please advise if seed from McPheeters Turf will suffice for “Turf Establishment”.
Please wait for the solicitation documents
(Invitation for Bids that includes the Special
Contract Requirements [SCRs], plans, and physical data) that will be posted when this project goes on advertisement.
12/12/25
4 X Please advise if Mobile/Portable traffic signals will suffice for traffic control?
Please wait for the solicitation documents
(Invitation for Bids that includes the Special
Contract Requirements [SCRs], plans, and physical data) that will be posted when this project goes on advertisement.
12/12/25
5 X Please advise if there is by chance a date that we should start looking for the solicitation.
We are anticipating advertisement in early
2026.
12/12/25
6 X How do we receive this and future solicitations?
To get notifications about this project, in
SAM.gov, you can click on “Follow” and/or add your company to the Interested
Vendors List.
12/12/25
Check General or Technical
7 X
Clarification question regarding the full depth of reclamation. On sheet C.1, the typical section shows the full depth reclamation including the
2" crushed aggregate. Does the 2" aggregate get placed prior to the pulverization so that its mixed in or is it meant to be placed after the
Pulverization?
The 2-inch Crushed Aggregate layer should be placed and spread upon the existing roadway prior to pulverization. The intent is for the new aggregate to be incorporated into the pulverized asphalt and subbase material during the reclamation process to create a homogenous, stabilized base section of the specified 6-inch depth. Please note that payment for the crushed aggregate is incidental to Pay Item Number
"30402-5300 - FULL DEPTH RECLAMATION,
METHOD 2, 6-INCH DEPTH," per Section
304 of the Special Contract Requirements
(SCRs) and the Standard Specifications for
Construction of Roads and Bridges on
Federal Highway Projects FP-14 Manual.
1/30/26