This memorandum provides recommendations for an aquatic organism passage (AOP) culvert design on Forest Service Road 4010050 at milepost 0.78 in Okanogan County, Washington. The project involves replacing an existing failed culvert to improve fish passage and comply with regulations. The proposed design utilizes a stream simulation methodology with a 58-foot long, 11-foot diameter corrugated metal pipe installed at a 4% slope. Streambed material matching the natural channel will be placed inside. A defined low-flow channel 4 feet wide and 18 inches deep will be constructed, along with banks stabilized with cobbles and boulders. Seventeen 24-inch diameter boulders will provide low-velocity resting areas for fish. Class 3 riprap is recommended at the inlet and outlet. Construction is expected to commence in fall 2020 pending solicitation and last approximately one month, with an estimated budget between $1-2 million. The federal agencies involved are the US Forest Service and Federal Highway Administration.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Memorandum
Western Federal Lands Highway Division 610 E. Fifth Street
Vancouver, WA 98661-3801
OKANOGAN-WENATCHEE NATIONAL FORREST
FSR 4010050 MP 0.78 AOP HYDRAULICS REPORT
To: Craig Sanders, WFLHD Project Manager From: Matthew Dillin, P.E., WFLHD Hydraulics Engineer Date: September 9, 2019 Project: FS Oka-Wen ERFO – WA FS EFRO 2017(1)-23(3)
Background
The Forest Service (FS) is replacing a failed culvert on forest service road (FSR) 4010050 at mile post (MP) 0.78, Okanogan-Wenatchee National Forest, Okanogan County, Washington (Fig. 1). The Forest Service will maintain the new structure. Western Federal Lands Highway Division (WFLHD) is designing the replacement structure. Recommendations for the proposed aquatic organism passage (AOP) structure design are presented.
AOP Design Criteria
Forest Service biologists confirmed FSR 4010050 MP 0.78 crossing requires an AOP structure (48°02’43.1”/-120°03’48.5”, NAD1983). The crossing is located on Woody Creek where a fish survey was conducted. During the survey, either rainbow or cutthroat trout were observed upstream and downstream of the failed culvert. Constructing passable structures at this location will allow their passage to critical habitat.
Fish passage is required by Washington Administrative Code (WAC) 220-660-190, the Endangered Species Act (ESA), and the Magnuson-Stevens Fishery Conservation and Management Act. The recommended fish passage crossing design is consistent with requirements of the Aquatic Restoration Biological Opinion II (ARBOII).
The proposed AOP structure has been designed per Stream Simulation: An Ecological Approach to Providing Passage for Aquatic Organisms at Road-Stream Crossings (USDA-Forest Service 2008). This method provides a simplified design methodology that is intended to mimic natural upstream and downstream processes within the culvert. Fish passage, sediment transport, and debris conveyance within the culvert are designed to function as they would in the adjacent natural channel. Determination of the high and low fish passage design flows, water velocity, and water depth is not required for this method since the stream hydraulic characteristics within the culvert are intended to mimic the stream conditions upstream and downstream of the crossing. The method utilizes streambed materials that are like the adjacent channel, providing similar channel complexity, flow depth, flow velocities, and resting areas.
The following requirements have been incorporated into the AOP design:
Flood Conveyance: Culvert capacity exceeds the 100-year recurrence flood (70 cfs) without roadway overtopping.
Culvert Width: Must accommodate the design channel bankfull width plus additional width for construction of stable bank rocks along both sides of the channel inside the culvert. The minimum culvert
Memo to: Craig Sanders, WFLHD Project Manager September 2019 bed width is 1.3 times the bankfull channel width for non-entrenched streams. For entrenched streams (entrenchment ratio < 1.4) the minimum width is bankfull channel width plus room for natural channel banks.
Channel Vertical Clearance: Clearance from bed to ceiling must be at least 5.8 feet to allow for ease of construction, maintenance, and debris removal.
Channel Slope: Reconstructed streambed within the culvert should approximate the average slope of the adjacent stream from approximately ten channel widths upstream and downstream of the culvert site, and should not deviate by more than 1%.
