AK_DENA10(48).pdf
PDF 20 MB Posted
- Solicitation number
- 69056718B000028
About this file
This document provides details on a federal contract opportunity for bridge and culvert repair work in Denali National Park, Alaska. The National Park Service is seeking bids to repair two bridges and replace a culvert on the Denali Park Road at mileposts 52 and 52.9. The work includes minor bridge repairs, painting bridge rails, stream stabilization, removal of sheet piles and placement of riprap. The estimated price range for the contract is between $1,000,000 and $2,000,000. The tentative completion date for the work is Summer 2019. Interested vendors must register at FBO.gov in order to view the interested vendors list and be notified when solicitation documents, including specifications and plans, are posted. This opportunity is offered as a small business set-aside.
Revised Preliminary Plans
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Prelim_Letter_DENA1048.pdf | ||
| PROJECT_DESCRIPTION.pdf | ||
| DENA1047_PreAdd2018.pdf | ||
| DENA1047_Preliminary-Plans-Letter.pdf | ||
| PROJECT_DESCRIPTION_DENA_10(47).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C
� Project Location :g ai
.0 "O
QJ
QJ
C
C
.0 "O
QJ
C:
Cl "iii
QJ
N
SOUTH CENTRAL
ALASKA KEY MAP
TYPE OF CONSTRUCTION:
WRANGELL
ST. EUAS
NATL PARK
Minor bridge repair, excavation, drainage, aggregate, rock scaling and concrete box culvert
DESIGN DESIGNATION:
ADT (2019)
ADT(2039)
V e (max)
<100 <100
35MPH
6%
SPECIFICATION:
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14
PLANS PREPARED BY
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
VANCOUVER, WASHINGTON
i PROJECT MANAGER
� B. Chon
I I
I
U.S. DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICE
DENALI NATIONAL PARK AND PRESERVE
•�� p::� s
��� p����� �c�:)
NPS PMIS No. 242398A & 242400A 'l,J
81ATESG��� CULVERT REPLACEMENT MP 52
& ROCKFALL MITIGATION MP 52.9
AND
AK NPS DENA 10(47)
NPS PMIS No. 164258A
REPAIR TWO DENALI PARK ROAD BRIDGES
N
SCALE IN MILES
25 0 25 50 75 100
STATE PROJECT
AK NPS DENA 10( 48)
SHEET
NUMBER
A.1
NPS PMIS No. 242398A & 242400A NPS Drwg. No.
NPS PMIS No. 164258A NPS Drwg. No.
INDEX TO SHEETS
A. GENERAL INFORMATION
A.1 TITLE SHEET
A.2 PLAN SYMBOLS AND ABBREVIATIONS
A.3 VICINITY MAP
B. SUMMARIES
B.1-2 SUMMARY OF QUANTITIES
C. TYPICAL SECTION
C.1 TYPICAL SECTION TABULATION OF QUANTITIES
C.2 TYPICAL SECTIONS
D. PLAN-PROFILE
D.1 TABULATION OF PLAN-PROFILE QUANTITIES
D.2 PLAN AND PROFILE - CONCRETE BOX CULVERT MP 52
D.3 PLAN AND PROFILE- ROCKFALL MITIGATION MP 52.9
D.4 PLAN AND PROFILE- ROCKFALL MITIGATION MP 52.9
E. BRIDGES
E.1 SANCTUARY RIVER BRIDGE
E.2 STONY CREEK BRIDGE
F. EROSION CONTROL
F.1
F.2
F.3
TABULATION OF EROSION CONTROL QUANTITIES
EROSION CONTROL PLAN
CONCRETE BOX CULVERT MP 52
EROSION CONTROL PLAN
ROCKFALL MITIGATION MP 52.9
F.4 SWPP SIGN
F.5-6 EROSION CONTROL STANDARD DRAWINGS
G. GEOTECHNICAL DETAILS
G.1 GEOTECHNICAL QUANTITIES
G.2 ROCKFALL DITCH AND EARTH BERM
G.3-6 PRELIMINARY SCALING AND ROCK REINFORCEMENT
LAYOUTS - TOKLAT BLUFFS (SITE 964)
G.7 ROCK BOLT AND ROCK DOWL DETAILS
H. DRAINAGE
H.1 BUGSTUFFER CREEK - MP 52 CULVERT PLAN & PROFILE
H.2 BOX CULVERT STRUCTURAL DETAILS
H.3 BOX CULVERT RIPRAP DETAILS
I. TEMPORARY TRAFFIC CONTROL
1.1 TABULATION OF TEMPORARY TRAFFIC
CONTROL QUANTITIES
1.2-5 TEMPORARY TRAFFIC CONTROL
STANDARD DRAWINGS
J. PERMANENT TRAFFIC CONTROL
J.1 PERMANENT TRAFFIC CONTROL QUANTITIES
AND PLAN
J.2 STANDARD DETAIL
PRELIMINARY
CP GPS
JH
BH
TP
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
RIP
G G
W W
DI
T
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS
A
M
M a y
U
S C c p w w o r k d d e n a a b .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.2 NPS DENA 10(48) AK
DI
T
NO SCALE
- no symbol -wall face
N
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material
NOTE:
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø
∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
Fiber Roll or Wattle
NPS Drwg. No.
NPS PMIS No. 242398A & 242400A
184/80301
SCALE IN MILES
A.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft
D p w w o r k d d e n a a c .d g n
AK NPS DENA 10(47)
J u ly
C h e c k e d b y
D e s ig n e d b y
VICINITY MAP
N
R o a d a ki n al k e
T r e vi R
Mt. Wright egdiR esoremirP yr au t c n a S r e vi R
Mt. Sheldon
Campground
River
Santuary
R iv e r
R iv e r
R iv e r
T
S
T
S
T
S
R 14 W R 13 W R 12 W R 11 W
T o k la t
Overlook Stony Hill
Pass
Highway
Truck Turnaround
& P R E S E R V E
P A R K
N A T I O N A L
D E N A L I
R 10 W R 9 W
T
S
T
S
De na li
Pa rk
Ro ad
Truck Turn Around (MP 53.5)
Toklat Road Camp and
Toklat Pit
& P R E S E R V E
P A R K
N A T I O N A L
D E N A L I
Mountain
Divide
Rock Fall Mitigation (MP 52.9)
Stony Creek Bridge
MP 60.7
Sanctuary River Bridge
MP 22.9
D e n a li
P a rk
Ranger Cabin
Mt. Pendleton
Sable Mountain
Pass Thorofare
Vistors Center Eielson
E a s t
F o r k
T o k la t
(MP 27.2)
Teklanika Pit
(MP 30.32)
Teklanika Gate
NOTE:
0 25 50 7525 100
Sanctuary River Bridge
MP 22.9
Long 149°28'41.01"W
Lat 63°43'11.94" N
Long 150°14'23.07"W
Lat 63°27'10.89" N
Stony Creek Bridge
MP 60.7
Truck turnarounds are available at each bridge site and Toklat Pit.1.
