This amendment modifies a solicitation for the AK PFH 59(2) Snug Harbor Road Paving and Bike Lane Phase II project for the Department of Transportation Federal Highway Administration. It revises special contract requirements regarding commencement and completion of work dates, labor requirements, and determination of contract time extensions. It also modifies provisions for turf establishment, fertilizer, and silt fence materials. Bidders must acknowledge receipt of this amendment by the stated deadline and include the amendment number in any offer submitted.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Opening Summary_Snug Harbor.pdf | ||
| Amendment A002.pdf | ||
| QA_04-29-2021.pdf | ||
| QA_04-28-2021.pdf | ||
| QA_04-15-2021.pdf | ||
| af05902_Plan.pdf | ||
| IFB_Snug Harbor Road.pdf | ||
| Physical Data_Snug Harbor.zip | ZIP file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A001 04/06/2021 N/A See Box 14
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
69056720B000012
9B. DATED (SEE ITEM 11)
04/01/2021
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
N/A
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
N/A
D OTHER (Specify type of modification and authority) N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
AK PFH 59(2), Snug Harbor Road Paving and Bike Lane Phase II
See page 2.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A001, dated 04/06/2021 AK PFH 59(2) Solicitation No. 69056720B000012 Snug Harbor Road Paving and Bike Lane Phase II
REVISIONS ARE AS FOLLOWS:
SPECIAL CONTRACT REQUIREMENTS
Page E-18, Subsection 108.01, Commencement, Prosecution, and Completion of Work.
Deletes Subsection (c).
Page F-16, Section 625, Turf Establishment. Revises Subsections 625.06, 625.07, and 625.08.
Page G-3, Subsection 713.03, Fertilizer. Revises Subsection (a).
ENCLOSURES
Pages:
E-16 F-18 G-3
E-18 DIVISION 100
Special Contract Requirements Project: AK PFH 59(2), Snug Harbor Paving and Bike Lane Phase II
Section 108. — PROSECUTION AND PROGRESS
04/03/20– FP-14
108.01 Commencement, Prosecution, and Completion of Work. Add the following:
Furnish at least a 48-hour advanced notice before changing the current work schedule. Work schedule changes that include additional shifts require a 14-day advanced notice.
Perform work under this contract according to the following:
(a) Limit work as provided for in Sections 104, 105, 107, and 157.
(b) Limit work as provided for in Subsections 156.04 and 156.07.
(c) Do not perform work, except as indicated in (1) through (5) below, from November 9, 2020 through March 31, 2021, for Winter Suspension:
(1) Mobilization to and from the project;
(2) Survey and staking;
(3) Production of materials at Contractor-located sources;
(4) Installation of temporary traffic control; and
(5) Erosion control work as directed by CO under Section 622 and Section 623.
108.01A Labor. (Added Subsection).
Follow the requirements of FAR Clause 52.222-6 Construction Wage Rate Requirements.
Adjacent or virtually adjacent work sites, as used in FAR Clause 52.222-6, are defined to be work sites within ½ mile of the project. Application of Construction Wage Rate Requirements (Davis- Bacon Act) for work sites beyond ½ mile of the project will be determined by the CO.
108.03 Determination and Extension of Contract Time. Add the following to paragraph (c):
No adjustment in contract time or amount will be made for stop orders issued under Subsection 108.05(a) or (b), except an adjustment in contract time, as provided by FAR Clause 52.249-10 Default (Fixed-Price Construction), may be made when the Contractor is able to demonstrate that the weather was unusually severe based on the most recent 10 years of historical data.
108.04 Failure to Complete Work on Time. Delete this Subsection and substitute the following:
Follow the requirements of FAR Clause 52.211-12 Liquidated Damages — Construction.
Revised by Amendment A001
F-16 DIVISION 600
Project: AK PFH 59(2), Snug Harbor Paving and Bike Lane Phase II
Section 625. — TURF ESTABLISHMENT
08/01/14–FP14
Construction Requirements
625.03 General. Delete the text of this Subsection and substitute the following:
Apply turf establishment to finished slopes and ditches. Do not apply turf establishment during windy weather or when the ground is excessively wet, frozen, snow covered, extremely dry, cloddy, hard pan, or not friable.
625.06 Fertilizing. Add the following to paragraph (b):
Apply fertilizer at the rate of 425 pounds (kilograms) per slurry unit. Fertilize areas inaccessible to hydraulic-type equipment by hand.
625.07 Seeding. Add the following to paragraph (b):
Apply the seed at the rate of 87 pounds (kilograms) of live seed per acre. Apply the seed with a tackifier.
625.08 Mulching. Delete the second and third paragraphs of paragraph (b) and substitute the following:
Apply mulch at a the manufacturer’s recommended rate for the slopes that mulch is being applied. of 46 pounds (kilograms) per acre upon completion of seeding and fertilizing applications. This rate does not apply to mulch for tracer applied under Subsection 625.07 (b), Seeding, Hydraulic Method.
G-3 DIVISION 700
Project: AK PFH 59(2), Snug Harbor Paving and Bike Lane Phase II
Section 713. — ROADSIDE IMPROVEMENT MATERIAL
04/03/20–FP14
713.03 Fertilizer. Add the following:
(a) Fertilizer for turf establishment. Furnish fertilizer with the following minimum percentages of available nutrients:
20N : 20P : 10K
Each ingredient is acceptable up to 5 percent over the minimum requirements.
Potassium need not be present but will be allowed.
Formulate the 38:0:0 fertilizer from urea-formaldehyde compounds. The maximum activity index is 50.
713.04 Seed. Add the following:
Furnish a mixture consisting of the following kinds of seed with the corresponding percentages by weight of “live seed”:
Alyeska Polargrass (Arctagnosis latifolia) 20% Actrared Red Fescue (Festuca rubra) 30% Norcoast Bering Harigrass (Deschampia beringensis) 30% Fireweed (Epilotium latifolium) 5% Nookta Lupine (Lupinus nootkatensis) 15%
Determine the amount of “live seed” in a container by the following formula:
Net weight of seed in container multiplied by the purity percentage multiplied by the germination percentage. (If seed is 85 percent pure and tests 90 percent germination, then a 100 pound (45.4 kilogram) container would contain 76.5 pounds (34.7 kilograms) of “live seed”.)
713.16 Silt Fence. Delete Subsection (a) and substitute the following:
(a) Geotextile. Conform to Table 8 of AASHTO M 288.