Amendment_A001.pdf
PDF 331 KB Posted
- Solicitation number
- 69056718R000003
About this file
This amendment modifies a solicitation for multiple award task order contracts to support highway, bridge, and road construction projects in and around Yellowstone and Grand Teton National Parks. The contracts have a total maximum value of $350 million over five years and will be awarded to between two and eight contractors, with two reserved for small businesses. Task orders will range from around $2 million to $40 million and will be competed among MATOC holders on a lowest price technically acceptable basis. Offerors should review the forthcoming RFP for submission instructions and evaluation criteria.
Amendment A001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP_Yellowstone.pdf | ||
| Technical_Information_Form_1.pdf | ||
| Master_Subcontracting_Plan.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A001 11/14/2018 N/A See Block 14
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
69056718R000003
9B. DATED (SEE ITEM 11)
10/19/2018
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
N/A
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
N/A
D OTHER (Specify type of modification and authority) N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Yellowstone, Grand Teton, & Surrounding area Multiple Award Task Order Contract (MATOC).
See page 2
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A001, dated 11/14/2018 Yellowstone, Grand Teton, & Surrounding Area Solicitation No. 69056718R000003 Multiple Award Task Order Constract (MATOC)
REVISIONS ARE AS FOLLOWS:
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF
WORK
Page C-4. Revises section C.4. Ordering Procedures for Competitive Task Orders.
ENCLOSURES
Pages:
C-4
C-4
SECTION C – Description/Specifications/Statement of Work Yellowstone, Grand Teton, & Surrounding Area Multiple Award Task Order Contract (MATOC)
C.3. WAGE RATES
Construction Wage Rate Requirements are applicable to construction task orders awarded under this contract.
C.4. ORDERING PROCEDURES FOR COMPETITIVE TASK ORDERS.
It is anticipated that most, if not all, of the Task Orders will be awarded based on competition between all MATOC contract holders.
Task Orders will not be publicly opened or released. Following receipt of bids for any TO-IFB, bid tabulations will be posted to the FHWA WFL site, https://flh.fhwa.dot.gov/business/construction/bids/.
Unsuccessful offerors' task proposal information will not be made available to the public, however, the information will be shared among other bidders (bid tabs will be shared with all MATOC holders after each Task Order bid opening.)
(1) Task Order Synopsis - When the Government requires work under the MATOC and time allows, a Task Order-Synopsis will be posted on FedBizOps (https://www.fbo.gov/). The synopsis will provide a brief description of the project and the anticipated solicitation issue date. In some instances, the synopsis may be issued via e-mail.
(2) Task Order Requests for Proposals (TO-RFP) - When the Government requires work under the MATOC, a TO-RFP will be issued. The TO-RFP will include information concerning the project such as, contract requirements, physical data, drawings, site visit details, evaluation criteria, and submission requirements (e.g. bid schedule, proposal requirements, etc).
(3) Task Order Pre-award Expenses - The Contractor will not be reimbursed for proposal preparation, attendance during negotiations, site visits, walk-through or other pre-award task order costs.
(4) Site Visits - Failure to visit the site cannot be used as an excuse for omission or miscalculation in offers. The Government may or may not schedule a joint site visit for individual task orders.
(5) Proposal Contents - Depending upon the requirements of each TO-RFP, the Contractor may be required to provide a price proposal only, or a technical proposal and a price proposal. Respond within the number of calendar days stated in the TO-RFP by submitting a proposal to the CO.
(6) Contract Prices - Bid Schedules - Payment for items listed in the Bid Schedule constitutes full compensation for furnishing all labor, equipment, services, and materials needed to complete construction. Include in the prices for the items listed in the Bid Schedule all costs for the specified work, whether or not specifically listed in the Bid Schedule.
(7) Bid Bonds. Submit bid bonds with the TO proposal as required in the TO-RFP.
Revised by Amendment A001
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT |
| A001 |
| Amd_Page_2_Master.pdf |
| SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK |
File details come from the government source that posted it. Updated .