To Healy: 47 miles
To George Parks Hwy: 23 miles
Concrete Box Culvert (MP 52)
NPS Drwg. No.
NPS PMIS No. 242398A & 242400A
TABULATION OF QUANTITIES
TYPICAL SECTION
C.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d d e n a c a .d g n
AK NPS DENA 10(48)
P
M a y
B V in c e n t
R e a d o w s
C h e c k e d b y
D e s ig n e d b y
NO SCALE
NPS Drwg. No.
NPS PMIS No. 242398A & 242400A o n s tr u c ti o n l im it o n s tr u c ti o n l
303+75 to 319+23
TYPICAL SECTIONS
100+00 to 107+36
C o n s tr u c ti o n l
C o n s tr u c ti o n l
C.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d d e n a c b .d g n
AK NPS DENA 10(48)
A u g u s t in c e e a d o w s
C h e c k e d b y
D e s ig n e d b
FOOTNOTE:
surface
Existing p r o fi le
M a tc h
CONNECTION DETAIL
NO SCALE
method 2
Roadway aggregate, [1]3% [1]3%
Profile grade point
[2
1V:
2H
[2]
1V:2H
Existing ground
DENALI PARK ROAD
LC
Traveled way varies Traveled way variesVaries
Construction limit varies s ta k e l im it s
S lo p e s ta k e l im it s
[2
V a ri e s
[2]1V:4H
S lo p e
12' 12' ground
Existing
3'
6" compacted depth method 2, (Government furnished)
Roadway aggregate, [1]3% [1]3%
Profile grade point
[2
1V:
2H
[2]
1V:2H
Existing ground
Existing ground
DENALI PARK ROAD
LC
Varies
Varies
Construction limit varies topsoil, 4-inch depth
Placing conserved s ta k e l im it s
S lo p e
S lo p e s ta k e l im it s
[2
V ar ie s
Embankment top soil, 4-inch depth
Placing conserved
12'
Traveled wayTraveled way varies
12' - 19'
6" compacted depth method 2, (Government furnished)
Roadway aggregate, Construct slopes as shown in the Staking Report.[2] sections.
Superelevate roadway at the rate 'e' as indicated on the cross[1]
Embankment
VARIES 12' TO 18'
NPS Drwg. No.
NPS PMIS No. 242398A & 242400A
QUANTITIES
PLAN-PROFILE
TABULATION OF
D.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d d e n a fa .d g n
AK NPS DENA 10(48)
A u g u s t
V in c e
M e a d o w
C h e c k e d b y
D e s ig n e d b y
NPS Drwg. No.
NPS PMIS No. 242398A & 242400A
CP
X4
X5
X6
X7
X8
X9
X1
N
Curve= BUG1
D
R= 400.00'
T= 92.34'
L= 181.51' e = 6%
-5 .7
8%
CUYD
EXC.
CUYD
EMB.
D.2
NUMBER
SHEET
U
S S u r ft p w w o r k d d e n a fb .d g n
AK NPS DENA 10(48)
u g u s t
V in c e
M e a d o
C h e c k e d b y
D e s ig n e d b y
100+00103+00106+00 101+50104+50107+50
P O
T
.0
P C
.0
P T
.6
P O
T
.0
3,230
3,240
3,250
,2
.3
,2
.1
-2.5
200' VC
,2
.1
-5 .7
8%
115' VC
,2
.4
Profile grade
Existing ground
Existing ground
Line to be constructed
Existing 30" pipe culvert
BEGIN PROJECT
107+36.00
AK NPS DENA 10(48) 100+00.00
AK NPS DENA 10(48)
El=3247.24
E=1641337.2109
N=3476885.0184
El=3223.49
E=1640660.1887
N=3477133.8759
C u lv e r t
C u lv e r t
Limits of construction method A, class 1
Riprap ditch, Remove pipe culvert
SUSPEND PROJECT
Profile grade
See Sheet XXX.
concrete box culvert
Install 10 ft. x 4 ft. x 64 ft.
103+76.60 c o n c r e te b o x c u lv e r t
I n s ta ll f t.
x f t.
R e m o v e c u lv e r t in c h
Proposed edge of pavement
Remove pipe culvert
NPS Drwg. No.
NPS PMIS No. 242398A & 242400A
3045 3045
3045 3045
30503
3050 3050
3050 3050 3050
3050 3050
3050 3050 3050
3050 3050
3050 3050
3050 3050
3050 3050
3050 3050
3050 3050 3050
5 3055
30553055
3095 3095
31053105
3110 3115
3145 3145
31503150
3155 3155
31553155
31603160
32103210
20 3220
P O
T
.0
N
CUYD
EXC.
CUYD
EMB.
310+00307+50305+00302+50300+00
3035 3035
3040 3040
3045 3045
3050 3050
3055 3055
3060 3060
3065 3065
3070 3070
3075 3075
D.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d d e n a fc .d g n
AK NPS DENA 10(48)
A u g u s t
C h e c k e d b y
D e s ig n e d b y
,0
.1
,0
.2
-1.1414%
-1.9652%
200' VC
NPS Drwg. No.
NPS PMIS No. 242398A & 242400A
184/80301
Line to be constructed
BEGIN PROJECT
Profile grade
Existing ground
El=3061.14
E=1636766.4435
N=3478045.8722
303+75.00
MP 52.9
ROCKFALL MITIGATION
AK NPS DENA 10(48)
3040 3040
3045 3045
3045 3045
3045 3045 3045 3045
3045 3045 3045 3045 3045
3050 3050
3050 3050 3050 3050
3050 3050 3050 30503050
5 3245
P C
.1
P T
.0
P C
.3
P T
.6
P O
T
.1
N
Curve= ROCK3-1
D
R= 600.00'
T= 151.03'
L= 295.91'
Curve= ROCK3-2
D
R= 650.00'
T= 123.60'
L= 244.29'
CUYD
EXC.
CUYD
EMB.
