Wallowa_PreAdPlans_REVISED.pdf
PDF 41 MB Posted
- Attached to
- OR WALLOWA 4602(1), Wallowa Mountain Loop Road
- Solicitation number
- 69056718B000023
About this file
Preliminary Plans
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
.0
"O
.c
.D
"O " C:
Cl "iii "
N
Pro ·ect Location
CALIFORNIA 1- - - - NEVADA -
OREGON KEY MAP
TYPE OF CONSTRUCTION:
Bridge replacement, grading, aggregate base, asphalt paving, pavement rehabilitation and minor drainage
DESIGN DESIGNATION:
ADT (2018)
ADT(2038)
V e (max)
30 MPH (RECONSTRUCTION)
35 MPH (REHABILITATION)
0.040
SPECIFICATION:
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14
PLANS PREPARED BY
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
VANCOUVER, WASHINGTON
I PROJECT MANAGER
� C. SANDERS
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
N
PLANS FOR PROPOSED PROJECT
OR WALLOWA 4602(1)
WALLOWA MOUNTAIN LOOP ROAD
RECONSTRUCTION
T35
--t
WALLOWA-WHITMAN NATIONAL FOREST
WALLOWA COUNTY
OREGON
LENGTH 4. 968 MILES
'"CC
I -=-�
_ , UNIO� CO.
1 '-:-:_ BAKEf CO.
-+ !- )�J---+--�-
SCALE IN MILES
0 5 10
STATE PROJECT
OR WALLOWA 4602(1)
SECTION INDEX
A. GENERAL INFORMATION
B. SUMMARY OF QUANTITIES
C. TYPICAL SECTIONS
D . PLAN-PROFILE
E. APPROACH ROADS
F. EROSION CONTROL
G. STRUCTURES
H. DRAINAGE
I. MISCELLANEOUS DETAILS
J. TEMPORARY TRAFFIC CONTROL PLAN
K. PERMANENT TRAFFIC CONTROL PLAN
PRE-AD l
APPROVED:
DATE ____ _
Chief of Engineering, Western Federal Lands Highway Division
SHEET
NUMBER
A.1
PRELIMINARY
NOT FOR CONSTRUCTION
INDEX TO SHEETS
A.2
STATE PROJECT
NUMBER
SHEET
I n t_ ft
D c m y fi le s p w p r o d u c ti o n d o r a a b .d g n
OR WALLOWA 4602(1)
A
M
J u ly
B
V in c e n t
K
P a r k e r
C h e c k e d b y
D e s ig n e d b y
CP GPS
JH
BH
TP
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
RIP
G G
W W
DI
T
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS
DI
T
NO SCALE
- no symbol -wall face
N
P
A p r il
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a a c .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.3 WALLWA 4602(1) OR
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material
NOTE:
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø
∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
Fiber Roll or Wattle
W a ll o w a d
R n w o
D r e k c u
T
29 28
27 26 25 30 29
27 26
31 32
353433323136
6 5 4 3
2 1
18 17 16 15 14
222120
25 30
36 31 32
33 34 35 36
27 26 25
31 32 33
29 28 27
212019
18 17 16 15 14 13
121110
6 5 4
3 2
36353433
212019
N
R
IL
C
N Y
O N
Spring d
R yt r e bi L
VICINITY MAP
d
R yt r e bi L
T e n d e r v a ll e y R d
A.4
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a a d .d g n
OR WALLOWA 4602(1)
J u n e
V in c e
P a r k e r
C h e c k e d b y
D e s ig n e d b y ponds diposal Sewage d
R r e p p a n K
Creek Hill Sheep ywH a hanmI htiffir G keer C eltti L p e e h
S k e e r
C ylluCcM k e e r
C
.dR ekaL yenniK
Kinney Lake
.nL renruT
Quarry
4WD
W
D
W
D
W
D
W
D
W D
4W D
Gors line Gulch
M it c h ll
Ca ny on
W e s t
F o k
R iv e r
Mount Howard ya w ma rT ei ri ar P k e er C
Airport
State
Joesph
Si lv er
La ke
D it ch
Prairie Creek Rd.
Radio Facility
Weir
Liberty Grange
Grote Ln.
Airpo rt Ln
State Park Wallowa y w H et at
S a w ol l a W
Wallowa Lake State Park d
R e s u o H r e w o P
.nL llessuR
Dorrance Rd.
.nL llessuR a w oll a
W r e vi R
Walker Ln.
Bicentennial Rd.
LAKE
WALLOWA
J o s e p h
Main St.
L a G r a n d e
O R m il e s
10+40.45
272+68.69
D A
O R
P O
O L .
N T
M A
W O
L L
A W k eerC p e e h
S eltti
L
B O
U N
D A
R Y
W I L
D E
R N
E S
S
NATIONAL FOREST
WALLOWA
NATIONAL FOREST
WALLOWA
FOREST
NATIONAL
WALLOWA
R
E
R
E
R
E
R
E
R
E
R
E
T2S
T3S
SCALE IN MILES
0 1 m ile s
Im n a h a
O R
C o p p e r fi e ld
O R m il e s
E A G L E C
A P W
I L D E R N E S S
BEGIN REHABILITATION
BEGIN RECONSTRUCTION
16+25.00
END REHABILITATION
END PROJECT
BEGIN RECONSTRUCTION
BEGIN PROJECT
QUANTITIES
TYPICAL SECTION
TABULATION OF
C.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r a c a .d g n
OR WALLOWA 4602(1)
J u ly
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y
FOOTNOTE:
Adjust locations in the field as directed by the CO.[2]
See Sheet G.5, 2" wearing surface on concrete bridge deck.[1]
TYPICAL SECTION
TABULATION OF
C.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r a c b .d g n
OR WALLOWA 4602(1)
J u ly
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y
NO SCALE
ti mil g ni r a el C
S lo p e s ta k e l im it
[5]
[4]1' [4]1'
C.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r a c c .d g n
OR WALLOWA 4602(1)
J u ly
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y
SHEET 1 of 2
TYPICAL SECTIONS
10+62.63 to 11+12.03 RT
10+40.45 to 11+12.03 LT
11+74.20 to 16+25.00
10+40.45 to 11+12.03
SAFETY EDGE DETAIL
FOOTNOTE:
ROUNDING DETAIL
CUT SLOPE
.2
D
C le a r in g l im it
Profile grade
LC
Travel laneTravel lane
5'
S lo p e s ta k e l im it
.2
D
ROUNDING DETAIL
FILL SLOPE
Shldr. Shldr.
[6]
[9]11'
[1] 2% Crown
(between lifts)
Tack coat
[1] 2% Crown [2]
1:3
[2
V a rie s 1 :1 .5 to
:1
[2]
Varies 1:1.5 to 1:3
Turf establishment establishment
Turf
4" depth topsoil, 4" depthC o n s tr u c ti o n l im it
C o n s tr u c ti o n l im it
MAINLINE TYPICAL SECTION - RECONSTRUCTION
4" compacted depth (placed in two equal lifts) type IV pavement roughness, size aggregate, 0.3 to < 3 million ESAL, -inch nominal4 3 or 2
1gyratory mix, Asphalt concrete pavement, furnished topsoil, Place conserved or or furnished
Place conserved
GUARDRAIL DETAIL
2' tr a v e le d w a y
E d g e o f
[2]
Variable
[9]11'
Detail (typ.)
See Safety Edge method 2, 8" compacted depth
Roadway aggregate, or unclassified borrow
Embankment construction
Varies 3.6'
[8]5' as shown in the Staking Report.
Additinal widening required at intersection with OR-350W,[9] as directed by the CO.
of trees, minimize wetland impact and to remain within easement, Reduce or eliminate slope rounding width to avoid removal [8]
Add curve widening as shown in the Staking Report.[7]
See Fill Slope Rounding Detail.[6]
See Cut Slope Rounding Detail.[5]
See Sheet C.6 for Turnout Detail.
