This notice provides details for a federal construction contract opportunity for repair work on the Denali Park Road in Alaska. The project includes repairing joints on two bridge decks, replacing a culvert at milepost 52, conducting rockfall mitigation at milepost 52.9 which involves scaling rock slopes and reinforcing structures, and repairing a joint on a third bridge deck at milepost 60.7. The work is to be completed during the summer of 2019. The estimated price range for the work is between $1 million and $2 million. Interested vendors must register on FBO.gov in order to view the vendor list and be notified when solicitation documents are posted. Preliminary plans and additional project information are provided in electronic format with the notice. The solicitation will be offered as a small business set-aside.

Revised Preliminary Letter

View the file

Other files

File Type Posted
AK_DENA10(48).pdf PDF
PROJECT_DESCRIPTION.pdf PDF
DENA1047_PreAdd2018.pdf PDF
DENA1047_Preliminary-Plans-Letter.pdf PDF
PROJECT_DESCRIPTION_DENA_10(47).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Western Federal Lands Highway Division 610 E. Fifth Street

Vancouver, WA 98661 Phone 360-619-7700

Fax 360-619-7846

NOTICE TO PROSPECTIVE BIDDERS

RE: AK NPS DENA 10(48), Culvert Replacement MP 52 & rockfall Mitigation MP 52.9 &

AK NPS DENA 10(47), Repair Two Denali Park Road Bridges Solicitation No. 69056718B000028

The attached preliminary plans are being furnished to aid prospective Bidders in identifying the location and type of work for this project. The project will be advertised during a period when viewing of the project may not be possible due to snow. Therefore, prospective Bidders are encouraged to view the project during fall as conditions permit. After September 30, access will be weather dependent; contact the Denali National Park and Preserve website for current road conditions at http://www.nps.gov/dena/index.htm. Contact Norm Sollie at 907.683.9691 or norman_sollie@nps.gov OR Raymond Moore at 907.683.6407 or raymond_moore@nps.gov.

Contact them even after September 30 if weather permits for access. No Federal Highway Administration personnel will be available for show-me tours.

Project Location and Type of Work - All project work is located in Denali National Park and Preserve, Denali Borough, Alaska. The works are located at the following location:

Sanctuary River Bridge at MP 22.9 – Repair bridge deck joint and paint bridge rail Culvert Replacement at MP 52 – Remove existing culvert and install concrete box culvert Rockfall Mitigation at MP 52.9 – Rock slope scaling, reinforce larger structures with rock bolts and dowels, raise roadway grade, and resurfacing Stony Creek Bridge at MP 60.7 – Repair bridge deck joint and paint bridge rail

Access - Denali National Park and Preserve restricts private vehicle traffic beyond milepost 15.0 of the Park Road. In addition, a special set of "rules-of-the-road" exists on the restricted section of Park Road for visitor and wildlife safety. Contractors planning to view the project site will need a road travel permit to access the project location. You will also be required view a video on the rules-of-the- road and to follow those rules during your visit

To obtain a road travel permit:

Request permits by emailing Norm Sollie at norman_sollie@nps.gov. Request the permit at least one week prior to your intended visit.

Permit requests not meeting this timeline may not be processed in time for your visit.

Provide the following required information for the permit:

o Company name and address including phone number o Driver's name and address o License number of the vehicle you intend to use

August 28, 2019

Preliminary Plans letter o Make, model and color of the vehicle you intend to use (Note: Vehicles over 8' wide, 22' long and 12' high are considered oversize and will be required to travel between 10PM and 6AM) o Purpose of the trip: To view the MP 30, 52, 52.9, and 60 for project sites; MP

53.5 Toklat Compound for lodging and staging; MP 43 East Fork and MP 34 Igloo Pit for possible dry camp and/or staging; MP 70 pit for waste site o Date and day of the trip:

To view the rules-of-the-road-video:

Contact Norm Sollie via email at norman_sollie@nps.gov, by phone at 907-683-9691 to set up a viewing between the hours of 8:00 AM and 4:30 PM, Tuesday through Friday.

The video can be viewed at the Road Crew office in the Park's Autoshop in C-Camp, Mile 3 Park Road.

While viewing days and hours are Tuesday through Friday between 8:00AM and 4:30PM, you may schedule your trip to the project site on any day of the week.

Technical Questions – All technical questions must be submitted by email wfl.plans-spec@dot.gov or FAX 360-619-7932

General Questions - Contact our office at wfl.contracts@dot.gov or at 360-619-7520.