320+00317+50315+00312+50310+00
3025 3025
3030 3030
3035 3035
3040 3040
3045 3045
3050 3050
3055 3055
3060 3060
3065 3065
D.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d d e n a fd .d g n
AK NPS DENA 10(48)
u g u s t
C h e c k e d b y
D e s ig n e d b y
,0
.4
250' VC
,0
.1
-0.4256% +0.1942%
150' VC
,0
.5
-0.8948%
100' VC
,0
.9
+0.2730%
80' VC
,0
.0
NPS Drwg. No.
NPS PMIS No. 242398A & 242400A
184/80301
END PROJECTLine to be constructed
El=3046.03
E=1635233.4415
N=3478288.8905
Profile grade
Existing ground
319+60.00
MP 52.9
ROCKFALL MITIGATION
AK NPS DENA 10(48)
NO. DATE BY REVISIONS NO. DATE BY REVISIONS
9830-007P
REPAIR DETAILS
SANCTUARY RIVER BRIDGE
ELEVATION
PLAN
TYPICAL SECTION
A A
"2 164'-8 65'-2" "2
164'-8
Along centerline
194'-7"
12'-0" 12'-0"2'-3" 2'-3"
(Typ.)
MC8x21.4
Begin bridge End bridge
1" joint seal and filler
Remove existing
SECTION A-A
EXISTING PROPOSED
1"10""
4'-0" 4'-0"8'-0" 8'-0"1'-9" 1'-9"
No scale beads and silicone band
Field applied silicone corner
1 M in silicone
Precompressed
Impregnated foam both sides
Epoxy adhesive N
(Typ.)
elastomeric concrete joint header with
Remove and recast
Legend:
S a n c tu a ry R iv e r
Note:
BAO
A C
T U
A L F I L E R
D
E N
A
P
E .D
G N
(Typ.)
(To remain) reinforcement
Existing
Footnote:
391 LNFT (Information Only Quantity) [2]
65 LNFT (Information Only Quantity)[1] welded to angle
" Support bar 8
30°
(Typ.)
recast joint headers.
joints. Remove and remove and reseal pier
Repair Concrete;
Type 2 (1V)
Object Marker, C Abutment 2LLC Abutment 1L C Pier 1 LC Pier 2
(See Note 2) welded stud anchor @ 1'-0"
" Ø 4 1"x4
1 with 24 1L2x2x
(Typ.)
mounting brackets repaint steel railing and remove existing paint and
Painting, Steel Structure;
(Typ.)
mounting brackets repaint steel railing and remove existing paint and
Painting, Steel Structure;
Continue new joint seal up curb line face to exterior face of curb.
to ASTM A123. Install angle between curbs matching bridge deck crown.
Provide steel angle conforming to ASTM A36. Galvanize angle according2.
mounting bracket details.
Field verify all dimensions. Refer to as-builts for steel railing layout and 1.
C StructureL
E.1
Structure Number
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
DRAWING NO.
DENALI NATIONAL PARK AND PRESERVE
2B. OLTMANNAF AF
AK NPS DENA 10(47)
NPS PMIS No. 164258A
NPS Drwg. No. 184/80,300
AUGUST 2019
D e fa u lt p w w o r k d E
D E
N A P
E .D
G N
A u g u s t
9 PRELIMINARY
NO. DATE BY REVISIONS NO. DATE BY REVISIONS
9830-015P
REPAIR DETAILS
STONY CREEK BRIDGE
ELEVATION
PLAN
TYPICAL SECTION
12'-0" 12'-0"2'-3" 2'-3"
Begin bridge
End bridge
4'-0" 4'-0"8'-0" 8'-0"1'-9" 1'-9"
104'-7"
"2 134'-8 35'-2" "2
134'-8
DETAIL A
B
B
O v e rl a p
(Typ.)
21WF59
N
S to n y C r e e k
"4
Legend:
VIEW B-B
Note:
No Scale
(Typ.)
See Detail A
BAO
A C
T U
A L F I L E R
D
E N
A
P
E .D
G N
Control, Fiber Roll
Place Soil Erosion
Footnote:
3,000 SQFT (Information Only Quantity)[1] as directed by the CO
Riprap, Method A, Class 1
Repair erosion with Placed
AT INTERMEDIATE AND PIER DIAPHRAGM AT ABUTMENT DIAPHRAGM
14WF30 MC12x25
Existing scupper
Type 2 (1V)
Object Marker, bent plate
" Three-sided16
C Abutment 2C Abutment 1L LC Pier 1 LC Pier 2 L repair to no more than 5".
Concrete repair area to be determined by CO. Limit depth of3.
Paint scupper extensions after installation.
Furnish steel for scupper extensions conforming to ASTM A36.2.
layout and bearing assembly details.
Field verify all dimensions. Refer to as-builts for steel superstructure1.
(Typ.)
and all bearing assemblies repaint steel superstructure remove existing paint and
Painting, Steel Structure;
approx. 3'-0" x 2'-6" deck surface, repair deteriorated
Minor Bridge Work;
(See Detail A)
8 locations extend scupper, Minor Bridge Work;
C StructureL
E.2
Structure Number
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
DRAWING NO.
DENALI NATIONAL PARK AND PRESERVE
2B. OLTMANNAF AF
AK NPS DENA 10(47)
NPS PMIS No. 164258A
NPS Drwg. No. 184/80,300
AUGUST 2019
D e fa u lt p w w o r k d E
D E
N A P
E .D
G N
A u g u s t
9 PRELIMINARY
EROSION CONTROL
TABULATION OF
F.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d d e n a d a .d g n
AK NPS DENA 10(48)
A u g u s t
V in c e
M e a d o
C h e c k e d b y
D e s ig n e d b y
SCALE IN FEET
35 3
MP
N
LEGEND
Fiber log
Riprap
F.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d d e n a d b .d g n
AK NPS DENA 10(48)
A u g u s t
V in c e
M e a d o
C h e c k e d b y
D e s ig n e d b y
MP 52
CONCRETE BOX CULVERT
0 2525 50
NPS Drwg. No.
NPS PMIS No. 242398A & 242400A
SCALE IN FEET
30453045
30453045
304530453045
30453045
30503050
305030503050
653070
P C
.1
P T
.0
P T
.0
5P
C
.3
N
N
MP 52.9
ROCKFALL MITIGATION
EROSION CONTROL PLAN
LEGEND
Fiber log
F.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d d e n a d c .d g n
AK NPS DENA 10(48)
A u g u s t
V in c e
M e a d o
C h e c k e d b y
D e s ig n e d b y
NPS Drwg. No.