Additional widening required for turnout, bridge rail and guardrail.[4] proportionally.
dimension and reduce the front slope rounding distance
For cut heights less than 5-feet, reduce "B" to the cut height[3]
Construct slopes as shown in the Staking Report. [2] curve data of the plan and profile sheets.
Superelevate curves at maximum rate "e" as indicated in the[1]
Red top
Point available in survey notes
Second lift of asphalt
First lift of asphalt
Pull aggregate base to cover safety edge
Aggregate base course
[8][3]B=5'
5' g r a v e l s h ld r
E d g e o f
Typical Section
See
Match existing
~1:4 ~1:4
C.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r a c d .d g n
OR WALLOWA 4602(1)
J u ly
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y
SHEET 2 of 2
TYPICAL SECTIONS
SAFETY EDGE DETAIL
Match existing
E x is ti n g e d g e o f p a v e m e n t
E x is ti n g e d g e o f p a v e m e n t
LC
Full depth reclamation with foamed asphalt, 6" depth
Tack coat
(between lifts)
1'
Top of existing pavement
1'
Red top
Point available in survey notes
Second lift of asphalt
First lift of asphalt
Aggregate base course
Traveled way
Varies
See Safety Edge Detail (typ.)
shoulder finishing
Roadway aggregate, MAINLINE TYPICAL SECTION - REHABILITATION NOTE:
See Sheets C.4-6 for Subexcavation details.1.
Tack coat
Place shoulder finishing to cover safety edge
TYPICAL SECTION - BRIDGE OVERLAY
11+12.03 to 11+74.20
6" concrete deck, (see Section G)
(see Section G)
Voided bridge slab, 3" compacted depth (placed in two equal lifts) type III pavement roughness, overlay size aggregate, 0.3 to < 3 million ESAL, " nominal4 3" or 2
1gyratory mix, Asphalt concrete pavement, Asphalt concrete pavement, gyratory mix, 12 4 or 3 -inch nominal size aggregate, 0.3 to < 3 million ESAL, type IV pavement roughness, 2" compacted depth asphalt wearing surface
(see Section G)
Waterproofing membrane
Shldr.
"4 11'-5
Traveled way
11'
Traveled way
11'
Shldr.
"4 11'-5
4.00 %
4.00 %
LC
(See Section G)
Bridge railintg (typ.)
C.5
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r a c e .d g n
OR WALLOWA 4602(1)
J u ly
P a r k
P a r k
C h e c k e d b y
D e s ig n e d b y
DETAILS
SUBEXCAVATION
Subexcavation
2%
2:
1 2:1
Limit of subexcavation
Subgrade
TransitionSubexcavation pay limitsTransition
E n d S ta ti o n
B e g in S ta ti o n geotextile, class 1, type C
Separation-stabilization
TYPE 1, 2, AND 2A ELEVATION
(subexcavation backfill)
Select borrow
NOTE:
FOOTNOTE:
ditchline is required.
Construct mirror image of outlet pipe(s) where draining to the[1]
3.
2.
1.
granular backfill.
collector pipe, outlet pipe, rodent screen, geotextile, and
Standard underdrain system includes trench subexcavation, requirements and minimize disturbances.
Skew outlet pipe as directed by the CO to meet pipe slope
Install outlet pipes to drain at a minimum 0.5% slope.
trench limits before excavating outlet trenches.
Conserve 2-inches of existing topsoil layer within outlet
LEGEND:
Existing ground
LC
Bottom of subexcavation
Outlet pipe subexcavation trench
Bottom of pipe (6" dia.)
collector
Perforated
Subgrade
2%
136+50 to 137+50 LT
SUBEXCAVATION AND BACKFILL SECTION
HALF-WIDTH TYPE 2
m in
(subexcavation backfill)
Select borrow
Match existing pavement grade geotextile, class 1, type C
Separation-stabilization this sheet
See Detail A, method 2, 6" compacted depth
Roadway aggregate, geotextile, class 1, type C
Separation-stabilization
Granular backfill
18" 6" Outlet pipe
TRENCH SUBEXCAVATION
DETAIL A
subexcavation
Bottom of collector pipe
6" Perforated
(subexcavation backfill)
Select borrow
2.0%
Subgrade
2.0%
(Top of subexcavation trench)
Bottom of subexcavation
LC
SUBEXCAVATION AND BACKFILL SECTION
HALF-WIDTH TYPE 1
Shoulder subgrade
2%
6" compacted depth
Roadway aggregate method 2, 74+00 to 75+00 RT m in pavement grade
Match existing geotextile, class 1, type C
Separation-stabilization
Existing ground LC Subgrade
2%
(subexcavation backfill)
Select borrow m in subexcavation
Bottom of
SUBEXCAVATION AND BACKFILL SECTION
HALF-WIDTH TYPE 2A
Match existing pavement grade method 2, 6" compacted depth
Roadway aggregate, 66+50 to 67+50 LT
COLLECTOR AND OUTLET PIPE PLAN
P r o fi le g r a d e
Subexcavation trench
(Mirror image for ditch RT)
(see Notes 1 and 2)
[1]Outlet pipe
2.0% (min.) slope
D it h li e
Bottom of subexcavation
Shoulder subgrade
LC
Shoulder subgrade
SUBEXCAVATION AND BACKFILL SECTION
TYPE 1
m in
49+00 to 51+00
45+75 to 47+75
29+50 to 30+50
110+50 to 112+00
109+00 to 109+50
105+50 to 107+50
12" pavement grade
Match existing
Subgrade method 2, 6" compacted depth
Roadway aggregate
(subexcavation backfill)
Select borrow geotextile, class 1, type C
Separation-stabilization
2"
WITH RODENT SCREEN
OUTLET PIPE END DETAIL
Outlet pipe
Hose clamp
Wire mesh
"4 1" x 4
C o ll e c to r p ip e
PLAN VIEW
SUBEXCAVATION AREA
S u b e x c a v a ti o n l im it
S u b e x c a v a ti o n l im it or
TURNOUT SECTION
C.6
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a c f.
d g n
OR WALLOWA 4602(1)
J u ly
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y
4%
See Typical Section, Sheet C.2
11'
Turnout
Varies turnout grade
Match existing
Varies
TURNOUT SECTION
12+55.11 to 13+81.99
Roadway aggregate, method 2
SHEET 1 of 2
DETAILS
SHOULDER STABILIZATION
REINFORCED
C.7
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a c g .d g n
OR WALLOWA 4602(1)
J u ly
P a r k
E
G a r ic h
C h e c k e d b y
D e s ig n e d b y
Conserve transition ramp material ramp material
Conserve transition
NO SCALE
form course 18" Welded wire
12" Bottom course
Extend lap to back of excavation
Hardware cloth
Conserved backfill
FOOTNOTE:
4' Lap (min.)
Finished slope
1'-0"
Excavation line
Existing pavement grade
SECTION A-A
Geogrid, stabilization
NOTE:
See Section B-B
SECTION B-B
S T
A B I L I Z
A T
O N P
A Y L I
M I T S
R E I N
F O
R C
E D S
H O
U L
D E
R
REINFORCED SHOULDER STABILIZATION AREA
areas are suitable as conserved backfill.
Materials excavated from reinforced shoulder stabilization1.
A A
LC LC
B
B
Varies 6.5' - 12.5'
Varies 7.7' - 13.7'
Varies 5.5' - 11.5'
S H
O U
L D
E R
B E
G I N R
E I N
F O
R C
E M
E N
T
S T
A B I L I Z
A T I O
N
S T
A B I L I Z
A T I O
N
S H
O U
L D
E R
E N
D R
E I N
F O
R C
E M
E N
T
Reinforced shoulder stabilization pay limits m in m in both courses
Select granular backfill, Shoulder subgrade
Geogrid, (Reinforcement, type 2)
Excavation limits Excavation limits
Transition ramp Transition ramp stabilization area
Reinforced shoulder Transition ramp
Transition ramp of pavement
Existing edge of pavement
Existing edge
Construct finished slope no steeper than 1:1.25.[2] backfill.