Embedment: Bottom of the culverts should be buried into the streambed between 30 and 50 percent of the culvert height, and a minimum of 3 feet.
Maximum Length of Road Crossing: Length should be less than 150 feet.
Fill Materials: Fill materials are comprised of material similar in size composition to natural bed materials that form the natural stream channels adjacent to the road crossing. Larger material is added for assisting stream gradient retention and providing resting areas for migrating fish.
Water Depth and Velocity: Water depth and velocity in the culvert must closely resemble those existing in the adjacent stream.
FSR 4010050 MP 0.78 AOP Culvert
Woody Creek is a tributary to Canyon Creek and ultimately the Methow River. The stream currently crosses Forest Road (FSR) 4010050 approximately 0.25 miles upstream of its confluence with Canyon Creek. The current crossing is located within a fairly stable stream reach.
Heavy rains during the winter of 2017 resulted in the mobilization of a large sediment pulse. High flows carried the material downstream where they were deposited at the crossing, causing the channel to aggrade and bury the existing 24” culvert. During the event flows overtopped the road and washed out some of the roadway embankment material.
The crossing in located in a fairly stable reach. Good references were found for accurate measurements of bankfull widths near the crossing. Vegetation and bank features found downstream of the crossing (Appendix, photo 7) suggest that the natural bankfull width is roughly 4 feet to 4.5 feet with a channel slope around 7 percent and a channel depth of approximately 12 inches to 18 inches. These values were supported by additional measurements taken upstream of the crossing where the bankfull width was found to be between 3.5 feet and 6 feet with channel slopes around 7 percent. The existing stream appears to be in a step-pool controlled system. Boulder, cobble, and gravel is the dominant bed material. Streambed gradation was measured by digital pebble count using FHWA Hydraulic Toolbox, version 4.2, and processing digital-scaled photographs at seven stream locations. Resulting gradation is D100 22 inches, D85 11 inches, D50 6 inches, and D15 2.7 inches (Fig.3).
Based on observed post flood conditions, the stream can likely carry a moderate to high amount of small to moderate sized woody debris. Stream flow when fish passage is needed will be low. Smaller flows could submerge within the natural channel where larger loose material has been deposited. To avoid creation of similar low flow subsurface conditions, material placed within the proposed culvert and outlet will need to avoid excessive amounts of oversized loose bed material or large stone. Additional debris flows during large flood events can be expected.
September 2019
Recommendations:
• Install new culvert on existing stream alignment.
• Install a 58-foot long, corrugated metal culvert with a 11-foot diameter (Preliminary Sheet F.1).
• Place culvert floor at elevation 2266.60 feet upstream and at elevation 2264.28 feet downstream (project datum).
• Maximizing clearance for debris passage and maintenance access while economizing culvert size by installing culvert at a 4 percent grade.
• Place conserved streambed material inside the culvert matching the gradation of the natural streambed material upstream.
• Slope the channel surface to match immediate downstream gradient (6.2 percent).
• Construct a defined flow channel 4 feet wide at the bottom and 18 inches deep (Preliminary Sheet F.11).
• Construct the flow channel banks from coarser gravel, cobble, and boulder material.
• Install 17 boulders, approximately 24 inches in diameter, as shown on Preliminary Sheet F.11 for inducing channel migration and providing low velocity fish resting areas.
• Install Class 3 riprap (FHWA FP-14), minimum 3 feet thick, at the inlet and outlet for controlling road embankment erosion near the culvert (Preliminary Sheet F.10).
• Install Class 1-C nonwoven geotextile (FHWA FP-14) under the riprap.
• Shape new channel approximately 15 lineal feet immediately upstream and 15 lineal feet immediately downstream for aligning the culvert channel with the natural channel.
• Seed and plant any disturbed areas with local native vegetation.
Construction
The Washington Department of Fish and Wildlife instream work period is July 1 to February 28.