NPS PMIS No. 242398A & 242400A
184/80301
0 25 5025 levels:GSCOLORFILL|GSBWFILL|GSOUTLINE
SWPPP SIGN
F.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d d e n a d g .d g n
AK NPS DENA 10(48)
A u g u s t
C h e c k e d b y
D e s ig n e d b y
3'-6"
3"
4"C
"2
"B2
3"
2"C
2"
2"C
14"
"8
3IN = 0
"8
5TH = 0
"8 1R = 1
BORDER
specific project information background. Adjust text to match
Black border and text on white
Refer to Subsection 107.01A(d) of Special Contract Requirements
SWPPP Sign
157-5
STANDARD APPROVED FOR USE 6/2005
DRAFT: 3/2014
REVISED: 6/2007
DIVERSION CHANNELS
TEMPORARY
STATE PROJECT
NUMBER
SHEET
F.5
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
NPS DENA 10(48) AK
U S
C c p w w o r k d d e n a d d .d g n
A u g u s t
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
PLASTIC LINED DIVERSION CHANNEL
RIPRAP LINED DIVERSION CHANNEL
TEMPORARY CULVERT
DIVERSION CHANNEL
SECTION B-B
SECTION A-A
SECTION A-A SECTION B-B
SECTION B-B
PLAN
W
B
W
B
W
B B
W
T T
Ø when scheduled)
Silt fence (typ.
Roadway embankment
Roadway embankment
Temporary culvert backfill
Subgrade
Bedding
Sandbags
Riprap lining Riprap lining backflow into natural channel
Use sandbags to prevent
Permanent natural channel
Earthwork limits when scheduled)
Silt fence (typ.
See Note 5
Permanent culvert
Roadway centerline temporary barrier
Use sandbags to construct
SandbagsPlastic liner
SSSS
SS SS
D
D D
D
SS
SS
SS SS
1.
2.
3.
4.
5.
FlowFlow
FlowFlow
Plastic liner when scheduled)
Silt fence (typ.
When specified replace the portion of the diversion channel through the roadway embankment with temporary culvert. Compact temporary culvert backfill using one of the methods listed in Subsection 204.11(a).
See Erosion Control Section for temporary culvert diameter, riprap class, channel dimensions and quantities.
Use plastic liner or riprap along the entire length and width of the temporary diversion channel.
Construct channel at a minimum grade of 0.5 percent.
Do not construct with longitudinal joints if using a plastic liner. Bury the upstream edge of the liner a minimum of
A
A
BB
GeotextileGeotextile
Flow
Natural ground and secure with sandbags (typ.)
NPS Drwg. No.
NPS PMIS No. 242398A & 242400A
184/80301
6" deep and secure with riprap or sandbags.
2'2'
Bury plastic liner 6" deep
2'2'
NOTE:
with plastic liner or riprap
Temporary diversion channel
REVISED: 10/2016
DETAIL APPROVED FOR USE --/----
WESTERN FEDERAL LANDS HIGHWAY DIVISION
SILT FENCE
W157-1
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
F.6
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
NPS DENA 10(48) AK
U S
C c p w w o r k d d e n a d e .d g n
A u g u s t
POST AND GEOTEXTILE INSTALLATION DETAIL
SILT FENCE INSTALLATION AT TOE OF FILL
Fi ll slo pe
T o e o f s lo p e
PLAN
ELEVATION
4.
3.
2.
1.
T o e o f s lo p e
Fi ll sl op e
ELEVATION
PLAN
PLAN
PLAN
END DETAIL
END POSTS DETAIL
POSTS AT JOINTS
Varies
Geotextile
Steel or wood post
Backfilled and compacted soil fo r s p a c in g
S e e N o te
Limits of clearing
(undisturbed)
Existing ground
Silt fence reinforcement
NPS Drwg. No.
NPS PMIS No. 242398A & 242400A
184/80301
NOTE:
Staple or tie
Section B
Geotextile fabric, Tie top of posts together driven tightly together.
Steel or wood posts
Steel or wood post
Staple or tie
Geotextile fabric
Fasten fabric to posts around each post one full turn.
Fold geotextile fabric See Note 3
End Posts Detail
End posts, see
End Posts Detail
End posts, see
See Note 3 fabric, Section A
Geotextile
Flow
Flow
Flow running around the ends.
Curve ends of silt fence upgrade to prevent water from as possible.
Install silt fence to follow the ground contours as closely does not slide down, supporting posts.
All types must ensure silt fence remains attached to, and manufacturer's recommendations for installation procedures.
as long as specified dimensions are satisfied. Follow
Alternate preassembled silt fence options will be allowed m in m in m in
6-foot (max.) spacing without silt fence reinforcement.
10-foot (max.) spacing with silt fence reinforcement.
4" min.
6" min. trench
Spacing Slope
STAKES REQUIRED
1:1
1:2
1:3
1:4 or flatter for each roll
Stakes required
FIBER ROLL SPACING
Fiber roll length
DRAFT: 7/2016
REVISED:
DETAIL APPROVED FOR USE 10/2014
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FIBER ROLL
(FT)
(FT)
W157-21
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
F.7
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
NPS DENA 10(48) AK
U S
C c p w w o r k d d e n a d f.
d g n
A u g u s t
Fl ow
T o e o f fi ll s lo p e
ELEVATION
PLAN
disturbed areas
Runoff from
INSTALLATION BEYOND TOE OF SLOPE
INSTALLATION ALONG SLOPES
FIBER ROLL STAKING DETAIL
PROPERLY STAKED AND ENTRENCHED FIBER ROLL
Existing ground (typ.)
Fiber roll
Flow direction
Slope
Direction of runof f from distur bed area s sp ac in g ch ar t
S ee F ib er R ol l
Fiber roll ff o n ur f o n oi t c er i
D along contours
Install fiber rolls
Fiber roll
Slope
Fi ll slo pe
Direction of runoff ground
Existing soil to match ground level
Backfilled and compacted
Flow larger than fiber roll wood stakes. See Note 2.
Pay lim its
Pay lim its
SLOPE PROTECTION INSTALLATION
ALTERNATE FIBER ROLL JOINT DETAIL
FIBER ROLL LAPPING DETAIL
on uphill side of fiber roll
Place excavated material Stagger joints (typ.)
2.
1.
permanent installations. Do not crush fiber roll while staking.
roll is secure to slope. Live stakes may be used for and install fiber rolls
Step 1: Excavate trench Step 2: Backfill soil against fiber rolls
NPS Drwg. No.
