This document provides details for a federal contract opportunity to perform bridge repair work on three bridges along the Denali Park Road in Alaska. The project involves minor bridge repairs, painting bridge rails, removing sheet piles and placing riprap for stream stabilization, and other minor work along a three mile stretch of road. The estimated price range for the work is between $1 million to $2 million. The tentative completion date is Summer 2019. The solicitation for this small business set-aside opportunity will include preliminary plans and additional project information. Interested vendors should register to receive notification when the solicitation is posted. The National Park Service is the contracting agency for this bridge repair work located approximately 145 miles southwest of Fairbanks, Alaska.

Project Description

View the file

Other files

File Type Posted
Prelim_Letter_DENA1048.pdf PDF
AK_DENA10(48).pdf PDF
PROJECT_DESCRIPTION.pdf PDF
DENA1047_PreAdd2018.pdf PDF
DENA1047_Preliminary-Plans-Letter.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AK NPS DENA 10(47), Repair Three Denali Park Road Bridges, Denali Borough, Alaska

The work consists of Minor bridge repairs, Paint bridge rails, and stream stabilization (remove sheet piles and place riprap) and other small items of work.

Project length: 3 Miles

Tentative Fixed Completion Date: Summer 2019 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $1million to $2 million

Location: Approximately 145 Miles SW of Fairbanks, Alaska.

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

On e S ch ed ul e

Sc h

Na m e

DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance

(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion & Sediment Control (erosion control devices) Fiber Roll Temporary Diversion Channel

500 LNFT

LPSM

DIVISION 200 – Earthwork 203 Removal of Structures and Constructions and obstructions (gabion basket/revetment mattress) LPSM 203 Removal of Structures and Constructions and obstructions (steel sheet pile wall) LPSM 207 Separation-Stabilization Geotextile 2,900 SQYD 251 Placed Riprap, Method A, Class 5 3,740 CUYD DIVISION 500 – Rigid Pavement 552 Repair Concrete (Sanctuary River Bridge Joints) 250 SQYD 563 Painting, Steel Structure (Sanctuary River Bridge) LPSM 563 Painting, Steel Structure (Stony Creek Bridge) LPSM 575 Minor Bridge Work (Stony Creek Bridge) LPSM

On e S ch ed ul e

Sc h

Na m e

DIVISION 600 – Incidental Construction 635 Temporary Traffic Control LPSM 647 Mitigation, Streambed Material 1,800 CUYD