Cover geogrid reinforcement with 4-inch depth select granular[1] existing pavement
Top of
[2]
Varies
C to C spacing (max.)
Support struts 24"
Match existing slope
Welded wire form, see Sheet C.8
4 x 4 - W4.0 x W4.0
(min.)
1'-6" o f p a v e m e n t
E x is ti n g e d g e method 2, 6" depth
Roadway aggregate, 7' or 13' e e t a b le o r
S h e e t
C .1
Match existing pavement grade
Reinforced Shoulder Stabilization Detail on Sheet C.7.
Hardware cloth not shown. Install hardware cloth according to[10]
Shoulder Stabilization Detail on Sheet C.7.
Geogrid lap is not shown for clarity. Lap according to Reinforced[9]
Except at curve sections where overlapping is allowed.[8] bend longitudinal wire 90 degrees.
Connect welded wire form facing to form return. Alternative, [7] of 720.01(k).
Provide welded wired forms that meet the requirements [6]
Provide support struts that meet the requirements of 720.01(l).[5]
See Sheet C.7 for dimensions.[4] permanent fasteners that meet the requirements of 720.01(m).
or the manufacturers recommended method). Provide with permanent fasteners (hog rings, wire ties, spiral binders, Connect adjacent welded wire reinforcement facing elements [3] support strut length.
The Contractor is responsible for determining the appropriate[2] requirements.
Field cut transverse wires to meet welded wire form layout [1]
C.8
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a c h .d g n
OR WALLOWA 4602(1)
J u ly
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y
SHEET 2 OF 2
DETAILS
SHOULDER STABILIZATION
REINFORCED
WELDED WIRE FORM
FOOTNOTE:
Longitudinal wires
Reinforcement length
Top of form
96"
30"
4 x 4 - W4.0 x W4.0 direction
Machine (roll)
P a r a ll e l to s lo p e f a c e
Bottom course
REINFORCEMENT LAYOUT
SHOULDER STABILIZATION
3' min.
AND FORM RETURN DETAIL
SHOULDER STABILIZATION FORM COURSE
[8]Butt geogrid, no overlap
[1]Transverse wires
[5] [2]spaced 24" C. to C. (max.)
No. 4 wire support struts
[6]
[9]Geogrid, reinforcement
[10](see detail this sheet)
Welded wire form
[3]welded wire forms
Connect adjacent
[7] [3]facing to form return
Connect form form return
Welded wire
Geogrid, reinforcement, type 2
[4]
Geogrid, reinforcement, type 2 length (L)
PLAN
TABULATION OF
D.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r a fa .d g n
OR WALLOWA 4602(1)
J u ly
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y
FOOTNOTE:
quantity.
Topsoil to be conserved is also included in roadway excavation [1]
95419
42154215
5 4260
El=4215.572
E=9082658.557
N=628513.294
See Sheet E.5 for dimensions type 2, concrete, 12" depth
Construct curb and gutter, 16+00 to 16+27, LT
,1
.6
,2
.4
+4.06 80%
80' VC
K = 54
,2
.1
+5.5
+1.9723%
120' VC
K = 34
SSD = 362'
POT 1
0+
.45
PC 11+97.49
P C
C
.5
P T
.6
N
D
CONNECTION DETAIL
+1.9723%
Min. low chord elev. = 4193.0
Bridge
CONNECTION DETAIL
CUYD
EXC.
CUYD
EMB.
17+5015+0012+5010+00 p a v e m e n t
M a tc h p r o p o s d
BRIDGE CONNECTION DETAIL
11+12.03 or 11+74.20 xx xx
Curve= C400
D
R= 150.00'
T= 58.81'
Curve= C401
D
R= 300.00'
T= 69.23'
D.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r a fb .d g n
OR WALLOWA 4602(1)
J u ly
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y e= 0.040
L= 136.08' e= 0.040
L= 112.09'
CenturyLink
Klamath Falls, OR 97603
2980 Crosby Avenue
Engineer-
Mr. Alex Jaunzems
Frontier Communications
(503) 350-2355
Beaverton, OR 97005
4650 SW Betts Avenue
FOOTNOTE:
See Sheet D.1 for Stationing[1]
POWER-
TELEPHONE-
See detail, Sheet I.5 obliteration, method 2.
Perform roadway
UTILITY CONTACTS
NOTE:
10+40.45
OR WALLOWA 4602(1)
Profile grade
El.= 4193.681
E=9082640.640
N=629024.185
Existing ground
.4
See Typical Section
Construct turnout
Proposed edge of pavement
Existing edge of pavement
Construct right-turn lane (See Section E)
11+12.03 to 11+74.20
(See Section G)
Proposed bridge
RECONSTRUCTION
END
REHABILITATION
BEGIN
16+25.00 p ip e c u lv e r t
R e m o v e e x is ti n g p ip e c u lv e r t
R e m o v e e x is ti n g p ip e c u lv e r t
R e m o v e e x is ti n g p a v e m e n t
M a tc h e x is ti g
569 255
Creek
Existing edge of pavement pavement
Existing
See Typical SectionSee Typical Section
.0
Sheet C.2
Reconstruction
Sheet C.3
Rehabilitation
LEGEND:
Shoulder stabilization
Subexcavation
16+25.0010+40.45
Proposed edge of shoulder
Match proposed right turn lane
Line to be constructed
Slope stake limits
Existing edge of shoulder
Existing edge of shoulder
See Typical Section
.2
.0 o
Driveway approach symbol
Type Mainline station stake limits
Slope
[1]structure transition railing, LT
Install guardrail, terminal and
[1]structure transition railing, RT
Install guardrail, terminal and ditch, method A, class 1
Construct riprap
13+10 to 14+55, RT
Roadway obliteration
[1]Remove existing fence (typ.)
Install fence, at end of curb)
(slope protection method A, class 2
Place riprap, Riprap
Tack coat
Tack coat
S e e H
S h e e ts f o r d e ta il s a n d p r o te c ti v e a p r o n a t o u tl e t.
w it h r ip r a p h e a d w a ll s
I n s ta ll p ip e c u lv e r t a t o u tl t.
e H
S h e e ts f o r d e ta il s h e a d w a ll s a n d p r o te c ti v e a p r o n
I n s ta ll p ip e c u lv e r t w it h r ip r a p
R e m o v e e x is ti n g p ip e c u lv e r t.
Sheet C.2
Reconstruction
Sheet C.2
Reconstruction
Proposed bridge deck
2.
1.
See Sheets I.1-3 for details
See Sheets I.1-3 for details details
See Sheet H.9 for
RECONSTRUCTION
BEGIN PROJECT
15 2
Little Sheep and locations.
Right-of-way Plans for permanent and construction easement boundary description
Refer to Wallowa Mountain Loop Road Reconstruction OR WALLOWA 4602(1) and do not include topsoil.
