Text version
.0 "O u
<LI
.c u
.0 "O
<LI
C:
Cl "iii
<LI
INDEX TO SHEETS
A. GENERAL INF ORMATION
A.1 TITLE SHEET
A.2 INDEX TO SHEETS
A.3 PLAN SYMBOLS AND ABBREVIATIONS
A.4 VICINITY MAP
B. SUMMARY OF QUANTITIES
B.1-4 SUMMARY OF QUANTITIES
C.l
C.2
C. TYPICAL SECTIONS
TABULATION OF TYPICAL SECTION QUANTITIES
EARTHWORK SUMMARY
C.3-4 TYPICAL SECTIONS
C.5 SUBEXCAVATION DETAILS
C .6 TURNOUT SECTION
C.7-8 REINFORCED SHOULDER STABILIZATION DETAILS
D. PLAN-PROFILE
D.l TABULATION OF PLAN QUANTITIES
D.2 PLAN AND PROFILE
D.3-11 PLAN AND PLAN
D.12-13 SURVEY CONTROL
E.l
E.2
E.3
E.4
E.5
E. APPROACH ROADS
TABULATION OF APPROACH ROAD QUANTITIES
APPROACH ROAD TYPICAL SECTIONS
PLAN AND PROFILE RIGHT TURN LANE
INTERSECTION LAYOUT
DRIVEWAY APRON AND TAPER LAYOUT
F . EROSION CONTROL
F.l TABULATION OF EROSION CONTROL QUANTITIES
F.2-10 EROSION CONTROL PLAN
F.11-15 STANDARD DRAWINGS AND DETAILS
F.16 ESCP SIGN
G. STRUCTURES
G.1-9 LITTLE SHEEP CREEK BRIDGE PLANS
G.10 TABULATION OF GRS-IBS ABUTMENT QUANTITIES
G.11 GRS-IBS TYPICAL PLAN AND ELEVATION
G.12-13 GRS-IBS DETAILS
G.14 GRS-IBS ABUTMENT PROFILES
INDEX T O SHEET S
H. DRAINAGE
H.1-2 TABULATION OF DRAINAGE QUANTITIES
H.3 LITTLE SHEEP CREEK BRIDGE SCOUR MITIGATION PLAN
H.4 LITTLE SHEEP CREEK BRIDGE SCOUR MITIGATION
SECTIONS
H.5-7 STANDARD DRAWINGS
H.8
H.9
H.10
RIPRAP HEADWALL AND PIPE END TREATMENT DETAILS
RIPRAP DITCH DETAIL
CURB, GUTTER, AND SLOPE PROTECTION DETAILS
I. GUARDRAIL
1.1 GUARDRAIL LAYOUT
1.2-4
1.5
1.6
I. 7
GUARDRAIL STANDARD DRAWINGS
STRUCTURAL TRANSITION RAIL PLAN AND ELEVATION
STRUCTURAL TRANSITION RAIL DETAILS
STRUCTURE TRANSITION RAIL PARTS
J. TEMPORARY TRAFFIC CONTROL
J.l TABULATION OF TEMPORARY TRAFFIC CONTROL
QUANTITIES
J.2 TEMPORARY TRAFFIC CONTROL ROAD CLOSURE LAYOUT
J.3-9 STANDARD DRAWINGS
K. PERMANENT TRAFFIC CONTROL
K.1 TABULATION OF PERMANENT TRAFFIC CONTROL
QUANTITIES
K.2-10 PERMANENT TRAFFIC CONTROL PLAN
K.11 STANDARD DRAWING
K.12 LINEAR PAVEMENT MARKING DETAILS
K.13 SIGN PANEL DETAILS
L. LANDSCAPING
L.1 LANDSCAPING PLAN AND QUANTITIES
M. UTILITIES
M.1 UTILITY PLAN
N. MISCELLANEOUS DETAILS
N.1 ROADWAY OBLITERATION DETAILS
N.2 OREGON RIGHT OF WAY FENCE DETAILS
STATE PROJECT
OR WALLOWA 4602(1)
INDEX TO SHEETS
SHEET
NUMBER
A.2
CP GPS
JH
BH
TP
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
RIP
G G
W W
DI
T
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS
DI
T
NO SCALE
- no symbol -wall face
N
A
M
N o v e m b e r
I n t_ ft
D c m y fi le s p w p r o d u c ti o n d o r a a c .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.3 WALLOWA 4602(1)OR
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material
NOTE:
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø
∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
Fiber Roll or Wattle
W a ll o w a d
R n w o
D r e k c u
T
29 28
27 26 25 30 29
27 26
31 32
353433323136
6 5 4 3
2 1
18 17 16 15 14
222120
25 30
36 31 32
33 34 35 36
27 26 25
31 32 33
29 28 27
212019
18 17 16 15 14 13
121110
6 5 4
3 2
36353433
212019
N
R
IL
C
N Y
O N
Spring d
R yt r e bi L
VICINITY MAP
d
R yt r e bi L
T e n d e r v a ll e y R d
A.4
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a a d .d g n
OR WALLOWA 4602(1)
P
J u n e
B
V in c e n t
K
P a r k e r
C h e c k e d b y
D e s ig n e d b y ponds diposal Sewage d
R r e p p a n K
Creek Hill Sheep ywH a hanmI htiffir G keer C eltti L p e e h
S k e e r
C ylluCcM k e e r
C
.dR ekaL yenniK
Kinney Lake
.nL renruT
Quarry
4WD
W
D
W
D
W
D
W
D
W D
4W D
Gors line Gulch
M it c h e ll
Ca ny on
W e s t
F o r k
R iv e r
Mount Howard ya w ma rT ei ri ar P k e er C
Airport
State
Joesph
Si lv er
La ke
D it ch
Prairie Creek Rd.
Radio Facility
Weir
Liberty Grange
Grote Ln.
Airpo rt Ln
State Park Wallowa y w H et at
S a w ol l a W
Wallowa Lake State Park d
R e s u o H r e w o P
.nL llessuR
Dorrance Rd.
.nL llessuR a w oll a
W r e vi R
Walker Ln.
Bicentennial Rd.
LAKE
WALLOWA
J o s e p h
Main St.
L a G r a n d e
O R m il e s
10+40.45
272+68.69
D A
O R
P O
O L .
