This document appears to be a Question and Answer (Q&A) exchange related to an upcoming federal contract opportunity for the project "MT FLAP DOT 236(2), Winifred North". The key details are:
The solicitation has not yet been officially released, but the agency has posted preliminary documents on SAM.gov to help prospective bidders identify the location and type of work. Bidders are advised to monitor SAM.gov for the actual solicitation release date and submission deadline, and to submit any questions during the official advertisement period.
The questions cover topics such as the required size and specifications for cattle guards, color preferences, availability of project drawings, and clarification on a potential typo in the completion date. The agency provided responses indicating that specific details would be available in the forthcoming solicitation documents, and offered guidance on how to properly register and access the solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BidTab MT FLAP DOT 236(2).pdf | ||
| BidSum_MT FLAP DOT 236(2).pdf | ||
| QA_08-19-2024.pdf | ||
| QA_08-13-2024.pdf | ||
| Amendment A001.pdf | ||
| QA_07-29-2024.pdf | ||
| mta-dot236-2_WinifredNorth_Final Geotechnical Report-Signed.pdf | ||
| mta-dot236-2_WinifredNorth_plans.pdf | ||
| mta-dot236-2_WinifredNorth_Hydraulics_Memo_Final.pdf | ||
| mta-dot236-2_WinifredNorth_control-points.xlsx | XLSX spreadsheet | |
| mta-dot236-2_WinifredNorth_Grizzly_Bear_Sightings_Log.docx | DOCX document | |
| IFB 69056724B000007.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MT FLAP DOT 236(2)
Winifred North
# General Technical Question Answer Date
1 X Is it OK to provide you with 4–12‐foot Cattle
Guards? (You are requesting 2‐24 foot)
The preliminary documents posted on sam.gov have been posted to aid prospective bidders in identifying the location and type of work for this project.
Please monitor the SAM site for the actual date of solicitation release
(https://sam.gov/), and the duration of the advertisement period; and submit your questions during the advertisement period for the project. To receive automatic notification through SAM, you must login and select “Follow” feature and follow the steps as indicated.
7/25/2024
2 X What are the load specs for the Cattle Guards needed? ie U‐54?, U‐80?, etc
The preliminary documents posted on sam.gov have been posted to aid prospective bidders in identifying the location and type of work for this project.
Please monitor the SAM site for the actual date of solicitation release
(https://sam.gov/), and the duration of the advertisement period; and submit your questions during the advertisement period for the project. To receive automatic notification through SAM, you must login and select “Follow” feature and follow the steps as indicated.
7/25/2024
3 X Wanted to verify the color you wanted (green or yellow?)
The preliminary documents posted on sam.gov have been posted to aid prospective bidders in identifying the location and type of work for this project.
Please monitor the SAM site for the actual date of solicitation release
(https://sam.gov/), and the duration of the advertisement period; and submit your questions during the advertisement period for the project. To receive automatic notification through SAM, you must login and select “Follow” feature and follow the steps as indicated.
7/25/2024
Check General or Technical
4 X Can you provide Drawings for the project?
The preliminary documents posted on sam.gov have been posted to aid prospective bidders in identifying the location and type of work for this project.
Please monitor the SAM site for the actual date of solicitation release
(https://sam.gov/), and the duration of the advertisement period; and submit your questions during the advertisement period for the project. To receive automatic notification through SAM, you must login and select “Follow” feature and follow the steps as indicated.
7/25/2024
5 X
It appears there is a typo in Section 52.211‐10
“The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 10/31/2025 subject to such extensions as may be authorized. The time stated for completion shall include final cleanup of the premises. The completion date is based on the assumption that the successful offeror will receive the notice to proceed by 10/28/2025. “
Is the NTP meant to be 10/28/2024?
Yes. This will be addressed under
Amendment A001.
7/29/2024
6 X
My company recently became a registered entity and I am currently set to “Pending” on approval for a data entry role, and we cannot see interested bidders. Would you be able to provide any guidance or help point us in the right direction on how to obtain access to interested bidders?
If you need additional assistance, you can reach the Federal Service Desk at 866‐606‐
8220 or https://www.fsd.gov/gsafsd_sp?id=gsa_ind ex.
7/30/2024
7 X
SCR 703.05A (f) States 70 percent minimum fractured faces. Does this include more than a single fractured face on the aggregate or just a single fractured face?
In accordance with SCR 703.05A, comply with ASTM D 5821, and please submit bids according to the solicitation documents.
8/12/2024
File details come from the government source that posted it. Updated .