OR_BLM_ERFO_2017(1)-32(1)_Plans_10_18_18.pdf
PDF 10 MB Posted
- Solicitation number
- 69056718B000018
About this file
Plans
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Summary_Medford.pdf | ||
| Q&A_12-19-18.pdf | ||
| Amendment_A001.pdf | ||
| Q&A_12-13-18.pdf | ||
| Q&A_12-11-18.pdf | ||
| Q&A_12-6-18.pdf | ||
| Plan_Request_form.pdf | ||
| IFB_Medford.pdf | ||
| PROJECT_DESCRIPTION.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CP GPS
JH
BH
TP
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
RIP
G G
W W
DI
T
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS
A
M a r c h
U
S C c m y fi le s p w p r o d u c ti o n d o r e b a b .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.2BLM ERFO 2017(1)-32(1)OR
DI
T
NO SCALE
- no symbol -wall face
N
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material
NOTE:
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø
∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
Fiber Roll or Wattle
Lower Grave
Rd.
Crk
SCALE IN MILES
0 1 2
SCALE IN MILES
0 1 2
0 1 2
SCALE IN MILES
0 1 2
SCALE IN MILES
SCALE IN MILES
0 1 2
SCALE IN MILES
0 1 2
SCALE IN MILES
0 10.5
N A T I O N A L F O R E S T
S I S K I Y O U
VICINITY MAP
R W
R W
T 33 S
T 32 S
T 34 S
T 33 S
R E
R W
T 33 S
T 32 S
T 34 S
T 33 S
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
T 35 S
T 34 S
R W
R W
R W
R W
T 36 S
T 35 S
T 35 S
T 36 S
Jo ne s Cr ee k
F ie ld e r Rd.
Rogue River Hwy.
River
Rogue Pass
Grants
Foothill B lvd.
T 40 S
T 39 S
R E
R W
C re ek
Robert
D ollar Rd.
Glen
Va lle y R d.Old
Pa ci fic
H w y
Junction Glendale
SCALE IN MILES
0 1 2
T 35 S
T 34 S
T 34 S
T 33 S
R W
R W
R W
R W
T 33 S
T 32 S
A.3
STATE PROJECT
NUMBER
SHEET
U
S I n t2
D c m y fi le s p w p r o d u c ti o n d o r e b a c .d g n
OR BLM ERFO 2017(1)-32(1)
P
A u g u s t
T
H a s h e m i
W it u c k
C h e c k e d b y
D e s ig n e d b y
R W
R
WT 36 S
T 36 S
Fielder Rd.
DOUGLAS CO.
JOSEPHINE CO.
Cow
C re e k
DOUGLAS CO.
DOUGLAS CO.
JOSEPHINE CO.
Dutch Henry Rd.
Dutch Henry Rd.
Cow Creek Rd.
LONG: 123°36'26.28"W
LAT: 42°46'46.02"N
DUTCH HENRY RD. M.P. 2.73
LONG: 123°35'5.16"W
LAT: 42°46'51.74"N
DUTCH HENRY RD. M.P. 0.29
Glendale
Rand
Galice
B la n c h a rd G le n R d t.P e a v in e
R d
N o rt h
R id g e
M c K n a b e Spur
Rd.
M c
K n a b e
S p u r
LONG: 123°37'16.26"W
LAT: 42°34'14.16"N
PEAVINE ROAD M.P. 1.8
LONG: 123°38'36.24"W
LAT: 42°35'9.89"N
PEGGLER BUTTE M.P. 0.56
FOREST
NATIONAL
SISKIYOU
RIVER
ROGUE
DOUGLAS CO.
JACKSON CO.
SITE
RECREATION
STATE
CASEY
McLeod t s e W h c n a r
B kl E k e er C
.d
R
Wild Lily Rd.
t al
F k ee r C d
R
Sawyer Rd.
Cabin Canyon Rd.
LONG: 122°46'57.29"W
LAT: 42°46'33.82"N
WILD LILY M.P. 0.30
LONG: 122°53'7.81"W
LAT: 42°40'50.65"N
BOARD MOUNTAIN M.P. 1.45
J O
S E
P H
IN
E
C
O
J A
C K
S O
N C
O
Branch Rd.
Queens
Wimer
Ev an sCreek
R d
E v a n s
C r e e k
R d
R d
LONG: 123°5'24.30"W
LAT: 42° 31'49.80"N
MURPHY GULCH M.P. 1.52
LONG: 123°21'37.01"W
LAT: 42°9'28.48"N
LOW DIVIDE M.P. 2.24
Junction Cave
Cow
LONG: 123°28'19.49"W
LAT: 42°45'42.75"N
TOTTEN CREEK M.P. 0.06
Valley Sunney
Grave
Cre ek
R o g u e
Riv er
Creek Road Lower Graves
LONG: 123°31'39.60"W
LAT: 42°37'48.83"N
MCKNABE CREEK M.P. 0.76
LeLand
Hugo
Pines
Three
See Upper Left Spur Detail Above
J O
S E
P H
IN
E
C
O
J A
C K
S O
N C
O
Rogue
River
River
Rogue
W e s t
E v a n s
C r e e k
R d
Crk
Fielder Creek Rd.
LONG: 123°13'40.68"W
LAT: 42°26'55.42"N
UPPER LEFT SPUR M.P. 1.1
T 32 S
T 33 S
Gold Hill
LONG: 123°3'43.36"W
LAT: 42° 32'11.47"N
DISPOSAL SITE
MURPHY GULCH
Sheet and Description
D.1 D.2 D.3 D.4 D.5 D.6 D.7 D.8 D.9 D.10 D.11
Dutch Henry
BLM Road 32-7-19.3 M.P. 0.29
Dutch Henry
BLM Road 32-7-19.3 M.P. 2.73
Totten Creek
BLM Road 32-7W-25 M.P. 0.06
Mcknabe Creek
BLM Road 34-7W-3.1 M.P. 0.76
Pegler Butter
BLM Road 34-8W-27 M.P. 0.56
Peavine BLM Road 35-8W-2 M.P. 1.8
Wild Lily BLM Road
32-17-
23.02 M.P.
0.30
Board Mountain BLM Road 33-1W-
19.01 M.P.
1.45
Murphy Gulch
BLM Road 35-3W-7.00 M.P. 1.52
Upper Left Spur
BLM Road 36-4W-7.01
M.P. 1.1
Low Divide BLM Road 39-5-18.1 M.P. 2.24
ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM All ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL
AND ASSURANCE LPSM All ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM All ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM All ALL
A0120 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 350 270 180 130 150 310 80 200 80 1,750
A0140 20301-1900 REMOVAL OF PIPE CULVERT EACH 1 1
A0160 20303-1600 REMOVAL OF PAVEMENT, ASPHALT SQYD 734 500 203 224 64 1,725
A0180 20401-0000 ROADWAY EXCAVATION CUYD 400 40 440
A0200 20402-0000 SUBEXCAVATION CUYD 411 95 43 51 600
A0220 20411-0000 SELECT BORROW TON 810 187 85 68 1,150
A0240 20420-0000 EMBANKMENT CONSTRUCTION CUYD 712 396 473 179 1,760
A0260 20703-2000 GEOGRID, STABILIZATION SQYD 2,190 240 120 2,550
A0280 25101-0200 PLACED RIPRAP, METHOD A,
CLASS 2 CUYD 3 5 2 10
A0300 25101-0300 PLACED RIPRAP, METHOD A,
CLASS 3 CUYD 15 5 20
A0320 25201-1000 SPECIAL ROCK EMBANKMENT,
MECHANICALLY-PLACED CUYD 436 169 60 665
A0340 30201-1000 ROADWAY AGGREGATE, METHOD 1 CUYD 188 130 60 60 57 61 70 74 15 24 36 775 1.97 TON/CUYD
A0360 30302-1000 DITCH RECONDITIONING LNFT 100 125 25 250
A0380 30302-6000 ROADWAY RECONDITIONING LNFT 400 80 20 500
A0400 40301-0200 ASPHALT CONCRETE PAVEMENT, 1.94 TON/CUYD
TYPE 2 TON 81 56 35 38 31 14 255
A0420 60201-0600 18-INCH PIPE CULVERT LNFT 40 40
A0440 60201-0800 24-INCH PIPE CULVERT LNFT 26 4 30
A0460 60201-1000 36-INCH PIPE CULVERT LNFT 56 4 60
A0480 60601-0000 SPILLWAY ASSEMBLY (36-INCH) EACH 1 1
A0500 60602-0900 PIPE ANCHOR ASSEMBLY, 36-INCH EACH 1 1
A0520 60704-0000 CLEANING CULVERT IN PLACE EACH 1 1
A0540 62201-0250 DUMP TRUCK, 10 CUBIC YARD
MINIMUM CAPACITY HOUR 60 60
A0560 62201-0700 BACKHOE LOADER, 1 CUBIC YARD
HP MINIMUM FLYWHEEL HOUR 60 60
MileStone: Final Date Completed: In Progress Report Date: 09/12/18
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES - Schedule A
-S ep
-2
9:
A
M
Remarks and/or Determination of Estimated
Quantity Pay Item Description Unit
Estimated Quantities c:
\m yf ile s\ pw
_p ro du ct io n\ d0
O
R B
LM
E
R
FO
7( 1)
-3 2(
1) _E
E.
xl sm ]S he et
STATE PROJECT
B.1BLM ERFO 2017(1)-32(1)OR
SHEET
NUMBER
Sheet and Description
D.1 D.2 D.3 D.4 D.5 D.6 D.7 D.8 D.9 D.10 D.11
Dutch Henry
BLM Road 32-7-19.3 M.P. 0.29
Dutch Henry
BLM Road 32-7-19.3 M.P. 2.73
Totten Creek
BLM Road 32-7W-25 M.P. 0.06
Mcknabe Creek
BLM Road 34-7W-3.1 M.P. 0.76
Pegler Butter
BLM Road 34-8W-27 M.P. 0.56
Peavine BLM Road 35-8W-2 M.P. 1.8
Wild Lily BLM Road
32-17-
23.02 M.P.
0.30
Board Mountain BLM Road 33-1W-
19.01 M.P.
1.45
Murphy Gulch
BLM Road 35-3W-7.00 M.P. 1.52
Upper Left Spur
BLM Road 36-4W-7.01
M.P. 1.1
Low Divide BLM Road 39-5-18.1 M.P. 2.24
ALLOWANCE Bid Schedule
A0580 62301-0000 GENERAL LABOR HOUR 60 60
A0600 62502-0000 TURF ESTABLISHMENT SQYD 84 608 1,532 45 196 225 110 2,800
A0620 62901-1100 ROLLED EROSION CONTROL
PRODUCT, TYPE 4 SQYD 147 822 103 225 247 46 1,590
A0640 63401-0300 PAVEMENT MARKINGS, TYPE B,
SOLID (WHITE) LNFT 520 30 550
A0660 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM All ALL
-O ct -2
1:
P M
MileStone: Final Date Completed: In Progress Report Date: 10/17/18 c:
\m yf ile s\ pw
_p ro du ct io n\ d0
O
R B
LM
E
R
FO
7( 1)
-3 2(
1) _E
E.
xl sm ]S he et
2)
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B.2BLM ERFO 2017(1)-32(1)OR
SHEET
NUMBER
Travel Way
TYPICAL SECTIONTYPICAL SECTION
C.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft
D m y fi le s p w p r o d u c ti o n d o r e b c a .d g n
OR BLM ERFO 2017(1)-32(1)
A u g u s t
H a s h e
W it u c
C h e c k e d b y
D e s ig n e d b y
[1]
[2]
[1]
[2]
[1]
[2]
NO SCALE
LC
Profile grade
3:1
20' min.
2%
Existing ground
3:1
LC
Profile grade
3:1
18' min.
2%
Existing ground
3:1 l im it s
C o n s tr u c ti o n it s
C o n s tr u c ti
FOOTNOTE:
rate of 25:1 between widths.
Adjust to match existing road width as approved by CO. Taper at a superelevation. Do not exceed 6% superelevation.
Superelevate roadway on curves to match the existing roadway variable it s
C o n s tr u c ti it s
C o n s tr u c ti type 2, 2" compacted depth
Asphalt concrete pavement, type 2, 2" compacted depth
Asphalt concrete pavement, method 1, 8" compacted depth
Roadway aggregate, method 1, 8" compacted depth
Roadway aggregate, DUTCH HENRY ROAD
~ 330 LNFT
BLM ROAD 32-7-19.3 M.P. 0.29
ty p ty p
~ 250 LNFT
BLM ROAD 32+7+19.3 M.P. 2.73
DUTCH HENRY ROAD
TYPICAL SECTIONTYPICAL SECTION
C.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r e b c a .d g n
OR BLM ERFO 2017(1)-32(1)
A u g u s t
H a s h e
W it u c
C h e c k e d b y
D e s ig n e d b y
[2]
[1]
[1]
[2]
[1]
[2] type 2, 3" compacted depth
Asphalt concrete pavement, method 1, 8" compacted depth
Roadway aggregate, method 1, 8" compacted depth
Roadway aggregate, LC
Profile grade
3:1
NO SCALE
14' min.
3:1
T y p
4% it s
C o n s tr u c ti it s
C o n s tr u c ti rate of 25:1 between widths.
Adjust to match existing road width as approved by CO. Taper at a superelevation. Do not exceed 6% superelevation.
Superelevate roadway on curves to match the existing roadway
LC
Profile grade
3:1
14' min.
2% T y p
Existing ground 1
3:1 l im it s
C o n s tr u c ti it s
C o n s tr u c ti
TOTTEN CREEK
MCKNABE CREEK
WILD LILY
~ 152.5 LNFT
BLM ROAD 32-7W-25 M.P.0.06
~ 150 LNFT
BLM ROAD 34-7W-31 M.P. 0.76
~ 175 LNFT
BLM ROAD 32-17-23.02 M.P.0.30
PEGGLER BUTTE PEAVINE ROAD
~ 130 LNFT
BLM ROAD 34-8W-27 M.P. 0.56
~ 130 LNFT
BLM ROAD 35-8W-2 M.P.1.8
shldr. shldr.
2'2'
TYPICAL SECTIONTYPICAL SECTION
C.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r e b c a .d g n
OR BLM ERFO 2017(1)-32(1)
A u g u s t
H a s h e
W it u c
C h e c k e d b y
D e s ig n e d b y
[2]
[1]
[1]
[2]
[2]
[1] method 1, 4" compacted depth
Roadway aggregate, LC
Profile grade 1:3
1:3
NO SCALE
16' min.
Existing ground
FOOTNOTE:
rate of 25:1 between widths.
Adjust to match existing road width as approved by CO. Taper at a superelevation. Do not exceed 6% superelevation.
Superelevate roadway on curves to match the existing roadway
LC
Profile grade
3:1
14' min.