N T
M A
W O
L L
A W k eerC p e e h
S eltti
L
B O
U N
D A
R Y
W I L
D E
R N
E S
S
NATIONAL FOREST
WALLOWA
NATIONAL FOREST
WALLOWA
FOREST
NATIONAL
WALLOWA
R
E
R
E
R
E
R
E
R
E
R
E
T2S
T3S
SCALE IN MILES
0 1 m ile s
Im n a h a
O R
C o p p e r fi e ld
O R m il e s
E A G L E C
A P W
I L D E R N E S S
BEGIN REHABILITATION
BEGIN RECONSTRUCTION
16+25.00
END REHABILITATION
END PROJECT
BEGIN RECONSTRUCTION
BEGIN PROJECT
Sheet and Description
SECTION C SECTION D SECTION E SECTION F SECTION G SECTION H SECTION J SECTION K SECTION L SECTION M -
TYPICAL
SECTION
PLAN &
PROFILE
APPROACH
ROADS
EROSION
CONTROL STRUCTURES DRAINAGE
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
LANDSCAPING UTILITIES ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL
AND ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15703-1500 SOIL EROSION CONTROL,
TEMPORARY SOIL TACKIFIER ACRE 0.6 0.1 0.7
A0140 15705-0100 SOIL EROSION CONTROL, SILT
FENCE LNFT 220 10 230
A0160 15705-1000 SOIL EROSION CONTROL,
TEMPORARY 48-INCH CULVERT PIPE LNFT 18 2 20
A0180 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 17,875 925 18,800
A0200 15705-1800 SOIL EROSION CONTROL,
TEMPORARY DIVERSION BERM LNFT 275 25 300
A0220 15801-0000 WATERING FOR DUST CONTROL MGAL 6,000 6,000
A0240 20101-0000 CLEARING AND GRUBBING ACRE 0.6 0.1 0.1 0.8
A0260 20301-1900 REMOVAL OF PIPE CULVERT EACH 2 1 3
A0280 20301-2400 REMOVAL OF SIGN EACH 12 1 13
A0300 20302-0800 REMOVAL OF FENCE, BARBED WIRE LNFT 598 260 32 890
A0320 20401-0000 ROADWAY EXCAVATION CUYD 1,495 118 87 1,700
A0340 20402-0000 SUBEXCAVATION CUYD 2,068 102 2,170
A0360 20404-0000 UNCLASSIFIED BORROW TON 770 90 860
A0380 20411-0000 SELECT BORROW (SUBEXCAVATION
BACKFILL) TON 3,827 463 4,290
A0400 20411-0000 SELECT BORROW (GRS-IBS) TON 765 35 800
A0420 20701-0300 SEPARATION-STABILIZATION
GEOTEXTILE, CLASS 1, TYPE C SQYD 3,016 440 154 3,610
A0440 20801-0000 STRUCTURE EXCAVATION CUYD 1,572 1,572 Contract Quantity
A0460 21101-1000 ROADWAY OBLITERATION, METHOD 1 SQYD 27 3 30
A0480 21101-2000 ROADWAY OBLITERATION, METHOD 2 SQYD 225 15 240
A0500 25101-0100 PLACED RIPRAP, METHOD A,
CLASS 1 CUYD 60 5 65
A0520 25101-0200 PLACED RIPRAP, METHOD A,
CLASS 2, SLOPE PROTECTION CUYD 3 1 4
A0540 25101-0200 PLACED RIPRAP, METHOD A,
CLASS 2, PROTECTIVE APRON CUYD 10 1 11
MileStone: 100% Date Completed: In Progress Report Date: 11/30/18
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES
-N ov
-2
1:
P
M
Remarks and/or Determination of Estimated
Quantity Pay Item Description Unit
Estimated Quantities c:
\p w -w or k\ d0 or
-a
1_ ba
_E
EB
AC
S.
xl sm
]S he et
STATE PROJECT
B.1WALLOWA 4602(1)OR
SHEET
SECTION C SECTION D SECTION E SECTION F SECTION G SECTION H SECTION J SECTION K SECTION L SECTION M -
TYPICAL
SECTION
PLAN &
PROFILE
APPROACH
ROADS
EROSION
CONTROL STRUCTURES DRAINAGE
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
LANDSCAPING UTILITIES ALLOWANCE Bid Schedule
A0560 25101-0300 PLACED RIPRAP, METHOD A,
CLASS 3, HEADWALL CUYD 12 2 14
A0580 25101-0500 PLACED RIPRAP, METHOD A,
CLASS 5 CUYD 560 30 590
A0600 25120-0100 RIPRAP DITCH, METHOD A, CLASS
1 LNFT 145 5 150
A0620 26105-0000 REINFORCED SHOULDER
STABILIZATION, 7-FOOT LENGTH SQFT 15,225 775 16,000
A0640 26105-0000 REINFORCED SHOULDER
STABILIZATION, 13-FOOT LENGTH SQFT 2,600 130 2,730
A0660 30202-1000 ROADWAY AGGREGATE, METHOD 1 TON 380 60 440
A0680 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 2,742 895 443 4,080
A0700 30205-0500 ROADWAY AGGREGATE, SHOULDER
FINISHING MILE 9.7 0.3 10.0
A0720 30302-1000 DITCH RECONDITIONING LNFT 2,800 200 3,000
A0740 30604-0600 FULL DEPTH RECLAMATION WITH
FOAMED ASPHALT, 6-INCH DEPTH SQYD 67,275 3,365 70,640
A0760 30611-0000 CEMENT TON 220 10 230
A0780 30613-0000 ASPHALT BINDER TON 550 30 580
A0800 40101-5600 ASPHALT CONCRETE PAVEMENT,
GYRATORY MIX, 1/2-INCH OR
3/4-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, 0.3 TO <3 MILLION
ESAL TON 11,257 1,123 12,380
A0840 40105-3000 ANTISTRIP ADDITIVE, TYPE 3 TON 112.6 0.5 6.1 119.2
A0880 41201-0000 TACK COAT TON 29.1 0.1 1.8 31.0
A0900 55201-0800 STRUCTURAL CONCRETE, CLASS D Contract Quantity
(AE) CUYD 43 43
A0920 55302-0500 PRECAST, PRESTRESSED CONCRETE Contract Quantity
SLABS, 48-INCH VOIDED LNFT 436 436
A0940 55401-2000 REINFORCING STEEL, EPOXY Contract Quantity
COATED LB 2,470 2,470
A0960 55601-1200 BRIDGE RAILING, STEEL, THREE Contract Quantity
RAIL LNFT 125 125
A0980 55901-0000 MEMBRANE WATERPROOFING SQYD 202 8 210
A1000 57401-0000 GRS-IBS, GEOSYNTHETIC Contract Quantity
REINFORCEMENT SQYD 5,361 5,361
A1020 57402-0000 GRS-IBS, OPEN-GRADED BACKFILL TON 1,465 1,465 Contract Quantity
A1040 57403-1000 GRS-IBS, SEGMENTAL RETAINING Contract Quantity
WALL UNIT (SRWU) SQYD 318 318
Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-N ov -2
1:
P M
MileStone: 100% Date Completed: In Progress Report Date: 11/30/18 c:
\p w -w or k\ d0 or
-a
1_ ba
_E
EB
AC
S.
xl sm
]S he et
2)
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number
STATE PROJECT
B.2WALLOWA 4602(1)OR
SECTION C SECTION D SECTION E SECTION F SECTION G SECTION H SECTION J SECTION K SECTION L SECTION M -
TYPICAL
SECTION
PLAN &
PROFILE
APPROACH
ROADS
EROSION
CONTROL STRUCTURES DRAINAGE
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
LANDSCAPING UTILITIES ALLOWANCE Bid Schedule
A1060 58501-0000 ULTRA HIGH PERFORMANCE Contract Quantity
CONCRETE (UHPC) CUYD 3 3
A1080 60201-0800 24-INCH PIPE CULVERT LNFT 95 5 100
A1100 60501-0000 STANDARD UNDERDRAIN SYSTEM LNFT 140 10 150
A1120 60704-0000 CLEANING CULVERT IN PLACE EACH 27 1 28
A1140 60902-1000 CURB AND GUTTER, CONCRETE,
12-INCH DEPTH LNFT 27 3 30
A1160 61701-4550 GUARDRAIL SYSTEM MGS, TYPE 2,
CLASS A WOOD POSTS LNFT 250.0 12.5 262.5
A1180 61702-1500 TERMINAL SECTION, TYPE MGS
TANGENT EACH 2 2
A1200 61702-1600 TERMINAL SECTION, TYPE MGS
FLARED EACH 2 2
A1220 61707-4000 STRUCTURE TRANSITION RAILING,
MGS SYSTEM, STEEL POSTS LNFT 84.0 84.0
A1240 61901-0900 FENCE, BARBED WIRE, 4 STRAND LNFT 517 260 43 820
A1260 62201-0250 DUMP TRUCK, 10 CUBIC YARD
MINIMUM CAPACITY HOUR 40 40
A1280 62201-0600 BACKHOE LOADER, 8 CUBIC FOOT
MINIMUM RATED CAPACITY
BUCKET, 30-INCH WIDTH HOUR 20 20
A1300 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC
YARD MINIMUM CAPACITY WITH
THUMB ATTACHMENT HOUR 20 20
A1320 62201-3750 CHAIN SAW HOUR 20 20
A1340 62301-0000 GENERAL LABOR HOUR 40 40
A1360 62406-0300 PLACING CONSERVED TOPSOIL,
4-INCH DEPTH ACRE 0.2 0.1 0.1 0.4
A1380 62501-0000 TURF ESTABLISHMENT ACRE 0.2 0.1 0.1 0.4
A1400 62635-1000 CUTTINGS, COTTONWOOD POLE EACH 15 1 16
A1420 62635-3000 CUTTINGS, WILLOW POLE,
EMERGENT EACH 15 1 16
A1440 62635-3000 CUTTINGS, WILLOW POLE, BANK EACH 15 1 16
A1460 63302-0000 SIGN SYSTEM SQFT 148 12 160
A1480 63309-0900 DELINEATOR, TYPE FLEXIBLE EACH 20 2 22
A1500 63401-0300 PAVEMENT MARKINGS, TYPE B,
SOLID, WHITE EDGE LINE LNFT 105,332 5,268 110,600
A1520 63401-0300 PAVEMENT MARKINGS, TYPE B,
SOLID, WHITE STOP LINE,
24-INCH WIDTH LNFT 300 15 315
Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-N ov -2
1:
P M
MileStone: 100% Date Completed: In Progress Report Date: 11/30/18 c:
\p w -w or k\ d0 or
-a
1_ ba
_E
EB
AC
S.
