Technical_Information_Form_1.pdf

PDF 38 KB Posted

Attached to
Yellowstone, Grand Teton, & Surrounding area MATOC
Solicitation number
69056718R000003
Issued by

About this file

This document contains a federal contract opportunity notice and technical evaluation forms. The federal contract opportunity is for multiple award task order contracts covering highway, bridge and road construction projects in Yellowstone National Park, Grand Teton National Park and surrounding areas within 100 air-miles. The Department of Transportation Federal Highway Administration intends to award two to eight indefinite delivery, indefinite quantity contracts worth a total of $350 million over five years, with two set aside for small businesses. The minimum guarantee per contract is $25 million. Project values will range from $2 million to $40 million. Evaluation will use the lowest price technically acceptable process. The technical evaluation forms require information on recent and relevant experience, including summaries of one to five qualifying prime contracts and details on road reconstruction, bridge work, materials sourcing, environmental and cultural protections, and stone masonry experience. Unsatisfactory performance must also be noted.

Technical Evaluation Form 1

View the file

Other files

File Type Posted
Amendment_A001.pdf PDF
RFP_Yellowstone.pdf PDF
Master_Subcontracting_Plan.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Source Selection Information See FAR 2.101 and 3.104

(Applicable when filled-in)

Technical Information Form 1

Technical Evaluation Factor 1 - Recent and Relevant Experience Project Information

A brief summary of a minimum of one and maximum of five contracts as a prime contractor meeting the following requirements:

(1) Completed after September 1, 2010 or the project is at least 50% complete as of the date of proposal submission; AND

(2) 50% of the work performed by the Prime (25% if a Bridge project); AND

(3) Road reconstruction or new construction; AND

(4) $6 million minimum contract award amount

In addition, each individual project must include a minimum of four of the following elements, and all seven of the elements must be cumulatively represented.

(1) Roadway reconstruction of 2-mile or more corridor, 2-lane with ADT 3,000 veh/day or greater, and with no available detours or closures.

(2) Protection of wetlands or Class 1 waters within 20’ of construction limits

(3) Protection or preservation of cultural resources such as: historic features or sites;

archeological sites; or historic stone masonry such as found in Yellowstone and Grand Teton National Parks

(4) Reassembly or new construction of stone masonry features such as: headwalls, curbing or rock facing.

(5) Performance where material sources were 60 miles or greater from the construction site

(6) Paving – 8000 tons minimum

(7) Bridge construction of a vehicular bridge with multiple spans

Technical Experience Criteria

Also include in the summary the following:

Unsatisfactory Performance – Submit comments regarding any known performance deemed not acceptable to the customer or not in accordance with the contract terms and conditions.

This form must be completed and submitted for EACH project.

Source Selection Information See FAR 2.101 and 3.104

(Applicable when filled-in)

Technical Information Form 1 (Page 2) Technical Evaluation Factor 1 - Recent and Relevant Experience Project Information

Project Name/Number: _________________________________________________ Project Contract Number: ___________________________________ Owner/Organization Name: _______________________________________________ Address: ______________________________ P.O. Box/Street City, State, Zip Code Owner/Organization Point of Contact: _______________________________________ Name Owner/Organization e-mail address: _______________________________________ Owner/Organization Phone Number: _______________________________________ Award Amount: $_________________ Completion Date: _______________ Road Description: ________________________________________________________

Brief Summary:

A brief summary of a minimum of one and maximum of five contracts as a prime contractor meeting the following requirements: