This document contains questions and answers related to a solicitation for road repairs on the Okanogan-Wenatchee National Forest in Washington. The solicitation involves installing culverts and aquatic organism pipes, rebuilding damaged road slopes, rehabilitating roadways, reconstructing ditches, and placing aggregate and chip seal surfacing. Eligible excavated material from project sites may be used in embankments. The estimated value ranges from $1-2 million and work is to be completed in the fall of 2020. The solicitation is issued by the Department of Transportation Federal Highway Administration.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WA FS ERFO 2017(1)‐23(3)
Okanogan‐Wenatchee 2017 Repairs, Phase 3
# General Technical Question Answer Date
1 X
Per the specs in Section 204.06 Roadway Excavation, it states the “All excavated material is unsuitable.” Is it intended that all of the excavated material at each site be hauled off and replaced with import borrow?
See Subsections 204.10 and 204.14 of FP‐ 14.
1/6/2020
2 X Can any of the excavated material be used as fill material on any of the sites that require fill?
In accordance with Subsections 204.10 and 208.03, suitable material from excavations may be incorporated into embankment construction.
1/6/2020