xl sm
]S he et
3)
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number
STATE PROJECT
B.3WALLOWA 4602(1)OR
SECTION C SECTION D SECTION E SECTION F SECTION G SECTION H SECTION J SECTION K SECTION L SECTION M -
TYPICAL
SECTION
PLAN &
PROFILE
APPROACH
ROADS
EROSION
CONTROL STRUCTURES DRAINAGE
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
LANDSCAPING UTILITIES ALLOWANCE Bid Schedule
A1540 63401-0300 PAVEMENT MARKINGS, TYPE B,
SOLID, DOUBLE YELLOW
CENTERLINE LNFT 1,904 96 2,000
A1560 63405-0500 PAVEMENT MARKINGS, TYPE B,
TURN ARROW, RIGHT EACH 3 1 4
A1580 63405-0700 PAVEMENT MARKINGS, TYPE B,
"STOP" WORD MESSAGE EACH 1 1
A1600 63502-0600 TEMPORARY TRAFFIC CONTROL,
BARRICADE TYPE 3 EACH 8 2 10
A1620 63502-1000 TEMPORARY TRAFFIC CONTROL,
CONE, TYPE 36-INCH EACH 450 20 470
A1640 63502-3000 TEMPORARY TRAFFIC CONTROL,
RAISED PAVEMENT MARKER EACH 5,400 300 5,700
A1660 63503-0400 TEMPORARY TRAFFIC CONTROL,
CONCRETE BARRIER LNFT 220 10 230
A1680 63503-1000 TEMPORARY TRAFFIC CONTROL,
PLASTIC FENCE LNFT 149 11 160
A1700 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 205.50 10.50 216.00
A1720 63506-0600 TEMPORARY TRAFFIC CONTROL,
PILOT CAR HOUR 1,200 1,200
A1740 63507-0700 TEMPORARY TRAFFIC CONTROL,
TRAFFIC CONTROL SUPERVISOR DAY 170 5 175
A1760 63509-1000 TEMPORARY TRAFFIC CONTROL,
FLAGGER FXHR 2,500 2,500
A1780 63610-3010 CONDUIT, 4-INCH, HDPE,
SCHEDULE 80 LNFT 527 23 550
A1800 65001-1000 CONSTRUCT AND MAINTAIN
DIVERSION LPSM ALL
Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-N ov -2
1:
P M
MileStone: 100% Date Completed: In Progress Report Date: 11/30/18 c:
\p w -w or k\ d0 or
-a
1_ ba
_E
EB
AC
S.
xl sm
]S he et
4)
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number
STATE PROJECT
B.4WALLOWA 4602(1)OR
QUANTITIES
TYPICAL SECTION
TABULATION OF
C.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r a c a .d g n
OR WALLOWA 4602(1)
e c e m b e r
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y
FOOTNOTE:
Adjust locations in the field as directed by the CO.[2]
See Sheet G.5, 2" wearing surface on concrete bridge deck.[1]
EARTHWORK SUMMARY
C.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r a c b .d g n
OR WALLOWA 4602(1)
e c e m b e r
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y
NO SCALE
ti mil g ni r a el C
S lo p e s ta k e l im it
[5]
[4]1' [4]1'
SHEET 1 of 2
TYPICAL SECTIONS
10+62.63 to 11+12.03 RT
10+40.45 to 11+12.03 LT
11+74.20 to 16+25.00
10+40.45 to 11+12.03
SAFETY EDGE DETAIL
C.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r a c c .d g n
OR WALLOWA 4602(1)
e c e m b e r
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y
FOOTNOTE:
ROUNDING DETAIL
CUT SLOPE
.2
D
C le a r in g l im it
Profile grade
LC
Travel laneTravel lane
5'
S lo p e s ta k e l im it
.2
D
ROUNDING DETAIL
FILL SLOPE
Shldr. Shldr.
[6]
[9]11'
[1] 2% Crown
(between lifts)
Tack coat
[1] 2% Crown [2]
1:3
[2
V a rie s 1 :1 .5 to
:1
[2]
Varies 1:1.5 to 1:3
Turf establishment
4" depth
C o n s tr u c ti o n l im it
C o n s tr u c ti o n l im it
MAINLINE TYPICAL SECTION - RECONSTRUCTION
4" compacted depth (placed in two equal lifts) type IV pavement roughness, size aggregate, 0.3 to < 3 million ESAL, -inch nominal4 3 or 2
1gyratory mix, Asphalt concrete pavement, furnished topsoil, Place conserved or
GUARDRAIL DETAIL
2' tr a v e le d w a y
E d g e o f
[2]
Variable
[9]11'
Detail (typ.)
See Safety Edge method 2, 8" compacted depth
Roadway aggregate, or unclassified borrow
Embankment construction
Varies 3.6'
[8]5' as shown in the Staking Report.
Additinal widening required at intersection with OR-350W,[9] as directed by the CO.
of trees, minimize wetland impact and to remain within easement, Reduce or eliminate slope rounding width to avoid removal [8]
Add curve widening as shown in the Staking Report.[7]
See Fill Slope Rounding Detail.[6]
See Cut Slope Rounding Detail.[5]
See Sheet C.6 for Turnout Section.
Additional widening required for turnout, bridge rail and guardrail.[4] proportionally.
dimension and reduce the front slope rounding distance
For cut heights less than 5-feet, reduce "B" to the cut height[3]
Construct slopes as shown in the Staking Report. [2] curve data of the plan and profile sheet.
Superelevate curves at maximum rate "e" as indicated in the[1]
Red top
Point available in survey notes
Second lift of asphalt
First lift of asphalt
Pull aggregate base to cover safety edge
Aggregate base course
5'
[8][3]B=5' g r a v e l s h ld r
E d g e o f
Typical Section
See topsoil or furnished conserved
Place
4" depth establishment
Turf
Match existing
~1:4 ~1:4
SHEET 2 of 2
TYPICAL SECTIONS
SAFETY EDGE DETAIL
C.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r a c d .d g n
OR WALLOWA 4602(1)
e c e m b e r
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y
Match existing
E x is ti n g e d g e o f p a v e m e n t
E x is ti n g e d g e o f p a v e m e n t
LC
Full depth reclamation with foamed asphalt, 6" depth
Tack coat
(between lifts)
1'
Top of existing pavement
1'
Red top
Point available in survey notes
Second lift of asphalt
First lift of asphalt
Aggregate base course
Traveled way
Varies
See Safety Edge Detail (typ.)
shoulder finishing
Roadway aggregate, MAINLINE TYPICAL SECTION - REHABILITATION NOTE:
1.
Tack coat
Place shoulder finishing to cover safety edge
TYPICAL SECTION - BRIDGE OVERLAY
11+12.03 to 11+74.20
6" concrete deck, (see Section G)
(see Section G)
Voided bridge slab, 3" compacted depth (placed in two equal lifts) type III pavement roughness, overlay size aggregate, 0.3 to < 3 million ESAL, " nominal4 3" or 2
1gyratory mix, Asphalt concrete pavement, Asphalt concrete pavement, gyratory mix, 12 4 or 3 -inch nominal size aggregate, 0.3 to < 3 million ESAL, type IV pavement roughness, 2" compacted depth asphalt wearing surface
(see Section G)
Waterproofing membrane
Shldr.
"4 11'-5
Traveled way
11'
Traveled way
11'
Shldr.
"4 11'-5
4.00 %
4.00 %
LC
(See Section G)
Bridge railintg (typ.)
