08a_Ankeny Main Parking Earthwork Report.pdf

PDF 10 KB Posted

Attached to
OR FWS BKS 2016(1), Baskett Slough Headquarters Access Design
Solicitation number
69056719B000016
Issued by

About this file

This document contains a federal construction solicitation and related earthwork report. The solicitation is for OR FWS BKS 2016(1), Baskett Slough Headquarters Access Design & OR FWS ANK13588(1), Ankeny Hill Nature Center Access. The Department of Transportation Federal Highway Administration is the contracting agency. The solicitation is designed to address construction work outlined in the attached earthwork report for Ankeny Main Parking. The report provides volumetric calculations for excavation and fill work needed for the parking area, indicating a net cut of 1843.87 cubic yards. Relevant details include the original and design ground surfaces used, a cut and fill factor of 1.00 applied, and a 10 foot grid interval used for the volume calculations.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Grid Volume Report

Original Surface: Existing Ankeny Design Surface: MA-Parking

Ignore Cut Factor: 1.00 Fill Factor: 1.00 Grid Interval: 10.00

Cut: 50168.37 cu ft Fill: 383.75 cu ft Net: 49784.62 cu ft

Cut: 1858.09 cu yd Fill: 14.21 cu yd Net: 1843.87 cu yd