Amendment_A001.pdf

PDF 199 KB Posted

Attached to
OR BLM ERFO 2017(1)-32(1), Medford District Road Repairs
Solicitation number
69056718B000018
Issued by

View the file

Other files

File Type Posted
Bid_Opening_Summary_Medford.pdf PDF
Q&A_12-19-18.pdf PDF
Q&A_12-13-18.pdf PDF
Q&A_12-11-18.pdf PDF
Q&A_12-6-18.pdf PDF
Plan_Request_form.pdf PDF
IFB_Medford.pdf PDF
OR_BLM_ERFO_2017(1)-32(1)_Plans_10_18_18.pdf PDF
PROJECT_DESCRIPTION.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A001 12/14/2018 N/A OR BLM ERFO 2017(1)-32(1)

Medford District Road Repairs 2017

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

69056718B000018

9B. DATED (SEE ITEM 11)

11/15/2018

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

N/A

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

N/A

D OTHER (Specify type of modification and authority) N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

OR BLM ERFO 2017(1)-32(1), Medford District Road Repairs 2017

Amendment A001 is issued to revise the following:

SPECIAL CONTRACT REQUIREMENTS

Page F-3, Subsection 204.14 Disposal of Unsuitable or Excess Material. Adds requirements.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

F-3 DIVISION 200

Special Contract Requirements Project: OR BLM ERFO 2017(1)-32(1), Medford District Road Repairs 2017

Section 204. — EXCAVATION AND EMBANKMENT

7/21/17– FP-14

Construction Requirements

204.14 Disposal of Unsuitable or Excess Material. Delete the text of the first paragraph and substitute the following:

Unsuitable or excess material from Murphy Gulch BLM Road 35-3W-7.00 M. P. 1.52 may be disposed at the Disposal Site shown on the Vicinity Map (LAT: 42° 32’ 11.47” N, LONG: 123° 3’ 43.36” W).

Unsuitable or excess rock and earth material from Murphy Gulch BLM Road 35-3W-7.00 M. P.

1.52 will be stockpiled no higher than 7 feet. Vegetation will be piled separately at a minimum of 25 feet from trees and stockpiles will not be longer than 20 feet and at least 50 feet from adjacent stockpiles.

Dispose of unsuitable or excess material from other sites according to Subsection 203.05.

Revised by Amendment A001

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
A001