Temporary flow deflectors placed for isolating the work area and diverting the stream flow must have a minimum height of 3 feet above the stream bottom and be stable assuming 8 feet per second parallel flow and 2 feet maximum water depth. Use plastic-lined channels or pipes for temporally conveying stream flow through the construction area. Protect the outfalls from erosion. Fish passage downstream through the temporary flow diversions is required. Ensure fish can pass smoothly from the upstream diversion point to the downstream diversion point. Locate diversion points in the main stream channel. Fish passage upstream is not required. Temporary stream diversions in place must have minimum flow capacity equal to the 2-year discharge (10 cfs). Before installing the flow deflectors, remove fish from the work area to the level and methods specified in the environmental permits.
Vehicular traffic will not be maintained through the work site. Full construction area dewatering is expected up to the groundwater level for excavation and installing the culvert, streambed material, backfill, and riprap. Water pumped from work area must be discharged at an upland area near the site.
Access for culvert installation work can be accomplished within the existing road embankment footprint.
Temporary access route adjacent to the road embankment is needed for installing flow barriers, removing the channel debris, and completing culvert inlet, interior, and outlet work. Constructing the proposed culvert and in-stream work may require heavy track-mounted equipment operating on the stream bed, possibly in water up to 2 feet deep.
The State of Washington and the U.S. Fish and Wildlife Service will restrict the release of turbidity from the work areas into the stream. The agencies require turbidity control and monitoring, and should be
September 2019 contacted for specific requirements and allowable discharge limits.
Stream Impacts
The proposed fish passage culvert is expected to dramatically improve stream flow conveyance, sediment transport, and woody debris transport to a level that is similar for adjacent natural streams. Both channel degradation and aggradation is expected upstream, inside, and downstream of the proposed fish passage culvert.
A moderate amount of turbidity and sediment is expected to be released when the flow barriers are removed and stream flow is introduced into the newly constructed culvert. The amount of turbidity and sediment will be reduced by removing the flow barriers gradually introducing the stream flow over an extended two to three-hour time.
Operation and Maintenance
Woody debris will tend to accumulate more frequently at the culvert inlet and inside the culvert barrel.
The FS should increase the frequency of culvert inspection and woody debris removal. Stream degradation is not expected to negatively impact culvert structure or performance. Stream aggradation could reduce the culvert hydraulic capacity. Remove sediment from the upstream channel, inside the culvert, the downstream channel when there is less than 5 feet of clearance between the stream bottom and culvert crown at the inlet. Riprap placed at the culvert inlet and outlet should be inspected annually and after each extreme flood event. Replace or reposition dislodged stone.
Floodplain and Flood-rise Impacts
Flood limits and elevations have not been mapped by the National Flood Insurance Program for the site.
The proposed culverts will improve hydraulic conveyance and is not expected to negatively impact flooding at the site.
Hydrology
The USGS StreamStats (Version 4) web-based application was used for delineating the watershed and calculating drainage area (3.1 sq. miles), canopy cover (53 percent), and mean annual precipitation (20.3 inches). Peak discharges were estimated with StreamStats using USGS regression equations from Magnitude and Frequency of Floods in Washington (USGS WRIR 97-4277). Watershed is entirely within Region 2 for the USGS regression equations. The watershed is mostly forested (Fig. 2). Fires and logging have occurred within the adjacent area and can occur in the future. No flow diversions or lakes occur. The drainage area is mountainous with moderately incised drainages. Area with slopes greater than 30 percent is 83 percent. Elevations range from 2280 to 5860 feet (NAD83/WGS84). A summary of peak discharges and their corresponding water depths at the culvert inlet are presented in Table 1.
Dominant flooding is from snow melt. Larger floods typically occur in April, May, June, and July. Rain-on-snow flood events can occur in October, November, and December. Lowest flows occur in August and September.
Culvert Hydraulics
Water surface profiles and culvert capacities were estimated using the FHWA Culvert Hydraulics Analysis Program, HY-8, version 7.5 (results attached). Floods larger than the 2-year were analyzed assuming culvert slope of 6.2 percent and Manning’s Roughness coefficient of 0.054 for the channel bottom and 0.024 for the culvert sides and top. Headwater depths are shown on Table 1.