Excavation and embankment volumes have not been adjusted for shrink / swell, 16003CP
CP
16002
P C
P C
42054205 4205 42104210
42104210
42154215
42204220
42204220
4225422
42254225 42254225
42254225
423042304230
4230423042304230
42354235
42354235 42354235
42404240
42404240
4245 42504250
42504250
42504250
425042504250 42504250
42604260
42604260
42604260426042604260
4265 42704270
42804280 42804280
42854285
5 4290
42904290
42904290
42904290
54295
429542
43004300
43054305
43054305
43104310
43104310
10 4315
43154315
43154315
4315431
15 4320
43204320
4320432
54325
43254325
04330
43304330
433043304330
4335433
43354335
4335433
0 4340
434543
43454345
43504350
4355 4355
5 4355
43604360
43604360
4360 4360
42454245
42504250
42554255
4260426042604260
426542654265
42704270
427042704270
42704270
42754275
427542754275
42754275
42804280
42804280
42804280
42854285
42854285
42904290
42904290
42904290
42954295
42954295
43004300
43004300
43004300
430043004300
43054305
43054305
43104310
43154315
43154315
43204320
43254325
43304330
43504350
4355435
43604360
43704370
43754375
4380 4380
4385 4385 4385
4390 4390
4395 4395
4400 4400
4400 4405
P C
.4
P T
.2
P C
.1
P T
.1
P C
.2
P T
.8
P C
.6
P T
.3
P C
.9
P T
.3
16+00 to 45+00
PLAN AND PLAN
N N
D
R= 1,350.00'
T= 160.28'
D
R= 600.00'
T= 9.31'
Curve= C203
Curve= C204
D
R= 1,200.00'
T= 27.37'
Curve= C205
D
R= 6,000.00'
T= 57.21'
Curve= C206
LEGEND:
D.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r a fc .d g n
OR WALLOWA 4602(1)
J u ly
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y
Curve= C202 D
R= 6,000.00' T= 138.96'
Curve= C203
D
R= 1,350.00'
T= 160.28' e= Match exist.
L= 277.87' e=- Match exist.
L= 319.07' e= Match exist.
L= 319.07' e= Match exist.
L= 18.62' e= Match exist.
L= 54.73' e= Match exist.
L= 114.42'
CP
16005
CP
16004
CP
16006
CP
16007 16008
CP
RECONSTRUCTION
END
REHABILITATION
BEGIN
16+25.00
Line to be constructed
Line to be constructed
Existing edge of shoulder
Existing edge of pavement
Existing edge of pavement
Existing edge of shoulder
Existing edge of shoulder
Existing edge of shoulder
Existing edge of pavement
Existing edge of pavement
C
Shoulder stabilization
Subexcavation
Roadway obliteration
Riprap
Clean culvert in place
Clean culvert in place
428042804280
42804280
428542854285
4290429
42954295
4295429542954295
4300430043004300
430543054305
431043104310
431543154315
4320432
43254325
43254325
4325 43304330
43304330
4330 4335
43354335
4335433
43404340
43454345
54345434
4345 4350
43504350
43504350
43554355
43604360
43604360
43654365
4365436
43704370 437043704370
43704370
4375437
43754375
43754375
4380 4380
4380 4380
4385 4385
4385 4385 4385
4385 438
5 4385
43854390 439
4390 4390
4390 4390
43904395
4395 4395
4400 4400
44004405
4405 4405
440544054405
44104410
54415
4430 4
5 4310
0 4315
43254325
43304330
43304330
43354335
43354335
4335433543354335
434043404340
4340434043404340
434543454345
4345434543454345
43504350
43504350
43504350
43554355
4355435543554355
43604360
43654365
4365436543654365
43704370
43754375
4380 4380 4380
4380 4380
54385
4385 4385 4385
4390 4390
4390 4390 4390
4395 4395
4395 4395 4395
4400 4400 4400
4405 4
4410 4410
4410 4410 4410 4410
104415
4415 4415
4415 4415
4420 4420
0 44
4425 4425
4435 4435 44
4435 4435
4445 4445
4450 4450 445
4450 4450
4455 4455
4460 4460 4460
4460 44
P C
.6
P T
.7
P C
.9
P T
.6
P
C
.0
P T
.0
P C
.9
P T
.8
P C
.6
P T
.3
P C
.1
P T
.3
45+00 to 75+00
PLAN AND PLAN
N
D
R= 1,500.00'
T= 66.60'
Curve= C207
D
R= 3,000.00'
T= 44.89'
Curve= C208
D
R= 2,700.00' T= 176.74'
Curve= C209
D
R= 1,200.00'
T= 69.51'
Curve= C210
D
R= 6,000.00'
T= 135.38'
Curve= C211
D
R= 900.00'
T= 62.67'
D
R= 900.00'
T= 62.67'
L= 125.13'
Curve= C212
LEGEND:
D.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r a fd .d g n
OR WALLOWA 4602(1)
J u ly
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y e= Match exist.
L= 133.10' e= Match exist.
L= 352.98' e= Match ecxist.
L= 138.87' e= Match exist.
L= 270.71' e= Match exist.
L= 125.13' e= Match exist.
L= 89.77'
CP
16009
CP
16010
CP
16011
CP
16012
CP
16013
CP
16014
CP
16015
N
Line to be constructed
Line to be constructed
Existing edge of pavement
Existing edge of pavement
Existing edge of shoulder
Existing edge of shoulder
Proposed edge of shoulder
Existing edge of pavement
Existing edge of pavement
Existing edge of shoulder
Proposed edge of gravel shoulder
A
A 74+
B
A
Shoulder stabilization
Subexcavation
Roadway obliteration
Riprap
Clean culvert in place
Clean culvert in place
Clean culvert in place
POT 50
2+00.0
POT 51
0+00.0
43854385
4395439543954395
44004400
44004400
44004400
44054405
44054405
44104410
44104410
441544154415
44154415
44154415
44204420
44204420
44204420
44254425
44254425
44254425
44304430
44304430
44304430
4435443544354435
44354435
44354435
4440444044404440
44404440
44404440
4445444544454445
44454445
4450445044504450
44504450
4455445544554455
44554455
446044604460
44604460
4465446544654465
44654465
4470447044704470
44704470 4475 4475
4475 4475
4475 4475 4475 4475
4480 4480
4480 4480 4480 4480
4485 4485
4485 4485 4485 4485
4490 4490
4490 4490 4490
4495 4495
4495 4495 4495
4500 4500
4500 4500 4500 4500
4505 4505
4505 4505
4505 4505 4505
4510 4510 4510
4515 4515
4515 4515 4515
4520 4520
4520 4520
4530 4530
43604360
43754375
43804380
43854385
43854385
43904390
43954395
440044004400
44004400
44054405
44054405
44104410
441044104410
441544154415
44204420
442544254425
44354435
443544354435
44354435
44404440
44454445
444544454445
44454445
44504450
44554455
445544554455
44654465
44654465
44704470
447044704470
44704
4475 4475
4480 4480 4480
4480 4480
4485 4485
4485 4485
4500 4500
45054 f t
WALLOWA MOUNTAIN L
OOP ROAD
P T
.6
P C
.9
P T
.7
P C
.4
P T
.8
P C
.0
P T
.7
P C
.6
P T
.3
P C
.4
P T
.6
P C
.2
75+00 to 105+00
PLAN AND PLAN
N
N
D
R= 900.00'
T= 121.09'
Curve= C213
D
R= 900.00'
T= 13.85'
Curve= C214
T= 93.63'
D
R= 6,000.00'
Curve= C215
D
R= 9,000.00'
T= 132.21'
Curve= C216
D
R= 9,000.00'
T= 132.21'
Curve= C216
T= 157.03'
D
R= 3,000.00'
Curve= C217 D
R= 2,700.00' T= 167.94'
Curve= C218
LEGEND:
D.5
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r a fe .d g n
OR WALLOWA 4602(1)
J u ly
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y e= Match exist.
L= 240.74' e= Match exist.
L= 187.25' e= Match exist.
L= 313.77' e= Match exist.
L= 335.46' e= Match exist.
L= 27.69' e= Match exist.
L= 264.40' e= Match exist.