NPS PMIS No. 242398A & 242400A
184/80301
2" (min.) Excavate trench 2"
1" x 1" or 1" Ø ove rlap
12" (m in.)
t o m in m in
1" x 1" Wood stake as specified in plans
3' min. or
3' (min.)
Drive stakes at each end and at 4-foot spacing until fiber fiber roll and space stakes at 4-foot max.
6-inches from fiber roll end angles towards the adjacent
Overlap fiber rolls 12-inch minimum. Drive stakes at
NOTE:
GEOTECHNICAL QUANTITIES
G.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d d e n a s a .d g n
AK NPS DENA 10(48)
A u g u s t in c e e a d o w s
C h e c k e d b y
D e s ig n e d b
NPS Drwg. No. 184/80,299
NPS PMIS No. 148115A
TOKLAT BLUFFS (SITE 964)
REINFORCEMENT LAYOUTS
PRELIMINARY SCALING & ROCK
G.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d d e n a s c .d g n
AK NPS DENA 10(48)
A u g u s t
N
F a r
M e a d o
C h e c k e d b y
D e s ig n e d b y
NPS Drwg. No.
NPS PMIS No. 242398A & 242400A
DETAILS
ROCK DOWEL
ROCK BOLT AND
G.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d d e n a s d .d g n
AK NPS DENA 10(48)
J u ly
C h e c k e d b y
D e s ig n e d b y
NO SCALE
FOOTNOTE:
Rock face
Hex nut
Stable rock Unstable block
De-air/grout tube
20° max.
Free stressing length (varies)
Minimum total rock bolt length
ROCK BOLT
ROCK DOWEL
Unstable block Stable rock with keyhole and de-air/grout tube
" (nom.) bearing plate4 38" x 8" x
Minimum total rock dowel length
Rock face
Hex nut
Flat or beveled washers max.
20°
De-air/grout tube with keyhole and de-air/grout tube
" (nom.) bearing plate4 38" x 8" x
Flat or beveled washer
(to be designed by contractor)
Minimum bond zone length
NOTE:
[4]Centralizer
[4]Centralizer
[2]Drilled rock dowel hole
[4]Centralizer
[2]Drilled rock bolt hole
[4]Centralizer
[2] [1]threaded steel bar
Deformed continuously
[3]Nonshrink grout
[3]Nonshrink grout
[2] [1]threaded steel bar continuously
Deformed for project design loads.
Thickness of bearing plate to be designed by the contractor[5] bar. Place additional centralizers on 10-foot centers.
Place lowest centralizer within 12-inches of the distal end of the[4]
Fully encapsulated bar in nonshrink grout.[3] to be determined by rock bolt contractor.
Drill hole diameter, bar size, and minimum bond zone length [2] is 25 Kips.
Rock bolt design load is 25 Kips. Rock dowel design load[1]
Treat according to Section 563.
orientations shown in the plans or as directed by the CO.
Install rock dowels and rock bolts at the locations and
2.
1.
060 50 40 30 20 1070
8090100110120130140
605040302010 70 80 90 100 110 120 130 140150160170180190200210 150 160 170 180 190 200
36" CMP
30" CMP
SCALE IN FEET
0 1515 30 45
Flow
PIPE INLET OUTLET
ACTIVE CHANNEL WIDTH: 10 feet
LENGTH: 64 feet
SPAN: 10'-0"
HYDRAULIC INFORMATION
100 100
OHW : 1.3 feet
HW : 3.6 feetQ : 221 cfs
TYPE: Concrete Box Culvert
WALL THICKNESS: 12 in LOWER BEVEL HEIGHT: None LOWER BEVEL HEIGHT: None
HEADWALL: Precast Concrete HEADWALL: Precast Concrete
INV N/E/EL: 3240.0 INV N/E/EL: 3231.6Q : 53 cfs
INSTREAM WORK WINDOW:
RISE: 4'-0"
PIPE SLOPE: 0.13 ft/ft FLOWLINE SLOPE: 0.13 ft/ft
INFILL TYPE: None TYPE: None
BURIAL DEPTH: 0 feet BURIAL DEPTH: 0 feet
BEVEL: 7.4 deg.BEVEL: 7.4 deg.
FISH SPECIES: None
H.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d B u g s tu ff e r c u lv e r t_
L O
S u r ft
D .d g n
AK NPS DENA 10(48)
J u ly
C h e c k e d b y
D e s ig n e d b y
N
PLAN & PROFILE
CULVERT
BUGSTUFFER CREEK - MP 52
LC New culvert
Station 103+77.3
Proposed roadLC
LCExisting road
Proposed road grade Proposed roadLC
(L=64') concrete box culvert
New 10' x 4' precast
New precast wingwall (L-12') (typ.)
New precast wingwall (L-12') (typ.)
class 3 (Government furnished)
Placed riprap, method A,
0.13 ft/ft
0.13 ft/ft
0.13 ft/ft concrete box culvert (L64')
New 10' x 4' precast
LCExisting channel
New channel edge
LCNew channel
LC
New channel edge
Existing channelLC
New channel
Remove 36" CMP pipe culvert
Culvert invert
Culvert crown
New channel bottom
Existing channel bottom
Proposed road edge
Existing road edge
Install 30" CMP riser
Footing bottom, elev. 3236.0'
Wall top, elev. 3246.0'
Elev. 3240.0'
Wall top, elev. 3237.6'
Elev. 3231.6'
Footing bottom, elev. 3227.6'
'-0
"4 331'-6
"8 731'-10
122.6°
170', R egrade chann el, 2' to
4'
190', R egrade chann el, 2' to
4'
" (min.)2 12'-6
1'-3" (min.)
ty p
STRUCTURAL DETAILS
BOX CULVERT
SECTION PROFILE
H.2
STATE PROJECT
NUMBER
SHEET
I n t_ ft p w w o r k d B u g s tu ff e r
B o x
C u lv e r t_
T y p ic a l_
S tr u c tu r a l_
D e ta il s v .d g n
AK NPS DENA 10(48)
J u ly
C h e c k e d b y
D e s ig n e d b y plate assembly
Welded connection
Headed Stud
GENERAL NOTES:
15°
Precast footing
O Ring if required over pipe joint
Do not install fastener m a x precast permitted when
Tapered holes
" (max.)2 12'-9
(ref.)
"8 11 "2 on top and sides
(outside joint) mastic joint wrap
Grout and 9" wide box culvert
Outside of box culvert
Inside of "2
14 " (ref.)8
Non-shrink grout
V a ri e s
" Gap2
1¼" Mastic rope foam gasket
Closed cell
1'-5" (max.)
