QA_04-15-2021.pdf
PDF 93 KB Posted
- Solicitation number
- 69056720B000012
About this file
This document contains questions and answers regarding a federal solicitation for road paving and bike lane construction work. The opportunity involves Phase 2 of the Snug Harbor Road Paving and Bike Lane project in Alaska. While prior participation in Phase 1 is not required to bid on Phase 2, the anticipated solicitation release date was April 1, 2021 and can be viewed on SAM.gov. No geotechnical data, such as bore logs, regarding roadway excavation material characteristics will be provided. The agency also will not provide any anticipated information about potential rock cuts or subsurface water flow, requiring bidders to account for uncertainties in their pricing. The related federal contract posted is solicitation number 69056720B000012 for the Snug Harbor Road Paving and Bike Lane, Phase 2 project, issued by the Federal Highway Administration within the Department of Transportation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Opening Summary_Snug Harbor.pdf | ||
| Amendment A002.pdf | ||
| QA_04-29-2021.pdf | ||
| QA_04-28-2021.pdf | ||
| Amendment A001.pdf | ||
| af05902_Plan.pdf | ||
| IFB_Snug Harbor Road.pdf | ||
| Physical Data_Snug Harbor.zip | ZIP file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AK PFH 59(2)
Snug Harbor Road Paving and Bike Lane, Phase 2
# General Technical Question Answer Date
1 X Is it required that the contractor participate in Phase I to participate in Phase 2?
No. 4/17/2020
2 X
I am hoping to find out if there are recent developments to the above mentioned opportunity? Is there an anticipated Solicitation timeframe release?
The posting of this solicitation onto beta.sam occurred on 4/1/2021. See https://beta.sam.gov/opp/869428ce1a944c 5f87c0bcef500af475/view.
4/14/2021
3 X Is there any geotechnical data (i.e. bore logs) regarding the material characteristics of the anticipated Roadway Excavation?
No. 4/15/2021
4 X Are there any rock cuts anticipated?
We will not be providing anticipated information. Bid accordingly.
4/15/2021
5 X Is there any subsurface water flow anticipated?
We will not be providing anticipated information. Bid accordingly.
4/15/2021
Check General or Technical