L= 264.40'
16019
1601816017
CP
16015
CP
16016
CP
CP
CP
CP
16020
Line to be constructed
Line to be constructed
Existing edge of shoulder
Existing edge of pavement
Existing edge of shoulder
Existing edge of pavement
Existing edge of pavement edge of pavement
Existing
Shoulder stabilization
Subexcavation
Roadway obliteration
Riprap
Clean culvert in place
Clean culvert in place
Clean culvert in place
16021
CP
44304430
44354435
444044404440
44404440
44454445
44454445
44504450
4455445
445544554455
44604460 44604460
446544654465
44704470
447044704470
4475 4475 4475
4475 4475
4480 4480
4480 4480
4485 4485 4485
4485 4485
4490 4490
4490 44
4490 4490
4495 4495
95 4495 4495
4500 4500 4500 4500
4505 4505
4505 4505
10 4510
4515 4515
4520 4520
45254530
4530 4530
4535 4535
4535 4535 4535
4540 4540
0 4540
0 4540
4545 4545 4545
4545 4545
4550 455
45504550 4550
4555 45
4560456
0 4455
5 44
44704470
44754475
44754475
4475 447
44954495
54495
4495 4495
45154515
4515 4515
45204520
4525 4525
45304530
4530 4530 4
45354535
45404540
45454545
45504550
45554555
4555 4
45604560
45654565
45704570
45754575
45804580
45854585
P C
.9
P T
.6
P C
.7
P T
.7
P C
.3
P T
.0
P C
.6
P T
.6
P C
.0
P T
.8
P C
.6
P T
.1
P C
.3
P T
.6
P C
.2
0 P
T
.4
P C
.7
105+00 to 135+00
PLAN AND PLAN
N
N D
R= 1,200.00'
T= 160.81'
Curve= C219
D
R= 1,200.00'
T= 43.00'
Curve= C220
D
R= 1,200.00'
T= 29.36'
Curve= C221
D
R= 1,200.00' T= 43.92'
Curve= C223
D
R= 1,200.00'
T= 76.08'
Curve= C222
D
R= 900.00'
T= 21.79'
Curve= C225
D
R= 600.00'
T= 30.20'
Curve= C226
R= 1,200.00'
T= 100.83'
D
Curve= C227
D
R= 1,500.00'
T= 180.23'
Curve= C228
LEGEND:
D.6
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r a ff .d g n
OR WALLOWA 4602(1)
J u ly
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y e= Match exist.
L= 319.71' e= Match exist.
L= 85.95' e= Match exist.
L= 151.95' e= Match exist.
L= 87.79' e= Match exist.
L= 58.70' e= Match exist.
L= 43.57' e= Match exist.
L= 60.35' e= Match exist.
L= 201.18' e= Match exist.
L= 358.74'
16024
CP
CP
CP
16023
16025
CP
16026
CP
16022
Line to be constructed
Line to be constructed
Existing edge of pavement
Existing edge of pavement
Existing edge of pavement
Existing edge of pavement
Existing edge of shoulder
Existing edge of shoulder
A C
A
C
C
Shoulder stabilization
Subexcavation
Roadway obliteration
Riprap
Clean culvert in place
Clean culvert in place
Clean culvert in place
Clean culvert in place
Clean culvert in place
448544854485
44904490
449544954495
45004500
45004500
4505450545054505
45054505
451045104510
45104510
45154515
45154515
4520452045204520
45254525
45254525
45254525
45304530
45304530
45304530
453545354535
45404540
45404540
45454545
45454545
45504550
45504550
45554555
45554555
45604560
45654565
45654565
45704570
45704570
45754575
45804580
45804580
45854585
4600460
46054605
4615 4615
46204
4510 4515
45154515
45204520
45254525
4525 4
45354535
45404540
45504550
45554555
45604560
45604560
45654565
457045704570
45704570
45704570
45704570
457545754575
45754575
45754575
45754575
45804580
45854585
45854585
45904590
45954595
45954595
46004600
46004600
46054605
46104610
46154615
46204620
4635 4635
4635 4635
4640 4640
4645 4645
4650 4650
4670 4670
4680 4680
4690 4690
P T
.4
P C
.2
P T
.2
P C
.9
P T
.7
P C
.7
P T
.7
P C
.5
P T
.5
P C
.5
P T
.3
P C
.3
P T
.0
P C
.7
P T
.0
P C
.3
P T
.5
P C
.7
P T
.4
135+00 to 165+00
PLAN AND PLAN
N
D
R= 1,500.00'
T= 180.23'
Curve= C228 D
R= 1,800.00'
T= 108.61'
Curve= C229
D
R= 600.00'
T= 72.32'
Curve= C231
D
R= 3,000.00'
T= 103.59'
Curve= C232
D
R= 600.00'
T= 17.90'
Curve= C233
D
R= 1,200.00'
T= 87.97'
Curve= C234
D
R= 1,200.00'
T= 29.13'
Curve= C235
D
R= 1,200.00'
T= 51.17'
Curve= C236
D
R= 1,200.00'
T= 92.56'
Curve= C237
LEGEND:
D.7
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r a fg .d g n
OR WALLOWA 4602(1)
J u ly
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y e= Match exist.
L= 358.74' e= Match exist.
L= 216.95' e= Match exist.
L= 143.94' e= Match exist.
L= 207.09' e Match exist.
L= 35.79' e= Match exist.
L= 175.63' e= Match exist.
L= 58.25' e= Match exist.
L= 102.27' e= Match exist.
L= 184.74
16028
16031
16033
16029
16030
16031
16027
CP
CP
CP
CP
CP
N
Line to be constructed
Existing edge of pavement
Existing edge of pavement
Existing edge of pavement
Existing edge of pavement
Existing edge of shoulder
Existing edge of shoulder
Line to be constructed
A
C
Shoulder stabilization
Subexcavation
Roadway obliteration
Riprap
Clean culvert in place
Clean culvert in place
Clean culvert in place
Standard underdrain system
See Section C for
A C
P C
P C
45854585
45954595 45954595
46004600
460546054605
461046104610
46104610
46154615
46154615
46204620
46204620
46254625
46254625
463046304630
46304630
46354635
46354635
46354635
46404640
46454645
46504650
465546554655
46604660
4665 4665
4670 4670
4670 4670 4670
4675 4675
4675 4675 4675 4675
4680 4680 4680
4685 4685 4685
4690 4690
4690 4690 4690
4695 4695
4695 4695 4695
4700 4700 4700
4705 4705 4705 4705
4710 4710 4710
4715 4715
4715 4715 4715
4720 4720
4730 4730
47404
4570457045704570
45754575 45754575
45804580
4585458545854585 45854585
45854585
45904590
45904590
4595459
45954595
460046004600
46004600
460546054605
46054605
461046104610461046104610
46104610
46154615
46154615
46204620
54625462546254625
46254625
463046304630
46304630
4635 4635
4635 4635 4635 4635
54640
4640 4640
4640 4640
0 4
4645 4645
4650 4650 4650 465
554655 4655
4655 4655
4660 4660
4660 4660
4665 4665
4665 4665
4670 4670 4670
4675 4675
4675 4675
4680 4680
4685 4685 4685
4690 46904690
P C
.1
P T
.9
5 P
C
.7
P T
.7
P
C
.0
P T
.8
P C
.0
P T
.0
P C
.2
P T
.8
P C
.7
P T
.6
P C
.1
P T
.0
165+00 to 195+00
PLAN AND PLAN
N
D
R= 1,200.00'
T= 34.04'
D
R= 1,200.00'
T= 22.84'
Curve= C238
Curve= C239
D
R= 1,500.00'
T= 93.06'
Curve= C240
D
R= 650.00'
T= 117.70'
Curve= C241
D
R= 600.00'
T= 122.04'
Curve= C242
D
R= 900.00'
T= 78.66'
Curve= C243
D
R= 1,650.00'
T= 343.20'
Curve= C244LEGEND:
D.8
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r a fh .d g n
OR WALLOWA 4602(1)
J u ly
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y e= Match exist.
L= 68.05' e= Match exist.
L= 45.67' e= Match exist.
L= 185.88' e= Match exist.
L= 232.87' e= Match exist.
L= 240.79' e= Match exist.
L= 156.92' e= Match exist.