September 2019
Flow depths and average channel velocities inside the proposed culverts for up to the 2-year peak discharge were estimated with the FHWA Hydraulic Toolbox, version 4.3, open-channel flow calculator.
The calculations assumed 4 feet channel bottom width, 1:1 sides, and 6.2 percent channel slope. The Manning’s Roughness coefficient was iterated using the Blodgett Equation for the 2-year discharge. This equation calculates the Manning’s Roughness coefficient as a function of flow depth and median stone size. A Manning’s Roughness coefficient of 0.054 was calculated. Average channel flow velocities inside the culverts are presented in Figure 4.
Attachments: Table 1 – Peak Discharges and Water Depths Figures 1, 2, 3, and 4 Photographs 1 to 9 Preliminary Sheets F.1, F.10, and F.11 Peak Discharge Estimates HY-8 Calculations Hydraulic Toolbox Calculations Channel Profile
Drainage
Site Area (mi²) 2 5 10 25 50 100 500
Culvert Peak Q (cfs) 3.1 10 NA 29 43 56 70 NA
Water Elev. at Inlet (ft) 2,272.4 NA 2,273.0 2,273.3 2,273.6 2,273.9 NA
Clearance at Inlet (ft) 5.2 NA 4.7 4.3 4.0 3.7 NA
Water Depth at Inlet (ft) 0.6 NA 1.2 1.5 1.8 2.1 NA
Notes:
1. USGS - USGS Regression Equations, “Magnitude and Frequency of Floods in Washington”, WRIR 97-4277, 1998.
NA = Not analyzed.
Table 1. Peak Discharges (ft3/sec) and Water Depths at Inlets
Recurrence Intervals (years)
Image date: 7/14/2017
Project AOP Culvert Site Location
Project Area Location
USGS Topographic Maps on Google Earth
N
FIGURE 1
FSR 4010050 MP 0.78
AOP CULVERT
SITE LOCATION
MP 0.78
1000 feet0
FSR 4010050
Map printed from Google Earth, Image date 7/14/2017.
N
DA = 3.1 sq. mi.
FIGURE 2
FSR 4010050 MP 0.78
AOP CULVERT
DRAINAGE AREA
0 5000 feet
FIGURE 3
FSR 4010050 MP 0.78
AOP CULVERT
STREAMBED GRADATION
FIGURE 4
FSR 4010050 MP 0.78
AOP CULVERT
2-YEAR FLOW VELOCITY
Photos
PHOTO 1
PHOTO 2
PHOTO 3
12/1/2018
FSR 4010050 MP 0.78
Foreground is the channel with woody debris across the stream. In the background is the roadway overtopping path.
Looking at cuvlert outlet. No noticeable scour hole.
Upstream of crossing. Looking back at roadway.
Culvert Inlet.
Existing culvert inlet almost completely burried by sediment. To the right of the culvert was the overtopping path that eroded some of the roadway.
Culvert outlet.
PHOTO 4
PHOTO 5
PHOTO 6
12/1/2018
FSR 4010050 MP 0.78
Several bankfull measurements upstream of the crossing were taken.
They varied from 3.5 feet to 6 feet.
Standing on roadway looking upstream.
Pinch point created by large boulder and existing tree. Located just upstream of existing culvert. Will likely need to remove tree to install larger AOP culvert.
Approximately 50 feet upstream of roadway. Looking upstream.
Presence of small to moderiately sized woody debris in channel.
Bankfull width measured roughly 300 feet upstream of the existing crossing.
PHOTO 7
PHOTO 8
PHOTO 9
12/1/2018
FSR 4010050 MP 0.78
Channel roughly 300 feet downstream of crossing.
Very stable looking channel with good bankfull indicators and small bankfull bench. Bankfull measurements at this location and several others downstream were between 4 feet to 4.5 feet.
Stable channel downstream of crossing.
Natural step-pool bed features helping to stabilize channel.
Channel 200 to 300 feet downstream of crossing.
Downstream of crossing some larger boulder step-pools helping to control grade.
Channel just downstream of crossing.
