QA_20Q00005_.pdf
PDF 65 KB Posted
- Attached to
- OR DOT 20(3) Upper Sunken Grade and Double Gate Slide Repairs Geotechnical Investigation
- Solicitation number
- 69056720Q000005
About this file
Q&A 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Upper Sunken Excel Sheet.xlsx | XLSX spreadsheet | |
| QA 4 20Q00005 .pdf | ||
| QA_3_20Q00005_.pdf | ||
| Amendment_0002_69056720Q000005.pdf | ||
| QA_2_20Q00005_.pdf | ||
| Amendment_0001_69056720Q000005.pdf | ||
| RFQ_69056720Q000005_Upper_Sunken_Grade.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q&A
RFI: 69056720Q00005
Q1. Will we be able to install slope inclinometers at the base of the LS and monitor these for a winter period to determine the failure surface and geometry of the slides? The slope inclinometers/monitoring are a “bullet proof” approach for evaluating LS. It does take additional time.
A1. Inclinometer casing will be installed in the boring locations shown in the table of borings.
Any additional items outside of the statement of work is not authorized.
File details come from the government source that posted it.