L= 676.75'
CP
CP
CP
16033
16036
16037
CP
16038
CP
CP
16034
16035
N
7 2
Line to be constructed
Line to be constructed
Existing edge of pavement
Existing edge of pavement
Existing edge of pavement
Existing edge of pavement
Existing edge of shoulder
Existing edge of shoulder
Existing edge of shoulder
B
Shoulder stabilization
Subexcavation
Roadway obliteration
Riprap
Do Not Disturb
"We Love You Rachel"
Memorial cross
172+37, 26' LT
Clean culvert in place
Clean culvert in place
Clean culvert in place
16043
46754675
46804680
46904690
46954695
46954695
46954695
47004700
004700
47004700
47054705
47054705
47054705
47104710
47104710
471547154715 47154715
47154715
47154715
47204720
47204720
472047204720
4725472547254725
47254725
473047304730
473047304730
47354735 47354735
47354735
47404740
47404740
47454745
47454745
47454745
47504750
475047504750
47554755
47554755
04760
47604760
47654765
4770 4775
47754775
478047
5 4785
4800 4800
46604660
04660
46654665
46654665
46704670
46754675
46954695
47004700
4700 4700
47154715 4715
4720 4720 f t
P T
.6
P C
.0
P T
.1
P C
.9
P T
.5
P C
.0
P T
.3
P C
.8
P T
.9
P C
.7
P T
.8
P C
.0
P T
.0
P C
.9
P T
.4
P C
.2
P T
.0
P C
.1
P T
.3
P C
.0
P T
.6
195+00 to 225+00
PLAN AND PLAN
N N
D
R= 1,500.00'
T= 101.13'
Curve= C245
D
R= 1,800.00'
T= 16.23'
Curve= C246
D
R= 300.00'
T= 71.74'
Curve= C247
D
R= 450.00'
T= 125.19'
Curve= C248
D
R= 1,200.00'
T= 138.91'
Curve= C249
D
R= 900.00'
T= 99.46'
Curve= C250
D
R= 900.00'
T= 58.85'
Curve= C251
D
R= 600.00'
T= 40.19'
Curve= C252
D
R= 1,200.00'
T= 95.24'
Curve= C253
D
R= 1,200.00'
T= 106.79'
Curve= C254
LEGEND:
D.9
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r a fi .d g n
OR WALLOWA 4602(1)
J u ly
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y e= Match exist.
L= 201.96' e= Match exist.
L= 32.47' e= Match exist.
L= 140.83' e= Match exist.
L= 244.20' e= Match exist.
L= 276.60' e= Match exist.
L= 198.12' e= Match exist.
L= 117.54' e= Match exist.
L= 80.26' e= Match exist.
L= 190.09' e= Match exist.
L= 213.01'
CP
16044
CP
16045
CP
16039
CP
16040
CP
16041
16042
CP
Line to be constructed
Line to be constructed
Existing edge of shoulder
Existing edge of shoulder
Existing edge of pavement
Existing edge of pavement
Existing edge of pavement
Existing edge of pavement
C
B 1
Shoulder stabilization
Subexcavation
Roadway obliteration
Riprap
Clean culvert in place
Clean culvert in place
Clean culvert in place
16050
16051
CP
0 4 047054705
47254725
47354735
47404740
47404740
474547454745
47454745
47504750
47504750
47504750
47554755 47554755
47554755
47604760
47604760
47604760
47654765
47654765
47704770
47704770
47704770
47754775
47804780
47804780
4780 4
4785 4785
4785 4785
4785 4785
4790 4790 4790
4790 4790
4795 4795
4795 4795
4800 4800
4800 4800
4800 4800
4800 4800
4805 4805
4805 4805 4805
4805 4805
4820 4820
4820 4820
4820 4820
4825 4825 4825 4825 4825
4830 4830
4830 4830 4830
4835 4835
4835 4835 4835
4840 4840
4845 4845
4845 4845
4850 4850 4850 4850
4855 4855 4855 4855
4860 4860 4860 4860 4860 4860
4860 4865
4865 4870
0 4775
47754775
4795 4795
4800 4800
4805 4805
4810 4810 4810
4815 4815
4830 4830
4840 4840
4880 4880
4910 4910
4920 49204 f t
WALLOWA MOUNTAIN LOOP ROAD
P T
.7
P C
.3
P T
.2
P C
.2
5 P
T
.3
P C
.0
P T
.5
P C
.6
0 P
T
.9
P C
.1
P T
.8
P C
.9
P T
.3
P C
.6
P T
.4
P C
.6
P T
.4
P C
.5
P T
.5
P C
.9
225+00 to 255+00
PLAN AND PLAN
N
N
D
R= 1,200.00'
T= 106.79'
Curve= C254
D
R= 6,000.00' T= 33.49'
Curve= C255
D
R= 1,200.00'
T= 49.11'
Curve= C256
D
R= 1,200.00'
T= 24.74'
Curve= C257
D
R= 900.00'
T= 84.42'
Curve= C258
D
R= 900.00'
T= 25.38'
Curve= C259
D
R= 1,200.00'
T= 62.75'
Curve= C260
D
R= 450.00'
T= 70.97'
Curve= C261
D
R= 600.00'
T= 32.91'
D
R= 600.00'
T= 23.02'
Curve= C262
Curve= C263
LEGEND:
D.10
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r a fj .d g n
OR WALLOWA 4602(1)
J u ly
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y e= Match exist.
L= 213.01' e= Match exist.
L= 66.98' e= Match exist.
L= 98.17' e= Match exist.
L= 168.35' e= Match exist.
L= 49.48' e= Match exist.
L= 50.74' e= Match exist.
L= 125.38' e= Match exist.
L= 140.79' e= Match exist.
L= 65.76' e= Match exist.
L= 46.03'
16046
CP
16047
CP
16048
CP
16049
CP
Line to be constructed
Line to be constructed
C
Shoulder stabilization
Subexcavation
Roadway obliteration
Riprap
Clean culvert in place
Clean culvert in place
Clean culverts in place
4790 4
4805 4805
4810 4810
48104810
4815 4815
4815 4815
4820 4820
4820 4820
4820 4820
4825 4825
4825 4825
4830 4830
4830 4830
4835 4835
4835 4835
4835 4835 4835 4835
4840 4840
4840 4840
4845 4845
4845 4845
4850 4850
4850 4850
4850 4850 4850 4850
4855 4855
4855 4855 4855 4855
4860 4860
4860 4860
4865 4865
4865 4865
4865 4865
4870 4870
4870 4870 4870
4870 4870
4870 4870
4875 4875
4875 4875 4875
4875 4875
4880 4880
4880 4880 4880
4880 4880 4880 4880
4885 4885 4885
4885 4885 4885 4885
4890 4890 4890
4890 4890
4895 4895 4895
4895 4895 4895
4900 4900 4900 4900
4900 4900
4905 4905
4905 4905
4905 4905
4910 4910 4910 4910 4910 4910
4910 4910
4915 4915 4915 4915
4915 4915
4915 4915 4915
4920 4920 4920 4920 4920 4920
4920 4920
4925 4925 4925 4925 4925
4925 4925
4930 4930 4930 4930
4930 4930 4930
4935 4935 4935 4935 4935
4935 4935
4940 4940 4940
4945 4945
49504950
4845 4
4855 4855
4860 4860 4860
4865 4865
4880 4880
4885 4885
WALL
OWA M
OUNTAIN
LOOP R
OAD
P C
.9
P T
.5
P C
.0
P T
.7
P C
.0
P T
.6
P C
.6
5 P
T
.3
P C
.1
P C
.1
P T
.7
255+00 to 272+68.69
PLAN AND PLAN
N
N
D
R= 1,200.00'
T= 12.31'
Curve= C266
D
R= 900.00'
T= 71.01'
Curve= C265
D
R= 450.00'
T= 109.36'
Curve= C264 e= 0.040
L= 214.56'
D
R= 1,200.00'
T= 54.35'
Curve= C267
D
R= 900.00'
T= 125.63'
Curve= C268
CONNECTION DETAIL
LEGEND:
D.11
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r a fk .d g n
OR WALLOWA 4602(1)
J u ly
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y e= Match exist.
L= 141.72' e= Match exist.
L= 24.62' e= Match exist.
L= 108.62' e= Match exist.