See Sheet C.5 for Subexcavation Details.
NO SCALE DETAILS
SUBEXCAVATION
Subexcavation
2%
C.5
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r a c e .d g n
OR WALLOWA 4602(1)
N o v e m b e r
P a r k
P a r k
C h e c k e d b y
D e s ig n e d b y
2:
1 2:1
Limit of subexcavation
Subgrade
TransitionSubexcavation pay limitsTransition
E n d S ta ti o n
B e g in S ta ti o n geotextile, class 1, type C
Separation-stabilization
TYPE 1, 2, AND 2A ELEVATION
(subexcavation backfill)
Select borrow
NOTE:
FOOTNOTE:
ditchline is required.
Construct mirror image of outlet pipe(s) where draining to the[1]
3.
2.
1.
granular backfill.
collector pipe, outlet pipe, rodent screen, geotextile, and
Standard underdrain system includes trench subexcavation, requirements and minimize disturbances.
Skew outlet pipe as directed by the CO to meet pipe slope
Install outlet pipes to drain at a minimum 0.5% slope.
trench limits before excavating outlet trenches.
Conserve 2-inches of existing topsoil layer within outlet
LEGEND:
Existing ground
LC
Bottom of subexcavation
Outlet pipe subexcavation trench
Bottom of pipe (6" dia.)
collector
Perforated
Subgrade
2%
136+50 to 137+50 LT
SUBEXCAVATION AND BACKFILL SECTION
HALF-WIDTH TYPE 2
m in
(subexcavation backfill)
Select borrow
Match existing pavement grade geotextile, class 1, type C
Separation-stabilization this sheet
See Detail A, method 2, 6" compacted depth
Roadway aggregate, geotextile, class 1, type C
Separation-stabilization
Granular backfill
18" 6" Outlet pipe
TRENCH SUBEXCAVATION
DETAIL A
subexcavation
Bottom of collector pipe
6" Perforated
(subexcavation backfill)
Select borrow
2.0%
Subgrade
2.0%
(Top of subexcavation trench)
Bottom of subexcavation
LC
SUBEXCAVATION AND BACKFILL SECTION
HALF-WIDTH TYPE 1
Shoulder subgrade
2%
6" compacted depth
Roadway aggregate method 2, 74+00 to 75+00 RT m in pavement grade
Match existing geotextile, class 1, type C
Separation-stabilization
Existing ground LC Subgrade
2%
(subexcavation backfill)
Select borrow m in subexcavation
Bottom of
SUBEXCAVATION AND BACKFILL SECTION
HALF-WIDTH TYPE 2A
Match existing pavement grade method 2, 6" compacted depth
Roadway aggregate, 66+50 to 67+50 LT
COLLECTOR AND OUTLET PIPE PLAN
C o ll e c to r p ip e
PLAN VIEW
SUBEXCAVATION AREA
S u b e x c a v a ti o n l im it
S u b e x c a v a ti o n l im it or
P r o fi le g r a d e
Subexcavation trench
(Mirror image for ditch RT)
(see Notes 1 and 2)
[1]Outlet pipe
2.0% (min.) slope
D it h li e
Bottom of subexcavation
Shoulder subgrade
LC
Shoulder subgrade
SUBEXCAVATION AND BACKFILL SECTION
TYPE 1
m in
49+00 to 51+00
45+75 to 47+75
29+50 to 30+50
110+50 to 112+00
109+00 to 109+50
105+50 to 107+50
12" pavement grade
Match existing
Subgrade method 2, 6" compacted depth
Roadway aggregate
(subexcavation backfill)
Select borrow geotextile, class 1, type C
Separation-stabilization
2"
WITH RODENT SCREEN
OUTLET PIPE END DETAIL
Outlet pipe
Hose clamp
Wire mesh
"4 1" x 4
2.0%
TURNOUT SECTION
C.6
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a c f.
d g n
OR WALLOWA 4602(1)
e c e m b e r
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y
See Typical Section, Sheet C.3
11'
Turnout
Varies turnout grade
Match existing
Varies
TURNOUT SECTION
12+55.11 to 13+81.99
Roadway aggregate, method 2
[1]Super
FOOTNOTE:
data on the Plan and Profile sheet.
Superelevate curve at maximum rate "e" as indicated in the curve[1]
SHEET 1 of 2
DETAILS
SHOULDER STABILIZATION
REINFORCED
C.7
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a c g .d g n
OR WALLOWA 4602(1)
e c e m b e r
P a r k
G a r ic h
C h e c k e d b y
D e s ig n e d b y
Conserve transition ramp material ramp material
Conserve transition
12" Bottom course
Extend lap to back of excavation
Hardware cloth
Conserved backfill
4' Lap (min.)
Finished slope
Excavation line
Existing pavement grade
SECTION A-A
Geogrid, stabilization
NOTE:
See Section B-B
SECTION B-B
S T
A B I L I Z
A T
O N P
A Y L I
M I T S
R E I N
F O
R C
E D S
H O
U L
D E
R
REINFORCED SHOULDER STABILIZATION AREA
areas are suitable as conserved backfill.
Materials excavated from reinforced shoulder stabilization1.
A A
LC LC
B
B
Varies 6.5' - 12.5'
Varies 7.7' - 13.7'
Varies 5.5' - 11.5'
S H
O U
L D
E R
B E
G I N R
E I N
F O
R C
E M
E N
T
S T
A B I L I Z
A T I O
N
S T
A B I L I Z
A T I O
N
S H
O U
L D
E R
E N
D R
E I N
F O
R C
E M
E N
T
Reinforced shoulder stabilization pay limits m in m in
Shoulder subgrade
Geogrid, (reinforcement, type 2)
Excavation limits Excavation limits
Transition ramp Transition ramp stabilization area
Reinforced shoulder Transition ramp
Transition ramp of pavement
Existing edge of pavement
Existing edge existing pavement
Top of
[2]
Varies
C to C spacing (max.)
Support struts 24"
Match existing slope
Welded wire form, see Sheet C.8
4 x 4 - W4.0 x W4.0
(min.)
1'-6" o f p a v e m e n t
E x is ti n g e d g e
Match existing pavement grade
1'-0" m in .)Roadway aggregate, method 2, 6" depth
20" Top course
Sawcut o r
[3]7' or 13'
Select granular backfill, both courses
See Sheet C.1 for Shoulder Stabilization Quantities.[3]
Construct finished slope no steeper than 1:1.25.[2] backfill.
Cover geogrid reinforcement with 4-inch depth select granular[1]
Reinforced Shoulder Stabilization Detail on Sheet C.7.
Hardware cloth not shown. Install hardware cloth according to[10]
Shoulder Stabilization Detail on Sheet C.7.
Geogrid lap is not shown for clarity. Lap according to Reinforced[9]
Except at curve sections where overlapping is allowed.[8] bend longitudinal wire 90 degrees.
Connect welded wire form facing to form return. Alternative, [7] of 720.01(k).
Provide welded wired forms that meet the requirements [6]
Provide support struts that meet the requirements of 720.01(l).[5]
See Sheet C.7 for dimensions.[4] permanent fasteners that meet the requirements of 720.01(m).
or the manufacturers recommended method). Provide with permanent fasteners (hog rings, wire ties, spiral binders, Connect adjacent welded wire reinforcement facing elements [3] support strut length.
The Contractor is responsible for determining the appropriate[2] requirements.
Field cut transverse wires to meet welded wire form layout [1]
SHEET 2 OF 2
DETAILS
SHOULDER STABILIZATION
REINFORCED
C.8
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a c h .d g n
OR WALLOWA 4602(1)
e c e m b e r
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y
WELDED WIRE FORM
Longitudinal wires
Reinforcement length
Top of form
96"
30"
4 x 4 - W4.0 x W4.0 direction
Machine (roll)
P a r a ll e l to s lo p e f a c e
Bottom course
REINFORCEMENT LAYOUT
SHOULDER STABILIZATION
3' min.
AND FORM RETURN DETAIL
SHOULDER STABILIZATION FORM COURSE
[8]Butt geogrid, no overlap
[1]Transverse wires
[5] [2]spaced 24" C. to C. (max.)
