This document is a tabulation of bids report for the MT BIGHORN 46(1) WARMAN LOOP ROAD project. The project involves full depth reclamation over 47,500 square yards, 3,500 square yards of placed riprap, 185 cubic yards of roadway aggregate, and asphalt concrete pavement. The solicitation was issued by the Department of Transportation Federal Highway Administration as solicitation number 69056724B000008. The bids were opened on February 6, 2024 in Vancouver, WA. Riverside Contracting, Inc. provided the lowest bid at $2,622,675 while the engineer's estimate was $4,104,789.50. FM Construction LLC bid $4,204,224.72. The anticipated award date is not provided. The document lists the line items, quantities, units, unit prices, and amounts for each bidder and the engineer's estimate.

View the file

Other files for this federal contract opportunity

Other files attached to MT BIGHORN 46(1) WARMAN LOOP ROAD, newest first.
File Type Posted
BidSum_MT BIGHORN 46(1).pdf PDF
QA_02-05-2024.pdf PDF
QA_01-31-2024.pdf PDF
QA_01-29-2024.pdf PDF
Amendment A001.pdf PDF
QA_01-24-2024.pdf PDF
QA_01-23-2024.pdf PDF
MDT Structure Inspection Report v1.2_02247_01-31-2022_RFS.pdf PDF
mt-a0300461_control-points.xlsx XLSX spreadsheet
mt-a0300461_Geotechnical Pavement Recon Report.pdf PDF
mt-a0300461_plans.pdf PDF
mt-a0300461_WarmanLoopRoad_HydraulicsReport.pdf PDF
mt-a0300461_WarmanLoopRoad_RevisedFinalGeotechnicalReport.pdf PDF
Physical Data MT BIGHORN 46(1).zip ZIP file
FLH Bridge oversized or overload vehicle permit request form Oct 2018.pdf PDF
mt-a0300461_proposedalignment.pdf PDF
IFB 69056724B000008.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tabulation of Bids Report Date: 02/07/24

1 out of 7 Project No: MT BIGHORN 46(1)

Project Name: Warman Loop Road

Solcitation No: 69056724B000008

Division: Western Federal Lands

State: MT County: BIGHORN

Schedule: A

Schedule Type: Base

Federal Land: Opened at: Vancouver, WA

Opened by: Marino Chea

Date: 02/06/24

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed:

Title:

Date:

Contract Awarded to:

Contractor

RIVERSIDE CONTRACTING, INC.

5571 Alloy South Missoula, MT 59808

FM Construction LLC 157 High Eagle Ave Crow Agency, MT 59022

Engineer's Estimate

Award Date:

Comment Bid Amount

$4,104,789.50

$4,204,224.72

$2,622,675.00

Responsive

Project No: MT BIGHORN 46(1)

Project Name: Wannan Loop Road

Line Item

Number

A0020

A0040

A0060

A0080

A0l00

Pay Item No.

15101-0000

15201-0000

15301-0010

15401-0000

15501-0000

Description Quantity

MOBILIZATION

RIVERSIDE CONTRACTING, INC.

FM Construction LLC Engineer's Estimate ALL

CONSTRUCTION SURVEY AND STAKING

RIVERSIDE CONTRACTING, INC.

FM Construction LLC Engineer's Estimate ALL

CONTRACTOR QUALITY CONTROL AND ASSURANCE

RIVERSIDE CONTRACTING, INC.

FM Construction LLC Engineer's Estimate ALL

CONTRACTOR TESTING

RIVERSIDE CONTRACTING, INC.

FM Construction LLC Engineer's Estimate ALL

CONSTRUCTION SCHEDULE

RIVERSIDE CONTRACTING, INC.

FM Construction LLC Engineer's Estimate ALL

Report Date: 02/07/24 2 out of?

Schedule: A

Schedule Type: Base

Unit Unit Price

Lump Sum Lump Sum

LPSM Lump Sum

Lump Sum Lump Sum

LPSM Lump Sum

Lump Sum Lump Sum

LPSM Lump Sum

Lump Sum Lump Sum

LPSM Lump Sum

Lump Sum Lump Sum

LPSM Lump Sum

Amount

$1,040,000.00 $458,303.00 $250,000.00

$145,000.00 $77,140.91 $80,000.00

$110,000.00 $197,881.92

$70,000.00

$70,000.00 $87,501.03 $70,000.00

$15,000.00 $11,220.11 $5,000.00

A0120 15702-6000 SOIL EROSION CONTROL, TEMPORARY STREAM DIVERSION (WAR MAN CREEK)

RIVERSIDE CONTRACTING, INC. Lump Sum $55,000.00 FM Construction LLC Lump Sum $34,394.80 Engineer's Estimate ALL LPSM Lump Sum $5,000.00

A0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

RIVERSIDE CONTRACTING, INC. $5.25 $32,812.50

FM Construction LLC $6.13 $38,312.50 Engineer's Estimate 6,250 LNFT $7.00 $43,750.00

Project Name: Wannan Loop Road

Line Item

Number

A0160

A0180

A0200

A0220

A0240

A0260

A0280

Pay Item No.

