QA_04-28-2021.pdf
PDF 99 KB Posted
- Solicitation number
- 69056720B000012
About this file
This document contains questions and answers regarding Federal Solicitation Number 69056720B000012 for the AK PFH 59(2), Snug Harbor Road Paving and Bike Lane, Phase 2 project. The solicitation was posted to beta.sam.gov on April 1, 2021 and seeks bids for road paving and installation of a bike lane on Snug Harbor Road in Phase 2 of the project. The government did not perform formal geotechnical or hydrological investigations of the site and will not provide any related subsurface data to bidders. Bidders are instructed to bid accordingly without this information. The document does not provide pricing terms or response dates for the solicitation. The Department of Transportation Federal Highway Administration is the contracting agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Opening Summary_Snug Harbor.pdf | ||
| Amendment A002.pdf | ||
| QA_04-29-2021.pdf | ||
| QA_04-15-2021.pdf | ||
| Amendment A001.pdf | ||
| af05902_Plan.pdf | ||
| IFB_Snug Harbor Road.pdf | ||
| Physical Data_Snug Harbor.zip | ZIP file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AK PFH 59(2)
Snug Harbor Road Paving and Bike Lane, Phase 2
# General Technical Question Answer Date
1 X Is it required that the contractor participate in Phase I to participate in Phase 2?
No. 4/17/2020
2 X
I am hoping to find out if there are recent developments to the above mentioned opportunity? Is there an anticipated Solicitation timeframe release?
The posting of this solicitation onto beta.sam occurred on 4/1/2021. See https://beta.sam.gov/opp/869428ce1a944c 5f87c0bcef500af475/view.
4/14/2021
3 X Is there any geotechnical data (i.e. bore logs) regarding the material characteristics of the anticipated Roadway Excavation?
No. 4/15/2021
4 X Are there any rock cuts anticipated?
We will not be providing anticipated information. Bid accordingly.
4/15/2021
5 X Is there any subsurface water flow anticipated?
We will not be providing anticipated information. Bid accordingly.
4/15/2021
6 X Why is the government not sharing the geotechnical information that was used for this design?
Geotechnical information is not being provided because a formal geotechnical investigation of site conditions was not performed by the government.
4/28/2021
7 X Is there any hydrological information that was used for this design?
Hydrological information is not being provided because a formal hydrological investigation of site conditions was not performed by the government.
4/28/2021
Check General or Technical
8 X Will any "constant" surface or subsurface water flows have to be diverted to accommodate the construction?
Follow the requirements of FP‐14 Subsection 157.10.
4/28/2021
9 X
Vertical trench side slopes are shown on both of the underdrain system typical sections. Is rock excavation going to be necessary for any of these trenches? Will these slopes hold vertical?
We don’t know the exact conditions one will encounter in the field. Please bid accordingly.