3:1
T y p
4% it s
C o n s tr u c ti it s
C o n s tr u c ti it s
C o n s tr u c ti it s
C o n s tr u c ti
2%
Va ria ble
Existing aggregate
Asphalt concrete pavement, type 2, 2" compacted depth
UPPER LEFT SPUR
MURPHY GULCH
BOARD MOUNTAIN
LOW DIVIDE
~ 400 LNFT
BLM ROAD 33-1W-19.01 M.P. 1.45
80 LNFS
BLM ROAD 35-3W-7.00 M.P. 1.52
~ 125 LNFT
BLM ROAD 39-5-18.1 M.P. 2.24
~ 125 LNFT
BLM ROAD 36-4W-7.01 M.P. 1.1
NO SCALE
100'
150'
80'
A
A
B B
CC
pavement structure
See Sheet C.1 for
LEGEND:
Subexcavation
SECTION A-A
SECTION B-B
SECTION C-C
Adjust to fit field conditions.
1. Site not surveyed. Horizontal alignment is a representation.
M.P. 0.29
BLM ROAD 32-7-19.3
DUTCH HENRY ROAD
DETAIL A
D.1
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r e b d a .d g n
OR BLM ERFO 2017(1)-32(1)
A u g u s t
H a s h e
W it u c
C h e c k e d b y
D e s ig n e d b y
NOTE:
Existing Roadway Sawcut
CONNECTION DETAIL
Failure
20' EOP
Edge of Road
2'12'6'
15'5'
12'8'
See Detail A
(this sheet)
See Detail A
(this sheet)
See Detail A
(this sheet)
9"
Geogrid, stabilization
Select borrow product, type 4
Rolled erosion control
9"
9"
Asphalt concrete pavement, type 2, 2" compacted depth
Roadway aggregate, method 1, 8" compacted depth pavement structure
See Sheet C.1 for
LEGEND:
Subexcavation
A
B
B
A
85'
100'
65'
Edge of Road
Ditch
Failure
B B
SECTION A-A
SECTION B-B
Adjust to fit field conditions.
1. Site not surveyed. Horizontal alignment is a representation.
M.P. 2.73
BLM ROAD 32-7-19.3
DUTCH HENRY ROAD
DETAIL A
g ni n oiti d n o c e r h cti
D
D.2
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r e b d b .d g n
OR BLM ERFO 2017(1)-32(1)
e p te m b e r
H a s h e
W it u c
C h e c k e d b y
D e s ig n e d b y
NOTE:
Existing Roadway Sawcut
CONNECTION DETAIL
18'
18'
Roadway aggregate, method 1, 8" compacted depth
Select borrow
Asphalt concrete pavement , type 2
2" compacted depth
See Detail A
(this sheet) See Detail A
(this sheet)
Failure area
Stream
Ditch
Edge of road
1.5H 1V
2' (typ.)
2' (typ.)
N
NO SCALE
A pavement structure
See Sheet C.2 for
Adjust to fit field conditions.
1. Site not surveyed. Horizontal alignment is a representation.
A
SECTION A-A
35'
52.5'
65'
LEGEND:
M.P. 0.06
BLM ROAD 32-7W-25
TOTTEN CREEK
30' (max.)
See Section 704.06.[1]
Embankment construction
D.3
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r e b d c .d g n
OR BLM ERFO 2017(1)-32(1)
J u n e
H a s h e
W it u c
C h e c k e d b y
D e s ig n e d b y
NOTE:
Existing Roadway Tie-in
CONNECTION DETAIL
14' product, type 4
Rolled erosion control
[1]construction
Embankment
10' (min.)
Edge of stream
Adjust to fit field conditions.
1. Site not surveyed. Horizontal alignment is a representation.
M.P. 0.76
BLM ROAD 34-7W-3.1
MCKNABE CREEK
D.4
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r e b d d .d g n
OR BLM ERFO 2017(1)-32(1)
u n e
H a s h e
W it u c
C h e c k e d b y
D e s ig n e d b y
NOTE:
Existing Roadway pavement structure
See Sheet C.2 for
Sawcut
CONNECTION DETAIL
150'
Edge of Road
See Sheet C.2 for typical section
Roadway aggregate, method 1, Adjust to fit field conditions.
1. Site not surveyed. Horizontal alignment is a representation.
LEGEND:
Subexcavation
SECTION A-A
SECTION B-B
B
A A
B
A
A
10'
40'
30'
40'
10'
4'10'
M.P. 0.56
BLM ROAD 34-8W-27
PEGGLER BUTTE
DETAIL A
D.5
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r e b d e .d g n
OR BLM ERFO 2017(1)-32(1)
u n e
H a s h e
W it u c
C h e c k e d b y
D e s ig n e d b y
Pavement slump
Cracking
Ditch
Edge of Road
Existing Roadway pavement structure
See Sheet C.2 for
Sawcut
CONNECTION DETAIL
NOTE:
2' Shoulder 9' 3'
Geogrid, stabilization
Select borrow
See Detail A
(this sheet)
See Detail A
(this sheet)
13"
Asphalt concrete pavement, type 2, 3" compacted depth
Roadway aggregate, method 1, 8" compacted depth product, type 4 erosion control
Rolled
SECTION A-A
1V
1.25H
LEGEND:
Special rock embankment
A A
35'
35'
60'
NO SCALE M.P. 1.8
BLM ROAD 35-8W-2
PEAVINE ROAD
20'
Adjust to fit field conditions.
Site not surveyed. Horizontal alignment is a representation.
D.6
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r e b d f.
d g n
OR BLM ERFO 2017(1)-32(1)
S e p te m b e r
H a s h e
W it u c
C h e c k e d b y
D e s ig n e d b y
Edge of Road
Top of Bank
Failure Area
Ditch
Clean culvert in place
Existing Roadway pavement structure
See Sheet C.2 for
Sawcut
CONNECTION DETAIL
NOTE:
Install 36" spillway assembly
See Sheet G.1 embankment.
Special rock 4
4'
(min.)
10'
Construction access
FOOTNOTE:
1.
Match existing.[1]
[1]1' (min.) 15.5'
LEGEND:
SECTION B-B
A
A
B
SECTION A-A
B
Remove existing culvert and install 18" CMP
25'
50'
70'
20'
10'
NO SCALE
Special rock embankment
M.P. 0.30
BLM ROAD 32-17-23.02
WILD LILY
1V
1.25H
4'
4' 1V
1.5H
2'
2'
10' (min.)
8' (min.)
Adjust to fit field conditions.
Site not surveyed. Horizontal alignment is a representation.
Embankment construction
D.7
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r e b d g .d g n
OR BLM ERFO 2017(1)-32(1)
A u g u s t
H s h e
W it u c
C h e c k e d b y
D e s ig n e d b y
Ditch
Edge of Road
Existing culvert
Existing Roadway pavement structure
See Sheet C.2 for
Tie-in
CONNECTION DETAIL
NOTE:
See Sheet G.1
Special Rock Embankment
Rolled erosion controlFailure area
Construction access
Construction access
Failure area
[1]Emankment construction
FOOTNOTE:
1.
14' [2]1' (min.)
Matching existing.[2]
See Section 704.06.[1]
Adjust to fit field conditions.
1. Site not surveyed. Horizontal alignment is a representation.
M.P. 1.45
BLM ROAD 33-1W-19.01
BOARD MOUNTAIN
D.8
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r e b d h .d g n
OR BLM ERFO 2017(1)-32(1)
u n e
H a s h e
W it u c
C h e c k e d b y
D e s ig n e d b y
Cracking
Edge of Road
Existing 18" CMP
See Sheet C.3 for Typical Section roadway aggregate, method 1.