15802-0000

20301-2400

20405-3000

25101-0400

30202-2000

30205-0500

30402-5600

Description Quantity

WATERING FOR DUST CONTROL

RIVERSIDE CONTRACTING, INC.

FM Construction LLC Engineer's Estimate ALL

REMOVAL OF SIGN

RIVERSIDE CONTRACTING, INC.

FM Construction LLC Engineer's Estimate 21

SUBEXCAVATION, 18-INCHDEPTH

RIVERSIDE CONTRACTING, INC.

FM Construction LLC Engineer's Estimate 3,500

PLACED RIPRAP, METHOD A, CLASS 4

RIVERSIDE CONTRACTING, INC.

FM Construction LLC Engineer's Estimate 185

ROADWAY AGGREGATE, METHOD 2

RIVERSIDE CONTRACTING, INC.

FM Construction LLC Engineer's Estimate 175

ROADWAY AGGREGATE, SHOULDER FINISHING

RIVERSIDE CONTRACTING, INC.

FM Construction LLC Engineer's Estimate 3.990

FULL DEPTH RECLAMATION, METHOD 2, 9-INCH DEPTH

RIVERSIDE CONTRACTING, INC.

FM Construction LLC Engineer's Estimate 47,500

Report Date: 02/07/24 3 out of?

Schedule: A

Schedule Type: Base

Unit Unit Price Amount

Lump Sum $15,000.00 Lump Sum $56,581.77

LPSM Lump Sum $10,000.00

$250.00 $5,250.00 $322.74 $6,777.54

EACH $250.00 $5,250.00

$130.00 $455,000.00 $83.71 $292,985.00

SQYD $50.00 $175,000.00

$285.00 $52,725.00 $215.35 $39,839.75

CUYD $200.00 $37,000.00

$125.00 $21,875.00 $69.79 $12,213.25

TON $60.00 $10,500.00

$45,000.00 $179,550.00 $4,214.89 $16,817.41

MILE $12,000.00 $47,880.00

$2.50 $118,750.00 $1.69 $80,275.00

SQYD $4.00 $190,000.00

Project Name: Wannan Loop Road

Line Item

Number Pay Item No. Description

Tabulation of Bids

Quantity

Schedule: A

Schedule Type: Base

Unit Unit Price

Report Date: 02/07/24 4 out of?

Amount

A0300 40101-5500 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE

AGGREGATE, <0.3 MILLION ESAL (TYPE III ROUGHNESS)

RIVERSIDE CONTRACTING, INC. $155.00 $1,201,250.00

FM Construction LLC $262.41 $2,033,677.50 Engineer's Estimate 7,750 TON $160.00 $1,240,000.00

A0340 40105-3000 ANTISTRIP ADDITIVE, TYPE 3

RIVERSIDE CONTRACTING, INC. $245.00 $19,110.00

FM Construction LLC $466.67 $36,400.26 Engineer's Estimate 78 TON $350.00 $27,300.00

A0380 41102-1000 PRIME COAT, METHOD 1

RIVERSIDE CONTRACTING, INC. $0.55 $26,125.00

FM Construction LLC $1.17 $55,575.00 Engineer's Estimate 47,500 SQYD $1.50 $71,250.00

A0400 57501-0000 MINOR BRIDGE WORK

RIVERSIDE CONTRACTING, INC. Lump Sum $20,000.00 FM Construction LLC Lump Sum $11,990.20 Engineer's Estimate ALL LPSM Lump Sum $5,000.00

A0420 60201-0400 12-INCH PIPE CUL VERT

RIVERSIDE CONTRACTING, INC. $225.00 $7,650.00

FM Construction LLC $214.04 $7,277.36 Engineer's Estimate 34 LNFT $70.00 $2,380.00

A0440 60201-0800 24-INCH PIPE CULVERT

RIVERSIDE CONTRACTING, INC. $255.00 $21,420.00

FM Construction LLC $222.88 $18,721.92 Engineer's Estimate 84 LNFT $150.00 $12,600.00

A0460 60220-2400 9 FEET SPAN, 5 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT

RIVERSIDE CONTRACTING, INC. $4,250.00 $225,250.00

FM Construction LLC $7,512.79 $398,177.87 Engineer's Estimate 53 LNFT $1,600.00 $84,800.00

Project Name: Wannan Loop Road

Line Item

Number

A0480

A0500

Pay Item No.

60704-0000

62201-0300

Description Quantity

CLEANING CUL VERT IN PLACE

RIVERSIDE CONTRACTING, INC.

FM Construction LLC Engineer's Estimate 7

DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY

RIVERSIDE CONTRACTING, INC.

FM Construction LLC Engineer's Estimate 10

Schedule: A

Schedule Type: Base

Report Date: 02/07/24 5 out of?