L= 249.64'
16055
CP
16054
CP
16053
CP
16052
CP
Line to be constructed
Existing edge of shoulder
Existing edge of shoulder
Existing edge of pavement
Existing edge of pavement
Existing edge of shoulder
Existing edge of shoulder
Existing edge of pavement
Existing edge of pavement
END PROJECT
END REHABILITATION
272+68.69
OR WALLOWA 4602(1)
El=4845.75
E=3079789.963
N=603530.295
Line to be constructed p a v e m e n t
M a tc h e x is ti g
Saw cut vertically and tack
.6
9Sheet C.3
Rehabilitation, A
265+
Shoulder stabilization
Subexcavation
Roadway obliteration
Riprap
See Typical Section 10'
Clean culvert in place
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
16001 629326.226 9083018.594 4180.340 N45°20'29.80303" W117°04'22.15377" 4129.37 0.999702182 5/8" IR w/fhwa Alum Cap 1.
16002 628979.787 9082511.624 4200.870 N45°20'26.59756" W117°04'29.45129" 4149.9 0.999701156 5/8" IR w/fhwa Alum Cap
16003 628665.367 9082717.244 4211.700 N45°20'23.40968" W117°04'26.76157" 4160.73 0.999700593 5/8" IR w/fhwa Alum Cap
16004 628260.175 9082505.410 4220.350 N45°20'19.50103" W117°04'29.96522" 4169.38 0.999700125 5/8" IR w/fhwa Alum Cap
16005 627712.524 9082178.563 4227.430 N45°20'14.23508" W117°04'34.86205" 4176.46 0.999699712 5/8" IR w/fhwa Alum Cap
16006 627183.047 9081924.954 4238.520 N45°20'09.11773" W117°04'38.72343" 4187.55 0.999699111 5/8" IR w/fhwa Alum Cap
16007 626673.650 9081775.384 4257.640 N45°20'04.15495" W117°04'41.11751" 4206.67 0.999698129 5/8" IR w/fhwa Alum Cap
16008 626154.996 9081617.751 4269.690 N45°19'59.10419" W117°04'43.62973" 4218.72 0.999697484 5/8" IR w/fhwa Alum Cap
16009 625618.542 9081449.106 4279.380 N45°19'53.88243" W117°04'46.30639" 4228.41 0.99969695 5/8" IR w/fhwa Alum Cap
16010 625116.587 9081365.224 4287.400 N45°19'48.96556" W117°04'47.77698" 4236.44 0.9996965 5/8" IR w/fhwa Alum Cap
16011 624604.794 9081238.634 4300.060 N45°19'43.96948" W117°04'49.85063" 4249.1 0.999695828 5/8" IR w/fhwa Alum Cap
16012 624191.516 9081194.432 4312.030 N45°19'39.91085" W117°04'50.71360" 4261.08 0.999695202 5/8" IR w/fhwa Alum Cap
16013 623822.925 9081185.257 4323.630 N45°19'36.27843" W117°04'51.06021" 4272.68 0.9996946 5/8" IR w/fhwa Alum Cap
16014 623382.727 9081195.941 4337.600 N45°19'31.93129" W117°04'51.17148" 4286.66 0.999693876 5/8" IR w/fhwa Alum Cap
16015 622921.022 9081227.078 4351.350 N45°19'27.36343" W117°04'51.00946" 4300.42 0.99969316 5/8" IR w/fhwa Alum Cap
16016 622522.265 9081301.165 4359.700 N45°19'23.39863" W117°04'50.20954" 4308.78 0.999692709 5/8" IR w/fhwa Alum Cap
16017 622021.981 9081242.489 4374.100 N45°19'18.48769" W117°04'51.32634" 4323.19 0.999691958 5/8" IR w/fhwa Alum Cap
16018 621517.702 9081231.210 4387.940 N45°19'13.51755" W117°04'51.78267" 4337.04 0.999691234 5/8" IR w/fhwa Alum Cap
16019 620950.628 9081169.705 4403.300 N45°19'07.94888" W117°04'52.97849" 4352.41 0.99969043 5/8" IR w/fhwa Alum Cap
16020 620420.724 9081103.526 4414.090 N45°19'02.74886" W117°04'54.21759" 4363.2 0.99968985 5/8" IR w/fhwa Alum Cap
16021 619940.082 9080943.123 4418.280 N45°18'58.07417" W117°04'56.74497" 4367.4 0.999689591 5/8" IR w/fhwa Alum Cap
16022 619389.529 9080889.121 4424.930 N45°18'52.66534" W117°04'57.82588" 4374.06 0.999689207 5/8" IR w/fhwa Alum Cap
16023 618921.033 9080905.872 4438.680 N45°18'48.03648" W117°04'57.86890" 4387.82 0.999688494 5/8" IR w/fhwa Alum Cap
16024 618425.964 9080992.073 4446.330 N45°18'43.11648" W117°04'56.95662" 4395.48 0.999688069 5/8" IR w/fhwa Alum Cap
16025 617921.723 9081008.001 4459.280 N45°18'38.13533" W117°04'57.03232" 4408.45 0.999687391 5/8" IR w/fhwa Alum Cap
16026 617400.942 9081041.018 4473.890 N45°18'32.98387" W117°04'56.87889" 4423.07 0.999686632 5/8" IR w/fhwa Alum Cap
16027 616882.839 9081145.645 4489.060 N45°18'27.82892" W117°04'55.72272" 4438.25 0.999685847 5/8" IR w/fhwa Alum Cap
16028 616354.187 9081125.942 4501.140 N45°18'22.62182" W117°04'56.31102" 4450.35 0.99968521 5/8" IR w/fhwa Alum Cap
16029 615828.020 9081017.713 4514.930 N45°18'17.47620" W117°04'58.13541" 4464.15 0.999684492 5/8" IR w/fhwa Alum Cap
16030 615309.593 9080996.022 4532.800 N45°18'12.37080" W117°04'58.74537" 4482.03 0.999683581 5/8" IR w/fhwa Alum Cap
16031 614807.410 9080995.570 4550.620 N45°18'07.41678" W117°04'59.04878" 4499.86 0.999682675 5/8" IR w/fhwa Alum Cap
16032 614300.564 9080929.331 4564.860 N45°18'02.44422" W117°05'00.27456" 4514.11 0.99968194 5/8" IR w/fhwa Alum Cap
16033 613803.738 9080905.086 4573.250 N45°17'57.55298" W117°05'00.90734" 4522.51 0.999681485 5/8" IR w/fhwa Alum Cap
16034 613310.311 9080921.018 4581.800 N45°17'52.67850" W117°05'00.97648" 4531.08 0.999681023 5/8" IR w/fhwa Alum Cap
16035 612790.558 9080856.794 4590.300 N45°17'47.57776" W117°05'02.18159" 4539.59 0.999680562 5/8" IR w/fhwa Alum Cap
16036 612353.475 9080621.919 4602.050 N45°17'43.36380" W117°05'05.72305" 4551.35 0.999679956 5/8" IR w/fhwa Alum Cap
16037 611859.290 9080583.000 4612.250 N45°17'38.50472" W117°05'06.55919" 4561.56 0.999679417 5/8" IR w/fhwa Alum Cap
16038 611361.634 9080562.905 4623.460 N45°17'33.60354" W117°05'07.13423" 4572.79 0.99967883 5/8" IR w/fhwa Alum Cap
16039 610892.661 9080393.382 4636.080 N45°17'29.04766" W117°05'09.78080" 4585.42 0.99967818 5/8" IR w/fhwa Alum Cap
16040 610399.184 9080307.496 4657.080 N45°17'24.21515" W117°05'11.27278" 4606.44 0.999677129 5/8" IR w/fhwa Alum Cap
PROJECT : Wallowa Mountain Loop Road
DATE OF FIELD WORK : 8/2016-10-2016
PROJECT UNITS : Coordinates International foot, elevation US Survey Feet COORDINATE SYSTEM : Oregon North SPCS NAD83 (2011)
EPOCH DATE :2010.0000
VERTICAL DATUM : Orthometric Elevations based on the NAVD88 GEOID12b
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
C
M yF ile s\
Pr oj ec ts
\O re go n\
W al lo w a\ [O
R W
A
LL
O W
A
2(
1) _c on tr ol sh ee t.
xl sx
]S he et
-M ay
-2
8:
A
M D
J& A
D J&
A
D es ig ne d by
C he ck ed b y:
STATE PROJECT
D.12
SHEET
NUMBER
WALLOWA 4602(1)OR
SURVEY CONTROL
Sheet 1 of 2
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
16041 610001.080 9080066.427 4669.020 N45°17'20.38822" W117°05'14.87720" 4618.38 0.99967652 5/8" IR w/fhwa Alum Cap 1.