Roadway reconditioning
NOTE:
Existing Roadway pavement structure
See Sheet C.3 for
Tie-in
CONNECTION DETAIL
Adjust to fit field conditions.
1. Site not surveyed. Horizontal alignment is a representation.
M.P. 1.52
BLM ROAD 35-3W-7.00
MURPHY GULCH
A
A
D.9
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r e b d i.
d g n
OR BLM ERFO 2017(1)-32(1)
e p te m b e r
H a s h e
W it u c
C h e c k e d b y
D e s ig n e d b y
Edge of road
See Sheet C.3 for Typical Section roadway aggregate, method 1.
Roadway reconditioning
Existing Roadway pavement structure
See Sheet C.3 for
Tie-in
CONNECTION DETAIL
NOTE:
SECTION A-A
Remove slide material
~ 80'
[1]Remove slide material
Place material at provided Disposal Site.[1] pavement structure
See Sheet C.3 for
NO SCALE
SECTION A-A
A
A
LEGEND:
M.P. 1.1
BLM ROAD 36-4W-7.01
UPPER LEFT SPUR
1.5H 1V
Embankment construction g ni n oiti d n o c e r h cti
D
See Section 704.06.[1]
Adjust to fit field conditions.
Site not surveyed. Horizontal alignment is a representation. 1.
D.10
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r e b d j.
d g n
OR BLM ERFO 2017(1)-32(1)
u n e
H a s h e
W it u c
C h e c k e d b y
D e s ig n e d b y
Edge of Road
Failure Area
Existing Roadway Tie-in
CONNECTION DETAIL
NOTE:
product, type 4
Rolled erosion control
Install 24" pipe culvert
14'
[1]Embankment construction
2'
(min.)
8'
Adjust to fit field conditions.
1. Site not surveyed. Horizontal alignment is a representation.
M.P. 2.24
BLM ROAD 39-5-18.1
LOW DIVIDE
D.11
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r e b d k .d g n
OR BLM ERFO 2017(1)-32(1)
u n e
H a s h e
W it u c
C h e c k e d b y
D e s ig n e d b y
Edge of Road
Culvert in-place
Existing Roadway pavement structure
See Sheet C.3 for
Tie-in
CONNECTION DETAIL
~125'
NOTE:
See Sheet C.3 for Typical Section
Asphalt concrete pavement, type 2.
100'
150'
80'
A
A
B B
CC
LEGEND:
Subexcavation
SECTION A-A
SECTION B-B
SECTION C-C
Adjust to fit field conditions.
1. Site not surveyed. Horizontal alignment is a representation.
Fiber roll
M.P. 0.29
DUTCH HENRY ROAD
EROSION CONTROL
E.1
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r e b e a .d g n
OR BLM ERFO 2017(1)-32(1)
u n e
H a s h e
W it u c
C h e c k e d b y
D e s ig n e d b y
NOTE:
Failure
20' EOP
Edge of Road
2'12'6'
15'5'
12'8'
LEGEND:
Subexcavation
A
B
B
A
85'
100'
65'
Edge of Road
Ditch
Failure
B B
SECTION A-A
SECTION B-B
Adjust to fit field conditions.
1. Site not surveyed. Horizontal alignment is a representation.
Fiber roll
M.P. 2.73
DUTCH HENRY ROAD
EROSION CONTROL
E.2
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r e b e b .d g n
OR BLM ERFO 2017(1)-32(1)
u n e
H a s h e
W it u c
C h e c k e d b y
D e s ig n e d b y
NOTE:
18'
18'
Failure Area
Stream
Ditch
Edge of Road
1.5H 1V
2' (typ.)
2' (typ.)
N
NO SCALE
A
LEGEND: Adjust to fit field conditions.
1. Site not surveyed. Horizontal alignment is a representation.
A
35'
52.5'
65'
Fiber roll
SECTION A-A
Embankment
M.P. 0.06
TOTTEN CREEK
EROSION CONTROL
30' (max.)
E.3
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r e b e c .d g n
OR BLM ERFO 2017(1)-32(1)
u n e t
H a s h e
W it u c
C h e c k e d b y
D e s ig n e d b y
[1]construction
Embankment
10' (min.)
Edge of stream
Adjust to fit field conditions.
1. Site not surveyed. Horizontal alignment is a representation.
LEGEND:
Subexcavation
SECTION A-A
B
A A
B
A
A
10'
40'
30'
40'
10'
Fiber roll
M.P. 0.56
PEGGLER BUTTE
EROSION CONTROL
SECTION B-B
4'10'
E.4
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r e b e d .d g n
OR BLM ERFO 2017(1)-32(1)
u n e
H a s h e
W it u c
C h e c k e d b y
D e s ig n e d b y
Pavement slump
Cracking
Ditch
Edge of Road
NOTE:
2' Shoulder 9' 3'
Special rock embankment
A A
35'
35'
60'
NO SCALE
Adjust to fit field conditions.
1. Site not surveyed. Horizontal alignment is a representation.
Fiber roll
M.P. 1.8
PEAVINE ROAD
EROSION CONTROL
SECTION A-A
1V
1.25H
E.5
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r e b e f.
d g n
OR BLM ERFO 2017(1)-32(1)
A u g u s t
H a s h e
W it u c
C h e c k e d b y
D e s ig n e d b y
Edge of Road
Top of Bank
Failure Area
Ditch
Clean culvert in place
NOTE:
Special rock embankment
Install 36" spillway assembly
10'
1' (min.) 15.5'
Fiber roll
A
A
B
B
Remove existing culvert and install 18" CMP
25'
50'
70'
20'
10'
NO SCALE
Adjust to fit field conditions.
1. Site not surveyed. Horizontal alignment is a representation.
M.P. 0.30
WILD LILY
EROSION CONTROL
SECTION B-B
SECTION A-A
Special rock embankment
Embankment
N
1V
1.5H
1.25H
1V
E.6
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r e b e g .d g n
OR BLM ERFO 2017(1)-32(1)
A u g u s t
H a s h e
W it u c
C h e c k e d b y
D e s ig n e d b y
Ditch
Edge of Road
Existing culvert
NOTE:
product, type 4
Rolled erosion control
14'
Special rock embankment
1' (min.)
LEGEND:
Adjust to fit field conditions.
1. Site not surveyed. Horizontal alignment is a representation.
Fiber roll
M.P. 1.52
MURPHY GULCH
EROSION CONTROL
E.7
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r e b e h .d g n
OR BLM ERFO 2017(1)-32(1)
u ly
H a s h e
W it u c
C h e c k e d b y
D e s ig n e d b y
Edge of road
10'
10'
~60'
Remove slide material
Fiber rolls
NO SCALE
Adjust to fit field conditions.
1. Site not surveyed. Horizontal alignment is a representation.
A
A
M.P. 1.1
UPPER LEFT SPUR
EROSION CONTROL
SECTION A-A
Embankment
E.8
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r e b e i.
d g n
OR BLM ERFO 2017(1)-32(1)
u n e
H a s h e
W it u c
C h e c k e d b y
D e s ig n e d b y
Edge of Road
Failure Area
NOTE:
25'
50'
50'
14' product, type 4
Rolled erosion control
1.5H
1V
(min.)
