A001.pdf

PDF 5 MB Posted

Attached to
WA NPS BP MORA 2019(1), NISQUALLY GLACIER BRIDGE PRESERVATION
Solicitation number
69056720B000029
Issued by

About this file

This document is an amendment to a federal solicitation for bridge preservation work. The amendment revises plan sheets E.1 and E.2 of the solicitation package for the WA NPS BP MORA 2019(1), Nisqually Glacier Bridge Preservation project. Plan sheet E.1 adds span labels to the profile view, while plan sheet E.2 revises the typical bridge section. The solicitation number is 69056720B000029 and was issued by the Department of Transportation Federal Highway Administration. The amendment serves to clarify details of the bridge plans for offerors prior to the response date.

View the file

Other files

File Type Posted
BidSum.pdf PDF
Sign-in sheet.pdf PDF
QA_12-23-2020.pdf PDF
QA_12-09-2020.pdf PDF
QA_12-08-2020.pdf PDF
Nisqually Glacier Bridge - 2018 Inspection.pdf PDF
Nisqually Glacier Bridge - As-built 1957.pdf PDF
Nisually Bridge Plans.pdf PDF
IFB Nisqually Bridge.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A001 1/4/2021 N/A See Box 14

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

69056720B000029

9B. DATED (SEE ITEM 11)

12/01/2020

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

N/A

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

N/A

D OTHER (Specify type of modification and authority) N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

WA NPS BP MORA 2019(1), Nisqually Glacier Bridge Preservation

Amendment A001 is issued to revise the following:

PLANS

Plan Sheet E.1. Add span labels to profile view.

Plan Sheet E.2. Revises Typical Section.

ENCLOSURES: Sheets E.1 through E.2

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

DETAILS

BRIDGE PRESERVATION

Sheet 2 of 3

E.1

STATE PROJECT

NUMBER

SHEET

I n t_ ft

D

N is q u a ll y

G la c ie r B r d g P r e z A m e n d m e n ts A S h e e t

E .2 .d g n

C U s e r s C li n to n .C h o y D e s k to p P S

E R e v ie w E n g in e e r R e v ie w s

W A N

P S B

P M

O R

A

WA NPS BP MORA 2019(1)

A

M

D e c e m b e r

C h e c k e d b y

D e s ig n e d b y

NPS PMIS No.: 310801

SPAN 1 SPAN 5SPAN 5SPAN 4SPAN 3SPAN 2

Revised by Amendment A0011

DETAILS

BRIDGE PRESERVATION

Sheet 2 of 3

NPS PMIS No.: 310801

Revised by Amendment A001

E.2

STATE PROJECT

NUMBER

SHEET

I n t_ ft

D

N is q u a ll y

G la c ie r B r d g P r e z A m e n d m e n ts A S h e e t

E .2 .d g n

C U s e r s C li n to n .C h o y D e s k to p P S

E R e v ie w E n g in e e r R e v ie w s

W A N

P S B

P M

O R

A

WA NPS BP MORA 2019(1)

A

M

J a n u a r y

C h e c k e d b y

D e s ig n e d b y side of girders

Exterior of girders

Exterior side

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
A001
Sheets E.1 through E.2.pdf
Sheet E.1 signed
Sheet E.2 signed

File details come from the government source that posted it. Updated .