50 30 2040 10 0 10 20 30 40 50
FISH SPECIES:
HYDRAULIC INFORMATION
FLOWLINE SLOPE:
OUTLETINLETPIPE
INV N/E/EL:
BURIAL DEPTH:
LOWER BEVEL HEIGHT:
BEVEL:
HEADWALL:
INV N/E/EL:
BURIAL DEPTH:
LOWER BEVEL HEIGHT:
BEVEL:
HEADWALL:
RISE:
WALL THICKNESS:
TYPE:
LENGTH:
SPAN:
PIPE SLOPE:
OHW:
HW :
Q :
Q :
INFILL TYPE: TYPE:
F.1
STATE PROJECT
NUMBER
SHEET
WA
FS ERFO 2017(1)-23(3)
D A
T E
P
A T
H
C h e c k e d b y
D e s ig n e d b y
Corrugated Metal Pipe
Corrugated Metal Pipe Corrugated Metal Pipe
AOP
Riprap Riprap
4.0 ft
NA
N
100 100 1.4
1.0
5.2 ft
2.75 ft2.75 ft
0.062 ft/ft 1V : 2H1V : 2H0.04ft/ft
11 ft 11 ft
PLAN AND PROFILE
AOP CULVERT
FSR 4010-050 MP 0.78
PC 41+81.75
58 ft
382227.53/1828701.22/2266.60 382268.44/1828742.33/2264.28
Scale in feet
5 2.5 0 5 10 15 20
LC
boulder per detail Sheet F.11 material and fish passage Backfill with streambed
Existing ground
Flow Flo w
' m in
Slope 4.0%
Slope 6.2%
100yr WSE
132-inch pipe culvert
Traveled way
See sheet F.10 for details (riprap end treatment) method A, class 4 Place riprap
See sheet F.10 for details (riprap end treatment) method A, class 4 Place riprap road centerline elev. 2271.8' channel elev. 2268.3' channel
See sheet F.10 for details (riprap end treatment) method A, class 4 Placed riprap
See sheet F.10 for details (riprap end treatment) method A, class 4 Placed riprap elev. 2264.28' downstream invert elev. 2266.60' upstream invert
PRELIM
IN
ARY
NOT FOR C
ONSTRUCTIO
F.10 WA FS ERFO 2017(1)-23(3)
DETAILS
RIPRAP HEADWALL
STATE PROJECT
NUMBER
SHEET
S
L e o n
J
N e ig h o r n
C h e c k e d b y
D e s ig n e d b y
U
S S u r ft
D c p w w o r k d w a e f1 e k .d g n
P
M
A u g u s t
NOTE:
FOOTNOTE:
shown on site specific details, whichever is greater.
Construct riprap end treatment to a thickness of 36-inches or as[3]
Riprap end treatment slope to match roadway embankment slope.[2]
Bevel to match roadway embankment.[1]
Sl op e
PIPE BEVEL DETAIL
Sl op e
SKEW ANGLE DIAGRAM
c e n te r li n e
R o a d w a y
Cu lv er t ce nt er lin e
BOP
EOP
(DIAMETER OR SPAN GREATER OR EQUAL TO 48-INCHES)
(DIAMETER OR SPAN LESS THAN 48-INCHES)
.2
D o r R
.2
D o r R o r R is e
R
D ia m e te r
D o r R is e
R
D ia m e te r
D
W
RIPRAP END TREATMENT
Sl op e
FRONT VIEW SIDE VIEW
24" shown in the plans
Streambed material where shown in the plans
Streambed material where
V a r ia b le R is e
W2
Variable W2
V a r ia b le R is e
[1]
[1]
Manufacturer's standards
0.25 D or R or per the
Optional
Skew
Placed riprap
Placed riprap
NO SCALE
geotextile filter, class 1, type C
Place earthwork geotextile between riprap and soil.
Contractor to field verify all invert elevations, prior to installation.
2.
1.
[3
" m in
[2
PRELIM
IN
ARY
NOT FOR C
NO SCALE
PLAN
F lo w
A A
B
B
NOTE:
FOOTNOTE:
3.
2.
1.
Stagger in-channel fish passage boulder within the culvert span.
streambed cobble, and bank stone gradations.