No. 4 wire support struts
[6]
[9]Geogrid, reinforcement
[10](see detail this sheet)
Welded wire form
[3]welded wire forms
Connect adjacent
[7] [3]facing to form return
Connect form form return
Welded wire
Geogrid, reinforcement, type 2
[4]
Geogrid, reinforcement, type 2 length (L)
PLAN
TABULATION OF
D.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r a fa .d g n
OR WALLOWA 4602(1)
e c e m b e r
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y
FOOTNOTE:
quantity.
Topsoil to be conserved is also included in roadway excavation [1]
95419
42154215
5 4260
,1
.6
,2
.4
+4.06 80%
80' VC
K = 54
,2
.1
+5.5
+1.9723%
120' VC
K = 34
SSD = 362'
El=4215.572
E=9082658.557
N=628513.294
See Sheet E.5 for dimensions type 2, concrete, 12" depth
Construct curb and gutter, 16+00 to 16+27, LT
POT 1
0+
.45
PC 11+97.49
P C
C
.5
P T
.6
N
D
CONNECTION DETAIL
+1.9723%
Min. low chord elev. = 4193.0
Bridge
CONNECTION DETAIL
CUYD
EXC.
CUYD
EMB.
17+5015+0012+5010+00 p a v e m e n t
M a tc h p r o p o s d
BRIDGE CONNECTION DETAIL
11+12.03 or 11+74.20 xx xx
Curve= C400
D
R= 150.00'
T= 58.81'
Curve= C401
D
R= 300.00'
T= 69.23' e= 0.040
L= 136.08' e= 0.040
L= 112.09'
10+40.45 to 16+25
PLAN AND PROFILE
D.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r a fb .d g n
OR WALLOWA 4602(1)
e c e m b e r
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y
FOOTNOTE:
See Sheet D.1 for Stationing[1]
See detail, Sheet N.1 obliteration, method 2.
Perform roadway
NOTE:
10+40.45
OR WALLOWA 4602(1)
Profile grade
El.= 4193.681
E=9082640.640
N=629024.185
Existing ground
.4
See Typical Section
Construct turnout
Proposed edge of pavement
Existing edge of pavement
Construct right-turn lane (See Section E)
11+12.03 to 11+74.20
(See Section G)
Proposed bridge
RECONSTRUCTION
END
REHABILITATION
BEGIN
16+25.00 p ip e c u lv e r t
R e m o v e e x is ti n g p ip e c u lv e r t
R e m o v e e x is ti n g p ip e c u lv e r t
R e m o v e e x is ti n g p a v e m e n t
M a tc h e x is ti g
580 273
Creek
Existing edge of pavement pavement
Existing
See Typical SectionSee Typical Section
.0
Sheet C.3
Reconstruction
Sheet C.4
Rehabilitation
LEGEND:
Shoulder stabilization
Subexcavation
16+25.0010+40.45
Proposed edge of shoulder
Match proposed right turn lane
Line to be constructed
Slope stake limits
Existing edge of shoulder
Existing edge of shoulder
See Typical Section
.2
.0 o
Driveway approach symbol
Type Mainline station stake limits
Slope ditch, method A, class 1
Construct riprap
13+10 to 14+55, RT
Roadway obliteration at end of curb)
(slope protection method A, class 2
Place riprap, Riprap
Tack coat
Tack coat
S e e H
S h e e ts f o r d e ta il s a n d p r o te c ti v e a p r o n a t o u tl e t.
w it h r ip r a p h e a d w a ll s
I n s ta ll p ip e c u lv e r t a t o u tl t.
S e H
S h e e ts f o r d e ta il s h e a d w a ll s a n d p r o te c ti v e a p r o n
I n s ta ll p ip e c u lv e r t w it h r ip r a p
R e m o v e e x is ti n g p ip e c u lv e r t.
Sheet C.3
Reconstruction
Sheet C.3
Reconstruction
Proposed bridge deck
2.
1.
See Sheets I.1-3 for details
See Sheets I.1-3 for details details
See Sheet H.9 for
Little Sheep
BEGIN RECONSTRUCTION
BEGIN PROJECT
obliteration, method 1
Perform roadway
[1]structure transition railing, LT
Install guardrail, terminal and
[1]structure transition railing, RT
Install guardrail, terminal and construction easement boundary description and locations.
OR WALLOWA 4602(1) Right-of-way Plans for permanent and
Refer to Wallowa Mountain Loop Road Reconstruction for shrink / swell, and do not include topsoil.
Excavation and embankment volumes have not been adjusted
Remove existing fence (typ.)
[1]Install fence, (typ.)
[1]Install fence, (typ.)
Remove existing fence (typ.)
16003CP
CP
16002
.4
P T
.2
P C
.1
P T
.1
P C
.2
P T
.8
P C
.6
P T
.3
P C
.9
P T
.3
16+00 to 45+00
PLAN AND PLAN
N N
D
R= 1,350.00'
T= 160.28'
D
R= 600.00'
T= 9.31'
Curve= C203
Curve= C204
D
R= 1,200.00'
T= 27.37'
Curve= C205
D
R= 6,000.00'
T= 57.21'
Curve= C206
LEGEND:
Curve= C202 D
R= 6,000.00' T= 138.96'
Curve= C203
D
R= 1,350.00'
T= 160.28' e= Match exist.
L= 277.87' e=- Match exist.
L= 319.07' e= Match exist.
L= 319.07' e= Match exist.
L= 18.62' e= Match exist.
L= 54.73' e= Match exist.
L= 114.42'
D.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r a fc .d g n
OR WALLOWA 4602(1)
e c e m b e r
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y
CP
16005
CP
16004
CP
16006
CP
16007 16008
CP
RECONSTRUCTION
END
REHABILITATION
BEGIN
16+25.00
Line to be constructed
Line to be constructed
Existing edge of shoulder
Existing edge of pavement
Existing edge of pavement
Existing edge of shoulder
Existing edge of shoulder
Existing edge of shoulder
Existing edge of pavement
Existing edge of pavement
C
Shoulder stabilization
Subexcavation
Roadway obliteration
Riprap
Clean culvert in place
25+07
Clean culvert in place
31+29
P C
.6
P T
.7
P C
.9
P T
.6
P
C
.0
P T
.0
P C
.9
P T
.8
P C
.6
P T
.3
P C
.1
P T
.3
45+00 to 75+00
PLAN AND PLAN
N
D
R= 1,500.00'
T= 66.60'
Curve= C207
D
R= 3,000.00'
T= 44.89'
Curve= C208
D
R= 2,700.00' T= 176.74'
Curve= C209
D
R= 1,200.00'
T= 69.51'
Curve= C210
D
R= 6,000.00'
T= 135.38'
Curve= C211
D
R= 900.00'
T= 62.67'
D
R= 900.00'
T= 62.67'
L= 125.13'
Curve= C212
LEGEND:
e= Match exist.
L= 133.10' e= Match exist.
L= 352.98' e= Match exist.
L= 138.87' e= Match exist.
L= 270.71' e= Match exist.
L= 125.13' e= Match exist.
L= 89.77'
D.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r a fd .d g n
OR WALLOWA 4602(1)
e c e m b e r
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y
CP
16009
CP
16010
CP
16011
CP
16012
CP
16013
CP
16014
CP
16015
N
Line to be constructed
Line to be constructed
Existing edge of pavement
Existing edge of pavement
Existing edge of shoulder
Existing edge of shoulder
Proposed edge of shoulder
Existing edge of pavement
Existing edge of pavement
Existing edge of shoulder
Proposed edge of gravel shoulder
A
A 74+
B
A
Shoulder stabilization
Subexcavation
Roadway obliteration
Riprap
Clean culvert in place
47+71
Clean culvert in place
59+32
66+76
POT 50
2+00.0
POT 51
0+00.0
P T
.6
P C
.9
P T
.7
P C
.4
P T
.8
P C
.0
P T
.7
P C
.6
P T
.3
P C
.4
P T
.6
P C
.2
75+00 to 105+00
PLAN AND PLAN
N
N
D
R= 900.00'
T= 121.09'
Curve= C213
D
R= 900.00'
T= 13.85'
Curve= C214
T= 93.63'
D
R= 6,000.00'
Curve= C215
D
R= 9,000.00'
T= 132.21'
Curve= C216
D
R= 9,000.00'
T= 132.21'
Curve= C216
T= 157.03'
D
R= 3,000.00'
Curve= C217 D
R= 2,700.00' T= 167.94'
Curve= C218
LEGEND:
e= Match exist.
