QA_07-29-2024.pdf
PDF 102 KB Posted
- Attached to
- MT FLAP DOT 236(2), Winifred North Federal contract opportunity
- Solicitation number
- 69056724B000007
About this file
This document appears to contain a series of questions and answers related to a federal contract opportunity. The key details are:
The federal contract opportunity is for the MT FLAP DOT 236(2), Winifred North project, solicitation number 69056724B000007, issued by the Department of Transportation Federal Highway Administration. The solicitation was posted on SAM.gov to provide prospective bidders with information about the location and type of work. Bidders are instructed to monitor SAM.gov for the actual solicitation release date and duration of the advertisement period, and to submit questions during that time. The questions covered topics such as the size and load specifications for cattle guards, the desired color, and the availability of drawings. One question noted a potential typo in the solicitation regarding the notice to proceed date, which will be addressed in a forthcoming amendment. Overall, this document provides clarification on certain requirements for this upcoming federal contract opportunity.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BidTab MT FLAP DOT 236(2).pdf | ||
| BidSum_MT FLAP DOT 236(2).pdf | ||
| QA_08-19-2024.pdf | ||
| QA_08-13-2024.pdf | ||
| QA_08-12-2024.pdf | ||
| Amendment A001.pdf | ||
| mta-dot236-2_WinifredNorth_Final Geotechnical Report-Signed.pdf | ||
| mta-dot236-2_WinifredNorth_plans.pdf | ||
| IFB 69056724B000007.pdf | ||
| mta-dot236-2_WinifredNorth_Hydraulics_Memo_Final.pdf | ||
| mta-dot236-2_WinifredNorth_control-points.xlsx | XLSX spreadsheet | |
| mta-dot236-2_WinifredNorth_Grizzly_Bear_Sightings_Log.docx | DOCX document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MT FLAP DOT 236(2)
Winifred North
# General Technical Question Answer Date
1 X Is it OK to provide you with 4–12‐foot Cattle
Guards? (You are requesting 2‐24 foot)
The preliminary documents posted on sam.gov have been posted to aid prospective bidders in identifying the location and type of work for this project.
Please monitor the SAM site for the actual date of solicitation release
(https://sam.gov/), and the duration of the advertisement period; and submit your questions during the advertisement period for the project. To receive automatic notification through SAM, you must login and select “Follow” feature and follow the steps as indicated.
7/25/2024
2 X What are the load specs for the Cattle Guards needed? ie U‐54?, U‐80?, etc
The preliminary documents posted on sam.gov have been posted to aid prospective bidders in identifying the location and type of work for this project.
Please monitor the SAM site for the actual date of solicitation release
(https://sam.gov/), and the duration of the advertisement period; and submit your questions during the advertisement period for the project. To receive automatic notification through SAM, you must login and select “Follow” feature and follow the steps as indicated.
7/25/2024
3 X Wanted to verify the color you wanted (green or yellow?)
The preliminary documents posted on sam.gov have been posted to aid prospective bidders in identifying the location and type of work for this project.
Please monitor the SAM site for the actual date of solicitation release
(https://sam.gov/), and the duration of the advertisement period; and submit your questions during the advertisement period for the project. To receive automatic notification through SAM, you must login and select “Follow” feature and follow the steps as indicated.
7/25/2024
Check General or Technical
4 X Can you provide Drawings for the project?
The preliminary documents posted on sam.gov have been posted to aid prospective bidders in identifying the location and type of work for this project.
Please monitor the SAM site for the actual date of solicitation release
(https://sam.gov/), and the duration of the advertisement period; and submit your questions during the advertisement period for the project. To receive automatic notification through SAM, you must login and select “Follow” feature and follow the steps as indicated.
7/25/2024
5 X
It appears there is a typo in Section 52.211‐10
“The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 10/31/2025 subject to such extensions as may be authorized. The time stated for completion shall include final cleanup of the premises. The completion date is based on the assumption that the successful offeror will receive the notice to proceed by 10/28/2025. “
Is the NTP meant to be 10/28/2024?
Yes. This will be addressed under
Amendment A001.
7/29/2024