See special contract requirements for streambed sediment, Mix streambed cobbles evenly throughout streambed sediment.
[1]
TREATMENT
CULVERT INTERIOR
SIMULATED STREAM
F.11
STATE PROJECT
NUMBER
SHEET
U
S I n t2
D c p w w o r k d w a e f1 e l.
d g n
WA FS ERFO 2017(1)-23(3)
P
M
A u g u s t
C h e c k e d b y
D e s ig n e d b y
18-inches or as specified on plan sheet.[4] dimension.
smallest4 3 Embed fish passage boulders within active channel [3] streambed sediment.
Construct well defined banks with bank stone and[2] parabolic shape. Include meandering depressed low-flow.
Slope streambed aggregate towards flowline to ensure[1]
SECTION A-A
Flow
D2
SECTION B-B
LC
D
D ty p
D ty p
(typ.)
(typ.)
36" min.
or Length on plan sheet
W
Streambed sediment
Streambed cobble
Pipe arch culvert wall
Box culvert wall boulder
Fish passage boulder
Fish passage
[3]Fish passage boulder
[2]Bank stone
[2]Bank stones d e p th b u r ia l b u r ia l d e p th
Round pipe culvert wall top
Streambed
Culvert outlet
Culvert wall sediment
Streambed
Culvert inlet
Streambed cobble
Streambed sediment
Channel flowline depressed low-flow
Channel flowline with low-flow through culvert
Meander depressed
PRELIM
IN
ARY
NOT FOR C
4010050(0.78) Flow
Basin Characteristics
Parameter Code Parameter Description Value Unit
DRNAREA Area that drains to a point on a stream 3.1 square miles
PRECPRIS10 Basin average mean annual precipitation for 1981 to 2010 from PRISM 20.3 inches
CANOPY_PCT Percentage of drainage area covered by canopy as described in OK SIR 2009_5267 53 percent
Peak-Flow Statistics Parameters [Peak Region 2 2016 5118]
Parameter Code Parameter Name Value Units Min Limit Max Limit
DRNAREA Drainage Area 3.1 square miles 0.42 1330
PRECPRIS10 Mean Annual Precip PRISM 1981 2010 20.3 inches 8.86 84.2
CANOPY_PCT Percent Area Under Canopy 53 percent 0 81.8
Peak-Flow Statistics Flow Report [Peak Region 2 2016 5118]
PIl : Prediction Interval-Lower, PIu: Prediction Interval-Upper, SEp: Standard Error of Prediction, SE: Standard Error (other - - see report)
Statistic Value Unit PIl PIu SEp
2 Year Peak Flood 9.96 ft^3/s 3.22 30.8 77.2
5 Year Peak Flood 19.7 ft^3/s 7.01 55.4 69.1
10 Year Peak Flood 28.7 ft^3/s 9.83 84 72.2
25 Year Peak Flood 42.6 ft^3/s 13.1 138 81.2
50 Year Peak Flood 55.5 ft^3/s 15.6 197 89.2
100 Year Peak Flood 69.6 ft^3/s 18 269 96.9
200 Year Peak Flood 84.9 ft^3/s 20 359 106
500 Year Peak Flood 110 ft^3/s 23.1 526 120
Region ID: WA Workspace ID: WA20180917221021392000 Clicked Point (Latitude, Longitude): 48.04527, -120.06359 Time: 2018-09-17 15:10:38 -0700
HY-8 Culvert Analysis Report
Table 2 - Culvert Summary Table: 11' CMP
Straight Culvert
Inlet Elevation (invert): 2271.80 ft, Outlet Elevation (invert): 2269.48 ft
Culvert Length: 58.05 ft, Culvert Slope: 0.0400
Site Data - 11' CMP Site Data Option: Culvert Invert Data Inlet Station: 0.00 ft
Inlet Elevation: 2266.60 ft Outlet Station: 58.00 ft
Outlet Elevation: 2264.28 ft Number of Barrels: 1