L= 240.74' e= Match exist.
L= 187.25' e= Match exist.
L= 313.77' e= Match exist.
L= 335.46' e= Match exist.
L= 27.69' e= Match exist.
L= 264.40' e= Match exist.
L= 264.40'
D.5
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r a fe .d g n
OR WALLOWA 4602(1)
e c e m b e r
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y
16019
16018
16017
CP
16015
CP
16016
CP
CP
CP
CP
16020
Line to be constructed
Line to be constructed
Existing edge of shoulder
Existing edge of pavement
Existing edge of shoulder
Existing edge of pavement
Existing edge of pavement edge of pavement
Existing
Shoulder stabilization
Subexcavation
Roadway obliteration
Riprap
Clean culvert in place
75+92
Clean culvert in place
92+11
104+35
16021
P C
.9
P T
.6
P C
.7
P T
.7
P C
.3
P T
.0
P C
.6
P T
.6
P C
.0
P T
.8
P C
.6
P T
.1
P C
.3
P T
.6
P C
.2
0 P
T
.4
P C
.7
105+00 to 135+00
PLAN AND PLAN
N
N D
R= 1,200.00'
T= 160.81'
Curve= C219
D
R= 1,200.00'
T= 43.00'
Curve= C220
D
R= 1,200.00'
T= 29.36'
Curve= C221
D
R= 1,200.00' T= 43.92'
Curve= C223
D
R= 1,200.00'
T= 76.08'
Curve= C222
D
R= 900.00'
T= 21.79'
Curve= C225
D
R= 600.00'
T= 30.20'
Curve= C226
R= 1,200.00'
T= 100.83'
D
Curve= C227
D
R= 1,500.00'
T= 180.23'
Curve= C228
LEGEND:
e= Match exist.
L= 319.71' e= Match exist.
L= 85.95' e= Match exist.
L= 151.95' e= Match exist.
L= 87.79' e= Match exist.
L= 58.70' e= Match exist.
L= 43.57' e= Match exist.
L= 60.35' e= Match exist.
L= 201.18' e= Match exist.
L= 358.74'
D.6
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r a ff .d g n
OR WALLOWA 4602(1)
N o v e m b e r
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y
16024
CP
CP
CP
16023
16025
CP
16026
CP
16022
Line to be constructed
Line to be constructed
Existing edge of pavement
Existing edge of pavement
Existing edge of pavement
Existing edge of pavement
Existing edge of shoulder
Existing edge of shoulder
A C
A
C
C
Shoulder stabilization
Subexcavation
Roadway obliteration
Riprap
Clean culvert in place
110+99
Clean culvert in place 118+72
Clean culvert in place
123+00
Clean culvert in place
125+07
P T
.4
P C
.2
P T
.2
P C
.9
P T
.7
P C
.7
P T
.7
P C
.5
P T
.5
P C
.5
P T
.3
P C
.3
P T
.0
P C
.7
P T
.0
P C
.3
P T
.5
P C
.7
P T
.4
135+00 to 165+00
PLAN AND PLAN
N
D
R= 1,500.00'
T= 180.23'
Curve= C228 D
R= 1,800.00'
T= 108.61'
Curve= C229
D
R= 600.00'
T= 72.32'
Curve= C231
D
R= 3,000.00'
T= 103.59'
Curve= C232
D
R= 600.00'
T= 17.90'
Curve= C233
D
R= 1,200.00'
T= 87.97'
Curve= C234
D
R= 1,200.00'
T= 29.13'
Curve= C235
D
R= 1,200.00'
T= 51.17'
Curve= C236
D
R= 1,200.00'
T= 92.56'
Curve= C237
LEGEND:
e= Match exist.
L= 358.74' e= Match exist.
L= 216.95' e= Match exist.
L= 143.94' e= Match exist.
L= 207.09' e= Match exist.
L= 175.63' e= Match exist.
L= 58.25' e= Match exist.
L= 102.27' e= Match exist.
L= 184.74 e= Match exist.
L= 35.79'
D.7
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r a fg .d g n
OR WALLOWA 4602(1)
N o v e m b e r
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y
16028
16031
16033
16029
16030
16031
16027
CP
CP
CP
CP
CP
N
Line to be constructed
Existing edge of pavement
Existing edge of pavement
Existing edge of pavement
Existing edge of pavement
Existing edge of shoulder
Existing edge of shoulder
Line to be constructed
A
C
Shoulder stabilization
Subexcavation
Roadway obliteration
Riprap
Standard underdrain system
See Section C for
Clean culvert in place
134+95
Clean culvert in place
150+29
154+91
P C
.1
P T
.9
5 P
C
.7
P T
.7
P
C
.0
P T
.8
P C
.0
P T
.0
P C
.2
P T
.8
P C
.7
P T
.6
P C
.1
P T
.0
165+00 to 195+00
PLAN AND PLAN
N
D
R= 1,200.00'
T= 34.04'
D
R= 1,200.00'
T= 22.84'
Curve= C238
Curve= C239
D
R= 1,500.00'
T= 93.06'
Curve= C240
D
R= 650.00'
T= 117.70'
Curve= C241
D
R= 600.00'
T= 122.04'
Curve= C242
D
R= 900.00'
T= 78.66'
Curve= C243
D
R= 1,650.00'
T= 343.20'
Curve= C244LEGEND:
e= Match exist.
L= 68.05' e= Match exist.
L= 45.67' e= Match exist.
L= 185.88' e= Match exist.
L= 232.87' e= Match exist.
L= 240.79' e= Match exist.
L= 156.92' e= Match exist.
L= 676.75'
D.8
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r a fh .d g n
OR WALLOWA 4602(1)
N o v e m b e r
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y
CP
CP
CP
16033
16036
16037
CP
16038
CP
CP
16034
16035
N
Line to be constructed
Line to be constructed
Existing edge of pavement
Existing edge of pavement
Existing edge of pavement
Existing edge of pavement
Existing edge of shoulder
Existing edge of shoulder
Existing edge of shoulder
B
Shoulder stabilization
Subexcavation
Roadway obliteration
Riprap
Do Not Disturb
"We Love You Rachel"
Memorial cross
172+37, 26' LT
Clean culvert in place
175+10
Clean culvert in place
179+76
192+42
16043
P T
.6
P C
.0
P T
.1
P C
.9
P T
.5
P C
.0
P T
.3
P C
.8
P T
.9
P C
.7
P T
.8
P C
.0
P T
.0
P C
.9
P T
.4
P C
.2
P T
.0
P C
.1
P T
.3
P C
.0
P T
.6
195+00 to 225+00
PLAN AND PLAN
N N
D
R= 1,500.00'
T= 101.13'
Curve= C245
D
R= 1,800.00'
T= 16.23'
Curve= C246
D
R= 300.00'
T= 71.74'
Curve= C247
D
R= 450.00'
T= 125.19'
Curve= C248
D
R= 1,200.00'
T= 138.91'
Curve= C249
D
R= 900.00'
T= 99.46'
Curve= C250
D
R= 900.00'
T= 58.85'
Curve= C251
D
R= 600.00'
T= 40.19'
Curve= C252
D
R= 1,200.00'
T= 95.24'
Curve= C253
D
R= 1,200.00'
T= 106.79'
Curve= C254
LEGEND:
e= Match exist.
L= 201.96' e= Match exist.
L= 32.47' e= Match exist.
L= 140.83' e= Match exist.
L= 244.20' e= Match exist.
L= 276.60' e= Match exist.
L= 198.12' e= Match exist.
L= 117.54' e= Match exist.
L= 80.26' e= Match exist.
L= 190.09' e= Match exist.
