About this file

This document contains questions and answers related to a federal solicitation for a road construction project on MT BIGHORN 46(1) Warman Loop Road. The project involves removing existing asphalt pavement and potentially repairing any damage to the bridge deck, with the work to be completed according to Montana Department of Transportation specifications. Bids must be submitted according to the solicitation documents by the specified response dates. No as-built information, current weight limits, or damage details for the bridge are provided, but bidders are directed to referenced structure inspection reports. Submitted questions relate to scheduling, material requirements, the need for paving equipment, potential change orders, and electronic bidding procedures. The government will not evaluate alternate materials or specifications before awarding the contract.

View the file

Other files for this federal contract opportunity

Other files attached to MT BIGHORN 46(1) WARMAN LOOP ROAD, newest first.
File Type Posted
Tabulation of Bids_MT BIGHORN 46(1)pdf.pdf PDF
BidSum_MT BIGHORN 46(1).pdf PDF
QA_01-31-2024.pdf PDF
QA_01-29-2024.pdf PDF
QA_01-24-2024.pdf PDF
Amendment A001.pdf PDF
QA_01-23-2024.pdf PDF
mt-a0300461_WarmanLoopRoad_RevisedFinalGeotechnicalReport.pdf PDF
Physical Data MT BIGHORN 46(1).zip ZIP file
FLH Bridge oversized or overload vehicle permit request form Oct 2018.pdf PDF
mt-a0300461_proposedalignment.pdf PDF
IFB 69056724B000008.pdf PDF
MDT Structure Inspection Report v1.2_02247_01-31-2022_RFS.pdf PDF
mt-a0300461_control-points.xlsx XLSX spreadsheet
mt-a0300461_Geotechnical Pavement Recon Report.pdf PDF
mt-a0300461_plans.pdf PDF
mt-a0300461_WarmanLoopRoad_HydraulicsReport.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MT BIGHORN 46(1)

Warman Loop Road

# General Technical Question Answer Date

1 X

Paving contractors have informed us that they are booked through 2024. In addition, suppliers in Billings MT are not willing to supply/deliver asphalt to the project due to the specified temperature requirements. Will WFL please consider either revising the specifications to allow for the material to be hauled from Billings; or allow for pavement to be placed in 2025?

The Government does not intend to revise the solicitation requirements. Please submit bids according to the solicitation documents.

Revised

2/5/2024

1/23/2024

2 X Will an MTV be required to pave this project?

In accordance with FP‐14 Subsection

401.05(b), only when required to complete the prescribed work. Please submit bids according to the solicitation documents.

1/24/2024

3 X Is as‐built information available on the existing bridge?

No. 1/24/2024

4 X What is the current weight limit on the bridge?

See physical data file “MDT Structure

Inspection Report v1.2_02247_01‐31‐

2022_RFS.pdf” that is listed under FAR

Clause 52‐236‐4.

1/24/2024

5 X Is the current overlay on the bridge 2‐inches?

This will be addressed under Amendment

A001.

1/24/2024

6 X Is there damage to the bridge decking system?

See physical data file “MDT Structure

Inspection Report v1.2_02247_01‐31‐

2022_RFS.pdf” that is listed under FAR

Clause 52‐236‐4.

1/24/2024

7 X

If after the asphalt pavement is removed if there is damage to the deck will there be a change order issued for repairs?

This will be addressed under Amendment

A001.

1/24/2024

8 X Will bids be accepted electronically for this bid or only by mail?

See paragraph beneath BID REMINDERS on the Cover Page for the Invitation for Bids.

Also see last paragraph on Page A‐2 of the

Invitation for Bids.

1/29/2024

9 X

Would WFL accept a box culvert that meets the specifications of Montana Department of

Transportation?

The Government will not evaluate proposed alternate materials before contract award. Please submit bids according to the solicitation documents.

1/31/2024

Check General or Technical