8'
Spacing Slope
STAKES REQUIRED
1:1
1:2
1:3
1:4 or flatter for each roll
Stakes required
FIBER ROLL SPACING
Fiber roll length
DRAFT: 7/2016
REVISED:
DETAIL APPROVED FOR USE 10/2014
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FIBER ROLL
(FT)
(FT)
W157-21
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
E.9
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
BLM ERFO 2017(1)-32(1)OR
U S
C c m y fi le s p w p r o d u c ti o n d o r e b e j.
d g n u n e
Fl ow
T o e o f fi ll s lo p e
ELEVATION
PLAN
disturbed areas
Runoff from
INSTALLATION BEYOND TOE OF SLOPE
INSTALLATION ALONG SLOPES
FIBER ROLL STAKING DETAIL
PROPERLY STAKED AND ENTRENCHED FIBER ROLL
Existing ground (typ.)
Fiber roll
Flow direction
Slope
Direction of runof f from distur bed area s sp ac in g ch ar t
S ee F ib er R ol l
Fiber roll ff o n ur f o n oi t c er i
D along contours
Install fiber rolls
Fiber roll
Slope
Fi ll slo pe
Direction of runoff ground
Existing soil to match ground level
Backfilled and compacted
Flow larger than fiber roll wood stakes. See Note 2.
Pay lim its
Pay lim its
SLOPE PROTECTION INSTALLATION
ALTERNATE FIBER ROLL JOINT DETAIL
FIBER ROLL LAPPING DETAIL
on uphill side of fiber roll
Place excavated material Stagger joints (typ.)
2.
1.
permanent installations. Do not crush fiber roll while staking.
roll is secure to slope. Live stakes may be used for and install fiber rolls
Step 1: Excavate trench Step 2: Backfill soil against fiber rolls
2" (min.) Excavate trench 2"
1" x 1" or 1" Ø ove rlap
12" (m in.)
t o m in m in
1" x 1" Wood stake as specified in plans
3' min. or
3' (min.)
Drive stakes at each end and at 4-foot spacing until fiber fiber roll and space stakes at 4-foot max.
6-inches from fiber roll end angles towards the adjacent
Overlap fiber rolls 12-inch minimum. Drive stakes at
NO SCALE PRODUCT ON SLOPES
ROLLED EROSION CONTROL
E.10
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r e b e k .d g n
OR BLM ERFO 2017(1)-32(1)
S e p te m b e r
H a s h e
W it u c
C h e c k e d b y
D e s ig n e d b y edge overlap see N ote 3
S tap le sp acin g
4" (min.)
' (m ax.) c-c
12" (max.) c-c
4" (max.) C-C
Pr ev ai lin g w in d
4" (max.) C-C
4" (max.) c-c
Staple (typ.)
Blanket edge
Blanket ends
Slope stake
NOTE:
edge overlap
6" (min.)
staples at top of slope
Use a double row of staples at tow of slope
Use a double row of by installing staples at a rate of 1.5 per square yard.
Securely fasten the Rolled Erosion Control Product to the soil
Overlap in the direction of the prevailing wind.
recommendations and Section 629.
Install staples according to the manufacturer's
3.
2.
1.
10.4 x 16 20301 -1900
25101 -0200
25101 -0300
30302 -1000
60201 -0600
60201 -0800
60201 -1000
60601 -0000
60602 -0900
60704 -0000
Station
ES
TI
M A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
R
EM
O V A L
O F
PI
PE
C U
LV
ER
T
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
D
IT
C H
R
EC
O N
D
IT
IO
N
IN
G
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
S
PI
LL
W
A Y
A S S
EM
B
LY
(3 6-
IN
C
H
PI
PE
A N
C H
O R A
S S
EM
B
LY
IN
C H
C
LE
A N
IN
G
C U
LV
ER
T
IN
P
LA
C E
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered notes
FEET CUYD EACH CUYD CUYD LNFT LNFT LNFT LNFT EACH EACH EACH Lt Rt
Dutch Henry Road M.P. 2.73 100
Peavine Road M.P.1.8 15 36 1 1 1
Wild Lily M.P. 0.30 1 3 40
Upper Left Spur M.P. 1.1 5 125 26
PROJECT TOTAL 0 1 8 15 225 40 26 36 1 1 1
Allowable Pipe Material A Aluminum AS Aluminized steel C Concrete P Plastic (blank) Any appropriate material x/__ Any appropriate material except __
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
c:
\m yf ile s\ pw _p ro du ct io n\ d0
D ra in ag e.
xl sx ]S he et
-S ep -2
:1
S
W it uc ki 6/
T.
H as he m i
6/
D es ig ne d by
C he ck ed b y:
STATE PROJECT
F.1
SHEET
NUMBER
BLM ERFO 2017(1)-32(1)OR
Note: The quantities shown hereon are approximate and are subject to field adjustments.
METAL ROUND PIPE CULVERT
METAL PIPE ARCH CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
STEEL ALUMINUM
EQUI-
VALENT
DIAMETER
MINIMUM
CORNER
RADIUS
MINIMUM
COVERSPAN x RISE
PIPE ARCH
SIZE
PIPE ARCH
SIZE
SPAN x RISE
EQUI-
VALENT
DIAMETER
MINIMUM
CORNER
RADIUS
MINIMUM
COVER
MINIMUM
COVERDIAMETER
PIPE
SIZE
PIPE
SIZE
DIAMETER
MINIMUM
COVER
ALUMINUMSTEEL
When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 1% of the pipe length. Develop camber on a parabolic curve. If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.
602-1
STANDARD APPROVED FOR USE 12/1993
REVISED: 4/1994 6/2005
METAL PIPE CULVERT
Fill heights exceeding 100 feet require
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
0.060/160.075/140.105/120.135/10 0.164/8 0.060/160.075/140.105/120.135/10 0.164/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)INCHES INCHES
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS 5" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)INCHES
INCHES
INCHES
142 x 91
137 x 87
128 x 83
117 x 79
112 x 75
103 x 71
95 x 67
87 x 63
83 x 57
81 x 59
77 x 52
73 x 55
71 x 47
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
INCHES
INCHES
3.5
INCHES
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
5" x 1" CORRUGATIONS
0.064/160.079/140.109/120.138/10 0.168/8 0.079/140.109/120.138/10 0.168/8 0.079/14
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
0.109/120.138/10 0.168/8
INCHES INCHES INCHES
103 x 71
95 x 67
87 x 63
81 x 59
73 x 55
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
INCHES
3.5
" CORRUGATIONS2
1" x 3
METAL THICKNESS (INCH/GAGE)
3" x 1" CORRUGATIONS
0.135/100.105/120.075/14
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
0.060/160.135/100.105/120.075/140.060/16
STATE PROJECT
NUMBER
SHEET
F.2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
BLM ERFO 2017(1)-32(1)OR
U S
C c m y fi le s p w p r o d u c ti o n d o r e b fb .d g n u n e
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
1.
2.
3.
4.
special analysis by the CO.
The fill heights in the table are for helical lockseam and welded seam pipe only.
Fill heights for culvert pipe with annular corrugations are more restrictive than those of helical lockseam and welded seam pipe.
Obtain approval before furnishing annular corrugation pipe.
Measure minimum cover from the top of the pipe culvert to the subgrade for flexible pavements, and to the top of the pavement for rigid pavements. Measure maximum fill height from the top of the pipe to the top of the pavement for both flexible and rigid pavement.
ROUND PIPE
DIAMETER
PIPE ARCH
SPAN × RISE
CORRUGATION
[1] Fabricate annular, helical and semi-corrugated type coupling bands from the same metal as
[2] For helically corrugated pipe with rerolled ends, the nominal corrugations size refers to the dimension of the end corrugation in the pipe.