L= 213.01'
D.9
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r a fi .d g n
OR WALLOWA 4602(1)
N o v e m b e r
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y
CP
16044
CP
16045
CP
16039
CP
16040
CP
16041
16042
CP
Line to be constructed
Line to be constructed
Existing edge of shoulder
Existing edge of shoulder
Existing edge of pavement
Existing edge of pavement
Existing edge of pavement
Existing edge of pavement
C
B 1
Shoulder stabilization
Subexcavation
Roadway obliteration
Riprap
199+56
Clean culvert in place
208+19
Clean culvert in place
213+58
16050
16051
CP
P T
.7
P C
.3
P T
.2
P C
.2
5 P
T
.3
P C
.0
P T
.5
P C
.6
0 P
T
.9
P C
.1
P T
.8
P C
.9
P T
.3
P C
.6
P T
.4
P C
.6
P T
.4
P C
.5
P T
.5
P C
.9
225+00 to 255+00
PLAN AND PLAN
N
N
D
R= 1,200.00'
T= 106.79'
Curve= C254
D
R= 6,000.00' T= 33.49'
Curve= C255
D
R= 1,200.00'
T= 49.11'
Curve= C256
D
R= 1,200.00'
T= 24.74'
Curve= C257
D
R= 900.00'
T= 84.42'
Curve= C258
D
R= 900.00'
T= 25.38'
Curve= C259
D
R= 1,200.00'
T= 62.75'
Curve= C260
D
R= 450.00'
T= 70.97'
Curve= C261
D
R= 600.00'
T= 32.91'
D
R= 600.00'
T= 23.02'
Curve= C262
Curve= C263
LEGEND:
e= Match exist.
L= 213.01' e= Match exist.
L= 66.98' e= Match exist.
L= 98.17' e= Match exist.
L= 168.35' e= Match exist.
L= 49.48' e= Match exist.
L= 50.74' e= Match exist.
L= 125.38' e= Match exist.
L= 140.79' e= Match exist.
L= 65.76' e= Match exist.
L= 46.03'
D.10
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r a fj .d g n
OR WALLOWA 4602(1)
e c e m b e r
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y
16046
CP
16047
CP
16048
CP
16049
CP
Line to be constructed
Line to be constructed
C
Shoulder stabilization
Subexcavation
Roadway obliteration
Riprap
Clean culvert in place
225+74
Clean culverts in place
236+69
247+47
.9
P T
.5
P C
.0
P T
.7
P C
.0
P T
.6
P C
.6
5 P
T
.3
P C
.1
P C
.1
P T
.7
255+00 to 272+68.69
PLAN AND PLAN
N
N
D
R= 1,200.00'
T= 12.31'
Curve= C266
D
R= 900.00'
T= 71.01'
Curve= C265
D
R= 450.00'
T= 109.36'
Curve= C264 e= 0.040
L= 214.56'
D
R= 1,200.00'
T= 54.35'
Curve= C267
D
R= 900.00'
T= 125.63'
Curve= C268
CONNECTION DETAIL
LEGEND:
e= Match exist.
L= 141.72' e= Match exist.
L= 24.62' e= Match exist.
L= 108.62' e= Match exist.
L= 249.64'
D.11
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r a fk .d g n
OR WALLOWA 4602(1)
N o v e m b e r
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y
16055
CP
16054
CP16053
CP
16052
CP
Line to be constructed
Existing edge of shoulder
Existing edge of shoulder
Existing edge of pavement
Existing edge of pavement
Existing edge of shoulder
Existing edge of shoulder
Existing edge of pavement
Existing edge of pavement
END PROJECT
END REHABILITATION
272+68.69
OR WALLOWA 4602(1)
El=4845.75
E=3079789.963
N=603530.295
Line to be constructed p a v e m e n t
M a tc h e x is ti g
Saw cut vertically and tack
.6
9Sheet C.3
Rehabilitation, A
265+
Shoulder stabilization
Subexcavation
Roadway obliteration
Riprap
See Typical Section 10'
Clean culvert in place
260+65
Clean culverts in place
265+45 to 265+86
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
16001 629326.226 9083018.594 4180.340 N45°20'29.80303" W117°04'22.15377" 4129.37 0.999702182 5/8" IR w/fhwa Alum Cap 1.
16002 628979.787 9082511.624 4200.870 N45°20'26.59756" W117°04'29.45129" 4149.9 0.999701156 5/8" IR w/fhwa Alum Cap
16003 628665.367 9082717.244 4211.700 N45°20'23.40968" W117°04'26.76157" 4160.73 0.999700593 5/8" IR w/fhwa Alum Cap
16004 628260.175 9082505.410 4220.350 N45°20'19.50103" W117°04'29.96522" 4169.38 0.999700125 5/8" IR w/fhwa Alum Cap
16005 627712.524 9082178.563 4227.430 N45°20'14.23508" W117°04'34.86205" 4176.46 0.999699712 5/8" IR w/fhwa Alum Cap
16006 627183.047 9081924.954 4238.520 N45°20'09.11773" W117°04'38.72343" 4187.55 0.999699111 5/8" IR w/fhwa Alum Cap
16007 626673.650 9081775.384 4257.640 N45°20'04.15495" W117°04'41.11751" 4206.67 0.999698129 5/8" IR w/fhwa Alum Cap
16008 626154.996 9081617.751 4269.690 N45°19'59.10419" W117°04'43.62973" 4218.72 0.999697484 5/8" IR w/fhwa Alum Cap
16009 625618.542 9081449.106 4279.380 N45°19'53.88243" W117°04'46.30639" 4228.41 0.99969695 5/8" IR w/fhwa Alum Cap
16010 625116.587 9081365.224 4287.400 N45°19'48.96556" W117°04'47.77698" 4236.44 0.9996965 5/8" IR w/fhwa Alum Cap
16011 624604.794 9081238.634 4300.060 N45°19'43.96948" W117°04'49.85063" 4249.1 0.999695828 5/8" IR w/fhwa Alum Cap
16012 624191.516 9081194.432 4312.030 N45°19'39.91085" W117°04'50.71360" 4261.08 0.999695202 5/8" IR w/fhwa Alum Cap
16013 623822.925 9081185.257 4323.630 N45°19'36.27843" W117°04'51.06021" 4272.68 0.9996946 5/8" IR w/fhwa Alum Cap
16014 623382.727 9081195.941 4337.600 N45°19'31.93129" W117°04'51.17148" 4286.66 0.999693876 5/8" IR w/fhwa Alum Cap
16015 622921.022 9081227.078 4351.350 N45°19'27.36343" W117°04'51.00946" 4300.42 0.99969316 5/8" IR w/fhwa Alum Cap
16016 622522.265 9081301.165 4359.700 N45°19'23.39863" W117°04'50.20954" 4308.78 0.999692709 5/8" IR w/fhwa Alum Cap
16017 622021.981 9081242.489 4374.100 N45°19'18.48769" W117°04'51.32634" 4323.19 0.999691958 5/8" IR w/fhwa Alum Cap
16018 621517.702 9081231.210 4387.940 N45°19'13.51755" W117°04'51.78267" 4337.04 0.999691234 5/8" IR w/fhwa Alum Cap
16019 620950.628 9081169.705 4403.300 N45°19'07.94888" W117°04'52.97849" 4352.41 0.99969043 5/8" IR w/fhwa Alum Cap
16020 620420.724 9081103.526 4414.090 N45°19'02.74886" W117°04'54.21759" 4363.2 0.99968985 5/8" IR w/fhwa Alum Cap
16021 619940.082 9080943.123 4418.280 N45°18'58.07417" W117°04'56.74497" 4367.4 0.999689591 5/8" IR w/fhwa Alum Cap
16022 619389.529 9080889.121 4424.930 N45°18'52.66534" W117°04'57.82588" 4374.06 0.999689207 5/8" IR w/fhwa Alum Cap
16023 618921.033 9080905.872 4438.680 N45°18'48.03648" W117°04'57.86890" 4387.82 0.999688494 5/8" IR w/fhwa Alum Cap