Culvert Data Summary - 11' CMP Barrel Shape: Circular
Barrel Diameter: 11.00 ft Barrel Material: Corrugated Steel
Embedment: 62.40 in Barrel Manning's n: 0.0240 (top and sides)
Manning's n: 0.0540 (bottom) Culvert Type: Straight
Inlet Configuration: Mitered to Conform to Slope Inlet Depression: None
Discharge Names
Total Discharge
(cfs) Culvert
Discharge (cfs)
Headwater Elevation
(ft) Inlet
Control Depth (ft)
Outlet Control
Depth (ft) Flow Type Normal
Depth (ft) Critical Depth (ft) Outlet
Depth (ft) Tailwater Depth (ft)
Outlet Velocity
(ft/s) Tailwater Velocity
(ft/s) 2yr 10.00 10.00 2272.36 0.358 0.556 2-M2c 0.334 0.290 0.290 0.547 3.161 4.016 10yr 29.00 29.00 2272.95 0.700 1.145 2-M2c 0.642 0.593 0.593 1.024 4.466 5.636 25yr 43.00 43.00 2273.30 0.937 1.500 2-M2c 0.817 0.777 0.777 1.284 5.060 6.336 50yr 56.00 56.00 2273.60 1.145 1.799 2-M2c 0.961 0.926 0.926 1.492 5.528 6.837 100yr 70.00 70.00 2273.90 1.358 2.099 2-M2c 1.104 1.075 1.075 1.690 5.961 7.280
Table 3 - Downstream Channel Rating Curve (Crossing: 4010050 - 0.78 (11))
Tailwater Channel Data - 4010050 - 0.78 (11) Tailwater Channel Option: Trapezoidal Channel
Bottom Width: 4.00 ft Side Slope (H:V): 1.00 (_:1)
Channel Slope: 0.0620 Channel Manning's n: 0.0540
Channel Invert Elevation: 2268.30 ft
Roadway Data for Crossing: 4010050 - 0.78 (11) Roadway Profile Shape: Constant Roadway Elevation Crest Length: 20.00 ft
Crest Elevation: 2278.00 ft Roadway Surface: Gravel
Roadway Top Width: 16.00 ft
Flow (cfs) Water Surface Elev (ft) Depth (ft) Velocity (ft/s) Shear (psf) Froude Number
10.00 2268.85 0.55 4.02 2.12 1.01
29.00 2269.32 1.02 5.64 3.96 1.08
43.00 2269.58 1.28 6.34 4.97 1.10
56.00 2269.79 1.49 6.84 5.77 1.11
70.00 2269.99 1.69 7.28 6.54 1.12
Hydraulic Analysis Report Project Data Project Title:
Designer:
Project Date: Thursday, November 29, 2018 Project Units: U.S. Customary Units
Notes:
Channel Analysis: Channel Analysis Notes:
Input Parameters Channel Type: Trapezoidal
Side Slope 1 (Z1): 1.0000 ft/ft Side Slope 2 (Z2): 1.0000 ft/ft
Channel Width: 4.0000 ft Longitudinal Slope: 0.0620 ft/ft
Manning's n: 0.0538 Flow: 10.0000 cfs
Result Parameters Depth: 0.5464 ft
Area of Flow: 2.4841 ft^2 Wetted Perimeter: 5.5454 ft
Hydraulic Radius: 0.4480 ft Average Velocity: 4.0255 ft/s
Top Width: 5.0928 ft Froude Number: 1.0157
Critical Depth: 0.5517 ft Critical Velocity: 3.9824 ft/s
Critical Slope: 0.0600 ft/ft Critical Top Width: 5.10 ft
Calculated Max Shear Stress: 2.1139 lb/ft^2 Calculated Avg Shear Stress: 1.7331 lb/ft^2 matthew.dillin Text Box Existing Channel Profile 1"=20' matthew.dillin Callout Existing Ground matthew.dillin Callout Existing Roadway matthew.dillin Text Box Channel Profile at Crossing
| Background |
| AOP Design Criteria |
| FSR 4010050 MP 0.78 AOP Culvert |
| Operation and Maintenance |
| Floodplain and Flood-rise Impacts |
| Hydrology |
| Culvert Hydraulics |
File details come from the government source that posted it. Updated .