Upper Sunken Excel Sheet.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- OR DOT 20(3) Upper Sunken Grade and Double Gate Slide Repairs Geotechnical Investigation
- Solicitation number
- 69056720Q000005
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QA 4 20Q00005 .pdf | ||
| QA_3_20Q00005_.pdf | ||
| Amendment_0002_69056720Q000005.pdf | ||
| QA_2_20Q00005_.pdf | ||
| Amendment_0001_69056720Q000005.pdf | ||
| QA_20Q00005_.pdf | ||
| RFQ_69056720Q000005_Upper_Sunken_Grade.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Drilling RFQ 69056720Q000005 | QTY | Price | Unit | Sub Total |
| Project Name: Upper Sunken Grade/Double Gate Slide Repair - OR DOT20(3) |
| Mobilization/Demobilization Truck mounted drill | Mile | $0.00 |
| Mobilization/Demobilization Track mounted drill | Mile | $0.00 |
| Mobilization/Demobilization Portable drill | Mile | $0.00 |
| Casing Advancer Drilling (4 or 5-inch diameter) | Ft | $0.00 |
| Casing Advancer Drilling (port. rig) (2 ½ - 4-inch) | Ft | $0.00 |
| HQ3 and PQ3 core drilling | Ft | $0.00 |
| NQ core drilling (portable drill rig) | Ft | $0.00 |
| Asphalt Cores 4-inch diameter, through roadway | Each | $0.00 |
| Hollow stem auger drilling 4 ¼” ID (8 ¼” OD) | Ft | $0.00 |
| Hollow stem auger drilling 3 ¼” ID (portable drill rig) | Ft | $0.00 |
| 2.5 & 3 inch Split Spoon Drive Samples samples | Each | $0.00 |
| SPT samples (2”) | Each | $0.00 |
| Shelby Tube Samples 3-inch | Each | $0.00 |
| Per Diem Drill Crew per person per day at Gov rate for area:Sweet Home | Day | $0.00 |
| On Project Moves | Hour | $0.00 |
| Water Haul (Identify Source:___Contactor Idenified__) | Hour | $0.00 |
| 2.75-Inch Inclinometer Casing Installed | Lnft | $0.00 |
| 2-inch Slotted Piezometer Casing Installed | Lnft | $0.00 |
| 2-inch Solid Piezometer Casing Installed | Lnft | $0.00 |
| Crane Mob/Demob (each) (highly variable with location-neg) | Lump | $0.00 |
| Crane Use ( highly variable with location) (Hour/Day/Week) | Hour | $0.00 |
| Standby Time (crane and operator) (hour) (Neg) | Hour | $0.00 |
| Subgrade Drilling (includes crew, all materials and equipment) | Each | $0.00 |
| Monitoring Well Cover Flush Mount | Each | $0.00 |
| Monitoring Well Cover, above surface, with Locking Cap Installed | Each | $0.00 |
| Flagger Per Diem Per Person (Day) (Neg) | Day | $0.00 |
| Flagging Personnel (hr) (not subject to wage determination) (Neg) | Hour | $0.00 |
| Flagging Personnel OT (hr) (not subject to wage determination) (Neg) | Hour | $0.00 |
| Mob/Demob for flagging personnel (Each) (Neg) | Each | $0.00 |
| Flagging Equipment (Day/Week) (Negotiated at time) | Day | $0.00 |
| Shipping Samples (Lump) (variable for each project) (Neg)in labor tab | Lump | $0.00 |
| Standby Time (if any) for drill crew and equipment | Hour | $0.00 |
| Monitoring Well Permit (variable by jurisdiction) (neg) | Each | $0.00 |
| Helicopter Use, highly variable with location and helicopter size | Hour | $0.00 |
| Drill Crew Work (site preparation, skidding drill rig,) | Hour | $0.00 |
| Construct Drill Access (Bulldozer or Excavator) (Hour) | Hour | $0.00 |
| Drill Access Equipment Mob/Demob (Lump) | Lump | $0.00 |
| Ream Casing to Install Instrument | Ft | $0.00 |
| Crew Breaks (10 days on; 4 days off) Negotiated at Time | Each | $0.00 |
| Water Level Testing | Hour | $0.00 |
| Prepare gINT logs | Hour | $0.00 |
| Revise and finalize gINT logs | Hour | $0.00 |
| On Project Field Inspector | Hour | $0.00 |
| MOB and DEMOB for Field Inspector | Lump | $0.00 |
| Per Diem for Field Inspector(at the government rate) | Day | $0.00 |
| OTHER: | ||
| Utility Locate | Lump | $0.00 |
| 3.34" Inclinometer Casing Installed | Lnft | $0.00 |
| Furnish and install vibrating wire piezometer | Each | $0.00 |
| In-situ permeability testing | Each | $0.00 |
| Furnish SAAV materials and deliver | Each | $0.00 |
| Heliocopter Mob/Demob | Lump | $0.00 |
| Heliocopter Daily Standby | Day | $0.00 |
| Tree Faller | Lump |
TOTAL (BASE CONTRACT) $0.00
Field Inspector Option $0.00
| TOTAL (with OPTION) | $0.00 | |
| NOTES: | ||
| 1. Bold text indicates an item description modified from the text in the schedule of items | ||
| 2. Gray boxes indicate items that are not anticipated for this contract. |
Signature of Authorized Representative Date
File details come from the government source that posted it. Updated .