COUPLING BANDS FOR METAL PIPE CULVERT [1]
[3] Use annular corrugated bands with pipes having annular corrugations or with helical pipe the connecting pipe. Provide coupling bands not more than 3 nominal sheet thicknesses
ANNULAR
CORRUGATED
HELICALLY
CORRUGATED
BANDS [4]
SEMI-
CORRUGATEDSIZE [2]
BANDS [3] BANDS [5]
602-2
STANDARD APPROVED FOR USE 12/1993
REVISED: 4/1994 6/2005
MINIMUM BAND WIDTH (INCHES)
1 × 2
1 × 3
3 × 1
5 × 1 78 to 144
36 to 72
78 to 144
36 to 72
78 to 84
42 to 72
12 to 36
87 × 64 to 142 × 91
60 × 46 to 81 × 59
87 × 64 to 142 × 91
60 × 46 to 81 × 59
49 × 33 to 83 × 57
17 × 13 to 42 × 29
10.5
10.5
10.5
10.5
10.5
10.5
10.5
INCHESINCHESINCHES
COUPLING BAND
METAL PIPE CULVERT
" corrugations. A 12 inch band is acceptable on pipe ends 2 1" × 3
2pipe ends rerolled with 2 corrugations on rerolled pipe ends.
STATE PROJECT
NUMBER
SHEET
F.3
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
BLM ERFO 2017(1)-32(1)OR
U S
C c m y fi le s p w p r o d u c ti o n d o r e b fc .d g n u n e
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
1.
2.
SMOOTH SLEEVE BAND FLAT BAND
SEMI-CORRUGATED BAND
HELICAL BANDANNULAR BANDSTANDARD BAND CONNECTIONS
SLEEVE JOINT
SIDE VIEW SIDE VIEW SIDE VIEW
END VIEW
END VIEWEND VIEW
Oval Lug
Band Angle
Bar & Strap
Integral Flange Wedge and Strap
Smoother sleeve with center stop.
Stab type joint
W
Band Band
Band Bolts
Pipe
Band
Bolts
Angle
Pipe
BandBand
Bolts
Pipe heel and toe of angle of corrugation at fillet weld at crest
Rivet, spot weld, or
Angle
Wedge
Watertight pipe joints are not required unless specified in the Special Contract Requirements.
Other types of coupling bands or fastening devices that comply with the joint performance criteria of AASHTO Standard specifications for
Highway Bridges, Division II Section 26 may be used.
of corrugation at heel and toe of angle
Rivet, spot weld, or fillet weld at crest strap connector
Bolt, bar and
Band corrugation in pipe end with second annular around band meshes
Continuous corrugation
W
BoltsBand
WW
rerolled with 3" × 1" pipe corrugations.
having rerolled end to form annular corrugations. A 10.5 inch band is acceptable on steel or 0.048 inch for aluminum. Fasten coupling bands with the following diameter of bolt:
thinner than the thickness of the pipe to be connected, and no thinner than 0.052 inch for or 0.036 inch for aluminum, or a plastic with an equivalent strength to metal.
Use a matching metal having a nominal thickness of not less than 0.040 inch for steel, Smooth sleeve-type couplers and flat bands may be used for pipe diameters of 12" or less.
"2 1" × 3
2The minimum band widths shown for 3" × 1" and 5" × 1" corrugated sizes apply to 2 diameter, required above 42" diameter
Second angle connection optional to 42" diameter, required above 42" diameter
Second angle connection optional to 42"
NOTE:
underdrain [6]
[4] Use helical corrugated bands with pipes having helically corrugated ends.
[5]
[6]
" for 18" round culvert (21" × 15" pipe arch) or less8
" for 21" round culvert (24" × 18" pipe arch) or more2
BEDDING DEPTH
MINIMUM SPACING
SPACING
DIAMETER
or SPAN
PIPE SIZE (H) DEPTH
602-3
STANDARD APPROVED FOR USE 12/1993
DRAFT: 10/2014
REVISED: 4/1994 6/2005
> 54"
12" to 54"
6"
4"
UP to 48"
48" and UP
24" span or 36", PIPE CULVERT BEDDING
METAL AND PLASTIC
STATE PROJECT
NUMBER
SHEET
F.4
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
BLM ERFO 2017(1)-32(1)OR
U S
C c m y fi le s p w p r o d u c ti o n d o r e b fd .d g n u n e
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 1% of the pipe length. Develop camber on a parabolic curve. If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.
H equals the diameter of all round pipe culverts or the rise dimension of all pipe arch culverts.
See Section 704 for bedding and backfill requirements.
1.
2.
3.
Construct piping plug of impermeable backfill material at the pipe culvert inlet where granular material is used for backfill. Width may be adjusted to tie into impervious material.
MULTIPLE PIPE INSTALLATION
PIPING PLUG
BELOW NATURAL GROUND OR
TRENCH EXCAVATION IN EMBANKMENT
ON UNSTABLE MATERIAL
ABOVE AND BELOW
NATURAL GROUND
ON NATURAL GROUND
ABOVE NATURAL GROUND
ON UNYIELDING MATERIAL
PIPE BEDDING
ELEVATION
SECTION A-A
Bedding material (uncompacted)
Impermeable backfill material.
Roadway embankment Roadway embankment
Natural ground
Toe plate Toe plate
Natural ground Natural ground
Roadway embankment
Roadway excavation
Natural ground
H
Width
H H
H H
H H
H H
H
H
H
H
Finished subgrade Finished subgrade
Natural ground
Finished subgrade
Pipe culvert
Embankment slope
High water elevation treatment
Culvert end
Piping plug before trench excavation embankment height
Finished subgrade or
Original natural ground surface
A
A
Finished subgrade
Roadway embankment
Roadway embankment
Finished subgrade trench excavations
Embankment material placed in layers
Compacted backfill material placed in layers not backfill in accordance with Section 614.
depth table
See bedding excavation in trench
HH
compact in layers not over compressible material. Lightly and replace with selected fine
Remove unyielding material fill material properly compacted with approved granular foundation firm bearing soil and replace
Remove unstable material to
Bedding
Bedding
Bedding
Bedding
H
Half diameter or whichever is less
(see table)
Minimum spacing or Span
Diameter or Span
Diameter section
Metal endMetal end section or 36" (max.) for embankment installations not exceeding 6" compacted depth.
exceeding 6" compacted depth. Or lean concrete
18" (min.)
6" in uncompacted depth.
* Reduce to 18" for
2'-0" ±
1'-0" ±
18" ±
18" ±18"±
(min.)
6"
(min.)
6"
12" (min.), 24" (max.)
"/foot of cover,2 minimum
1'-0"
NOTE:
2H or 12' (max.)
2H or 12' (max.) 2H or 12' (max.) 2H or 12' (max.) 2H or 12' (max.)
2H or 12' (max.)2H or 12' (max.)
2H or 12' (max.) 2H or 12' (max.)
F.5
STATE PROJECT
NUMBER
SHEET
U m y fi le s p w p r o d u c ti o n d o r e b fe .d g n
OR BLM ERFO 2017(1)-32(1)
u n e
H a s h e
W it u c
C h e c k e d b y
D e s ig n e d b y ends. Use 0.064 inch galvanized steel or 0.060 inch aluminum.
1" ID x 2" inch 16 3Make all banded connections water tight by placing
" Iron2
" Galvanized washers4
S ec ti on
" x 3" 8
D= Diameter of culvert
NOTE:
PLAN
SPILLWAY ASSEMBLYBOLT DETAIL
PROTECTIVE APRON
See Bolt Detail
Galvanized pipe with galvanized nut
Galvanized bolt pipe stake
D D
D
D
D
D
D
D
Approved alternate designs may be used.
apron.