16024 618425.964 9080992.073 4446.330 N45°18'43.11648" W117°04'56.95662" 4395.48 0.999688069 5/8" IR w/fhwa Alum Cap
16025 617921.723 9081008.001 4459.280 N45°18'38.13533" W117°04'57.03232" 4408.45 0.999687391 5/8" IR w/fhwa Alum Cap
16026 617400.942 9081041.018 4473.890 N45°18'32.98387" W117°04'56.87889" 4423.07 0.999686632 5/8" IR w/fhwa Alum Cap
16027 616882.839 9081145.645 4489.060 N45°18'27.82892" W117°04'55.72272" 4438.25 0.999685847 5/8" IR w/fhwa Alum Cap
16028 616354.187 9081125.942 4501.140 N45°18'22.62182" W117°04'56.31102" 4450.35 0.99968521 5/8" IR w/fhwa Alum Cap
16029 615828.020 9081017.713 4514.930 N45°18'17.47620" W117°04'58.13541" 4464.15 0.999684492 5/8" IR w/fhwa Alum Cap
16030 615309.593 9080996.022 4532.800 N45°18'12.37080" W117°04'58.74537" 4482.03 0.999683581 5/8" IR w/fhwa Alum Cap
16031 614807.410 9080995.570 4550.620 N45°18'07.41678" W117°04'59.04878" 4499.86 0.999682675 5/8" IR w/fhwa Alum Cap
16032 614300.564 9080929.331 4564.860 N45°18'02.44422" W117°05'00.27456" 4514.11 0.99968194 5/8" IR w/fhwa Alum Cap
16033 613803.738 9080905.086 4573.250 N45°17'57.55298" W117°05'00.90734" 4522.51 0.999681485 5/8" IR w/fhwa Alum Cap
16034 613310.311 9080921.018 4581.800 N45°17'52.67850" W117°05'00.97648" 4531.08 0.999681023 5/8" IR w/fhwa Alum Cap
16035 612790.558 9080856.794 4590.300 N45°17'47.57776" W117°05'02.18159" 4539.59 0.999680562 5/8" IR w/fhwa Alum Cap
16036 612353.475 9080621.919 4602.050 N45°17'43.36380" W117°05'05.72305" 4551.35 0.999679956 5/8" IR w/fhwa Alum Cap
16037 611859.290 9080583.000 4612.250 N45°17'38.50472" W117°05'06.55919" 4561.56 0.999679417 5/8" IR w/fhwa Alum Cap
16038 611361.634 9080562.905 4623.460 N45°17'33.60354" W117°05'07.13423" 4572.79 0.99967883 5/8" IR w/fhwa Alum Cap
16039 610892.661 9080393.382 4636.080 N45°17'29.04766" W117°05'09.78080" 4585.42 0.99967818 5/8" IR w/fhwa Alum Cap
16040 610399.184 9080307.496 4657.080 N45°17'24.21515" W117°05'11.27278" 4606.44 0.999677129 5/8" IR w/fhwa Alum Cap
PROJECT : Wallowa Mountain Loop Road
DATE OF FIELD WORK : 8/2016-10-2016
PROJECT UNITS : Coordinates International foot, elevation US Survey Feet COORDINATE SYSTEM : Oregon North SPCS NAD83 (2011)
EPOCH DATE :2010.0000
VERTICAL DATUM : Orthometric Elevations based on the NAVD88 GEOID12b
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
c:
\m yf ile s\ pw
_p ro du ct io n\ d0
O
R W
A
LL
O W
A
2(
1) _c on tr ol sh ee t.
xl sx
]S he et
-N ov
-2
:1
D J&
A
D
J& A
D es ig ne d by
C he ck ed b y:
STATE PROJECT
D.12
SHEET
NUMBER
WALLOWA 4602(1)OR
SURVEY CONTROL
Sheet 1 of 2
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
16041 610001.080 9080066.427 4669.020 N45°17'20.38822" W117°05'14.87720" 4618.38 0.99967652 5/8" IR w/fhwa Alum Cap 1.
16042 609603.009 9079985.025 4679.330 N45°17'16.49503" W117°05'16.24999" 4628.7 0.999675989 5/8" IR w/fhwa Alum Cap
16043 609250.242 9079874.547 4687.730 N45°17'13.06090" W117°05'18.00232" 4637.11 0.999675553 5/8" IR w/fhwa Alum Cap
16044 608775.979 9079784.137 4700.590 N45°17'08.41979" W117°05'19.54588" 4649.98 0.999674893 5/8" IR w/fhwa Alum Cap
16045 608274.634 9079674.020 4717.640 N45°17'03.51971" W117°05'21.38076" 4667.05 0.999674032 5/8" IR w/fhwa Alum Cap
16046 607803.203 9079564.950 4731.610 N45°16'58.91430" W117°05'23.18326" 4681.03 0.99967332 5/8" IR w/fhwa Alum Cap
16047 607292.366 9079506.656 4744.610 N45°16'53.89896" W117°05'24.29938" 4694.04 0.999672652 5/8" IR w/fhwa Alum Cap
16048 606761.523 9079428.385 4759.110 N45°16'48.69458" W117°05'25.70641" 4708.55 0.999671911 5/8" IR w/fhwa Alum Cap
16049 606231.169 9079500.151 4777.840 N45°16'43.43251" W117°05'25.01652" 4727.3 0.999670968 5/8" IR w/fhwa Alum Cap
16050 605808.600 9079468.950 4790.680 N45°16'39.27669" W117°05'25.70185" 4740.15 0.999670317 5/8" IR w/fhwa Alum Cap
16051 605563.462 9079410.622 4795.320 N45°16'36.88259" W117°05'26.66152" 4744.79 0.999670073 5/8" IR w/fhwa Alum Cap
16052 605144.255 9079347.929 4801.520 N45°16'32.77304" W117°05'27.78484" 4751 0.99966974 5/8" IR w/fhwa Alum Cap
16053 604657.029 9079510.297 4806.690 N45°16'27.89871" W117°05'25.80358" 4756.18 0.999669449 5/8" IR w/fhwa Alum Cap
16054 604138.162 9079622.346 4820.110 N45°16'22.73318" W117°05'24.54414" 4769.62 0.999668763 5/8" IR w/fhwa Alum Cap
16055 603681.324 9079790.601 4838.600 N45°16'18.15617" W117°05'22.46286" 4788.12 0.99966784 5/8" IR w/fhwa Alum Cap
16056 603308.449 9079821.093 4852.690 N45°16'14.46488" W117°05'22.25689" 4802.22 0.999667136 5/8" IR w/fhwa Alum Cap
16057 602764.769 9079899.767 4869.990 N45°16'09.06845" W117°05'21.47855" 4819.53 0.999666265 5/8" IR w/fhwa Alum Cap
PROJECT : Wallowa Mountain Loop Road
DATE OF FIELD WORK : 8/2016-10-2016
PROJECT UNITS : Coordinates International foot, elevation US Survey Feet COORDINATE SYSTEM : Oregon North SPCS NAD83 (2011)
EPOCH DATE :2010.0000
VERTICAL DATUM : Orthometric Elevations based on the NAVD88 GEOID12b
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
c:
\m yf ile s\ pw
_p ro du ct io n\ d0
O
R W
A
LL
O W
A
2(
1) _c on tr ol sh ee t.
xl sx
]S he et
2)
-N ov
-2
:1
D J&
A
D
J& A
D es ig ne d by
C he ck ed b y:
STATE PROJECT
D.13
SHEET
NUMBER
WALLOWA 4602(1)OR
SURVEY CONTROL
Sheet 2 of 2
APPROACH ROAD
TABULATION OF
FOOTNOTE:
Quantity.
Topsoil to be conserved is also included in Roadway Excavation[1]
E.1
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r a g a .d g n
OR WALLOWA 4602(1)
A u g u s t
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b
130+36, RT
124+57, RT
116+17, RT
111+46, RT
74+42, RT
64+55, RT
56+34, RT
37+12, RT
265+68, RT
246+66, RT
199+22, LT
197+17, RT
179+31, RT
161+21, RT
138+52, RT
602+18.72 to 603+71.13
TYPICAL SECTION
TYPICAL SECTION
NO SCALE
FOOTNOTE:
[1] Width varies from 0-feet to 12-feet, from 602+18.72 to
602+60.72.
TYPICAL SECTIONS
APPROACH ROAD
E.2
STATE…