WATERTIGHT BOX JOINT SECTION
CONNECTION PLATE DETAIL
SUPPLEMENTAL CONCRETE PIPE TIE
WINGWALL DETAIL
(per manufacturer) wire mesh (typ.)
" 24 16"x6"xW
Non-shrink grout 1¼" Mastic rope foam gasket
Closed cell for 1"Ø joint tie
"Ø Hole4
Install tie rods or connector plates per manufacturer between precast sections (typ.)
along both sides (typ.)
" Bevel2 1" x 22
Weep holes per manufacturer
12" depth material, Bedding
BOX CULVERT BEDDING DETAIL
Bedding material
R is e
Span Thickness in 6" lifts
Soil compacted
R is e
DETAIL
HEADWALL AND CUTOFF WALL
Headwall (per precast culvert manufacturer)
Span + 4' plates (typ.)
connection
Embedded
Cutoff wall (per precast culvert manufacturer) spaced 2'-6" max.
No. 8 dowels
3" dia. holes with
R is e
Span
P e r p la n
P e r p la n
10" spaced 2'-6" max.
No. 8 dowels
3" dia. holes with
10" culvert manufacturer)
Headwall (per precast culvert manufacturer)
Cutoff wall (per precast
12" depth Bedding material, Friction angle: 36 degrees.
Factored bearing resistance: 6 kips per square foot.
Unit weight: 125 lb per cubic foot.
SOIL:
Provide 2-inch minimum concrete cover to the face of any bar.
ASTM A1064.
(ASTM, A615) grade 60, or welded wire reinforcing conforming to
Furnish reinforcing steel bars conforming to AASHTO M31, deformed
REINFORCING STEEL:
Chamfer all exposed edges 3/4-inch.
compressive strength f'c=5000 psi.
Furnish structural concrete, class A(AE) with minimum 28-day design
CONCRETE:
HL-93.
LIVE LOAD:
Soil: 125 lb per cubic foot.
Concrete: 150 lb per cubic foot.
DEAD LOAD:
latest edition.
accordance with AASHTO LRFD Bridge Design Specifications, Design cut -off walls, headwalls, wingwalls, and footings in
Design precast culverts in accordance with Section 602.
DESIGN:
precast sections.
Install tie rods or connector plates per manufacturer between
104.
plans and provide shop drawings for review by the CO. See section walls conforming ASTM-C1577 and to the and grades shown in the
Provide precast concrete culverts, headwalls, wingwalls, and cut-off
FP-14 (U.S. Customary).
Construction of Roads and Bridges on Federal Highway Projects, Federal Highway Administration Standard Specifications for
Detail is for general information only.
CONSTRUCTION:
Per plan
DETAILS
BOX CULVERT RIPRAP
Flow
ITEM NO. DESCRIPTION UNIT QUANTITY
25101-0300
20701-0200
Placed riprap, method A, class 3
Separation- stabilization geotextile, class 1, type C
CY
SQYD
RIPRAP QUANTITIES
H.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d B u g s tu ff e r
B o x
C u lv e r tR ip r a p .d g n
AK NPS DENA 10(48)
J u ly
C h e c k e d b y
D e s ig n e d b y
SECTION A-A
TYPICAL CULVERT & STREAM CHANNEL PROFILE
CULVERT INLET/OUTLET ELEVATION
TYPICAL CULVERT PLAN
Per plan
1 V a r ie s
ELEVATION
TYPICAL INSIDE WINGWALL FACE
Varies
Varies
Varies
Per plan
Per plan
Per plan
Varies
Per plan
Per plan
Geotextile, class 1-C
Geotextile, class 1-C
Geotextile, class 1-C
Geotextile, class 1-C
Geotextile, class 1-C
Geotextile, class 1-CGeotextile, class 1-C
Placed riprap, class 3 class 3 Placed riprap, class 3 Placed riprap, Placed riprap, class 3
Placed riprap, class 3
CL culvert & stream
CL culvert & stream
Existing stream bottom
Existing stream bottom bank top Stream bank top Stream bank top Stream bank top Stream
Proposed road grade
Proposed road grade bank top Stream
Box culvert headwall Box culvert headwall headwall Box culvert headwall Box culvert
Wingwall footing
Wingwall footing
Wingwall footing
Wingwall footing footing Headwall
Wingwall
Wingwall
Wingwall
Wingwall top
Placed riprap, class 3
A
A outside face Wingwall
Wingwall inside faceWingwall inside face
Stream bank toe
Stream bank toe wall Box culvert
NOTE:
for transition to existing bank top and toe.
1. Place conserved streambed material over riprap as needed
Grade break
Grade break
NO SCALE
5'-0"
5'-0"
5'-0"
5'-0"
'-0
"5 " 5
'-0
5'-0"
5'-0"
5'-0"
LC Culvert & stream Placed riprap, class 3 riprap, class 3 Placed
ELEVATION
TYPICAL OUTSIDE WINGWALL FACE
TRAFFIC CONTROL
TABULATION OF TEMPORARY
I.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d d e n a n a .d g n
AK NPS DENA 10()48
A u g u s t
V in c e
M e a d o
C h e c k e d b y
D e s ig n e d b y
NPS Drwg. No.
NPS PMIS No. 242398A & 242400A
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
ROAD WORK
END
WORK
ROAD
AHEAD
ROAD WORK
END
ROAD WORK
END
ROAD WORK
END
WORK
ROAD
AHEAD
WORK
ROAD
AHEAD
Expressway / Freeway
ROAD NAME
ROAD NAME
ROAD WORK
NEXT xx MILES
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxx
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxxxx
ROAD WORK
NEXT xx MILES
W13-1P
(optional)
W13-1P
(optional) xx
MPH
xx
MPH
STANDARD APPROVED FOR USE 6/2005
DRAFT: 6/2014
REVISED:
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
635-1
ADVANCE SIGNING
TEMPORARY TRAFFIC CONTROL
STATE PROJECT
NUMBER
SHEET
I.2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
NPS DENA 10(48) AK
U S
C c p w w o r k d d e n a n b .d g n
A u g u s t
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
G20-2
G20-2
G20-2
G20-1
See Note 11
G20-1
See Note 11
M in o r R o a d
M a jo r R o a d
W20-1
See Note 10
W20-1
See Note 10
W20-1 over
W16-8P
See Note 9
W20-1 over
W16-8P
See Note 9
W20-1
Ro ad N am e
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
W20-1
See Note 10
W20-1
See Note 10
G20-2
Erect all project advance warning signs before starting construction work.