Unit Unit Price Amount

$7,000.00 $49,000.00 $4,594.98 $32,164.86

EACH $2,000.00 $14,000.00

$180.00 $1,800.00 $199.30 $1,993.00

HOUR $150.00 $1,500.00

A0520 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH

RIVERSIDE CONTRACTING, INC. $220.00 $2,200.00

FM Construction LLC $270.06 $2,700.60 Engineer's Estimate 10 HOUR $150.00 $1,500.00

A0540 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE

RIVERSIDE CONTRACTING, INC. $270.00 $2,700.00

FM Construction LLC $234.65 $2,346.50 Engineer's Estimate 10 HOUR $200.00 $2,000.00

A0560 62301-0000 GENERAL LABOR

RIVERSIDE CONTRACTING, INC. $70.00 $1,400.00

FM Construction LLC $85.89 $1,717.80 Engineer's Estimate 20 HOUR $90.00 $1,800.00

A0580 62405-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH

RIVERSIDE CONTRACTING, INC. $55.00 $11,550.00

FM Construction LLC $7.00 $1,470.00 Engineer's Estimate 210 SQYD $5.00 $1,050.00

A0600 62502-0000 TURF ESTABLISHMENT (DRY METHOD)

RIVERSIDE CONTRACTING, INC. $20.00 $4,200.00

FM Construction LLC $13.89 $2,916.90 Engineer's Estimate 210 SQYD $5.00 $1,050.00

Project Name: Wannan Loop Road

Line Item

Number

A0620

A0640

A0660

A0680

A0700

A0720

Pay Item No.

63302-0000

63309-0000

63401-0700

63401-0700

63401-0800

63502-0600

Description Quantity

SIGN SYSTEM

RIVERSIDE CONTRACTING, INC.

FM Construction LLC Engineer's Estimate 112

DELINEATOR (DESIGN F)

RIVERSIDE CONTRACTING, INC.

FM Construction LLC Engineer's Estimate 30

PAVEMENT MARKINGS, TYPED, SOLID (YELLOW)

RIVERSIDE CONTRACTING, INC.

FM Construction LLC Engineer's Estimate 2,350

PAVEMENT MARKINGS, TYPED, SOLID (WHITE)

RIVERSIDE CONTRACTING, INC.

FM Construction LLC Engineer's Estimate 50

PAVEMENT MARKINGS, TYPED, BROKEN (YELLOW)

RIVERSIDE CONTRACTING, INC.

FM Construction LLC Engineer's Estimate 20,800

TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

RIVERSIDE CONTRACTING, INC.

FM Construction LLC Engineer's Estimate 2

Schedule: A

Schedule Type: Base

Report Date: 02/07/24 6 out of?

Unit Unit Price Amount

$145.00 $16,240.00 $168.59 $18,882.08

SQFT $175.00 $19,600.00

$86.00 $2,580.00 $99.17 $2,975.10

EACH $50.00 $1,500.00

$1.05 $2,467.50 $1.17 $2,749.50

LNFT $0.75 $1,762.50

$1.05 $52.50 $1.17 $58.50

LNFT $0.75 $37.50

$0.25 $5,200.00 $0.29 $6,032.00

LNFT $0.25 $5,200.00

$430.00 $860.00 $495.84 $991.68

EACH $325.00 $650.00

A0740 63502-1250 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER, TYPE 42-INCH

RIVERSIDE CONTRACTING, INC. $34.00 $3,400.00

FM Construction LLC $57.84 $5,784.00 Engineer's Estimate 100 EACH $40.00 $4,000.00

Project Name: Warman Loop Road

Line Item

Number

A0760

A0780

A0800

Pay Item No.

63504-1000

63506-0500

63506-0600

Description Quantity

TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

RIVERSIDE CONTRACTING, INC.

FM Construction LLC Engineer's Estimate 247

TEMPORARY TRAFFIC CONTROL, FLAGGER

RIVERSIDE CONTRACTING, INC.

FM Construction LLC Engineer's Estimate 1,360

TEMPORARY TRAFFIC CONTROL, PILOT CAR

RIVERSIDE CONTRACTING, INC.

FM Construction LLC Engineer's Estimate 200

Total Schedule - All Items

RIVERSIDE CONTRACTING, INC.

FM Construction LLC Engineer's Estimate

Schedule: A

Schedule Type: Base

Report Date: 02/07/24 7 out of 7

Unit Unit Price Amount

$76.00 $18,772.00 $87.50 $21,612.50

SQFT $45.00 $11,115.00

$90.00 $122,400.00 $77.36 $105,209.60

HOUR $70.00 $95,200.00

$116.00 $23,200.00 $112.78 $22,556.00

HOUR $90.00 $18,000.00

$4,104,789.50 $4,204,224.72 $2,622,675.00

2024-02-07T07:03:01-0800
MARINO CHEA