Place class 3 riprap conforming to Section 251 for protective tightening.
bead of approved caulking under each half of the band before from helically corrugated pipe with factory annular or reformed
Fabricate spillway assembly from annular corrugated pipe, or
5.
4.
3.
2.
1.
ELEVATION
sl op e V ar ia b le
Pipe anchor assembly as se m bl y
S pi llw ay
Section 602
SPILLWAY ASSEMBLY WITH DOWN DRAIN
plumb on 10' centers
D ow n d ra in S ec ti on
See Sheet F.6 for Pipe Anchor Assembly Detail.
m in m in min.
2'
4' (min.)
DOWN DRAIN
ASSEMBLY WITH
SPILLWAY
F.6
STATE PROJECT
NUMBER
SHEET
U m y fi le s p w p r o d u c ti o n d o r e b ff .d g n
OR BLM ERFO 2017(1)-32(1)
u n e
H a s h e
W it u c
C h e c k e d b y
D e s ig n e d b y
Place slope anchor assemblies on 10' max. centers on slopes
Collar of 2"
"16
" cable clamp8
" cable when8
" x 1" Slots4
7" Coupling band
" Slots4 3" x 32
" Steel plate thickness4
12"
"2 14"2
"8 71"8
1"
"2 12"2
3"
R
1" stakes, 2.72 lbs/ft (min.)
" Iron pipe2 18' x 1
12" or 24" Coupling band to the centerline of the pipe
Measure length of coupling band parallel
Va ria ble sl op e
ANCHOR ASSEMBLY
STEEL PLATE
METAL PIPE ASSEMBLY
4.
3.
2.
1.
Plate material to be ASTM A36. Galvanize after fabrication.
20% or greater.
Approved alternative pipe anchor assemblies may be used.
All pipe stakes and hardware to be galvanized after fabrication.
NOTE:
Culvert crown pipe or equal
Iron pipe stakes
Coupling band
Steel plate only when cable is specified specified in contract
ASSEMBLY
PIPE ANCHOR
QUANTITY
RIPRAP
ESTIMATED
CLASS
RIPAP
QUANTITY
GEOTEXTILE
ESTIMATED
SECTION
END
WITH
SECTION
END
WITHOUT
D
SIZE
CULVERT
QUANTITY
RIPRAP
ESTIMATED
CLASS
RIPAP
QUANTITY
GEOTEXTILE
ESTIMATED
SECTION
END
WITH
SECTION
END
WITHOUT
D
SIZE
CULVERT
NO SCALE
FOR INFORMATION ONLY
PROTECTIVE APRON DIMENSIONS AND QUANTITIES
OUTLET WITHOUT DITCH
FOR INFORMATION ONLY
PROTECTIVE APRON DIMENSIONS AND QUANTITIES
OUTLET WITH DITCH
L
LENGTH
APRON
H
DEPTH
APRON
L
LENGTH
APRON
H
DEPTH
APRON
REVISED: 8/2016
DETAIL APPROVED FOR USE --/----
WESTERN FEDERAL LANDS HIGHWAY DIVISION
CULVERT OUTLETS
PLACED RIPRAP AT
W251-1
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
F.7
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
BLM ERFO 2017(1)-32(1)OR
U S
C c m y fi le s p w p r o d u c ti o n d o r e b fg .d g n u n e
Variable slopeVariable slope
D
4D m in
H m in
H
D
H ditch slope
Match existing ditch slope
Match existing
D or Span
Dia.
or Span
Dia.
or Span
Dia.
or Span
Dia.
(INCHES) (FEET) (CUYD) (SQYD)
(INCHES) (FEET) (CUYD) (SQYD)
2' (min.)
2' (min.)
(INCHES)
(INCHES)
14.5
12.5
49.8
38.7
18.5
13.2
5.2
3.2
1.7
44.4
34.0
15.6
10.8
3.9
2.2
1.0
14.5
12.5
38.5
29.8
15.1
10.7
4.4
2.7
1.3
35.6
27.2
13.3
9.3
3.6
2.0
0.9
3.
2.
1.
SECTION A-A SECTION B-B
SECTION C-C SECTION D-D SECTION E-E
PROTECTIVE APRON AT CULVERT OUTLET WITH DITCH
PROTECTIVE APRON AT CULVERT OUTLET WITHOUT DITCH
END SECTION
CULVERT WITH STANDARD
PLAN VIEW
END SECTION
CULVERT WITHOUT STANDARD
PLAN VIEW
END SECTION
CULVERT WITH STANDARD
PLAN VIEW
END SECTION
CULVERT WITHOUT STANDARD
PLAN VIEW
NOTE:
A
1 1
A B B
C C DD
E
E
E
E b o tt o m w id th b o tt o m w id th for payment.
Do not measure riprap placement excavation
Furnish separation and stabilization geotextile.
less than 10%.
Use for aprons serving culverts with slopes or flatter
Sloped 1V:2H
Original ground
Geotextile m in
H
L
D it c h
D ground
Original
Geotextile Flowline m in
D
Geotextile m in
D m in
D ground
Original
Geotextile
D it c h
D
L ground
Original
Geotextile m in
H Original ground
L
Match existing.[2]
Cut bench steps in accordance with Section 204.09.[1]
NO SCALE
(m in
DETAIL
MECHANICALLY PLACED
SPECIAL ROCK EMBANKMENT
MECHANICALLY PLACED
SPECIAL ROCK EMBANKMENT
G.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r e b g a .d g n
OR BLM ERFO 2017(1)-32(1)
A u g u s t
H a s h e
W it u c
C h e c k e d b y
D e s ig n e d b y
Existing ground special rock embankment
Mechanically placed rock for
Bench width class 1, type B, non-woven
Geotextile filter, pavement structure
See C-Sheets for
B e n c h h e ig h ts m a x
LC Varies x
Finished face
10' (min.)
4' (min.)
V :1 .2 H o r fla tte r
Geotextile filter, class 1, type B, non-woven method 2, 8-inch (min.)
Roadway aggregate, [2]1' (min.)
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
ROAD WORK
END
WORK
ROAD
AHEAD
ROAD WORK
END
ROAD WORK
END
ROAD WORK
END
WORK
ROAD
AHEAD
WORK
ROAD
AHEAD
Expressway / Freeway
ROAD NAME
ROAD NAME
ROAD WORK
NEXT xx MILES
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxx
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxxxx
ROAD WORK
NEXT xx MILES
W13-1P
(optional)
W13-1P
(optional) xx
MPH
xx
MPH
STANDARD APPROVED FOR USE 6/2005
DRAFT: 6/2014
REVISED:
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
635-1
ADVANCE SIGNING
TEMPORARY TRAFFIC CONTROL
STATE PROJECT
NUMBER
SHEET
H.1
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
BLM ERFO 2017(1)-32(1)OR
U S
C c m y fi le s p w p r o d u c ti o n d o r e b n a .d g n u n e
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
G20-2
G20-2
G20-2
G20-1
See Note 11
G20-1
See Note 11
M in o r R o a d
M a jo r R o a d
W20-1
See Note 10
W20-1
See Note 10
W20-1 over
W16-8P
See Note 9
W20-1 over
W16-8P
See Note 9
W20-1
Ro ad N am e
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
W20-1
See Note 10
W20-1
See Note 10
G20-2
Erect all project advance warning signs before starting construction work.