Not all details shown on the temporary traffic control sheets may be applicable to this project. The Contractor may add or delete information and details in this traffic control plan as necessary to accommodate actual operations.
Where advance warning signs, placed as shown, interfere with permanent signs, locate the warning signs as determined by the CO for best results. Vary messages as required.
Additional or different message signs may be required to fit the actual construction conditions.
Install advisory speed plates under the W20 series warning signs as needed to indicate a maximum recommended speed through the construction area.
Ensure all sign supports exposed to impact by traffic meet the requirements of
NCHRP-350 or MASH for crashworthiness.
Maintain two-way traffic during all non-work hours except as approved by the CO.
Do not store traffic control devices along the roadway when not in use. Cover post-mounted signs when not applicable.
If W20-1 is placed on a roadway other than that on which the actual construction work occurs, include a supplementary plaque indicating the name of the road on which the construction does occur (applies to major roads only).
The message on the W20-1 signs may be "ROAD WORK AHEAD" or may specify the distance to the work area in feet or in miles. Install an additional W20-1 each end of the project. Show the distance on the G20-1 sign to the nearest whole mile.
If signing on a roadway under a jurisdiction other than the client agency, verify that an encroachment permit has been obtained.
State standards may be used as an alternative if approved by the CO.
Refer to the Section 635 of the Special Contract Requirements for allowable retroreflective sheeting types.
A
B
C
(S ee S ig n
Sp ac in g
Ta bl e)
ADVANCE
W
ARNI
NG
AREA
as d et er m in ed b y th e
CO
W or k zo ne A re a of In flu en ce
Pr oj ec t L im its
A
A
(S ee S ig n
Sp ac in g
Ta bl e)
ADVANCE
W
ARNI
NG
AREA
A
A
NPS Drwg. No.
NPS PMIS No. 242398A & 242400A
184/80301
For work zones that are 2 miles or more in length, install G20-1 signs at signs "B" feet apart according to the Sign Spacing Table.
sign when approach speeds exceed 50 MPH. When used place the two W20-1
NOTE:
LENGTH AND SPACING TABLE
APPROACH
SPEED*
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
* Approach speed based on the regulatory posted speed, not the advisory speed.
BUFFER SPACE
LENGTH
Expressway / Freeway
WORK
ROAD
AHEAD
BE
PREPARED
TO STOP
ROAD WORK
END
xxx
FEET
635-5
STANDARD APPROVED FOR USE 6/2005
DRAFT: 8/2013
REVISED:
MPH
FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
(WITH FLAGGERS)
ROAD CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
STATE PROJECT
NUMBER
SHEET
I.3
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
NPS DENA 10(48) AK
U S
C c p w w o r k d d e n a n c .d g n
A u g u s t
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
Traffic flow
Traffic flow
Signs are shown for one direction of travel only. Place devices similar to those depicted for the opposite direction of travel.
Final location and spacing of signs and devices may be changed to fit field conditions as approved by the CO.
For pilot car operation, mount the "PILOT CAR FOLLOW ME" (G20-4) sign at a conspicuous location on the rear of vehicle. Prominently display the name of the Contractor on the pilot car.
If closure is completely within the project limits, eliminate the "ROAD
WORK AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.
For night time flagging operation, provide floodlighting at flagger stations.
Do not allow equipment, materials, or vehicles to be parked or stored in the buffer space.
(See Length and
Spacing Table)
1.
2.
3.
4.
5.
6.
(See Length and
Spacing Table)
WORK SPACE
G20-2
See Note 4
W20-1
See Note 4
W3-4
W16-2P
(optional)
W20-7
BUFFER SPACE
NOTE:
ADVANCE WARNING AREA (See Sign Spacing Table)
TERMINATION AREAVARIABLEBUFFER SPACEABC
(optional)
A
Flagger location
Flagger location
NPS Drwg. No.
NPS PMIS No. 242398A & 242400A
STANDARD APPROVED FOR USE 6/2005
DRAFT: 6/2015
REVISED:
635-13
(WITH TEMPORARY BARRIER)
SINGLE LANE CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
STATE PROJECT
NUMBER
SHEET
I.4
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
DENA 10(48) AK
U S
C c p w w o r k d d e n a n d .d g n
A u g u s t
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
LENGTH AND SPACING TABLE
SPEED*
APPROACH
AREA
TAPER
SPACE
BUFFER
SPACE
WORK
CHANNELIZING DEVICE
RATE
FLARE
BARRIER
CONCRETE
1:16
1:16
1:16
1:16
1:14
1:12
1:10
1:9
1:8
1:8
1:8
LENGTH
BUFFER SPACE
Approach speed based on the regulatory posted speed, not the advisory speed.*
WIDTH
CLEAR ZONE
WORK ZONE
FEETSPACING IN FEETFEETMPH
NPS Drwg. No.
NPS PMIS No. 242398A & 242400A
184/80301
Traffic flow
Traffic flow
Install signs and other devices for single lane closure according to
6.
5.
4.
3.
2.
1.
NOTE:
barrier ends outside the work zone clear zone or protect the barrier ends
Place barrier according to the AASHTO Roadside Design Guide. Terminate devices may be changed to fit field conditions as approved by the CO.
to provide access to work space.
Reduce or eliminate drums and barrier in downstream taper if necessary the buffer space.
Do not allow equipment, materials, or vehicles to be parked or stored in when access is not needed.
Place channelizing devices at downstream taper during non-work hours or
Section 156.
For project specific minimum width, refer to Special Contract Requirements, spacing
Device pavement markings
Remove conflicting
Channelizing devices
See Note 2
Temporary concrete barrier.
See Note 4
TAPER AREA (
(optional)
BUFFER SPACE
VARIABLE WORK SPACE
(See Length and Spacing Table)
(optional)
BUFFER SPACE
TAPER AREA
50' - 100')
(50' - 100') with a crash cushion. Include reflectors on barrier at 25' intervals.
Standard 635-6, 7, 8, or 9. Final location and spacing of signs and
See Note 3
10' min.
