WFLHD Construction Contract Administration_OR FLAP 46(1).pdf

PDF 118 KB Posted

Attached to
OR FLAP DOT 46(1), Oregon Caves Highway (OR 46) Restoration
Solicitation number
69056722B000014
Issued by

About this file

This document contains details on a federal construction contract administered by the Federal Highway Administration. The contract is for restoration work on Oregon Caves Highway in Oregon Caves National Monument and Preserve in Josephine County, Oregon. An invitation to bid was issued for the project, with bids due by June 30, 2022. The work will involve repairing damage to the highway from winter storms and landslides. Additionally, the document provides data on the time required by the FHWA to definitize equitable adjustments on change orders for construction contracts over the past three fiscal years, with most being definitized within 90 days of receiving an adequate proposal.

View the file

Other files

File Type Posted
Bid Tabulation_OR FLAP DOT 46(1).pdf PDF
BidSum_OR FLAP DOT 46(1).pdf PDF
QA_02-03-2023.pdf PDF
Amendment A003.pdf PDF
QA_02-01-2023.pdf PDF
Amendment A002.pdf PDF
QA_01-30-2023.pdf PDF
OR FLAP DOT 46(1)_Oregon Caves Interested Vendor List.pdf PDF
QA_01-26-2023.pdf PDF
QA_01-25-2023.pdf PDF
Amendment A001.pdf PDF
or-04601_PLANS.pdf PDF
or-04601_Memo Project Name Change.pdf PDF
or-04601_Earthwork_Rdwy-W1.pdf PDF
or-04601_XS_culverts.pdf PDF
or-04601_Earthwork_W2.pdf PDF
Physical Data.zip ZIP file
or-04601_XS_Roadway.pdf PDF
or-04601_Earthwork_Rdwy-W2.pdf PDF
ak-b-gfo201901_PLANS.pdf PDF
or-04601_Horiz_Profile_Report.pdf PDF
IFB_OR FLAP DOT 46(1).pdf PDF
OR FLAP DOT 46(1) - Final Geotech Report (GM 13-22).pdf PDF
or-04601_Earthwork_W1.pdf PDF
or-04601_Vert_Profile_Report.pdf PDF
or-04601_XS_Guardrail.pdf PDF
or-04601_Survey Control.xlsx XLSX spreadsheet
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project: OR FLAP DOT 46(1), Oregon Caves Highway (OR 46) Restoration

WFLHD Construction Contract Administration

FAR 36.211 requires a description of the Federal Highway Administration’s (FHWA) procedures that apply to definitization of equitable adjustments for change orders under construction contracts. It also requires that FWHA furnish data on the agency’s past performance, for the prior 3 fiscal years, regarding the time required to definitize equitable adjustments for change orders under construction contracts.

Change orders as defined in FAR 2.101 are changes to the contract work pursuant to FAR 52.243-4, Changes.

There are no agency-specific additional policies and procedures that exist at this time.

The table below contains data regarding the definitization of equitable adjustments for change orders under construction contracts by fiscal year (FY).

Time to definitize after receipt of an adequate change order definitization proposal under construction contracts

Number of change order proposals definitized under construction contracts

FY 2020 FY 2021 FY 2022

0 to 30 days 0 1 1

31 to 60 days 3 1 0

61 to 90 days 0 0 0

91 to 180 days 0 5 1

181 to 365 days 0 0 7

366 or more days 4 2 0

After completion of contract performance via a contract modification addressing all undefinitized equitable adjustments received during contract performance

0 0 0 https://www.acquisition.gov/far/part-52#FAR_52_243_4

File details come from the government source that posted it. Updated .