16042 609603.009 9079985.025 4679.330 N45°17'16.49503" W117°05'16.24999" 4628.7 0.999675989 5/8" IR w/fhwa Alum Cap
16043 609250.242 9079874.547 4687.730 N45°17'13.06090" W117°05'18.00232" 4637.11 0.999675553 5/8" IR w/fhwa Alum Cap
16044 608775.979 9079784.137 4700.590 N45°17'08.41979" W117°05'19.54588" 4649.98 0.999674893 5/8" IR w/fhwa Alum Cap
16045 608274.634 9079674.020 4717.640 N45°17'03.51971" W117°05'21.38076" 4667.05 0.999674032 5/8" IR w/fhwa Alum Cap
16046 607803.203 9079564.950 4731.610 N45°16'58.91430" W117°05'23.18326" 4681.03 0.99967332 5/8" IR w/fhwa Alum Cap
16047 607292.366 9079506.656 4744.610 N45°16'53.89896" W117°05'24.29938" 4694.04 0.999672652 5/8" IR w/fhwa Alum Cap
16048 606761.523 9079428.385 4759.110 N45°16'48.69458" W117°05'25.70641" 4708.55 0.999671911 5/8" IR w/fhwa Alum Cap
16049 606231.169 9079500.151 4777.840 N45°16'43.43251" W117°05'25.01652" 4727.3 0.999670968 5/8" IR w/fhwa Alum Cap
16050 605808.600 9079468.950 4790.680 N45°16'39.27669" W117°05'25.70185" 4740.15 0.999670317 5/8" IR w/fhwa Alum Cap
16051 605563.462 9079410.622 4795.320 N45°16'36.88259" W117°05'26.66152" 4744.79 0.999670073 5/8" IR w/fhwa Alum Cap
16052 605144.255 9079347.929 4801.520 N45°16'32.77304" W117°05'27.78484" 4751 0.99966974 5/8" IR w/fhwa Alum Cap
16053 604657.029 9079510.297 4806.690 N45°16'27.89871" W117°05'25.80358" 4756.18 0.999669449 5/8" IR w/fhwa Alum Cap
16054 604138.162 9079622.346 4820.110 N45°16'22.73318" W117°05'24.54414" 4769.62 0.999668763 5/8" IR w/fhwa Alum Cap
16055 603681.324 9079790.601 4838.600 N45°16'18.15617" W117°05'22.46286" 4788.12 0.99966784 5/8" IR w/fhwa Alum Cap
16056 603308.449 9079821.093 4852.690 N45°16'14.46488" W117°05'22.25689" 4802.22 0.999667136 5/8" IR w/fhwa Alum Cap
16057 602764.769 9079899.767 4869.990 N45°16'09.06845" W117°05'21.47855" 4819.53 0.999666265 5/8" IR w/fhwa Alum Cap
PROJECT : Wallowa Mountain Loop Road
DATE OF FIELD WORK : 8/2016-10-2016
PROJECT UNITS : Coordinates International foot, elevation US Survey Feet COORDINATE SYSTEM : Oregon North SPCS NAD83 (2011)
EPOCH DATE :2010.0000
VERTICAL DATUM : Orthometric Elevations based on the NAVD88 GEOID12b
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
C
M yF ile s\
Pr oj ec ts
\O re go n\
W al lo w a\ [O
R W
A
LL
O W
A
2(
1) _c on tr ol sh ee t.
xl sx
]S he et
2)
-M ay
-2
8:
A
M D
J& A
D J&
A
D es ig ne d by
C he ck ed b y:
STATE PROJECT
D.13
SHEET
NUMBER
WALLOWA 4602(1)OR
SURVEY CONTROL
Sheet 2 of 2
APPROACH ROAD
TABULATION OF
E.1
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a g a .d g n
OR WALLOWA 4602(1)
J u ly
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y
FOOTNOTE:
Quantity.
Topsoil to be conserved is also included in Roadway Excavation[1]
130+36, RT
124+57, RT
116+17, RT
111+46, RT
74+42, RT
64+55, RT
56+34, RT
37+12, RT
265+68, RT
246+66, RT
199+22, LT
197+17, RT
179+31, RT
161+21, RT
138+52, RT
602+18.72 to 603+71.13
TYPICAL SECTION
TYPICAL SECTION
NO SCALE
FOOTNOTE:
[1] Width varies from 0-feet to 12-feet, from 602+18.72 to
602+60.72.
TYPICAL SECTIONS
APPROACH ROAD
E.2
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a g b .d g n
OR WALLOWA 4602(1)
J u ly
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y
1:4
1:4 1:
LC
OR-350W
OR-350W
Existing ground
Tack coat (between lifts)
Placing topsoil
Proposed Right-Turn Lane
[1]12'
Shoulder
4'
Traveled Lane, RT
13'
2% 2%
Existing driveway
Driveway apron
Varies
See Typical Section, Sheet C.3
Varies
E x is ti n g e d g e o f p a v e m e n t
Match overlay grade driveway grade
Match existing 6" depth (compacted) method 2, Roadway aggregate, RIGHT TURN LANE FROM OR-350W
DRIVEWAY APRON
Profile grade
Roadway aggregate, method 2, 8" depth
Turf establishment
Roadway aggregate, method 2
Asphalt concrete pavement, gyratory mix, 12 4" or 3 " nominal maximum size aggregate, 0.3 to < 3 million ESAL (type IV pavement roughness), 4" depth (placed in two equal lifts)
16002
,1
.9
,1
.2
-4.4709%
-3.3122%
70' VC
K = 60
,1
.4
P O
T
.7
P O
T
.1
POT 10+25.45
PC 11+97.49
N
CUYD
EXC.
CUYD
EMB.
604+00603+00602+00
E.3
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a g c .d g n
OR WALLOWA 4602(1)
J u ly
B
V in c e n t
K
P a r k e r
C h e c k e d b y
D e s ig n e d b y
POT 10+25.45
Line to be constructed
Slope stake limits
Profile grade
Existing ground
El=4199.91
E=9082504.7144
N=628907.7156
El=4194.44
E=9082620.4568
N=629006.8687
BEGIN WORK
602+18.72
FROM OR-350W
RIGHT TURN LANE
END WORK
edge of shoulder
Proposed
Existing edge of pavement
Match mainline roadway
STATE ROUTE 350W
PROPOSED RIGHT TURN LANE
NOTE:
= 10+40.47, 26.593' RT (MAINLINE)
603+71.13
FROM OR-350W
RIGHT TURN LANE
edge of pavement
Proposed
See Section G bridge.
Proposed
Existing edge of gravel guardrail
Proposed
Proposed guardrail
See Section D roadway
Mainline boundary descriptions and locations.
for permanent and construction easement
OR WALLOWA 4602(1) Right-of-way Plans
Refer to Wallowa Mountain Loop Road and do not include topsoil.
have not been adjusted for shrink/swell, Excavation and embankment volumes
See Sheet E.2 for Typical Section.
3.
2.
1.
N
O
T
.7
P O
T
.1
E.4
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a g d .d g n
OR WALLOWA 4602(1)
J u ly
V in c…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.