See Note 2
See Note 2
WIDTH
"X"
AREA
NUMBER
OF POSTS
POST SIZE D HOLE SIZE
WOOD POST SELECTION TABLE
NO SCALE
635-14
STANDARD APPROVED FOR USE 6/2005
DRAFT: 10/2017
REVISED:
Diamond ≤ 48"
> 30'
> 17'
12' - 16'
> 13'
< 10
65 - 95
65 - 95
50 - 65
50 - 65
20 - 50
10 - 20
10 - 20
6 x 6
4 x 6
4 x 6
6 x 6
4 x 6
4 x 4
6 x 6
4 x 6
4 x 4
(INCH) (INCH)
(INCH)(SQFT)
Other Shapes ≤ 48" Diamond ≤ 36"
Other Shapes ≤ 12' Diamond ≤ 48"
WOOD POSTS
SIGN INSTALLATION
TEMPORARY TRAFFIC CONTROL
1.5
1.5
1.5
1.5
STATE PROJECT
NUMBER
SHEET
I.5
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
NPS DENA 10(48) AK
U S
C c p w w o r k d d e n a n e .d g n
A u g u s t
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
SINGLE POST SIGN TWO POST SIGN
SIGN INSTALLATION ANGLE
POST DETAIL
S e e N o te
S e e N o te
See Note 4 E d g e o f tr a v e le d w a y
E d g e o f p a v e d s h o u ld e r
CL Post
Local tangent
Bottom of sign panel
X
H
H
D
H
0.75X
X
X
H
Y D
H
0.2X
0.6X
0.2X
D
See post detail (typ.)
Break-away holes.
Long side of post
D
90°
93°
NPS Drwg. No.
NPS PMIS No. 242398A & 242400A
184/80301
6" x 6" or larger.
Use 7' minimum spacing between posts for sign posts and 6' minimum mounting height for secondary sign.
use 7' minimum mounting height for main sign a minimum lateral distance of 1' behind the face of lateral offset of 2' may be used. In areas with curbs, 200' m in m in
6' - 12'
" dia. bolts 4 1Attach sign panels with a minimum of 2 - 1.
2.
3.
4.
5.
6.
7. State standards may be used as an alternative if approved by the CO.
per post.
H1 and H2 = Overall post length.
Select post lengths to fit field conditions.
D = Post embedment depth for average soil conditions.
In areas where lateral distance is limited, a minimum the curb may be used.
In pedestrian locations, or in areas with obstructed views, NOTE:
See table for hole size parallel to sign face.
Field drill holes through post
QUANTITIES AND PLAN
TRAFFIC CONTROL
PERMANENT
N
LOW
WATER
CROSSING
MPH
W35-8
W13-1P
LOW
WATER
CROSSING
MPH
W35-8
W13-1P
J.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d d e n a p a .d g n
AK NPS DENA 10(48)
A u g u s t
V in c e
M e a d o
C h e c k e d b y
D e s ig n e d b y
NPS Drwg. No.
NPS PMIS No. 242398A & 242400A
MINIMUM DISTANCE TO SIGN
WOOD POST SELECTION TABLE
SIZE
POST NUMBER OF POSTS
1 2 3 4 D diameter and hole depth
Notch from curb
Offset (W)
Lateral
Height (V)
Mounting
Location
Rural Districts
Residence Districts
Business or exceeds the limit for the largest post, use steel post installation.
Values shown are the maximum permitted. If the product of XYZ
NO SCALE
W633-7
REVISED:
DETAIL APPROVED FOR USE 10/2009
WESTERN FEDERAL LANDS HIGHWAY DIVISION
(inch)
8 x 12
8 x 10
6 x 10
6 x 8
6 x 6
4 x 6
4 x 4
Product of X-Y-Z in CUFT
6'-0"
5'-0"
5'-0"
4'-0"
4'-0"
4'-0"
3'-0"
"4
"4
"2
6 ft 5 ft
7 ft 2 ft
V may be reduced by 1 foot in rural districts for
WOOD POSTS
INSTALLATION
PERMANENT SIGN
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
J.2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
PRA DENA 10(48) AK
U S
C c p w w o r k d d e n a p c .d g n
A u g u s t
SINGLE POST SIGNS
POST DETAIL
THREE POST SIGNS FOUR POST SIGNS
SIGN INSTALLATION ANGLE
SIGNS WITHOUT ANGLES
TYPICAL MOUNTING FOR
Direction of traffic flow
5.
4.
3.
2.
1.
TWO POST SIGNS
of traveled way
Elevation at edge of traveled way
Elevation at edge of traveled way
Elevation at edge of traveled way
Elevation at edge
E d g e o f s h o u ld e r
E d g e o f tr a v e le d w a y
E d g e o f s h o u ld e r
E d g e o f tr a v e le d w a y
E d g e o f tr a v e le d w a y
E d g e o f s h o u ld e r
See table for hole size post, parallel to sign face.
Field drill holes through a secondary sign mounted below another sign.
E d g e o f tr a v e le d w a y
E d g e o f s h o u ld e r
Finish ground line rectangle enclosing all the signs.
- Multiple sign installations: X and Y are the dimensions of a dimensions of the signs.
- Single sign, or back to back signs: X and Y are the overall
For the purpose of post selection X and Y are as follows:
longest post.
Z is the height from ground line to mid-height of sign at the conditions. See Wood Post Selection Table below.
D is the minimum post embedment depth for average soil fit field conditions.
indicate overall post length. Select post lengths to 4 thru H1H is vulnerable to being struck when placed outside the clear zone.
Traffic barrier protection is required for all posts larger than
CL post
Backfill material
W
0.15X0.35X0.35X0.15X ty p
Z
.5
Y
H
H
H
V Y
Backfill material
W
0.125X0.25X0.25X0.25X0.125X
.5
Y Z
H
H
H
H ty p
D
V Y
V Y
H
Z ty p
D
Same post size
Same post size
Bottom of sign
Long side of post single post installations of post. Omit notch for
Saw cut notch full width
H
Same post size
Backfill material
(See Post Selection table)
Notch depth (where required)
W
W
Backfill material
.5
Y
Z ty p
D
V Y
H
.5
Y
0.2X0.6X0.2X
For all retroflectorized signs where W > 25'
22 ft (max.)
X=14 ft (min.) to maximum
X=5 ft to 12 ft (max.)
X=4 ft (min.)
18 ft (max.)
X=10 ft (min.) to
" outside dia.) 4 1(1 oversized washer
" nonmetallic16
" oversized washer16 5" lock nut16
" bolt16
" bolt thru the post8
6" x 8" when located within the clear zone or if the post
NOTE:
all around (typ.)
3" minimum all around (typ.)
3" minimum all around (typ.)
3" minimum all around (typ.)
3" minimum
File details come from the government source that posted it. Updated .