Not all details shown on the temporary traffic control sheets may be applicable to this project. The Contractor may add or delete information and details in this traffic control plan as necessary to accommodate actual operations.
Where advance warning signs, placed as shown, interfere with permanent signs, locate the warning signs as determined by the CO for best results. Vary messages as required.
Additional or different message signs may be required to fit the actual construction conditions.
Install advisory speed plates under the W20 series warning signs as needed to indicate a maximum recommended speed through the construction area.
Ensure all sign supports exposed to impact by traffic meet the requirements of
NCHRP-350 or MASH for crashworthiness.
Maintain two-way traffic during all non-work hours except as approved by the CO.
Do not store traffic control devices along the roadway when not in use. Cover post-mounted signs when not applicable.
If W20-1 is placed on a roadway other than that on which the actual construction work occurs, include a supplementary plaque indicating the name of the road on which the construction does occur (applies to major roads only).
The message on the W20-1 signs may be "ROAD WORK AHEAD" or may specify the distance to the work area in feet or in miles. Install an additional W20-1 each end of the project. Show the distance on the G20-1 sign to the nearest whole mile.
If signing on a roadway under a jurisdiction other than the client agency, verify that an encroachment permit has been obtained.
State standards may be used as an alternative if approved by the CO.
Refer to the Section 635 of the Special Contract Requirements for allowable retroreflective sheeting types.
A
B
C
(S ee S ig n
Sp ac in g
Ta bl e)
ADVANCE
W
ARNI
NG
AREA
B as d et er m in ed b y th e
CO
W or k zo ne A re a of In flu en ce
Pr oj ec t L im its
A
A
(S ee S ig n
Sp ac in g
Ta bl e)
ADVANCE
W
ARNI
NG
AREA
A
A
For work zones that are 2 miles or more in length, install G20-1 signs at signs "B" feet apart according to the Sign Spacing Table.
sign when approach speeds exceed 50 MPH. When used place the two W20-1
LENGTH AND SPACING TABLE
SPEED*
APPROACH
AREA
TAPER
SPACE
BUFFER
SPACE
WORK
CHANNELIZING DEVICE
not the advisory speed.
Approach speed based on the regulatory posted speed, *
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
LENGTH
BUFFER SPACE
Expressway / Freeway
WORK
ROAD
AHEAD
ONE LANE
ROAD
AHEAD
xx
MPH
xxx
FEET
ROAD WORK
END
635-6
STANDARD APPROVED FOR USE 6/2005
DRAFT: 8/2013
REVISED:
MPH FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
(WITH FLAGGERS)
SINGLE LANE CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
SPACING IN FEET
STATE PROJECT
NUMBER
SHEET
H.2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
BLM ERFO 2017(1)-32(1)OR
U S
C c m y fi le s p w p r o d u c ti o n d o r e b n b .d g n u n e
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
Traffic flow
Traffic flow
See Note 4
W20-1 W20-7W20-4
See Note 4
G20-2
Spacing Table)
(See Length and
(optional)
WORK SPACE (optional)(optional)
(optional)
W13-1P
(optional)
W16-2P
7.
6.
5.
4.
3.
2.
1.
the buffer space.
Do not allow equipment, materials, or vehicles to be parked or stored in
Requirements, Section 156.
For project specific minimum width, refer to the Special Contract
For night time flagging operation, provide floodlighting at flagger stations.
WORK AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.
If closure is completely within the project limits, eliminate the "ROAD name of the contractor on the pilot car.
a conspicuous location on the rear of vehicle. Prominently display the
For pilot car operation, mount the PILOT CAR FOLLOW ME (G20-4) sign at conditions as approved by the CO.
Final location and spacing of signs and devices may be changed to fit field those depicted for the opposite direction of travel.
Signs are shown for one direction of travel only. Place devices similar to
NOTE:
ATAPER AREABUFFER SPACEVARIABLEBUFFER SPACETAPER AREAABC
(See Length and Spacing Table)ADVANCE WARNING AREA (See Sign Spacing Table) TERMINATION AREA
Device spacing
BUFFER SPACE
Channelizing devices
Flagger location
Flagger location
50' - 100' 50' - 100' (optional)
See Note 6
10' min.
PROCEED
WHEN
CLEAR
NO SCALE
PROCEED
WHEN
CLEAR
PROCEED
WHEN
CLEAR
LENGTH AND SPACING TABLE
SPEED*
APPROACH
AREA
TAPER
SPACE
BUFFER
SPACE
WORK
CHANNELIZING DEVICE
not the advisory speed.
Approach speed based on the regulatory posted speed, *
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
STOP
STOP
LENGTH
BUFFER SPACE
Expressway / Freeway
WORK
ROAD
AHEAD
ONE LANE
ROAD
AHEAD
xx
MPH
ROAD WORK
END
xxx
FEET
635-8
STANDARD APPROVED FOR USE 6/2005
DRAFT: 8/2013
REVISED:
(WITH STOP SIGN)
SINGLE LANE CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
MPH FEET
SPACING IN FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
STATE PROJECT
NUMBER
SHEET
H.3
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
BLM ERFO 2017(1)-32(1)OR
U S
C c m y fi le s p w p r o d u c ti o n d o r e b n c .d g n u n e
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
Traffic flow
Traffic flow
R1-1
See Note 4
G20-2
W3-1
(optional)
W1-4
Special sign
R1-1
Special sign
Spacing Table)
(See Length and
8.
7.
6.
5.
4.
3.
2.
1.
Use the "STOP AHEAD" (W3-1) sign when approach speeds exceed
Section 3B.16 of the MUTCD.
If the roadway surface is paved, install stop lines that comply with
Requirements, Section 156.
For project specific minimum width, refer to Special Contract
WORK AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.
If closure is completely within the project limits, eliminate the "ROAD conditions as approved by the CO.
Final location and spacing of signs and devices may be changed to fit field
Place devices similar to those depicted for the opposite direction of travel.
Advance warning area signs are shown for one direction of travel only.
sufficient visibility of approaching vehicles.
approaching vehicular traffic through and beyond the work site and have
Use this layout only if road users from both directions are able to see in the buffer space.
Do not allow equipment, materials, or vehicles to be parked or stored
See Note 4
W20-1 W20-4
(optional)
W13-1P
See Note 7
(optional)
W16-2P
WORK SPACE
(optional) (optional)
NOTE:
reflective white background
Black lettering on
SPECIAL SIGN
ABC
ADVANCE WARNING AREA (See Sign Spacing Table) (See Length and Spacing Table) VARIABLE TERMINATION AREA
BUFFER SPACETAPER AREA
Device spacing
BUFFER SPACE TAPER AREA A
See Note 6
STOP LINE
light (optional)
Type B warning to provide access to work space downstream taper if necessary
Reduce or eliminate drums in
Channelizing devicesSee Note 6
STOP LINE
50 MPH.
50' - 100' (optional)50' - 100'
" Black border2
165' - 230'
See Note 5
10' min.
15'
D
D
D
24"
R
STANDARD APPROVED FOR USE 6/2005
DRAFT: 6/2015
REVISED:
635-13
(WITH TEMPORARY BARRIER)
SINGLE LANE CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
STATE PROJECT
NUMBER
SHEET
H.4
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
BLM ERFO 2017(1)-32(1)OR
U S
C c m y fi le s p w p r o d u c ti o n d o r e b n d .d g n u n e
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
LENGTH AND SPACING TABLE
SPEED*
APPROACH
AREA
TAPER
SPACE
BUFFER
SPACE
WORK
CHANNELIZIN…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.